Professional Documents
Culture Documents
Cultivos
Has.
Siembra
Cosecha
Campaa Principal
532.48
Arroz
504.59 Dic - Mayo
Jun - Jul
Algodn
5.00 Ene - Agos
Set Oct
Caa de azcar
22.89
Todo el ao
Campaa de Rotacin
Total (Has)
532.48
Total (Has)
rea
(Has)
Arroz
Algodn
Caa de azcar
Cultivo de Referencia
0.00
Campaa de Rotacin
0.00
0.00
0.00
532.48
17.00
549.48
Cultivo de
Referencia
Arroz
Algodn
Caa de azcar
Kc Ponderado
532.48
1.09
1.29
1.16
1.11
0.90
0.70
0.64
FUENTE: Informe Tecnico N 17, Remodelacin del Sistema de Riego Mochum - SALZGITTER CONSULT GMBH
Set.
Nov.
5.00
22.89 22.89 22.89 22.89
Dic.
504.59
22.89
Arroz
Algodn
Caa de azcar
17.00 17.00 17.00 17.00 17.00 17.00 17.00 17.00 17.00 17.00 17.00 17.00 17.00
Cultivo de Referencia
rea
(Has)
Dic.
1.00
0.07
0.74
0.78
0.78
0.86
0.91
0.62
0.78
0.78
0.86
1.00
Kc Ponderado
17.00
0.78
1.05
1.06
1.01
0.59
0.28
0.15
0.07
0.00
FUENTE: Informe Tecnico N 17, Remodelacin del Sistema de Riego Mochum - SALZGITTER CONSULT GMBH
0.00
0.00
0.00
Ene.
2.788
2.371
2.353
2.385
2.416
2.447
2.478
2.508
2.538
2.567
2.596
2.625
2.652
2.680
2.707
2.734
2.760
2.785
2.811
Feb.
2.117
2.136
2.154
2.172
2.189
2.205
2.221
2.237
2.251
2.266
2.279
2.292
2.305
2.317
2.328
2.339
2.349
2.359
2.368
Mar.
2.354
2.357
2.360
2.362
2.363
2.363
2.363
2.362
2.360
2.357
2.354
2.350
2.345
2.340
2.334
2.317
2.319
2.311
2.302
Abr.
2.197
2.182
2.167
2.151
2.134
2.117
2.099
2.081
2.062
2.043
2.023
2.002
1.981
1.959
2.937
1.914
1.891
1.867
1.843
May.
2.137
2.108
2.079
2.050
2.020
1.980
1.959
1.927
1.896
1.864
1.832
1.799
1.767
1.733
1.700
1.666
1.632
2.598
1.564
M E S
Jun.
1.990
1.956
1.922
1.888
1.854
1.820
1.785
1.750
1.715
1.679
1.644
1.608
1.572
1.536
1.500
1.464
1.427
1.391
1.354
E S
Jul.
2.091
2.050
2.026
1.993
1.960
1.976
1.893
1.858
1.824
1.789
1.754
1.719
1.684
1.648
1.612
1.576
1.540
1.504
1.467
Ago.
2.216
2.194
2.172
2.150
2.126
2.103
2.078
2.054
2.028
2.003
1.976
1.950
1.922
1.895
1.867
1.838
1.809
1.780
1.750
Set.
2.256
2.251
2.246
2.240
2.234
2.226
2.218
2.210
2.201
2.491
2.180
2.169
2.157
2.144
2.131
2.117
2.163
2.088
2.072
Oct.
2.358
2.372
2.386
2.398
2.411
2.422
2.433
2.443
2.453
2.462
2.470
2.477
2.484
2.490
2.496
2.500
2.504
2.508
2.310
Nov.
2.234
2.263
2.290
2.318
2.345
2.371
2.397
2.423
2.448
2.473
2.497
2.520
2.543
2.566
2.588
2.610
2.631
2.651
2.671
Dic.
2.265
2.301
2.337
2.372
2.407
2.442
2.476
2.510
2.544
2.577
2.610
2.643
2.675
2.706
2.738
2.769
2.799
2.830
2.859
Oct.
Abr.
8.49
8.52
8.56
8.59
8.62
8.65
8.67
8.69
8.76
8.80
8.83
8.86
8.89
8.94
8.97
9.00
Nov.
May.
8.22
8.29
8.33
8.38
8.47
8.52
8.58
8.65
8.72
8.80
8.85
8.90
8.96
9.10
9.19
9.24
Dic.
Jun.
8.49
8.55
8.65
8.74
8.84
8.96
8.95
9.01
9.17
9.24
9.32
9.38
9.47
9.61
9.73
9.80
Feb.
Ago.
7.67
7.71
7.76
7.81
7.84
7.86
7.91
7.97
8.02
8.06
8.09
8.12
8.17
8.28
8.31
8.33
Mar.
Set.
8.47
8.49
8.50
8.50
8.51
8.52
8.53
8.54
8.56
8.57
8.58
8.58
8.59
8.60
8.61
8.63
Abr.
Oct.
8.22
8.19
8.17
8.12
8.11
8.09
8.06
8.03
7.98
7.93
7.92
7.89
7.87
7.81
7.79
7.75
May.
Nov.
8.49
8.44
8.39
8.30
8.24
8.18
8.15
8.07
7.96
7.89
7.83
7.74
7.60
7.56
7.49
7.43
Jun.
Dic.
8.49
8.17
8.08
8.00
7.91
7.84
7.79
7.70
7.57
7.05
7.41
7.30
7.24
7.07
6.69
6.94
Jul.
Ene.
8.49
8.43
8.20
8.19
8.13
8.11
8.08
7.08
7.94
7.88
7.73
7.75
7.58
7.49
7.40
7.30
Ago.
Feb.
8.49
8.44
8.41
8.37
8.32
8.28
8.26
8.19
8.14
8.90
8.05
8.03
7.99
7.87
7.85
7.80
Set.
Mar.
8.49
8.59
8.19
8.18
8.18
8.18
8.17
8.16
8.14
8.14
8.13
8.13
8.12
8.11
8.10
8.09
PRECIPITACIN EFECTIVA
Incremento de la
% de la precipitacin
precipitacin (mm)
efectiva
5
0
30
95
55
90
80
82
105
65
130
45
155
25
ms de
155
5
FUENTE: El Riego de Absaln Vsquez Villanueva
Ferreafe
Ene.
25.00
24.00
25.60
25.50
25.40
25.10
Feb.
26.40
26.20
26.60
26.90
25.70
26.36
Lat.:
Mar.
26.30
27.40
26.00
26.80
25.30
26.36
Abr.
24.20
25.60
23.60
24.90
24.40
24.54
06 43' 44"
May.
20.90
24.00
21.50
21.80
21.40
21.92
37 msnm
Nov.
21.20
22.30
21.60
22.00
19.30
21.28
Dic.
22.00
24.00
23.00
23.00
22.00
22.80
Ferreafe
Ene.
72.00
73.00
76.00
72.00
74.00
73.40
Feb.
74.00
77.00
76.00
75.00
75.00
75.40
Lat.:
Mar.
77.00
79.00
73.00
71.00
77.00
75.40
Abr.
80.00
78.00
74.00
73.00
74.00
75.80
06 43' 44"
May.
82.00
74.00
79.00
76.00
79.00
78.00
37 msnm
Nov.
75.00
78.00
76.00
76.00
80.00
77.00
Dic.
74.00
77.00
75.00
75.00
73.00
74.80
Ferreafe
Ene.
0.00
0.10
0.00
0.00
0.70
0.16
Feb.
49.60
5.40
0.70
4.30
0.00
12.00
Mar.
30.50
0.00
8.10
2.20
24.90
13.14
Lat.:
Abr.
20.40
0.00
0.10
1.20
0.00
4.34
06 43' 44"
May.
0.00
0.00
0.00
0.00
0.00
0.00
37 msnm
Nov.
0.00
0.00
0.00
0.00
3.40
0.68
Dic.
3.80
4.20
2.80
0.00
0.00
2.16
Nov.
0.68
Dic.
2.16
Ene.
0.16
Feb.
12.00
Mar.
13.14
Abr.
4.34
May.
0.00
MESES
Jun.
Jul.
0.16
0.06
Ago.
0.00
Set.
0.34
Oct.
1.66
La precipitacion efectiva, sera considerada como la misma precipitacion media mensual, de acuerdo
a lo considerado en el Manual para la Operacin de Riego - Insituto Interamericao de Ciencias Agricolas
Pag 49, donde se manifiesta que es conveniente corregir la precipitacion a partir del valor de 20.00 mm
mensuales como tope minimo, las cifras menores o iguales se anotaran sin correccion, es por ello que
los datos de Precipitacion Media mensual, no han sido corregidos por algun metodo especifico para
obtener la Precipitacion efectiva requerida
En nuestro datos pluviometricos, solo exisen 2 valores que sobrepasan los 20.00 mm, sin embargo se les
considerara inalterbales, por ser los unicos valores, ademas de que en los meses restantes los valores son infimos
por lo tanto hemos creido conveniente no someter ningun dato a correciones para precipitacion efectiva
por ser pequeos y esporadicos.
ESTACIN:
Parmetros
TMC
TMF
HR
CH
CE
MF 1/
Eto
1/
Frmulas Empleadas : ETo = MF x TMF x CH X CE; TMC = (9/5)TMC + 32; CE = 1.0 + 0.04(E/2000)
CH = 0.166 x ( 100 - HR )1/2 , para HR>64%; para HR<64%, CH = 1.
Donde:
ETo = Evapotranspiracin potencial (mm/da)
ESTACIN:
Parmetros
T
P 2/
f
Kt
ETo
2/
Promedio de los valores de 6 y 8 de Latitud Sur de la Tabla "INSOLACIN O RESPLANDOR SOLAR. VALORES DE P."
Kt = 0.031144T + 0.2396
Donde:
T = Temperatura media mensual (C)
CALCULO DE LA DEMANDA DE AGUA PARA RIEGO PARA LAS REAS ACTUALES BAJO RIEGO
Variable
Unid.
Ene.
Feb.
Mar.
Abr.
May.
Jul.
Ago.
Set.
Oct.
Nov.
162.84
144.86
154.68
131.22
109.66
Jun.
95.37
100.79
107.80
116.85
132.90
133.53
1.09
1.29
1.16
1.11
0.90
0.70
0.64
0.62
0.78
0.78
0.86
177.93
187.24
180.15
146.27
99.08
66.62
64.75
66.82
91.14
103.66
114.84
Eto
mm
Kc_ponderado
s/u
UC
mm
P. Efec.
mm
0.16
12.00
13.14
4.34
0.00
0.16
0.06
0.00
0.34
1.66
0.68
Req.
mm
177.77
175.24
167.01
141.93
99.08
66.46
64.69
66.82
90.80
102.00
114.16
Req. Vol.
m/ha
Ef. Riego
s/u
N horas riego
horas
MR
lt/seg
1.84
1.81
1.72
1.47
1.02
0.69
0.67
0.69
0.94
1.05
1.18
rea Total
ha
532.48
532.48
532.48
532.48
532.48
27.89
27.89
27.89
22.89
22.89
22.89
Qdem.
lt/seg
977.19
963.26
918.07
780.17
544.64
19.14
18.63
19.24
21.46
24.10
26.97
990.81
664.64
646.91
668.24
0.62
0.62
0.62
0.62
0.62
0.62
0.62
0.62
0.62
0.62
14.00
14.00
14.00
14.00
14.00
14.00
14.00
14.00
14.00
14.00
14.00
Unid.
Ene.
Feb.
Mar.
Abr.
May.
Jul.
Ago.
Set.
Oct.
