KANO RIVER PROJECT PHASE 1

BILL OF ENGINEERING MEASUREMENT AND EVALUATION


Item No

Description

A1

Earthworks

A1.01

CANAL REGULATOR A
QTY

Clearing and grubbing of the area, for canals, drains, roads, night
storage, Reservoir and structure.

A1.02

Overhaul of borrow materials

A1.03

Supply, place and compact laterite


surfacing for service roads.

A1.04

Rate N

Amount

318,666.00

2,867,994

39

536,250

cu.m

1,992

4,980,000

2,300

sq.m

200

460,000

280

cu.m

160

sq.m

1,734

277,440

2,250

sq.m

3,750

8,437,500

Ha

13,750

st.cu.m

2,500

Place topsoil and plant grass on outer side


slopes and crest of embankment of canal regulator

A1.05

Rip-rap Protection

A1.06

Construction of coarse sand filter and


blanket

A1.07

Units

7,943.00

2,224,040

Rubble stone pitching protection (150mm


thickness)

Total Sub Section A Carried Forward

19,783,224

KANO RIVER PROJECT PHASE 1


BILL OF ENGINEERING MEASUREMENT AND EVALUATION
Item No

Description

CANAL REGULATOR A
QTY

Units

Rate N

Amount
19,783,224

Brought Forward
A2

Structural Works

A2.01

Excavate for Canal regulator structure

A2.02

Supply place and compact backfill for


structures

A2.03

(b) Structural Concrete Class B


(c) Structural Concrete Class E

782

971,244

6,500

cu.m

1,850

12,025,000

1,102
520
215

cu.m
cu.m
cu.m

55,000
45,000
22,500

60,610,000
23,400,000
4,837,500

101,904

kg

150

15,285,600

No

413,870

2,069,350

1,500

kg

710

1,065,000

Reinforcement including cutting bending


and fixing

A2.06

cu.m

Concrete for structure


(a) Structural Concrete Class A

A2.04

1,242

Supply and install Armco type rectangular


steel gates for turn outs
(a) size 1200mmm - model 10.00

A2.07

Miscellaneous metal works.

140,046,918

Total Section B to Summary Sheet

Item No

Description

|B1

Earthworks

B1.01

CANAL REGULATOR B
QTY

Clearing and grubbing of the area, for canals, drains, roads, night
storage, Reservoir and structure.

B1.02

Overhaul of borrow materials

B1.03

Supply, place and compact laterite


surfacing for service roads.

B1.04

Rate N

Amount

318,666.00

1,720,796

39

321,750

cu.m

1,992

4,980,000

2,300

sq.m

200

460,000

280

cu.m

160

sq.m

1,734

277,440

1,270

sq.m

3,750

4,762,500

Ha

8,250

st.cu.m

2,500

Place topsoil and plant grass on outer side


slopes and crest of embankment of canal regulator

B1.05

Rip-rap Protection

B1.06

Construction of coarse sand filter and


blanket

B1.07

Units

7,943.00

2,224,040

Rubble stone pitching protection (150mm


thickness)

Total Sub Section A Carried Forward

14,746,526

KANO RIVER PROJECT PHASE 1


BILL OF ENGINEERING MEASUREMENT AND EVALUATION
Item No

Description

CANAL REGULATOR B
QTY

Units

Rate N

Brought Forward
B2

Structural Works

B2.01

Excavate for Canal regulator structure

B2.02

Supply place and compact backfill for


structures

B2.03

(b) Structural Concrete Class B


(c) Structural Concrete Class E

cu.m

782

2,189,600

6,500

cu.m

1,850

12,025,000

938
381
205

cu.m
cu.m
cu.m

55,000
45,000
22,500

51,590,000
17,145,000
4,612,500

84,920

kg

150

12,738,000

No

413,870

1,241,610

1,500

kg

710

1,065,000

Reinforcement including cutting bending


and fixing

B2.06

2,800

Concrete for structure


(a) Structural Concrete Class A

B2.04

Amount
14,746,526

Supply and install Armco type rectangular


steel gates for turn outs
(a) size 1200mmm - model 10.00

B2.07

Miscellaneous metal works.

117,353,236

Total Section B to Summary Sheet

CONSTRUCTION OF CREST AT RUWAN KANYA


Description
QTY Units
Rate N

Item No
C2

Structural Works

C2.01

Hack exististing base

C3.02

Reinforcement including cutting bending


and fixing

C2.03

Amount

102

cu.m

422

kg

105

cu.m

5,000

510,000

150

63,300

55,000

5,775,000

Concrete for structure


(a) Structural Concrete Class A

6,348,300

Total Section B to Summary Sheet

KANO RIVER PROJECT PHASE 1


BILL OF ENGINEERING MEASUREMENT AND EVALUATION
SUMMARY SHEET
Section

Description

Construction of a Canal Regulator A

140,046,918

Construction of a Canal Regulator B

117,353,236

Construction of Crest at Ruwan Kanya

6,348,300

Net Total

Add 5% General Contingency


Sub Total

Page

Amount N

263,748,454

13,187,423
276,935,877

Add 5% VAT

13,846,794

Grand Total

290,782,671