You are on page 1of 7

AS PER CONTRACT

Item

Description

Unit

Quantity

Rate

Amount

PART - 6 LIGHTING AND ELECTRICAL DISTRIBUTION WORKS


Section 6.8 - Street Lighting Work
Supply and Install Road Lighting and Luminaries
complete including brackets, lanterns, lamps, cut-outs,
flexible cable and termination, winch system, grouting to
base plate, foundation, accessories and commissioning
as specified on drawings and specifications

6.8.1

30.5M High Mast complete for 4xI000W

No

100

39,516.00

3,951,600.00

6.8.2

30.5M High Mast complete for 6xI000W

No

30

44,084.00

1,322,520.00

Lanterns and Lamps


6.8.4

Supply and Install Lanterns and Lamps for 1000W High


Pressure Sodium, cut-off, type V, Max Candela 55 deg.
and with symmetrical distribution pattern (Installation
included in items 6.8.1 & 6.8.2)

No

322

1,770.00

569,940.00

6.8.5

Supply and Install Lanterns and Lamps for 1000W High


Pressure Sodium, cut-off, type V and with asymmetrical
distribution pattern (Installation included in items
6.8.1 & 6.8.2)

No

258

1,770.00

456,660.00

6.8.6

Supply and Install Ceiling Mounted Flood Light under


bridge with 150W High Pressure Sodium Lamps
(Supply & installation complete with accessories
included)

No

84

3,916.00

328,944.00

No

134

587.40

78,711.60

6.8.6a Laying of Conduit work (15% of Total Rate)

Section 6.8 Total Carried Forward

Main Contractor - Larsen and Toubro Limited

Page 1 of 7
254607073.xlsx.ms_office_BOQ

6,629,664.00

Sub Contractor - Danway EME

AS PER CONTRACT
Item

Description

Unit

Quantity

Rate

Amount

Total Brought to Forward

6,629,664.00

PART - 6 LIGHTING AND ELECTRICAL DISTRIBUTION WORKS (Cont'd)


6.8.7

Supply and Install Vehicular Underpass Lighting System


excluding Ceiling mounted Flood Light for Underpass
D1.1 with 150W High Pressure Sodium Lamps (Supply
& installation complete with accessories included)

No

3,283.00

26,264.00

No

14

492.45

6,894.30

No

33,563.00

167,815.00

Lantern 1000W High Pressure Sodium, cut-off, type V,


Max Candela 55 deg. and with symmetrical distribution
pattern

No

10

1,770.00

17,700.00

6.8.10 Lantern 1000W High Pressure Sodium, cut-off, type V,


with asymmetrical distribution pattern

No

10

1,770.00

17,700.00

6.8.11 Lantern 150W HPSL

No

10

1,418.00

14,180.00

6.8.7a Laying of Conduit work (15% of Total Rate)

6.8.8

Supply and Install Lighting System


Complete for Each Overhead Gantry Signs
(Power supply cables measured in item 6.8.15)
Supply Spare Lanterns and Lamps

6.8.9

Section 6.8 Total Carried Forward

Main Contractor - Larsen and Toubro Limited

Page 2 of 7
254607073.xlsx.ms_office_BOQ

6,873,323.00

Sub Contractor - Danway EME

AS PER CONTRACT
Item

Description

Unit

Quantity

Rate

Amount

Total Brought to Forward

6,873,323.00

PART - 6 LIGHTING AND ELECTRICAL DISTRIBUTION WORKS (Cont'd)


Ducts
UPVC Cable Road Crossings ducts laid and jointed in
trench including end caps, draw chords, warning tape
and duct markers as per specifications and as shown
on drawings

Lighting Control Cabinet


6.8.13 Supply and Install 6-way control cabinet including
excavation, backfilling all complete as per specifications
and as shown on drawings
Earthing
6.8.14 Supply and Install earthing system to the whole street
lighting network, including light poles, feeder pillar,
control cabinet, etc. complete with earth pits, earth rods
and the like (considered as shown in street light
drawings)

No

13

13,577.00

176,501.00

Item

91,218.00

91,218.00

12798

80.00

1,023,840.00

Cables for Street Lighting


Supply and Install the following Cables in trench
including excavation and backfilling of trench and
warning tapes, termination and commissioning
complete as per specifications and as shown on
drawings
6.8.15 4Cx25mm2 XLPE/SWA/PVC Copper Cable

Section 6.8 Total Carried Forward to Summary

Main Contractor - Larsen and Toubro Limited

Page 3 of 7
254607073.xlsx.ms_office_BOQ

8,164,882.00

Sub Contractor - Danway EME

AS PER CONTRACT
Item

Description

Unit

Quantity

Rate

Amount

PART - 6 LIGHTING AND ELECTRICAL DISTRIBUTION WORKS (Cont'd)

Section 6.9 - Power (11kV) System

Cables and Ducts


11kV XLPE/SWA/PVC Cable including earth wire pulled
in cable sleeves, including ducting, excavation,
backfilling surround, warning tapes, and any other
accessories in accordance with drawings and
specifications
6.9.2