Nov.
162.84
144.86
154.68
131.22
109.66
95.37
100.79
107.80
116.85
132.90
133.53
0.78
1.05
1.06
1.01
0.59
0.28
0.15
0.07
0.00
0.00
0.00
mm
127.01
152.11
163.96
132.53
64.70
26.70
15.12
7.55
0.00
0.00
0.00
P. Efec.
mm
0.16
12.00
13.14
4.34
0.00
0.16
0.06
0.00
0.34
1.66
0.68
Req.
mm
126.85
140.11
150.82
128.19
64.70
26.54
15.06
7.55
-0.34
-1.66
-0.68
Req. Vol.
m/ha
-6.80
Ef. Riego
s/u
N horas riego
horas
MR
lt/seg
1.31
1.45
1.56
1.32
0.67
0.27
0.16
0.08
0.00
-0.02
-0.01
rea Total
ha
17.00
17.00
17.00
17.00
17.00
17.00
17.00
17.00
17.00
17.00
17.00
Qdem.
lt/seg
22.26
24.59
26.47
22.50
11.35
4.66
2.64
1.32
-0.06
-0.29
-0.12
Eto
mm
Kc_ponderado
s/u
UC
Jun.
646.97
265.44
150.58
75.46
-3.40
-16.60
0.62
0.62
0.62
0.62
0.62
0.62
0.62
0.62
0.62
0.62
0.62
14.00
14.00
14.00
14.00
14.00
14.00
14.00
14.00
14.00
14.00
14.00
DEMANDA DE AGUA PARA RIEGO EN EL REA ATENDIDA POR EL PROYECTO SITUACIN "CON PROYECTO"
Demanda de agua en lt/seg
Cultivo
reas
(Has)
Ene.
Feb.
Mar.
Abr.
May.
Jun.
Jul.
Ago.
Set.
Oct.
Nov.
Has Actuales
bajo riego
Mejoradas
532.48
977.19
963.26
918.07
780.17
544.64
365.35
355.60
367.33
499.13
560.71
627.51
Arroz
504.59
926.01
912.81
869.98
739.30
516.11
346.21
336.97
348.09
472.98
531.34
5.00
9.18
9.05
8.62
7.33
5.11
3.43
3.34
3.45
4.69
5.27
5.89
Caa de azcar
22.89
42.01
41.41
39.47
33.54
23.41
15.71
15.29
15.79
21.46
24.10
26.97
Has Incorporadas
17.00
22.26
24.59
26.47
22.50
11.35
4.66
2.64
1.32
-0.06
-0.29
-0.12
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
17.00
22.26
24.59
26.47
22.50
11.35
4.66
2.64
1.32
-0.06
-0.29
-0.12
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Algodn
Arroz
Algodn
Caa de azcar
594.64
Total Demanda
Mensual
(m/mes) miles
549.48
999.45
987.85
944.54
802.66
555.99
370.00
358.24
368.65
499.07
560.42
627.39
868.69
559.45
559.72
575.98
754.59
875.60
948.61
Caudal en lit/seg
1,000.00
800.00
600.00
400.00
200.00
0.00
Ene.
Feb.
Mar.
Abr.
May.
Jun.
Jul.
Ago.
Set.
Oct.
Nov.
Dic.
-200.00
Qdem en reas actuales bajo riego
-0.38
0.00
-0.38
0.00
807.85
1,262.19
Cdigo
Correlativo
Elaborado
Actualizado
6/6/2007
FORMATO 2
COSTOS TOTALES A PRECIOS PRIVADOS
(ALTERNATIVA 1)
SECTOR
UNIDAD
FORMULADORA
Ministerio de Agricultura
REVESTIMIENTO CANAL FERNANDEZ TRAMO: LATERAL TAMARINDO LATERAL GUEVARA SUB SECTOR MOCHUMI
RUBRO
I. INVERSIN
Estudios
Infraestructura
Supervisin
Capacitacin
II. OPERACIN Y MANTENIMIENTO
Operacin
Mantenimiento
TOTAL COSTOS DEL PROYECTO
Factor de Actualizacin
2007
2008
799,663.43
6,500.00
743,222.32
37,161.12
12,780.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
20,220.00
15,240.00
4,980.00
20,220.00
15,240.00
4,980.00
20,220.00
15,240.00
4,980.00
20,220.00
15,240.00
4,980.00
799,663.43
20,220.00
20,220.00
20,220.00
27,620.00
27,620.00
799,663.43
-7,400.00
1.0000
0.9009
TOTAL
2014
2015
2016
2017
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
799,663.43
6,500.00
743,222.32
37,161.12
12,780.00
20,220.00
15,240.00
4,980.00
20,220.00
15,240.00
4,980.00
20,220.00
15,240.00
4,980.00
20,220.00
15,240.00
4,980.00
20,220.00 20,220.00
15,240.00 15,240.00
4,980.00
4,980.00
181,980.00
137,160.00
44,820.00
20,220.00
20,220.00
20,220.00
20,220.00
20,220.00
20,220.00 20,220.00
981,643.43
27,620.00
27,620.00
27,620.00
27,620.00
27,620.00
27,620.00
27,620.00 27,620.00
248,580.00
-7,400.00
-7,400.00
-7,400.00
-7,400.00
-7,400.00
-7,400.00
-7,400.00
-7,400.00
-7,400.00
733,063.43
0.8116
0.7312
0.6587
0.5935
0.5346
0.4817
0.4339
0.3909
0.3522
-6,006.01
-5,410.82
-4,874.61
-4,391.54
-3,956.34
-3,564.27
-3,211.06
-2,892.84
-2,606.17
758,689.28
Cdigo
Correlativo
Elaborado
Actualizado
6/6/2007
FORMATO 2
COSTOS TOTALES A PRECIOS PRIVADOS
(ALTERNATIVA 2)
SECTOR
UNIDAD
FORMULADORA
Ministerio de Agricultura
REVESTIMIENTO CANAL FERNANDEZ TRAMO: LATERAL TAMARINDO LATERAL GUEVARA SUB SECTOR MOCHUMI
RUBRO
I. INVERSIN
Estudios
Infraestructura
Supervisin
Capacitacin
II. OPERACIN Y MANTENIMIENTO
Operacin
Mantenimiento
TOTAL COSTOS DEL PROYECTO
Factor de Actualizacin
TOTAL
2007
2008
2014
2015
2016
2017
809,299.66
6,500.00
752,399.68
37,619.98
12,780.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
809,299.66
6,500.00
752,399.68
37,619.98
12,780.00
0.00
20,220.00
15,240.00
4,980.00
20,220.00
15,240.00
4,980.00
20,220.00
15,240.00
4,980.00
20,220.00
15,240.00
4,980.00
20,220.00
15,240.00
4,980.00
20,220.00
15,240.00
4,980.00
20,220.00
15,240.00
4,980.00
20,220.00
15,240.00
4,980.00
20,220.00 20,220.00
15,240.00 15,240.00
4,980.00
4,980.00
181,980.00
137,160.00
44,820.00
809,299.66
20,220.00
20,220.00
20,220.00
20,220.00
20,220.00
20,220.00
20,220.00
20,220.00
20,220.00 20,220.00
991,279.66
27,620.00
27,620.00
27,620.00
27,620.00
27,620.00
27,620.00
27,620.00
27,620.00
27,620.00 27,620.00
248,580.00
809,299.66
-7,400.00
-7,400.00
-7,400.00
-7,400.00
-7,400.00
-7,400.00
-7,400.00
-7,400.00
-7,400.00
-7,400.00
742,699.66
1.0000
0.9009
0.8116
0.7312
0.6587
0.5935
0.5346
0.4817
0.4339
0.3909
0.3522
-6,006.01
-5,410.82
-4,874.61
-4,391.54
-3,956.34
-3,564.27
-3,211.06
-2,892.84
-2,606.17
768,325.51
Cdigo
Correlativo
Elaborado
Actualizado
6/6/2007
FORMATO 3
COSTOS TOTALES A PRECIOS SOCIALES
(ALTERNATIVA 1)
UNIDAD
FORMULADORA
Ministerio de Agricultura
SECTOR
REVESTIMIENTO CANAL FERNANDEZ TRAMO: LATERAL TAMARINDO LATERAL GUEVARA SUB SECTOR MOCHUMI
RUBRO
TOTAL
2007
2008
2014
2015
2016
2017
585,656.92
5,915.00
539,963.74
26,998.19
12,780.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
585,656.92
5,915.00
539,963.74
26,998.19
12,780.00
0.00
18,072.60
13,540.80
4,531.80
18,072.60
13,540.80
4,531.80
18,072.60
13,540.80
4,531.80
18,072.60
13,540.80
4,531.80
18,072.60
13,540.80
4,531.80
18,072.60
13,540.80
4,531.80
18,072.60
13,540.80
4,531.80
18,072.60
13,540.80
4,531.80
18,072.60
13,540.80
4,531.80
18,072.60
13,540.80
4,531.80
106,433.73
79,744.91
26,688.82
585,656.92
18,072.60
18,072.60
18,072.60
18,072.60
18,072.60
18,072.60
18,072.60
18,072.60
18,072.60
18,072.60
692,090.66
24,806.60
24,806.60
24,806.60
24,806.60
24,806.60
24,806.60
24,806.60
24,806.60
24,806.60
24,806.60
146,091.82
-6,734.00
-6,734.00
-6,734.00
-6,734.00
-6,734.00
-6,734.00
-6,734.00
-6,734.00
-6,734.00
-6,734.00
545,998.84
0.9009
0.8116
0.7312
0.6587
0.5935
0.5346
0.4817
0.4339
0.3909
0.3522
-5,465.47
-4,923.84
-4,435.89
-3,996.30
-3,600.27
-3,243.49
-2,922.06
-2,632.49
-2,371.61
I. INVERSIN
Estudios
Infraestructura
Supervisin
Capacitacin
II. OPERACIN Y MANTENIMIENTO
Operacin
Mantenimiento
TOTAL COSTOS DEL PROYECTO
Factor de Actualizacin
1.0000
545,998.84
Cdigo
Correlativo
Elaborado
Actualizado
6/6/2007
FORMATO 3
COSTOS TOTALES A PRECIOS SOCIALES
(ALTERNATIVA 2)
UNIDAD
FORMULADORA
Ministerio de Agricultura
SECTOR
REVESTIMIENTO CANAL FERNANDEZ TRAMO: LATERAL TAMARINDO LATERAL GUEVARA SUB SECTOR MOCHUMI
RUBRO
TOTAL
2007
2008
2014
2015
2016
2017
593,751.35
5,915.00
547,672.72
27,383.64
12,780.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
593,751.35
5,915.00
547,672.72
27,383.64
12,780.00
0.00
18,072.60
13,540.80
4,531.80
18,072.60
13,540.80
4,531.80
18,072.60
13,540.80
4,531.80
18,072.60
13,540.80
4,531.80
18,072.60
13,540.80
4,531.80
18,072.60
13,540.80
4,531.80
18,072.60
13,540.80
4,531.80
18,072.60
13,540.80
4,531.80
18,072.60
13,540.80
4,531.80
18,072.60
13,540.80
4,531.80
106,433.73
79,744.91
26,688.82
593,751.35
18,072.60
18,072.60
18,072.60
18,072.60
18,072.60
18,072.60
18,072.60
18,072.60
18,072.60
18,072.60
700,185.09
24,806.60
24,806.60
24,806.60
24,806.60
24,806.60
24,806.60
24,806.60
24,806.60
24,806.60
24,806.60
146,091.82
-6,734.00
-6,734.00
-6,734.00
-6,734.00
-6,734.00
-6,734.00
-6,734.00
-6,734.00
-6,734.00
-6,734.00
554,093.27
0.9009
0.8116
0.7312
0.6587
0.5935
0.5346
0.4817
0.4339
0.3909
0.3522
-5,465.47
-4,923.84
-4,435.89
-3,996.30
