You are on page 1of 13

PROJECT NAME:

Release Version

Solar Efficient Energy


V4.1

Testcase#
TC_UI_01

Test Title
login page

Test Steps
positive-enter valid url on address bar

TC_UI_02

login credentials

positive-enter valid login credentials


negative-enter invalid login credentials

TC_UI-03

logo

positive-click on logo

TC_UI-04

upload

positive-click on upload link

TC_UI-05
TC_UI_06
TC_UI_07

"how to upload" link


"search" dropdown
"Search string"

positive-click on "how to upload" link


positive-click on "search" dropdown
positive-enter the string as per the search dropdown list

TC_UI_08
TC_UI_09

"Search" button
"Reset" button

positive-click on search button


positive-click on reset button

TC_UI_10

"all employees" dropdown

positive-click on all employees dropdown

TC_UI_11

Leads

positive-click on any lead

TC_UI_12

edit

positive-check edit button

TC_UI_13

edit

positive-check edit button

TC_UI_14

"Lead Open" dropdown

positive-select from drop down

TC_UI_15
TC_UI_16

edit quote
delete quote

positive-click on "edit" quote


positive-click on "delete" quote

TC_UI_17

Documents

positive-click on "documents"

TC_UI_18

Create New Lead

positive-Click on "Create New Lead"


negative-enter same e-mail id

TC_UI_19

mandatory fields

positive-fill the mandatory fields details and click on


"submit" button

TC_UI_20

create quote

positive-click on "create quote" button


Negative-enter invalid address

TC_UI_21

edit box

positive-uncheck the lead address check box

TC_UI_22

"Next" button

positive-click on "Next" button

TC_UI_23

"Prev" button

positive-click on "Prev" button

TC_UI_24

"layout" link

TC_UI_25

"Autopopulate" button

positive-click on "confirm the roof top visual" link


Negative-green rectangle
positive-after set the panel as per requirement click
on
"Autopopulate" button.

TC_UI_26

"Next" button

positive-click on "Next" button

TC_UI_27

"System" link
"Module manufacturers"
dropdown
"Module model number "
dropdown

positive-enter the input in mandatory field


positive-select module manufacturers from
dropdown list

TC_UI_28
TC_UI_29

positive-select module model number from dropdown list

"Module watt"

positive-enter the module watt


Negative-enter below 10watt

TC_UI_31

"Inverter manufacturer"
dropdown

positive-select inverter manufacturers from dropdown


list
Negative-leave the text box as blank

TC_UI_32

"Inverter model number"

positive-select inverter model number from dropdown


list

TC_UI_30

TC_UI_33

"Inverter Quantity"

positive-enter inverter quantity

TC_UI_34
TC_UI_35

"Next" button
"Energy" button

positive-click on "Next" button


positive-fill the mandatory fields details.

TC_UI_36

positive-select the providers from dropdown

TC_UI_37

"Utility Provider" dropdown


"Current Electric Rate"
dropdown

TC_UI_38

"PV Electric Rate" drop down

positive-select the services from dropdown

TC_UI_39

"Current Energy Consumption"


field

positive-select the energy consumption by monthly


data
or by annual bill or by uploading the green button
file

TC_UI_40

"New Energy Consumption"


field

positive-check the new energy consumption field

TC_UI_41
TC_UI_42

"Next" button
"Finance" Module

positive-click on next button


positive-enter the capital cost($)

TC_UI_43

"Next" button

positive-click on next button

TC_UI_44

"Result" Module

positive-Go to "result" module

TC_UI_45
TC_UI_46
TC_UI_47

"View Result" button


"Set Up" drop down
"Admin setup"

positive-click On "View Result" button


positive-click on set up drop down
positive-click on Admin set up link

TC_UI_48

"Add Employee" link

positive-fill the details

TC_UI_49

positive-click on Bom setup dropdown

TC_UI_50

"BOM Set Up" drop down


"Bom setup_Module_view"
button

TC_UI_51

"Bom setup_module_select"
button

positive-click on module-select

TC_UI_52

"module Manufacturers"
textbox

positive-click any manufacturers and select from


dropdown

TC_UI_53

"module manufacturers" name

positive-select from drop down and select the module


manufacturers and click on submit

TC_UI_55

Bom setup_Inverter_view"
button

positive-click on inverter- view

positive-select the services from dropdown

positive-click on module- view

TC_UI_57

Bom setup_inverter_select"
button
Inverter Manufacturers"
textbox

TC_UI_58

Inverter manufacturers" name

positive-select from drop down and select the module


manufacturers and click on submit

TC_UI_59

"Finance Setup" dropdown

positive-click on finance setup dropdown

TC_UI_60

"Finance setup_View"

