ITD CEMENTATION INDIA LIMITED

Name of work : Initial Test Piles at "OMG" At Sector-129 Noida


Toe level :- 170.675 ( Normal)
Toe level :- 157.45

Contractor: M/S ITD Cementation India Ltd.


BAR BENDING SCHEDULE - R - 0 (Initial Test Piles at OMG)
Initial Test Pile :-Test Pile 30 Mr.Long
Pile Dia : 1000 mm (Bored cast in situ)

Drawing title:-

S-101

COL:- 195.675 (Normal)


COL- 193.725 (LP)
cage top:- 196.675 (NP) ,
194.725 (LP)

Rev. No. - 0

Cage Length : 29.925 mtr.


Sl.No

1
a
b
c
2

ITEM

TOTAL
NOS

Total
length

DIA IN
mm

Cutting length in
mtr.

25
25
25

12.000
12.000
11.425

TOTAL LENGTH (mtr)


12 mm

Main Reinforcement
Main Reinforcement
Main Reinforcement

14
14
14

20 mm

Helical
L=Nx(D+d)+8d, D=75075-75

3.00

12

17.889

Helical @ 225 mm c/c

30.00

12

11.958

Spacer Ring @1500 mm


c/c

23

16

2.637

L=2PIr , Lap L=200mm

4
5
6
7

Lap in helical

35

12

0.480

Lap L=40 X D

Lifting Hook

4
2

25
25

0.800

= 300+300+200

Resting Hook

NOTE:
Lap length = 50 D is taken for Main Bars.
Spacer Ring of 12 mm Dia @1500 mm c/c is provided.
Outer dia of spacer ring
776

25 mm

168.000
168.000
159.950

Helical @ 150 mm c/c

16 mm

Main Reinforcement

mm

53.668
358.747
60.64272
16.977
3.200

Total Length(mtr)
Unit Wt(Kg/m)

429.391
0.889

60.643
1.580

499.150
3.858

Weight (Kg)

381.681

95.830

1925.733

2403.245

Total Weight (Kg)

Resting Hook is not included in this BBS , Actual length of the bar will be
measured at site by difference of (CTL- CAGE TOP)+ Lap length (1250 mm)
+ 200 mm === 2 Nos. in each cage

19.084

4.792

96.287

400.765

100.622

2022.020

2523.407

ITDC Representative

Requirement of steel for test pile at OMG


Type of pile

12 mm

16 mm

25 mm

Total

33 mtr pile
43 mtre pile
38 mtr.pile
Qty. in kg
Qty. in Ton

401
517
459
1376
1.38

101
130
115
346
0.35

2022
2667
2383
7071
7.07

2523
3313
2957
8794
8.79

864
70
66

ITD CEMENTATION INDIA LIMITED


Name of work : Initial Test Piles at "OMG" At Sector-129 Noida
Contractor: M/S ITD Cementation India Ltd.
BAR BENDING SCHEDULE - R - 0 (Initial Test Piles at OMG)
Drawing title : Test Pile
Details

Initial Test Pile 03 :-Test Pile 30 mtr.Long


Pile Dia : 1000 mm (Bored cast in situ)

Drawing No. COM-S00-0001(R3)

Cage Length : 33.225 mtr.


Sl.No

1
a1
a2
b1
b2
c1
c2
2
a

ITEM

TOTAL
NOS

Total
length

Bore Depth(Mtr.)
Toe level :TOTAL LENGTH (mtr)

DIA IN mm

Cutting length in
mtr.

25
20
25
20
25
20

12.000
12.000
12.000
12.000
11.725
11.225

26.754

L=Nx(D+d)+8d, D=75075-75

8 mm

12 mm

25 mm

Main Reinforcement

Main Reinforcement
Main Reinforcement
Main Reinforcement
Main Reinforcement
Main Reinforcement
Main Reinforcement

6
6
6
6
6
6

72.000
72.000
70.350

Helical

33.23

Helical @ 100 mm c/c

Spacer Ring @1500 mm


c/c

46

12

2.662

L=2PIr , Lap L=200mm

4
5
6
7

Lap in helical

75

0.400

Lap L=50 X D

Lifting Hook

4
2

25
25

0.800

= 300+300+200

Resting Hook

Total Length(mtr)
Unit Wt(Kg/m)

NOTE:
Lap length = 50 D is taken for Main Bars.
Spacer Ring of 12 mm Dia @1500 mm c/c is provided.
Outer dia of spacer ring
784

Design COL:-(RL)
Rev. No. - 0

Weight (Kg)
mm

Total Weight (Kg)

888.902
123.239488
30.030
3.200
918.932
0.889

123.239
1.580

217.550
3.858

816.828

194.749

839.313

1850.890

Resting Hook is not included in this BBS , Actual length of the bar will be
measured at site by difference of (CTL- CAGE TOP)+ Lap length (1250 mm)
+ 200 mm === 2 Nos. in each cage

ITDC Representative

Bayaweaver Representative

G)
187.4
30
157.4
20 mm

72.00
72.00
67.35

1850.890