-3,600.27
-3,243.49
-2,922.06
-2,632.49
-2,371.61
I. INVERSIN
Estudios
Infraestructura
Supervisin
Capacitacin
II. OPERACIN Y MANTENIMIENTO
Operacin
Mantenimiento
TOTAL COSTOS DEL PROYECTO
Factor de Actualizacin
1.0000
554,093.27
RUBRO
I. INVERSIN
Estudios
Infraestructura1/
Supervisin
Capacitacin
II. OPERACIN Y
MANTENIMIENTO
Operacin
Mantenimiento
TOTAL APORTES :
"GERENCIA SUB REGIONAL
JAN"
Factor de Actualizacin
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
539,535.62
6,500.00
483,094.51
37,161.12
12,780.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
539,535.62
1.0000
0.00
0.9009
0.00
0.8116
0.00
0.7312
0.00
0.6587
0.00
0.5935
0.00
0.5346
0.00
0.4817
0.00
0.4339
0.00
0.3909
0.00
0.3522
539,535.62
539,535.62
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
539,535.62
2017
El Programa Sub Sectorial de Irrigacin - PSI aportar con el 65% del Costo de la Inversin
RUBRO
I. INVERSIN
Estudios
Infraestructura1/
Supervisin
Capacitacin
II. OPERACIN Y
MANTENIMIENTO
Operacin
Mantenimiento
TOTAL APORTES :
"GERENCIA SUB REGIONAL
JAN"
Factor de Actualizacin
VALOR ACTUAL DE LOS
APORTES : "GERENCIA SUB
REGIONAL JAN"
1/
VALOR
ACTUAL
539,535.62
6,500.00
483,094.51
37,161.12
12,780.00
2017
VALOR
ACTUAL
545,959.77
6,500.00
489,059.79
37,619.98
12,780.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
545,959.77
6,500.00
489,059.79
37,619.98
12,780.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
545,959.77
1.0000
0.00
0.9009
0.00
0.8116
0.00
0.7312
0.00
0.6587
0.00
0.5935
0.00
0.5346
0.00
0.4817
0.00
0.4339
0.00
0.3909
0.00
0.3522
545,959.77
545,959.77
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
545,959.77
El Programa Sub Sectorial de Irrigacin - PSI aportar con el 65% del Costo de la Inversin
RUBRO
VALOR
2017 ACTUAL
I. INVERSIN
260,127.81
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 260,127.81
Estudios
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Infraestructura1/
260,127.81
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 260,127.81
Equipamiento
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Capacitacin
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
II. OPERACIN Y
0.00 -7,400.00 -7,400.00 -7,400.00 -7,400.00 -7,400.00 -7,400.00 -7,400.00 -7,400.00 -7,400.00 -7,400.00 -43,580.32
MANTENIMIENTO
Operacin (0.00% del incremental)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Mantenimiento (100% del incremental) -7,400.00 -7,400.00 -7,400.00 -7,400.00 -7,400.00 -7,400.00 -7,400.00 -7,400.00 -7,400.00 -7,400.00 -43,580.32
TOTAL APORTES :
"USUARIOS DE AGUA
260,127.81 -7,400.00 -7,400.00 -7,400.00 -7,400.00 -7,400.00 -7,400.00 -7,400.00 -7,400.00 -7,400.00 -7,400.00 216,547.49
PARA RIEGO"
Factor de Actualizacin
1.0000
0.9009
0.8116
0.7312
0.6587
0.5935
0.5346
0.4817
0.4339
0.3909
0.3522
VALOR ACTUAL DE LOS
APORTES : "USUARIOS
DE AGUA PARA RIEGO"
1/
260,127.81 -6,666.67 -6,006.01 -5,410.82 -4,874.61 -4,391.54 -3,956.34 -3,564.27 -3,211.06 -2,892.84 -2,606.17 219,153.66
Los usuarios tiene comprometido participar con el 35% del Costo de la Inversin
RUBRO
VALOR
2017 ACTUAL
I. INVERSIN
263,339.89
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 263,339.89
Estudios
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Infraestructura1/
263,339.89
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 263,339.89
Equipamiento
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Capacitacin
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
II. OPERACIN Y
0.00 -7,400.00 -7,400.00 -7,400.00 -7,400.00 -7,400.00 -7,400.00 -7,400.00 -7,400.00 -7,400.00 -7,400.00 -43,580.32
MANTENIMIENTO
Operacin (0.00% del incremental)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Mantenimiento (100% del incremental) -7,400.00 -7,400.00 -7,400.00 -7,400.00 -7,400.00 -7,400.00 -7,400.00 -7,400.00 -7,400.00 -7,400.00 -43,580.32
TOTAL APORTES :
"USUARIOS DE AGUA
263,339.89 -7,400.00 -7,400.00 -7,400.00 -7,400.00 -7,400.00 -7,400.00 -7,400.00 -7,400.00 -7,400.00 -7,400.00 219,759.57
PARA RIEGO"
Factor de Actualizacin
1.0000
0.9009
0.8116
0.7312
0.6587
0.5935
0.5346
0.4817
0.4339
0.3909
0.3522
VALOR ACTUAL DE LOS
APORTES : "USUARIOS
DE AGUA PARA RIEGO"
1/
263,339.89 -6,666.67 -6,006.01 -5,410.82 -4,874.61 -4,391.54 -3,956.34 -3,564.27 -3,211.06 -2,892.84 -2,606.17 219,759.57
Los usuarios tiene comprometido participar con el 35% del Costo de la Inversin
Cdigo
Correlativo
Elaborado
Actualizado
6/6/2007
FORMATO 4
APORTES DE LAS ENTIDADES : ALTERNATIVA 1
SECTOR
Ministerio de Agricultura
UNIDAD
FORMULADORA
NOMBRE
DEL PROYECTO
APORTES
VALOR ACTUAL
Proyecto Sub Sectorial de Irrigacin
BENEFICIARIOS DIRECTOS: Usuarios de agua para riego
TOTAL
TOTAL
539,535.62
219,153.66
539,535.62
260,127.81
758,689.28
799,663.43
Cdigo
Correlativo
Elaborado
Actualizado
6/6/2007
FORMATO 4
APORTES DE LAS ENTIDADES : ALTERNATIVA 2
SECTOR
Ministerio de Agricultura
NOMBRE
DEL PROYECTO
UNIDAD
FORMULADORA
APORTES
VALOR ACTUAL
Proyecto Sub Sectorial de Irrigacin
BENEFICIARIOS DIRECTOS: Usuarios de agua para riego
TOTAL
TOTAL
545,959.77
219,759.57
545,959.77
263,339.89
765,719.35
809,299.66
AO
2008
1/
AO
2010
AO
2011
AO
2012
AO
2013
AO
2014
AO
2015
2016
AO
2017
0.0017
AO
2009
0.00
12,149.35
0.0017
20,220.00
12,149.35
0.0017
20,220.00
12,149.35
0.0017
20,220.00
12,149.35
0.0017
20,220.00
12,149.35
0.0017
20,220.00
12,149.35
0.0017
20,220.00
12,149.35
0.0017
20,220.00
12,149.35
0.0017
20,220.00
12,149.35
0.0017
20,220.00
12,149.35
0.0017
20,220.00
15,240.00
4,980.00
20,220.00
0.00
0.9009
0.00
15,240.00
4,980.00
20,220.00
0.00
0.8116
0.00
15,240.00
4,980.00
20,220.00
0.00
0.7312
0.00
15,240.00
4,980.00
20,220.00
0.00
0.6587
0.00
15,240.00
4,980.00
20,220.00
0.00
0.5935
0.00
15,240.00
4,980.00
20,220.00
0.00
0.5346
0.00
15,240.00
4,980.00
20,220.00
0.00
0.4817
0.00
15,240.00
4,980.00
20,220.00
0.00
0.4339
0.00
15,240.00
4,980.00
20,220.00
0.00
0.3909
0.00
15,240.00
4,980.00
20,220.00
0.00
0.3522
0.00
AO
2008
1/
AO
2010
AO
2011
AO
2012
AO
2013
AO
2014
AO
2015
AO
2016
AO
2017
0.0017
AO
2009
0.00
12,149.35
0.0017
20,220.00
12,149.35
0.0017
20,220.00
12,149.35
0.0017
20,220.00
12,149.35
0.0017
20,220.00
12,149.35
0.0017
20,220.00
12,149.35
0.0017
20,220.00
12,149.35
0.0017
20,220.00
12,149.35
0.0017
20,220.00
12,149.35
0.0017
20,220.00
12,149.35
0.0017
20,220.00
15,240.00
4,980.00
20,220.00
0.00
0.9009
0.00
15,240.00
4,980.00
20,220.00
0.00
0.8116
0.00
15,240.00
4,980.00
20,220.00
0.00
0.7312
0.00
15,240.00
4,980.00
20,220.00
0.00
0.6587
0.00
15,240.00
4,980.00
20,220.00
0.00
0.5935
0.00
15,240.00
4,980.00
20,220.00
0.00
0.5346
0.00
15,240.00
4,980.00
20,220.00
0.00
0.4817
0.00
15,240.00
4,980.00
20,220.00
0.00
0.4339
0.00
15,240.00
4,980.00
20,220.00
0.00
0.3909
0.00
15,240.00
4,980.00
20,220.00
0.00
0.3522
0.00
RUBRO
INGRESOS INCREMENTALES DEL PROYECTO
Venta de Agua para Riego con Proyecto
Venta de Agua para Riego sin Proyecto1/
Venta de Tierras Incorporadas
TOTAL
Factor de Actualizacin
VALOR ACTUAL DE LOS INGRESOS
INCREMENTALES
1/
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
VALOR
ACTUAL
0.00 20,220.00 20,220.00 20,220.00 20,220.00 20,220.00 20,220.00 20,220.00 20,220.00 20,220.00 20,220.00
0.00
4,444.20
4,444.20
4,444.20
4,444.20
4,444.20
4,444.20
4,444.20
4,444.20
4,444.20
4,444.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 15,775.80 15,775.80 15,775.80 15,775.80 15,775.80 15,775.80 15,775.80 15,775.80 15,775.80 15,775.80
1.0000
0.9009
0.8116
0.7312
0.6587
0.5935
0.5346
0.4817
0.4339
0.3909
0.3522
0.00 14,212.43 12,803.99 11,535.13 10,392.01
9,362.17
8,434.39
7,598.55
6,845.54
6,167.15
5,555.99
92,907.33
RUBRO
INGRESOS INCREMENTALES DEL PROYECTO
Venta de Agua para Riego con Proyecto
Venta de Agua para Riego sin Proyecto1/
