ACTIVITY
Hot Work
Welding
activities
HAZARD
RISK
EVALUATION
Associated Risks
RISK
LEVEL
RESIDUAL RISK
IMPLEMENTED CONTROL MEASURES
H/M/L
H/M/L
supervisor
Metal particles
Electric burn
Responsible
Person
Grinding
Activities
Sparks
Sharp pieces,
particles
Skin dermatitis.
Ear deafness.
Electric shock and burn,
Dislocation of postures.
Page
1 of 5
RISK ASSESSMENT FOR ERECTION AND HOT WORK ACTIVITES OF CANOPY ON DOME, LOUVRE PROJECT.
3
2
Painting Works
Paints
HEMPELS GAL VOSIL15700, HEMPADUR
MASTIC-45881,
HEMPATHENE TOP
COAT-552H
Storage of
paints
Working at
heights
6
Wear the right personal Protective
Equipment
Property damage
Injury to eyes
Skin Allergy & Burns
Headache & Un consciousness.
Fire
Fire or explosion
Engineer
Supervisor
Engineer
Supervisor
Page
2 of 5
RISK ASSESSMENT FOR ERECTION AND HOT WORK ACTIVITES OF CANOPY ON DOME, LOUVRE PROJECT.
SN
ACTIVITY
Painting works
LOADING,
OFFLOADIN
G AND
ERECTION
OF Canopy
or Edge
cladding to
Dome
HAZARD
Environmental
Hazard
Danger of
personnel
falling from
load
RISK
EVALUATION
Associated Risks
Contamination
P
3
RISK
LEVEL
S
2
H/M/L
6
Injury
RESIDUAL RISK
IMPLEMENTED CONTROL MEASURES
Swinging
of load
Improper
weather
conditions
Crane
failure
Incompete
nt people
like riggers
etc.
Uneven
ground
conditions
on site
Improper
use of
lifting
S
2
H/M/L
2
Responsible
Person
Safety
Officer
Page
3 of 5
RISK ASSESSMENT FOR ERECTION AND HOT WORK ACTIVITES OF CANOPY ON DOME, LOUVRE PROJECT.
gears
Persons in danger
Safety Helmet, Safety Shoes, Coveralls, goggles. Chemical hand gloves , respiratory mask, painting dress, ear plug
All personnel in the team are to be made aware of the safe systems of work.
Emergency procedures
Site emergency procedures should make provision for the rescue of individuals.
First-aid facilities should be available to cope with any significant injuries that may arise from the hazard.
Work should be monitored by Foreman and charge hands that are trained to ensure that any additional precautions or equipment required are