TC_UI_61

"Finance setup_Select"

positive-click on view button


positive-select the Bank name from the list and click
on
submit

TC_UI_56

positive-click on module-select
positive-click any manufacturers and select from dropdown

positive-check the finance view details

TC_UI_62
TC_UI_63

"Rebate Setup" dropdown

positive-click on "Rebate setup" dropdown

TC_UI_64
TC_UI_65

"View" button
"Add" button

positive-click on view button


positive-click on add button

TC_UI_66

Logout

positive-click on logout

Test Designed By: Satyabrata Rout


Test Designed Date: 21/10/2104
Test Execution By:
Test Execution Date:

Test Data
http://qana.enact-systems.com/enact/pages/enact_partner_login.html
Account idEmail idPassword-

As per required

no

yes

As per required

As per required

As per required

As per required

As per required
As per required
As per required

10-500

As per required

As per required

As per required

As per required
As per required
As per required
As per required

As per required

more than 4000

As per required

Duplicate E-mail should not be entered

As per required

d select from dropdown

As per required

As per required

Expected Results
check login has displayed

positive result=desired homepage should be played


negative result=page should display the error message
positive result=same homepage with all functionality
should be displayed and all functionality should be
enabled
positive result-new pop up window from where you
upload data should be displayed
positive result-zip file named as "leaduploadsample"
should be download autometically
positive result-dropdown should be displayed
positive result-this field should take the data
positive result-Employee name should be displayed
as per desired string
positive result-check all lead owner should be
displayed.
positive result-Application should display the lead
details
positive result-By default edit button is in not editted.
positive result-as per the requirement lead details
should be editted.

positive result-confirm message should be displayed


in check box
positive result-exiting quote should be displayed
positive result-the quote should be deleted
positive result-documents page should be open with
necessery data

Post Condition

positive result-new window should be open with


required field
Negative Result-confirm that alert message is
showing

positive result-confirm message should be displayed .


positive result-new page should be displayed and
confirm that by
default "project" link and "lead address" check box
should be clicked
Negative Result-it should not navigate to next module
positive result-check address bar should be enabled.
positive result-confirm that next module should be
enabled.
positive result-confirm that previous module should be
enabled
positive result-check that panel dropping with all
functionality
should be enabled.
Negative result-green rectangle remain unchange
after clicking Reset button
positive result-check that panels setted up perfectly
with showing
number of panels
positive result-check that next module should be
enabled.
positive result-all the mandatory field should be filled
up as per
the requirement
positive result-desired module manufacturers should
be entrted
positive result-desired module model number should
be entered
positive result-desired module watt should be entered
Negative result-PV system size should not be
entered
positive result-desired inverter manufacturer should be
entered
Negative result-user should not naviagate to next tab
positive result-desired inverter model number should
be entered

positive result-desired inverter quantity should be


entered.
positive result-check that next module should be
enabled.
positive result-desired inputs should be entered
positive result-desired provider should be entered
positive result-desired services should be entered
positive result-desired services should be entered

positive result-desired input should be clicked


positive result-As clicked on "calculate" button
autometically new
energy consumption field should be calculated.
positive result-check that next module should be
enabled.
positive result-check the next module should be
enabled
positive result-check all the details are showing as per
the
requirement
positive result-check new window on pdf format should
be
opened.
positive result-drop down list should be opened
positive result-required field must be shown
positive result-confirmation message should be shown
positive result-Module and inverter link should be
shown
positive result-View module details must be displayed
positive result-module manufacturers field must be
shown with
empty stage
positive result-desired manufacturers name must be
entered

positive result-confirmation message must be shown

positive result-View Inverter details must be displayed

positive result-module manufacturers field must be


shown with
empty stage
positive result-desired manufacturers name must be
entered

positive result-confirmation message must be shown


positive result-confirm that view and select button
must be
displaying
positive result-confirm that all the bank details are
displayed

positive result-confirmation message must be shown


positive result-check the selected bank name should be
adeed
in viewed bank details
positive result-"view" and "add" link should be
displaying
positive result-check by default "prodrebate" should be
click
positive result-check all field should be empty
positive result-application must be display the login
page

Actual Result

You might also like