Venta de Tierras Incorporadas
TOTAL
Factor de Actualizacin
VALOR ACTUAL DE LOS INGRESOS
INCREMENTALES
1/
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
VALOR
ACTUAL
0.00 20,220.00 20,220.00 20,220.00 20,220.00 20,220.00 20,220.00 20,220.00 20,220.00 20,220.00 20,220.00
0.00
4,444.20
4,444.20
4,444.20
4,444.20
4,444.20
4,444.20
4,444.20
4,444.20
4,444.20
4,444.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 15,775.80 15,775.80 15,775.80 15,775.80 15,775.80 15,775.80 15,775.80 15,775.80 15,775.80 15,775.80
1.0000
0.9009
0.8116
0.7312
0.6587
0.5935
0.5346
0.4817
0.4339
0.3909
0.3522
0.00 14,212.43 12,803.99 11,535.13 10,392.01
9,362.17
8,434.39
7,598.55
6,845.54
6,167.15
5,555.99
92,907.33
Arroz
Algodn
Caa
6,800
4,500
115,000
7,800
4,000
120,000
91.76
105.26
101.69
114.71
88.89
104.35
99.57
51.32
8,500
3,800
118,000
CONCEPTO
CUADRO N 71
VALOR NETO DE LA PRODUCCIN AGROPECUARIA SIN PROYECTO (PRECIOS PRIVADOS)
PROGRAMACIN ANUAL
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
Numero de
Hectreas
Arroz
Algodn
Caa de azcar
0.00
0.00
0.00
0.00
532.48
504.59
5.00
22.89
532.48
504.59
5.00
22.89
532.48
504.59
5.00
22.89
532.48
504.59
5.00
22.89
532.48
504.59
5.00
22.89
532.48
504.59
5.00
22.89
532.48
504.59
5.00
22.89
532.48
504.59
5.00
22.89
532.48
504.59
5.00
22.89
532.48
504.59
5.00
22.89
Costos por
Hectrea
Arroz
Algodn
Caa de azcar
0.00
0.00
0.00
3,735.20
4,096.00
3,519.50
3,735.20
4,096.00
3,519.50
3,735.20
4,096.00
3,519.50
3,735.20
4,096.00
3,519.50
3,735.20
4,096.00
3,519.50
3,735.20
4,096.00
3,519.50
3,735.20
4,096.00
3,519.50
3,735.20
4,096.00
3,519.50
3,735.20
4,096.00
3,519.50
3,735.20
4,096.00
3,519.50
Rendimientos por
Hectrea
Arroz
Algodn
Caa de azcar
0.00
0.00
0.00
7,800.00
4,000.00
120,000.00
7,800.00
4,000.00
120,000.00
7,800.00
4,000.00
120,000.00
7,800.00
4,000.00
120,000.00
7,800.00
4,000.00
120,000.00
7,800.00
4,000.00
120,000.00
7,800.00
4,000.00
120,000.00
7,800.00
4,000.00
120,000.00
7,800.00
4,000.00
120,000.00
7,800.00
4,000.00
120,000.00
Precio de Venta
Arroz
Algodn
Caa de azcar
0.00
0.00
0.00
0.60
1.60
1.80
0.60
1.60
1.80
0.60
1.60
1.80
0.60
1.60
1.80
0.60
1.60
1.80
0.60
1.60
1.80
0.60
1.60
1.80
0.60
1.60
1.80
0.60
1.60
1.80
0.60
1.60
1.80
% de Destino al
mercado
Arroz
Algodn
Caa de azcar
0.00
0.00
0.00
85.00
90.00
85.00
85.00
90.00
85.00
85.00
90.00
85.00
85.00
90.00
85.00
85.00
90.00
85.00
85.00
90.00
85.00
85.00
90.00
85.00
85.00
90.00
85.00
85.00
90.00
85.00
85.00
90.00
85.00
Valor Bruto de la
Produccin
Arroz
Algodn
0.00
0.00
0.00
6,238,663.02
2,007,259.02
28,800.00
6,238,663.02
2,007,259.02
28,800.00
6,238,663.02
2,007,259.02
28,800.00
6,238,663.02
2,007,259.02
28,800.00
6,238,663.02
2,007,259.02
28,800.00
6,238,663.02
2,007,259.02
28,800.00
6,238,663.02
2,007,259.02
28,800.00
6,238,663.02
2,007,259.02
28,800.00
6,238,663.02
2,007,259.02
28,800.00
6,238,663.02
2,007,259.02
28,800.00
Caa de azcar
0.00
4,202,604.00
4,202,604.00
4,202,604.00
4,202,604.00
4,202,604.00
4,202,604.00
4,202,604.00
4,202,604.00
4,202,604.00
4,202,604.00
Costo Total
Arroz
Algodn
Caa de azcar
0.00
0.00
0.00
0.00
1,985,785.92
1,884,744.57
20,480.00
80,561.36
1,985,785.92
1,884,744.57
20,480.00
80,561.36
1,985,785.92
1,884,744.57
20,480.00
80,561.36
1,985,785.92
1,884,744.57
20,480.00
80,561.36
1,985,785.92
1,884,744.57
20,480.00
80,561.36
1,985,785.92
1,884,744.57
20,480.00
80,561.36
1,985,785.92
1,884,744.57
20,480.00
80,561.36
1,985,785.92
1,884,744.57
20,480.00
80,561.36
1,985,785.92
1,884,744.57
20,480.00
80,561.36
1,985,785.92
1,884,744.57
20,480.00
80,561.36
Valor Neto de la
Produccin
Arroz
Algodn
Caa de azcar
0.00
0.00
0.00
0.00
4,252,877.10
122,514.45
8,320.00
4,122,042.65
4,252,877.10
122,514.45
8,320.00
4,122,042.65
4,252,877.10
122,514.45
8,320.00
4,122,042.65
4,252,877.10
122,514.45
8,320.00
4,122,042.65
4,252,877.10
122,514.45
8,320.00
4,122,042.65
4,252,877.10
122,514.45
8,320.00
4,122,042.65
4,252,877.10
122,514.45
8,320.00
4,122,042.65
4,252,877.10
122,514.45
8,320.00
4,122,042.65
4,252,877.10
122,514.45
8,320.00
4,122,042.65
4,252,877.10
122,514.45
8,320.00
4,122,042.65
1.0000
0.9009
0.8116
0.7312
0.6493
0.5935
0.5346
0.4817
0.4339
0.3909
0.3522
0.00
3,831,420.81
3,451,730.46
3,109,667.08
2,761,481.06
2,523,875.56
2,273,761.77
2,048,434.02
1,845,436.06
1,662,555.01
1,497,797.30
Factor de
Actualizacin
Valor Actual Neto
del VNP
2007
Arroz
Algodn
Caa de azcar
0.00
0.00
0.00
2008
1,884,744.57
20,480.00
80,561.36
TOTAL
0.00
1,985,785.92
2009
1,884,744.57
20,480.00
80,561.36
2010
1,884,744.57
20,480.00
80,561.36
2011
1,884,744.57
20,480.00
80,561.36
2012
1,884,744.57
20,480.00
80,561.36
2013
1,884,744.57
20,480.00
80,561.36
2014
1,884,744.57
20,480.00
80,561.36
2015
1,884,744.57
20,480.00
80,561.36
2016
1,884,744.57
20,480.00
80,561.36
2017
1,884,744.57
20,480.00
80,561.36
1,985,785.92
1,985,785.92
1,985,785.92
1,985,785.92
1,985,785.92
1,985,785.92
1,985,785.92
1,985,785.92
1,985,785.92
CUADRO N 71
N AGROPECUARIA SIN PROYECTO (PRECIOS PRIVADOS)
VALOR
ACTUAL
25,006,159.13
CONCEPTO
CUADRO N 72
VALOR NETO DE LA PRODUCCIN AGROPECUARIA SIN PROYECTO (PRECIOS SOCIALES)
PROGRAMACIN ANUAL
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
Numero de
Hectreas
Arroz
Algodn
Caa de azcar
0.00
0.00
0.00
0.00
532.48
504.59
5.00
22.89
532.48
504.59
5.00
22.89
532.48
504.59
5.00
22.89
532.48
504.59
5.00
22.89
532.48
504.59
5.00
22.89
532.48
504.59
5.00
22.89
532.48
504.59
5.00
22.89
532.48
504.59
5.00
22.89
532.48
504.59
5.00
22.89
532.48
504.59
5.00
22.89
Costos por
Hectrea
Arroz
Algodn
Caa de azcar
0.00
0.00
0.00
3,308.77
3,582.24
3,077.34
3,308.77
3,582.24
3,077.34
3,308.77
3,582.24
3,077.34
3,308.77
3,582.24
3,077.34
3,308.77
3,582.24
3,077.34
3,308.77
3,582.24
3,077.34
3,308.77
3,582.24
3,077.34
3,308.77
3,582.24
3,077.34
3,308.77
3,582.24
3,077.34
3,308.77
3,582.24
3,077.34
Rendimientos por
Hectrea
Arroz
Algodn
Caa de azcar
0.00
0.00
0.00
7,800.00
4,000.00
120,000.00
7,800.00
4,000.00
120,000.00
7,800.00
4,000.00
120,000.00
7,800.00
4,000.00
120,000.00
7,800.00
4,000.00
120,000.00
7,800.00
4,000.00
120,000.00
7,800.00
4,000.00
120,000.00
7,800.00
4,000.00
120,000.00
7,800.00
4,000.00
120,000.00
7,800.00
4,000.00
120,000.00
Precio de Venta
Arroz
Algodn
Caa de azcar
0.00
0.00
0.00
0.60
1.30
1.80
0.60
1.30
1.80
0.60
1.30
1.80
0.60
1.30
1.80
0.60
1.30
1.80
0.60
1.30
1.80
0.60
1.30
1.80
0.60
1.30
1.80
0.60
1.30
1.80
0.60
1.30
1.80
% de Destino al
mercado
Arroz
Algodn
Caa de azcar
0.00
0.00
0.00
85.00
90.00
85.00
85.00
90.00
85.00
85.00
90.00
85.00
85.00
90.00
85.00
85.00
90.00
85.00
85.00
90.00
85.00
85.00
90.00
85.00
85.00
90.00
85.00
85.00
90.00
85.00
85.00
90.00
85.00
Valor Bruto de la
Produccin
Arroz
Algodn
0.00
0.00
0.00
6,233,263.02
2,007,259.02
23,400.00
6,233,263.02
2,007,259.02
23,400.00
6,233,263.02
2,007,259.02
23,400.00
6,233,263.02
2,007,259.02
23,400.00
6,233,263.02
2,007,259.02
23,400.00
6,233,263.02
2,007,259.02
23,400.00
6,233,263.02
2,007,259.02
23,400.00
6,233,263.02
2,007,259.02
23,400.00
6,233,263.02
2,007,259.02
23,400.00
6,233,263.02
2,007,259.02
23,400.00
Caa de azcar
0.00
4,202,604.00
4,202,604.00
4,202,604.00
4,202,604.00
4,202,604.00
4,202,604.00
4,202,604.00
4,202,604.00
4,202,604.00
4,202,604.00
Costo Total
Arroz
Algodn
Caa de azcar
0.00
0.00
0.00
0.00
1,757,922.76
1,669,571.25
17,911.20
70,440.31
1,757,922.76
1,669,571.25
17,911.20
70,440.31
1,757,922.76
1,669,571.25
17,911.20
70,440.31
1,757,922.76
1,669,571.25
17,911.20
70,440.31
1,757,922.76
1,669,571.25
17,911.20
70,440.31
1,757,922.76
1,669,571.25
17,911.20
70,440.31
1,757,922.76
1,669,571.25
17,911.20
70,440.31
1,757,922.76
1,669,571.25
17,911.20
70,440.31
1,757,922.76
1,669,571.25
17,911.20
70,440.31
1,757,922.76
1,669,571.25
17,911.20
70,440.31
Valor Neto de la