6.9.3

3 Core, 300mm XLPE Cable


Supply - 3 Core, 300mm2 XLPE Cable
Laying - 3 Core, 300mm2 XLPE Cable

m
m

2,219
2,219

551.00
47.00

1,222,669.00
104,293.00

Fibre Optic Cable in 100mm PVC Duct


Supply - Fibre Optic Cable
Laying - Fibre Optic Cable

m
m

2,219
2,219

36.00
12.00

79,884.00
26,628.00

Section 6.9 Total Carried Forward

Main Contractor - Larsen and Toubro Limited

Page 4 of 7
254607073.xlsx.ms_office_BOQ

1,433,474.00

Sub Contractor - Danway EME

AS PER CONTRACT
Item

Description

Unit

Quantity

Rate

Amount

Total Brought to Forward

1,433,474.00

PART - 6 LIGHTING AND ELECTRICAL DISTRIBUTION WORKS (Cont'd)


Substation Works
6.9.6

Furnish and Install 500 KVA, 11/0.4 KV Package unit


substation including Oil Type Transformer, RMU, LV
Switchgear, cables and other accessories in
accordance with drawings and specifications.(DMS not
included)

No

264,648.00

264,648.00

6.9.7

Relocate the existing 11/0.4 KV substation in


accordance with drawings and specifications and as
directed by the ADDC engineer (Only existing material
used)

No

57,679.00

173,037.00

Section 6.9 Total Carried Forward to Summary

1,871,159.00

Section 6.10 -Power(400V) Network

Cables and Ducts


400V XLPE/SWA/PVC Cable including earth wire pulled
in cable sleeves, including ducting, excavation,
backfilling sorround, warning tapes, and any other
accessories in accordance with drawings and
specifications
6.10.2 4Cx70mm2 XLPE/SWA/PVC Copper Cable
Supply - 4Cx70mm2 XLPE/SWA/PVC Copper Cable
Laying - 4Cx70mm2 XLPE/SWA/PVC Copper Cable

m
m

1,061
1,061

137.00
24.00

145,357.00
25,464.00

6.10.3 4Cx120mm2 XLPE/SWA/PVC Copper Cable


Supply - 4Cx120mm2 XLPE/SWA/PVC Copper Cable
Laying - 4Cx120mm2 XLPE/SWA/PVC Copper Cable

m
m

823
823

235.00
30.00

193,405.00
24,690.00

6.10.4 4Cx240mm2 XLPE/SWA/PVC Copper Cable


Supply - 4Cx240mm2 XLPE/SWA/PVC Copper Cable
Laying - 4Cx240mm2 XLPE/SWA/PVC Copper Cable

m
m

823
823

461.00
41.00

379,403.00
33,743.00

Section 6.10 Total Carried Forward

Main Contractor - Larsen and Toubro Limited

Page 5 of 7
254607073.xlsx.ms_office_BOQ

802,062.00

Sub Contractor - Danway EME

AS PER CONTRACT
Item

Description

Unit

Quantity

Rate

Amount

Total Brought to Forward

802,062.00

PART - 6 LIGHTING AND ELECTRICAL DISTRIBUTION WORKS (Cont'd)


LV Feeder Pillar
6.10.5 Supply and Install Street Lighting Feeder Pillar with
accessories including concrete foundations, excavation,
anchor bolts, complete in accordance with drawings and
specifications

No

12,696.00

76,176.00

No

12,470.00

112,230.00

LV Service Cabinet
6.10.6 Supply and Install LV Service Cabinet including
excavation, backfilling all complete in accordance with
drawings and specifications

Section 6.10 Total Carried Forward to Summary

990,468.00

Section 6.11 -Existing Works:


6.11.1 Remove, Salvage Existing 30.5M Light Poles complete
with all Lanterns, Foundations, Cables, Cable Tiles,
Control Cabinets and all associated equipment and
transport it to ADDC store or as directed by ADDC as
shown in the specifications.

6.11.2 Remove, Salvage Existing Lighting Control Cabinets,


Feeder Pillars, Service Turret, including foundations
and any associated equipment and transport it to ADDC
store or as directed by ADDC as shown in the
specifications.

No

100

4,435.00

443,500.00

No

15

1,034.00

15,510.00

Section 6.11 Total Carried Forward

Main Contractor - Larsen and Toubro Limited

Page 6 of 7
254607073.xlsx.ms_office_BOQ

459,010.00

Sub Contractor - Danway EME

AS PER CONTRACT
Item

Description

Unit

Quantity

Rate

Amount

Total Brought to Forward

459,010.00

PART- 6 LIGHTING AND ELECTRICAL DISTRIBUTION WORKS (Cont'd)


6.11.3 Remove, Salvage Existing POLE-MOUNTED 11/0.4kV
Transformer substation and any associated equipment
by ADDC as shown in the specifications.

No

10

6.11.4 Remove and Salvage Existing HV Cable

6.11.5 Remove and Salvage Existing MV/LV Cable

17,734.00

177,340.00

2,000

20.00

40,000.00

1,500

15.00

22,500.00

6.11.7 Raising or Lowering Existing MV/LV Cable

1,000

15.00

15,000.00

6.11.8 Raising or Lowering Existing HV Cable

800

20.00

16,000.00

6.11.9 Divert 11kV OHL as shown in the Drawing

1,000

396.00

396,000.00

Section 6.11 Total Carried Forward to Summary

Main Contractor - Larsen and Toubro Limited

Page 7 of 7
254607073.xlsx.ms_office_BOQ

1,125,850.00

Sub Contractor - Danway EME