Produccin
Arroz
Algodn
Caa de azcar
0.00
0.00
0.00
0.00
4,475,340.26
337,687.77
5,488.80
4,132,163.69
4,475,340.26
337,687.77
5,488.80
4,132,163.69
4,475,340.26
337,687.77
5,488.80
4,132,163.69
4,475,340.26
337,687.77
5,488.80
4,132,163.69
4,475,340.26
337,687.77
5,488.80
4,132,163.69
4,475,340.26
337,687.77
5,488.80
4,132,163.69
4,475,340.26
337,687.77
5,488.80
4,132,163.69
4,475,340.26
337,687.77
5,488.80
4,132,163.69
4,475,340.26
337,687.77
5,488.80
4,132,163.69
4,475,340.26
337,687.77
5,488.80
4,132,163.69
1.0000
0.9009
0.8116
0.7312
0.6587
0.5935
0.5346
0.4817
0.4339
0.3909
0.3522
0.00
4,031,838.07
3,632,286.55
3,272,330.23
2,948,045.25
2,655,896.62
2,392,699.66
2,155,585.28
1,941,968.72
1,749,521.37
1,576,145.38
Factor de
Actualizacin
Valor Actual Neto
del VNP
CUADRO N 72
N AGROPECUARIA SIN PROYECTO (PRECIOS SOCIALES)
VALOR
ACTUAL
26,356,317.13
CONCEPTO
CUADRO N 74
VALOR NETO DE LA PRODUCCIN AGROPECUARIA CON PROYECTO (PRECIOS PRIVADOS)
PROGRAMACIN ANUAL
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
VALOR
ACTUAL
2017
Numero de
Hectreas
Arroz
Algodn
Caa de azcar
0.00
0.00
0.00
0.00
549.48
504.59
22.00
22.89
549.48
504.59
22.00
22.89
549.48
504.59
22.00
22.89
549.48
504.59
22.00
22.89
549.48
504.59
22.00
22.89
549.48
504.59
22.00
22.89
549.48
504.59
22.00
22.89
549.48
504.59
22.00
22.89
549.48
504.59
22.00
22.89
549.48
504.59
22.00
22.89
Costos por
Hectrea
Arroz
Algodn
Caa de azcar
0.00
0.00
0.00
3,788.20
4,136.00
3,587.50
3,788.20
4,136.00
3,587.50
3,788.20
4,136.00
3,587.50
3,788.20
4,136.00
3,587.50
3,788.20
4,136.00
3,587.50
3,788.20
4,136.00
3,587.50
3,788.20
4,136.00
3,587.50
3,788.20
4,136.00
3,587.50
3,788.20
4,136.00
3,587.50
3,788.20
4,136.00
3,587.50
Rendimientos por
Hectrea
Arroz
Algodn
Caa de azcar
0.00
0.00
0.00
8,500.00
4,500.00
120,000.00
8,500.00
4,500.00
120,000.00
8,500.00
4,500.00
120,000.00
8,500.00
4,500.00
120,000.00
8,500.00
4,500.00
120,000.00
8,500.00
4,500.00
120,000.00
8,500.00
4,500.00
120,000.00
8,500.00
4,500.00
120,000.00
8,500.00
4,500.00
120,000.00
8,500.00
4,500.00
120,000.00
Precio de Venta
Arroz
Algodn
Caa de azcar
0.00
0.00
0.00
0.60
1.60
1.80
0.60
1.60
1.80
0.60
1.60
1.80
0.60
1.60
1.80
0.60
1.60
1.80
0.60
1.60
1.80
0.60
1.60
1.80
0.60
1.60
1.80
0.60
1.60
1.80
0.60
1.60
1.80
% de Destino al
mercado
Arroz
Algodn
Caa de azcar
0.00
0.00
0.00
85.00
90.00
85.00
85.00
90.00
85.00
85.00
90.00
85.00
85.00
90.00
85.00
85.00
90.00
85.00
85.00
90.00
85.00
85.00
90.00
85.00
85.00
90.00
85.00
85.00
90.00
85.00
85.00
90.00
85.00
Valor Bruto de la
Produccin
Arroz
Algodn
Caa de azcar
0.00
0.00
0.00
0.00
6,532,561.65
2,187,397.65
142,560.00
4,202,604.00
6,532,561.65
2,187,397.65
142,560.00
4,202,604.00
6,532,561.65
2,187,397.65
142,560.00
4,202,604.00
6,532,561.65
2,187,397.65
142,560.00
4,202,604.00
6,532,561.65
2,187,397.65
142,560.00
4,202,604.00
6,532,561.65
2,187,397.65
142,560.00
4,202,604.00
6,532,561.65
2,187,397.65
142,560.00
4,202,604.00
6,532,561.65
2,187,397.65
142,560.00
4,202,604.00
6,532,561.65
2,187,397.65
142,560.00
4,202,604.00
6,532,561.65
2,187,397.65
142,560.00
4,202,604.00
Costo Total
Arroz
Algodn
Caa de azcar
0.00
0.00
0.00
0.00
2,084,597.71
1,911,487.84
90,992.00
82,117.88
2,084,597.71
1,911,487.84
90,992.00
82,117.88
2,084,597.71
1,911,487.84
90,992.00
82,117.88
2,084,597.71
1,911,487.84
90,992.00
82,117.88
2,084,597.71
1,911,487.84
90,992.00
82,117.88
2,084,597.71
1,911,487.84
90,992.00
82,117.88
2,084,597.71
1,911,487.84
90,992.00
82,117.88
2,084,597.71
1,911,487.84
90,992.00
82,117.88
2,084,597.71
1,911,487.84
90,992.00
82,117.88
2,084,597.71
1,911,487.84
90,992.00
82,117.88
Valor Neto de la
Produccin
Arroz
Algodn
Caa de azcar
0.00
0.00
0.00
0.00
4,447,963.94
275,909.81
51,568.00
4,120,486.13
4,447,963.94
275,909.81
51,568.00
4,120,486.13
4,447,963.94
275,909.81
51,568.00
4,120,486.13
4,447,963.94
275,909.81
51,568.00
4,120,486.13
4,447,963.94
275,909.81
51,568.00
4,120,486.13
4,447,963.94
275,909.81
51,568.00
4,120,486.13
4,447,963.94
275,909.81
51,568.00
4,120,486.13
4,447,963.94
275,909.81
51,568.00
4,120,486.13
4,447,963.94
275,909.81
51,568.00
4,120,486.13
4,447,963.94
275,909.81
51,568.00
4,120,486.13
1.0000
0.9009
0.8116
0.7312
0.6587
0.5935
0.5346
0.4817
0.4339
0.3909
0.3522
0.00
4,007,174.72
3,610,067.31
3,252,312.90
2,930,011.62
2,639,650.11
2,378,063.16
2,142,399.24
1,930,089.41
1,738,819.29
1,566,503.86
Factor de
Actualizacin
Valor Actual Neto
del VNP
24,628,587.74
2007
Arroz
Algodn
Caa de azcar
0.00
0.00
0.00
2008
1,911,487.84
90,992.00
82,117.88
TOTAL
0.00
2,084,597.71
2009
1,911,487.84
90,992.00
82,117.88
2010
1,911,487.84
90,992.00
82,117.88
2011
1,911,487.84
90,992.00
82,117.88
2012
1,911,487.84
90,992.00
82,117.88
2013
1,911,487.84
90,992.00
82,117.88
2014
1,911,487.84
90,992.00
82,117.88
2015
1,911,487.84
90,992.00
82,117.88
2016
1,911,487.84
90,992.00
82,117.88
2017
1,911,487.84
90,992.00
82,117.88
2,084,597.71
2,084,597.71
2,084,597.71
2,084,597.71
2,084,597.71
2,084,597.71
2,084,597.71
2,084,597.71
2,084,597.71
CONCEPTO
CUADRO N 75
VALOR NETO DE LA PRODUCCIN AGROPECUARIA CON PROYECTO (PRECIOS SOCIALES)
PROGRAMACIN ANUAL
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
Numero de
Hectreas
Arroz
Algodn
Caa de azcar
0.00
0.00
0.00
549
504.59
22.00
22.89
549
504.59
22.00
22.89
549
504.59
22.00
22.89
549
504.59
22.00
22.89
549
504.59
22.00
22.89
549
504.59
22.00
22.89
549
504.59
22.00
22.89
549
504.59
22.00
22.89
549
504.59
22.00
22.89
549
504.59
22.00
22.89
Costos por
Hectrea
Arroz
Algodn
Caa de azcar
0.00
0.00
0.00
10,052.35
3,350.77
3,607.44
3,094.14
10,052.35
3,350.77
3,607.44
3,094.14
10,052.35
3,350.77
3,607.44
3,094.14
10,052.35
3,350.77
3,607.44
3,094.14
10,052.35
3,350.77
3,607.44
3,094.14
10,052.35
3,350.77
3,607.44
3,094.14
10,052.35
3,350.77
3,607.44
3,094.14
10,052.35
3,350.77
3,607.44
3,094.14
10,052.35
3,350.77
3,607.44
3,094.14
10,052.35
3,350.77
3,607.44
3,094.14
Rendimientos por
Hectrea
Arroz
Algodn
Caa de azcar
0.00
0.00
0.00
133,000.00
8,500.00
4,500.00
120,000.00
133,000.00
8,500.00
4,500.00
120,000.00
133,000.00
8,500.00
4,500.00
120,000.00
133,000.00
8,500.00
4,500.00
120,000.00
133,000.00
8,500.00
4,500.00
120,000.00
133,000.00
8,500.00
4,500.00
120,000.00
133,000.00
8,500.00
4,500.00
120,000.00
133,000.00
8,500.00
4,500.00
120,000.00
133,000.00
8,500.00
4,500.00
120,000.00
133,000.00
8,500.00
4,500.00
120,000.00
Precio de Venta
Arroz
Algodn
Caa de azcar
0.00
0.00
0.00
0.60
1.60
1.80
0.60
1.60
1.80
0.60
1.60
1.80
0.60
1.60
1.80
0.60
1.60
1.80
0.60
1.60
1.80
0.60
1.60
1.80
0.60
1.60
1.80
0.60
1.60
1.80
0.60
1.60
1.80
% de Destino al
mercado
Arroz
Algodn
Caa de azcar
0.00
0.00
0.00
85.00
90.00
85.00
85.00
90.00
85.00
85.00
90.00
85.00
85.00
90.00
85.00
85.00
90.00
85.00
85.00
90.00
85.00
85.00
90.00
85.00
85.00
90.00
85.00
85.00
90.00
85.00
85.00
90.00
85.00
Valor Bruto de la
Produccin
Arroz
Algodn
Caa de azcar
0.00
0.00
0.00
0.00
6,532,561.65
2,187,397.65
142,560.00
4,202,604.00
6,532,561.65
2,187,397.65
142,560.00
4,202,604.00
6,532,561.65
2,187,397.65
142,560.00
4,202,604.00
6,532,561.65
2,187,397.65
142,560.00
4,202,604.00
6,532,561.65
2,187,397.65
142,560.00
4,202,604.00
6,532,561.65
2,187,397.65
142,560.00
4,202,604.00
6,532,561.65
2,187,397.65
142,560.00
4,202,604.00
6,532,561.65
2,187,397.65
142,560.00
4,202,604.00
6,532,561.65
2,187,397.65
142,560.00
4,202,604.00
6,532,561.65
2,187,397.65
142,560.00
4,202,604.00
Costo Total
Arroz
Algodn
Caa de azcar
0.00
0.00
0.00
0.00
1,840,952.57
1,690,764.03
79,363.68
70,824.86
1,840,952.57
1,690,764.03
79,363.68
70,824.86
1,840,952.57
1,690,764.03
79,363.68
70,824.86
1,840,952.57
1,690,764.03
79,363.68
70,824.86
1,840,952.57
1,690,764.03
79,363.68
70,824.86
1,840,952.57
1,690,764.03
79,363.68
70,824.86
1,840,952.57
1,690,764.03
79,363.68
70,824.86
1,840,952.57
1,690,764.03
79,363.68
70,824.86
1,840,952.57
1,690,764.03
79,363.68
70,824.86
1,840,952.57
1,690,764.03
79,363.68
70,824.86
Valor Neto de la
Produccin
Arroz
Algodn
Caa de azcar
0.00
0.00
0.00
0.00
4,691,609.08
496,633.62
63,196.32
4,131,779.14
4,691,609.08
496,633.62
63,196.32
4,131,779.14
4,691,609.08
496,633.62
63,196.32
4,131,779.14
4,691,609.08
496,633.62
63,196.32
4,131,779.14
4,691,609.08
496,633.62
63,196.32
4,131,779.14
4,691,609.08
496,633.62
63,196.32
4,131,779.14
4,691,609.08
496,633.62
63,196.32
4,131,779.14
4,691,609.08
496,633.62
63,196.32
4,131,779.14
4,691,609.08
496,633.62
63,196.32
4,131,779.14
4,691,609.08
496,633.62
63,196.32
4,131,779.14
1.0000
0.9009
0.8116
0.7312
0.6587
0.5935
0.5346
0.4817
0.4339
0.3909
0.3909
0.00
4,226,674.85
3,807,815.18
3,430,464.12
3,090,508.22
2,784,241.64
2,508,325.80
2,259,752.97
2,035,813.49
1,834,066.21
1,834,066.21
Factor de
Actualizacin
Valor Actual Neto
del VNP
CUADRO N 75
UCCIN AGROPECUARIA CON PROYECTO (PRECIOS SOCIALES)
VALOR
ACTUAL
25,977,662.48
Cdigo
Correlativo
Elaborado
Actualizado
6/6/2007
FORMATO 5
INCREMENTO DEL VALOR NETO DE LA PRODUCCIN A PRECIOS PRIVADOS
( TODAS LAS ALTERNATIVAS)
UNIDAD
Junta de Usuarios del Distrito de Riego
FORMULADORA
Chancay - Lambayeque
REVESTIMIENTO CANAL FERNANDEZ TRAMO: LATERAL TAMARINDO LATERAL GUEVARA SUB SECTOR MOCHUMI
SECTOR
Ministerio de Agricultura
CONCEPTO
Valor Bruto de la
Produccin Incremental
Situacin con Proyecto
0.00
(-) Situacin Optimizada
0.00
Total
0.00
Factor de Actualizacin
1.0000
Valor Actual del VBP
0.00
Incremental
Costo Total Incremental
Situacin con Proyecto
0.00
(-) Situacin Optimizada
0.00
Total
0.00
Factor de Actualizacin
1.0000
Valor Actual de Costo Total
0.00
Incremental
Valor Neto de la
Produccin Incremental
Situacin con Proyecto
0.00
(-) Situacin Optimizada
0.00
Total
0.00
Factor de Actualizacin
1.0000
Valor Actual Neto del VNP
0.00
Incremental
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
VALOR
ACTUAL
6,532,561.65
6,238,663.02
293,898.63
6,532,561.65
6,238,663.02
293,898.63
6,532,561.65
6,238,663.02
293,898.63
6,532,561.65
6,238,663.02
293,898.63
6,532,561.65
6,238,663.02
293,898.63
6,532,561.65
6,238,663.02
293,898.63
6,532,561.65
6,238,663.02
293,898.63
6,532,561.65
6,238,663.02
293,898.63
6,532,561.65
6,238,663.02
293,898.63
6,532,561.65
6,238,663.02
293,898.63
1,453,731.91
0.9009
0.8116
0.7312
0.6587
0.5935
0.5346
0.4817
0.4339
0.3909
0.3522
264,773.54
238,534.72
214,896.15
193,600.13
174,414.53
157,130.21
141,558.75
127,530.40
114,892.25
103,506.54
1,627,330.68
2,084,597.71
1,985,785.92
98,811.79
2,084,597.71
1,985,785.92
98,811.79
2,084,597.71
1,985,785.92
98,811.79
2,084,597.71
1,985,785.92
98,811.79
2,084,597.71
1,985,785.92
98,811.79
2,084,597.71
1,985,785.92
98,811.79
2,084,597.71
1,985,785.92
98,811.79
2,084,597.71
1,985,785.92
98,811.79
2,084,597.71
1,985,785.92
98,811.79
2,084,597.71
1,985,785.92
98,811.79
488,759.86
0.9009
0.8116
0.7312
0.6587
0.5935
0.5346
0.4817
0.4339
0.3909
0.3522
89,019.63
80,197.87
72,250.33
65,090.39
58,639.99
52,828.82
47,593.53
42,877.05
38,627.98
34,799.98
547,125.58
4,447,963.94
4,252,877.10
195,086.84
4,447,963.94
4,252,877.10
195,086.84
4,447,963.94
4,252,877.10
195,086.84
4,447,963.94
4,252,877.10
195,086.84
4,447,963.94
4,252,877.10
195,086.84
4,447,963.94
4,252,877.10
195,086.84
4,447,963.94
4,252,877.10
195,086.84
4,447,963.94
4,252,877.10
195,086.84
4,447,963.94
4,252,877.10
195,086.84
4,447,963.94
4,252,877.10
195,086.84
964,972.05
0.9009
0.8116
0.7312
0.6587
0.5935
0.5346
0.4817
0.4339
0.3909
0.3909
175,753.91
158,336.86
142,645.82
128,509.74
115,774.54
104,301.39
93,965.22
84,653.35
76,264.28
76,264.28
1,080,205.11
Cdigo
Correlativo
Elaborado
Actualizado
6/6/2007
FORMATO 6
INCREMENTO DEL VALOR NETO DE LA PRODUCCIN A PRECIOS SOCIALES
(TODAS LAS ALTERNATIVAS)
UNIDAD
Junta de Usuarios del Distrito de Riego
FORMULADORA
Chancay - Lambayeque
REVESTIMIENTO CANAL FERNANDEZ TRAMO: LATERAL TAMARINDO LATERAL GUEVARA SUB SECTOR MOCHUMI
Ministerio de Agricultura
SECTOR
NOMBRE DEL PROYECTO
CONCEPTO
Valor Bruto de la
Produccin Incremental
Situacin con Proyecto
(-) Situacin Optimizada
Total
Factor de Actualizacin
Valor Actual del VBP
Incremental
Costo Total Incremental
Situacin con Proyecto
(-) Situacin Optimizada
Total
Factor de Actualizacin
Valor Actual de Costo
Total Incremental
Valor Neto de la
Produccin Incremental
Situacin con Proyecto
(-) Situacin Optimizada
Total
Factor de Actualizacin
Valor Actual Neto del VNP
Incremental
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
VALOR
ACTUAL
0.00 6,532,561.65 6,532,561.65 6,532,561.65 6,532,561.65 6,532,561.65 6,532,561.65 6,532,561.65 6,532,561.65 6,532,561.65 6,532,561.65
0.00 6,233,263.02 6,233,263.02 6,233,263.02 6,233,263.02 6,233,263.02 6,233,263.02 6,233,263.02 6,233,263.02 6,233,263.02 6,233,263.02
0.00
299,298.63
299,298.63
299,298.63
299,298.63
299,298.63
299,298.63
299,298.63
299,298.63
299,298.63
299,298.63
1.0000
0.9009
0.8116
0.7312
0.6587
0.5935
0.5346
0.4817
0.4339
0.3909
0.3855
0.00
269,638.41
242,917.48
218,844.58
197,157.28
177,619.17
160,017.27
144,159.70
129,873.61
117,003.25
115,392.58
1,657,230.74
0.00 1,840,952.57 1,840,952.57 1,840,952.57 1,840,952.57 1,840,952.57 1,840,952.57 1,840,952.57 1,840,952.57 1,840,952.57 1,840,952.57
0.00 1,757,922.76 1,757,922.76 1,757,922.76 1,757,922.76 1,757,922.76 1,757,922.76 1,757,922.76 1,757,922.76 1,757,922.76 1,757,922.76
0.00
83,029.81
83,029.81
83,029.81
83,029.81
83,029.81
83,029.81
83,029.81
83,029.81
83,029.81
83,029.81
1.0000
0.9009
0.8116
0.7312
0.6587
0.5935
0.5346
0.4817
0.4339
0.3909
0.3522
0.00
74,801.63
67,388.86
60,710.68
54,694.31
49,274.15
44,391.13
39,992.01
36,028.84
32,458.41
29,241.81
459,740.02
0.00 4,691,609.08 4,691,609.08 4,691,609.08 4,691,609.08 4,691,609.08 4,691,609.08 4,691,609.08 4,691,609.08 4,691,609.08 4,691,609.08
0.00 4,475,340.26 4,475,340.26 4,475,340.26 4,475,340.26 4,475,340.26 4,475,340.26 4,475,340.26 4,475,340.26 4,475,340.26 4,475,340.26
0.00
216,268.82
216,268.82
216,268.82
216,268.82
216,268.82
216,268.82
216,268.82
216,268.82
216,268.82
216,268.82
1.0000
0.9009
0.8116
0.7312
0.6587
0.5935
0.5346
0.4817
0.4339
0.3909
0.3909
0.00
194,836.77
175,528.62
158,133.90
142,462.97
128,345.02
115,626.14
104,167.70
93,844.77
84,544.84
84,544.84
1,197,490.73
CUADRO N 77: FLUJO DE CAJA A PRECIOS PRIVADOS DE LA ENTIDAD "PROGRAMA SUB SECTORIAL DE IRRIGACION" : Alternativa 1
RUBRO
1. INGRESOS INCREMENTALES DEL PROYECTO
Venta de Agua para Riego con Proyecto
Venta de Agua para Riego sin Proyecto (-)
Venta de Tierras Incorporadas
2. INCREMENTO EN EL VALOR NETO DE LA PRODUCCIN
3. COSTOS INCREMENTALES DEL PROYECTO
Costos de Inversin
Estudios
Infraestructura
Supervisin
Capacitacin
Costos de Operacin y Mantenimiento
Operacin
Mantenimiento
Pago de Posible Crdito
Compra de Agua para Riego con Proyecto
(-) Compra de Agua para Riego sin Proyecto
(-) Costos sin Proyecto
4. FLUJO NETO (1+2-3)
5. Factor de Actualizacin
6. VALOR ACTUAL DEL FLUJO NETO (VAN) (4x5)
7. TASA INTERNA DE RETORNO (TIR)
8. RATIO B/C
PROGRAMACIN ANUAL
2011
2012
0.00
0.00
2007
0.00
0.00
0.00
0.00
2008
0.00
2009
0.00
2010
0.00
2013
0.00
2014
0.00
2015
0.00
2016
0.00
2017
0.00
0.00
539,535.62
539,535.62
6,500.00
483,094.51
37,161.12
12,780.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-539,535.62
1.0000
-539,535.62
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.9009
0.00
0.00
0.8116
0.00
0.00
0.7312
0.00
0.00
0.6587
0.00
0.00
0.5935
0.00
0.00
0.5346
0.00
0.00
0.4817
0.00
0.00
0.4339
0.00
0.00
0.3522
0.00
0.00
0.3522
0.00
VALOR
ACTUAL
0.00
0.00
539,535.62
-539,535.62
-539,535.62
#NUM!
0.00
CUADRO N 78: FLUJO DE CAJA A PRECIOS PRIVADOS DE LA ENTIDAD "PROGRAMA SUB SECTORIAL DE IRRIGACION" : Alternativa 2
RUBRO
1. INGRESOS INCREMENTALES DEL PROYECTO
Venta de Agua para Riego con Proyecto
Venta de Agua para Riego sin Proyecto (-)
Venta de Tierras Incorporadas
2. INCREMENTO EN EL VALOR NETO DE LA PRODUCCIN
3. COSTOS INCREMENTALES DEL PROYECTO
Costos de Inversin
Estudios
Infraestructura
Supervisin
Capacitacin
Costos de Operacin y Mantenimiento
Operacin
Mantenimiento
Pago de Posible Crdito
Compra de Agua para Riego con Proyecto
(-) Compra de Agua para Riego sin Proyecto
(-) Costos sin Proyecto
4. FLUJO NETO (1+2-3)
5. Factor de Actualizacin
6. VALOR ACTUAL DEL FLUJO NETO (VAN) (4x5)
7. TASA INTERNA DE RETORNO (TIR)
8. RATIO B/C
PROGRAMACIN ANUAL
2011
2012
0.00
0.00
2007
0.00
0.00
0.00
0.00
2008
0.00
2009
0.00
2010
0.00
2013
0.00
2014
0.00
2015
0.00
2016
0.00
2017
0.00
0.00
545,959.77
545,959.77
6,500.00
489,059.79
37,619.98
12,780.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-545,959.77
1.0000
-545,959.77
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.9009
0.00
0.00
0.8116
0.00
0.00
0.7312
0.00
0.00
0.6587
0.00
0.00
0.5935
0.00
0.00
0.5346
0.00
0.00
0.4817
0.00
0.00
0.4339
0.00
0.00
0.3909
0.00
0.00
0.3522
0.00
VALOR
ACTUAL
0.00
0.00
545,959.77
-545,959.77
-545,959.77
#NUM!
0.00
CUADRO N 79: FLUJO DE CAJA A PRECIOS PRIVADOS DE LA ENTIDAD "COMISION DE REGANTES MOCHUMI" : Alternativa 1
RUBRO
1. INGRESOS INCREMENTALES DEL PROYECTO
Venta de Agua para Riego con Proyecto
Venta de Agua para Riego sin Proyecto (-)
Venta de Tierras Incorporadas
2. INCREMENTO EN EL VALOR NETO DE LA PRODUCCIN
3. COSTOS INCREMENTALES DEL PROYECTO
Costos de Inversin
Estudios
Infraestructura
Supervisin
Capacitacin
Costos de Operacin y Mantenimiento
Operacin
Mantenimiento
Pago de Posible Crdito
Compra de Agua para Riego con Proyecto
(-) Compra de Agua para Riego sin Proyecto
(-) Costos sin Proyecto
4. FLUJO NETO (1+2-3)
5. Factor de Actualizacin
6. VALOR ACTUAL DEL FLUJO NETO (VAN) (4x5)
7. TASA INTERNA DE RETORNO (TIR)
8. RATIO B/C
PROGRAMACIN ANUAL
2011
2012
15,775.80
15,775.80
20,220.00
20,220.00
4,444.20
4,444.20
0.00
0.00
2007
0.00
0.00
0.00
0.00
2008
15,775.80
20,220.00
4,444.20
0.00
2009
15,775.80
20,220.00
4,444.20
0.00
2010
15,775.80
20,220.00
4,444.20
0.00
0.00
260,127.81
260,127.81
0.00
260,127.81
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-260,127.81
1.0000
-260,127.81
195,086.84
8,375.80
0.00
0.00
0.00
0.00
0.00
20,220.00
15,240.00
4,980.00
0.00
20,220.00
4,444.20
27,620.00
202,486.84
0.9009
182,420.58
195,086.84
8,375.80
0.00
195,086.84
8,375.80
0.00
195,086.84
8,375.80
0.00
20,220.00
15,240.00
4,980.00
0.00
20,220.00
4,444.20
27,620.00
202,486.84
0.8116
164,342.86
20,220.00
15,240.00
4,980.00
0.00
20,220.00
4,444.20
27,620.00
202,486.84
0.7312
148,056.63
20,220.00
15,240.00
4,980.00
0.00
20,220.00
4,444.20
27,620.00
202,486.84
0.6587
133,384.35
2017
VALOR
ACTUAL
2013
15,775.80
20,220.00
4,444.20
0.00
2014
15,775.80
20,220.00
4,444.20
0.00
2015
15,775.80
20,220.00
4,444.20
0.00
2016
15,775.80
20,220.00
4,444.20
0.00
195,086.84
8,375.80
0.00
195,086.84
8,375.80
0.00
195,086.84
8,375.80
0.00
195,086.84
8,375.80
0.00
195,086.84
8,375.80
0.00
195,086.84 1,017,595.52
8,375.80
301,557.62
0.00
20,220.00
15,240.00
4,980.00
0.00
20,220.00
4,444.20
27,620.00
202,486.84
0.5935
120,166.08
20,220.00
15,240.00
4,980.00
0.00
20,220.00
4,444.20
27,620.00
202,486.84
0.5346
108,257.73
20,220.00
15,240.00
4,980.00
0.00
20,220.00
4,444.20
27,620.00
202,486.84
0.4817
97,529.49
20,220.00
15,240.00
4,980.00
0.00
20,220.00
4,444.20
27,620.00
202,486.84
0.4339
87,864.41
20,220.00
15,240.00
4,980.00
0.00
20,220.00
4,444.20
27,620.00
202,486.84
0.3909
79,157.12
20,220.00
15,240.00
4,980.00
0.00
20,220.00
4,444.20
27,620.00
186,711.04
0.3522
65,756.73
78,032.96
20,220.00
4,444.20
0.00
791,811.54
926,808.18
0.77
3.63
CUADRO N 80: FLUJO DE CAJA A PRECIOS PRIVADOS DE LA ENTIDAD "COMISION DE REGANTES MOCHUMI" : Alternativa 2
RUBRO
1. INGRESOS INCREMENTALES DEL PROYECTO
Venta de Agua para Riego con Proyecto
Venta de Agua para Riego sin Proyecto (-)
Venta de Tierras Incorporadas
2. INCREMENTO EN EL VALOR NETO DE LA PRODUCCIN
3. COSTOS INCREMENTALES DEL PROYECTO
Costos de Inversin
Estudios
Infraestructura
Supervisin
Capacitacin
Costos de Operacin y Mantenimiento
Operacin
Mantenimiento
Pago de Posible Crdito
Compra de Agua para Riego con Proyecto
(-) Compra de Agua para Riego sin Proyecto
(-) Costos sin Proyecto
4. FLUJO NETO (1+2-3)
5. Factor de Actualizacin
6. VALOR ACTUAL DEL FLUJO NETO (VAN) (4x5)
7. TASA INTERNA DE RETORNO (TIR)
8. RATIO B/C
PROGRAMACIN ANUAL
2008
2009
15,775.80
15,775.80
20,220.00
20,220.00
4,444.20
4,444.20
0.00
0.00
2004
0.00
0.00
0.00
0.00
2005
15,775.80
20,220.00
4,444.20
0.00
2006
15,775.80
20,220.00
4,444.20
0.00
2007
15,775.80
20,220.00
4,444.20
0.00
0.00
263,339.89
263,339.89
0.00
263,339.89
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-263,339.89
1.0000
-263,339.89
195,086.84
8,375.80
0.00
0.00
0.00
0.00
0.00
20,220.00
15,240.00
4,980.00
0.00
20,220.00
4,444.20
27,620.00
202,486.84
0.9009
182,420.58
195,086.84
8,375.80
0.00
195,086.84
8,375.80
0.00
195,086.84
8,375.80
0.00
20,220.00
15,240.00
4,980.00
0.00
20,220.00
4,444.20
27,620.00
202,486.84
0.8116
164,342.86
20,220.00
15,240.00
4,980.00
0.00
20,220.00
4,444.20
27,620.00
202,486.84
0.7312
148,056.63
20,220.00
15,240.00
4,980.00
0.00
20,220.00
4,444.20
27,620.00
202,486.84
0.6587
133,384.35
VALOR
ACTUAL
2010
15,775.80
20,220.00
4,444.20
0.00
2011
15,775.80
20,220.00
4,444.20
0.00
2012
15,775.80
20,220.00
4,444.20
0.00
2013
15,775.80
20,220.00
4,444.20
0.00
20,220.00
4,444.20
0.00
195,086.84
8,375.80
0.00
195,086.84
8,375.80
0.00
195,086.84
8,375.80
0.00
195,086.84
8,375.80
0.00
195,086.84
8,375.80
0.00
195,086.84
8,375.80
0.00
20,220.00
15,240.00
4,980.00
0.00
20,220.00
4,444.20
27,620.00
202,486.84
0.5935
120,166.08
20,220.00
15,240.00
4,980.00
0.00
20,220.00
4,444.20
27,620.00
202,486.84
0.5346
108,257.73
20,220.00
15,240.00
4,980.00
0.00
20,220.00
4,444.20
27,620.00
202,486.84
0.4817
97,529.49
20,220.00
15,240.00
4,980.00
0.00
20,220.00
4,444.20
27,620.00
202,486.84
0.4339
87,864.41
20,220.00
15,240.00
4,980.00
0.00
20,220.00
4,444.20
27,620.00
202,486.84
0.3909
79,157.12
20,220.00
15,240.00
4,980.00
0.00
20,220.00
4,444.20
27,620.00
186,711.04
0.3522
65,756.73
78,032.96
964,972.05
304,769.69
738,235.32
857,839.37
0.76
3.42
Cdigo
Correlativo
Elaborado
Actualizado
6/6/2007
FORMATO 7
EVALUACIN PRIVADA
(ALTERNATIVA 1)
SECTOR
UNIDAD
Junta de Usuarios del Distrito de Riego
FORMULADORA Chancay - Lambayeque
Ministerio de Agricultura
-539,535.62
926,808.18
TOTAL
387,272.55
TIR
B/C
ND
0.77
0.00
3.63
Cdigo
Correlativo
Elaborado
Actualizado
6/6/2007
FORMATO 8
EVALUACIN SOCIAL
(ALTERNATIVA 1)
SECTOR
Ministerio de Agricultura
CONCEPTO
5. Factor de Actualizacin
6. VALOR ACTUAL DEL FLUJO NETO (VAN) (4x5)
VALOR
ACTUAL
2007
0.00
0.00
0.00
0.00
0.00
2008
15,775.80
20,220.00
4,444.20
0.00
216,268.82
2009
15,775.80
20,220.00
4,444.20
0.00
216,268.82
2010
15,775.80
20,220.00
4,444.20
0.00
216,268.82
2011
15,775.80
20,220.00
4,444.20
0.00
216,268.82
2012
15,775.80
20,220.00
4,444.20
0.00
216,268.82
2013
15,775.80
20,220.00
4,444.20
0.00
216,268.82
2014
15,775.80
20,220.00
4,444.20
0.00
216,268.82
2015
15,775.80
20,220.00
4,444.20
0.00
216,268.82
2016
15,775.80
20,220.00
4,444.20
0.00
216,268.82
2017
15,775.80
20,220.00
4,444.20
0.00
216,268.82
1,128,083.17
585,656.92
585,656.92
5,915.00
539,963.74
26,998.19
12,780.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-585,656.92
9,041.80
0.00
0.00
0.00
0.00
0.00
18,072.60
13,540.80
4,531.80
0.00
20,220.00
4,444.20
24,806.60
223,002.82
9,041.80
0.00
0.00
0.00
0.00
0.00
18,072.60
13,540.80
4,531.80
0.00
20,220.00
4,444.20
24,806.60
223,002.82
9,041.80
0.00
0.00
0.00
0.00
0.00
18,072.60
13,540.80
4,531.80
0.00
20,220.00
4,444.20
24,806.60
223,002.82
9,041.80
0.00
0.00
0.00
0.00
0.00
18,072.60
13,540.80
4,531.80
0.00
20,220.00
4,444.20
24,806.60
223,002.82
9,041.80
0.00
0.00
0.00
0.00
0.00
18,072.60
13,540.80
4,531.80
0.00
20,220.00
4,444.20
24,806.60
223,002.82
9,041.80
0.00
0.00
0.00
0.00
0.00
18,072.60
13,540.80
4,531.80
0.00
20,220.00
4,444.20
24,806.60
223,002.82
9,041.80
0.00
0.00
0.00
0.00
0.00
18,072.60
13,540.80
4,531.80
0.00
20,220.00
4,444.20
24,806.60
223,002.82
9,041.80
0.00
0.00
0.00
0.00
0.00
18,072.60
13,540.80
4,531.80
0.00
20,220.00
4,444.20
24,806.60
223,002.82
9,041.80
0.00
0.00
0.00
0.00
0.00
18,072.60
13,540.80
4,531.80
0.00
20,220.00
4,444.20
24,806.60
223,002.82
9,041.80
632,819.98
0.00
0.00
0.00
0.00
18,072.60
13,540.80
4,531.80
0.00
20,220.00
4,444.20
24,806.60
223,002.82
577,551.56
1.0000
0.9009
0.8116
0.7312
0.6587
0.5935
0.5346
0.4817
0.4339
0.3909
0.3522
-585,656.92
200,903.44
180,994.09
163,057.74
146,898.86
132,341.32
119,226.41
107,411.18
96,766.83
87,177.33
78,538.13
Ratio B/C =
1.91
UNIDAD
Junta de Usuarios del Distrito de Riego
FORMULADORA
Chancay - Lambayeque
REVESTIMIENTO CANAL FERNANDEZ TRAMO: LATERAL TAMARINDO LATERAL GUEVARA SUB SECTOR MOCHUMI
35.62%
82,288.38
727,658.41
Cdigo
Correlativo
Elaborado
Actualizado
6/6/2007
FORMATO 8
EVALUACIN SOCIAL
(ALTERNATIVA 2)
SECTOR
Ministerio de Agricultura
CONCEPTO
2007
0.00
0.00
0.00
0.00
0.00
2008
15,775.80
20,220.00
4,444.20
0.00
216,268.82
2009
15,775.80
20,220.00
4,444.20
0.00
216,268.82
2010
15,775.80
20,220.00
4,444.20
0.00
216,268.82
2011
15,775.80
20,220.00
4,444.20
0.00
216,268.82
2012
15,775.80
20,220.00
4,444.20
0.00
216,268.82
2013
15,775.80
20,220.00
4,444.20
0.00
216,268.82
2014
15,775.80
20,220.00
4,444.20
0.00
216,268.82
2015
15,775.80
20,220.00
4,444.20
0.00
216,268.82
2016
15,775.80
20,220.00
4,444.20
0.00
216,268.82
2017
15,775.80
20,220.00
4,444.20
0.00
216,268.82
593,751.35
593,751.35
5,915.00
547,672.72
27,383.64
12,780.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-593,751.35
9,041.80
0.00
0.00
0.00
0.00
0.00
18,072.60
13,540.80
4,531.80
0.00
20,220.00
4,444.20
24,806.60
223,002.82
9,041.80
0.00
0.00
0.00
0.00
0.00
18,072.60
13,540.80
4,531.80
0.00
20,220.00
4,444.20
24,806.60
223,002.82
9,041.80
0.00
0.00
0.00
0.00
0.00
18,072.60
13,540.80
4,531.80
0.00
20,220.00
4,444.20
24,806.60
223,002.82
9,041.80
0.00
0.00
0.00
0.00
0.00
18,072.60
13,540.80
4,531.80
0.00
20,220.00
4,444.20
24,806.60
223,002.82
9,041.80
0.00
0.00
0.00
0.00
0.00
18,072.60
13,540.80
4,531.80
0.00
20,220.00
4,444.20
24,806.60
223,002.82
9,041.80
0.00
0.00
0.00
0.00
0.00
18,072.60
13,540.80
4,531.80
0.00
20,220.00
4,444.20
24,806.60
223,002.82
9,041.80
0.00
0.00
0.00
0.00
0.00
18,072.60
13,540.80
4,531.80
0.00
20,220.00
4,444.20
24,806.60
223,002.82
9,041.80
0.00
0.00
0.00
0.00
0.00
18,072.60
13,540.80
4,531.80
0.00
20,220.00
4,444.20
24,806.60
223,002.82
9,041.80
0.00
0.00
0.00
0.00
0.00
18,072.60
13,540.80
4,531.80
0.00
20,220.00
4,444.20
24,806.60
223,002.82
9,041.80
0.00
0.00
0.00
0.00
0.00
18,072.60
13,540.80
4,531.80
0.00
20,220.00
4,444.20
24,806.60
223,002.82
1.0000
0.9009
0.8116
0.7312
0.6587
0.5935
0.5346
0.4817
0.4339
0.3909
0.3522
-593,751.35
200,903.44
180,994.09
163,057.74
146,898.86
132,341.32
119,226.41
107,411.18
96,766.83
87,177.33
78,538.13
Ratio B/C =
1.89
UNIDAD
Junta de Usuarios del Distrito de Riego
FORMULADORA
Chancay - Lambayeque
REVESTIMIENTO CANAL FERNANDEZ TRAMO: LATERAL TAMARINDO LATERAL GUEVARA SUB SECTOR MOCHUMI
35.04%
VALOR
ACTUAL
82,288.38
1,128,083.17
640,914.41
569,457.13
719,563.98
0.7800
2.0800
2.3400
0.7200
1.9200
2.1600
0.6600
1.7600
1.9800
0.6000
1.6000
1.8000
0.5400
1.4400
1.6200
0.4800
1.2800
1.4400
701,952.86
711,974.53
647,956.48
657,207.26
593,960.11
602,439.99
539,963.74
547,672.72
485,967.36
492,905.45
431,970.99
438,138.17
7,650
4,050
108,000
6,800
3,600
96,000
11,050
5,850
156,000
10,200
5,400
144,000
9,350
4,950
132,000
8,500
4,500
120,000
ANLISIS DE SENSIBILIDAD
(Diversas Alternativas)
VARIACIONES REESTIMACIN DEL VAN SOCIAL* REESTIMACIN DE LA TIR REESTIMACIN DEL RATIO B/C
PORCENTUALES Alternat. 1
Alternat. 2
Alternat. 1
Alternat. 2
Alternat. 1
Alternat. 2
Variaciones de los precios de los productos agrcolas
30%
20%
10%
0%
-10%
-20%
-30%
12,269.19
8,422.01
4,574.84
727.66
-3,119.52
-6,966.70
-10,813.87
12,261.10
8,413.92
4,566.74
719.56
-3,127.61
-6,974.79
-10,821.97
372.70%
261.16%
149.58%
35.62%
#DIV/0!
#NUM!
#NUM!
367.62%
257.60%
147.54%
35.04%
#DIV/0!
#NUM!
#NUM!
18.07
12.68
7.30
1.91
-3.47
-8.86
-14.24
17.84
12.52
7.21
1.89
-3.43
-8.74
-14.06
1.52
1.63
1.76
1.91
2.09
2.31
2.57
1.50
1.61
1.74
1.89
2.06
2.28
2.54
18.07
12.68
7.30
1.91
-3.47
-8.86
-14.24
17.84
12.52
7.21
1.89
-3.43
-8.74
-14.06
30%
20%
10%
0%
-10%
-20%
-30%
565.67
555.26
26.14%
25.65%
619.67
610.03
28.87%
28.36%
673.66
664.80
32.00%
31.45%
727.66
719.56
35.62%
35.04%
781.65
774.33
39.90%
39.28%
835.65
829.10
45.04%
44.36%
889.65
883.87
51.38%
50.63%
Variaciones de los Rendimientos de los Cultivos
30%
12,269.19
12,261.10
372.70%
367.62%
20%
8,422.01
8,413.92
261.16%
257.60%
10%
4,574.84
4,566.74
149.58%
147.54%
0%
727.66
719.56
35.62%
35.04%
-10%
-3,119.52
-3,127.61
#DIV/0!
#DIV/0!
-20%
-6,966.70
-6,974.79
#NUM!
#NUM!
-30%
-10,813.87
-10,821.97
#NUM!
#NUM!
* VAN expresados en miles de nuevos soles
RUBRO
2009
0.00
0.00
0.00
0.00
0.00
2010
0.00
0.00
0.00
0.00
0.00
2011
0.00
0.00
0.00
0.00
0.00
2012
0.00
0.00
0.00
0.00
0.00
2013
0.00
0.00
0.00
0.00
0.00
2014
0.00
0.00
0.00
0.00
0.00
2015
0.00
0.00
0.00
0.00
0.00
2016
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
15.78
20.22
4.44
15.78
20.22
4.44
15.78
20.22
4.44
15.78
20.22
4.44
15.78
20.22
4.44
15.78
20.22
4.44
15.78
20.22
4.44
15.78
20.22
4.44
15.78
20.22
4.44
15.78
20.22
4.44
157.76
202.20
44.44
0.00
98.81
98.81
98.81
98.81
98.81
98.81
98.81
98.81
98.81
98.81
889.31
260.13
114.59
114.59
114.59
114.59
114.59
114.59
114.59
114.59
114.59
114.59
1,307.19
TOTAL
2017
0.00
0.00
0.00
0.00
0.00
TOTAL
2007
260.13
0.00
260.13
0.00
0.00
260.13
0.00
260.13
0.00
0.00
0.00
RUBRO
TOTAL
2007
263.34
0.00
263.34
0.00
0.00
2008
0.00
0.00
0.00
0.00
0.00
2009
0.00
0.00
0.00
0.00
0.00
2010
0.00
0.00
0.00
0.00
0.00
2011
0.00
0.00
0.00
0.00
0.00
2012
0.00
0.00
0.00
0.00
0.00
2013
0.00
0.00
0.00
0.00
0.00
2014
0.00
0.00
0.00
0.00
0.00
2015
0.00
0.00
0.00
0.00
0.00
2016
0.00
0.00
0.00
0.00
0.00
2017
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
15.78
20.22
4.44
15.78
20.22
4.44
15.78
20.22
4.44
15.78
20.22
4.44
15.78
20.22
4.44
15.78
20.22
4.44
15.78
20.22
4.44
15.78
20.22
4.44
15.78
20.22
4.44
15.78
20.22
4.44
157.76
202.20
44.44
0.00
98.81
98.81
98.81
98.81
98.81
98.81
98.81
98.81
98.81
98.81
988.12
263.34
114.59
114.59
114.59
114.59
114.59
114.59
114.59
114.59
114.59
114.59
1,409.22
TOTAL
263.34
0.00
263.34
0.00
0.00
ALTERNATIVA 1 ALTERNATIVA 2
1,346,789.01
799,663.43
547,125.58
1,356,425.24
809,299.66
547,125.58
549.48
219,153.66
539,535.62
549.48
219,759.57
545,959.77
Cdigo
Correlativo
Elaborado
Actualizado
6/6/2007
FORMATO 9
COMPARACIN DE ALTERNATIVAS DE INVERSIN
SECTOR
Ministerio de
Agricultura
UNIDAD
Junta de Usuarios del Distrito de Riego
FORMULADORA
Chancay - Lambayeque
REVESTIMIENTO CANAL FERNANDEZ TRAMO: LATERAL
TAMARINDO LATERAL GUEVARA SUB SECTOR MOCHUMI
ALTERNATIVA 1
ALTERNATIVA 2
727,658.41
35.62%
1.91
719,563.98
35.04%
1.89
2,451.02
1,394.55
981.90
2,468.56
1,395.66
993.59