13011/ 2 /2011-CA-I
Government of India
Ministry of Coal
..
New Delhi, dated 2nd March, 2012
OFFICE MEMORANDUM
Subject:
Meeting held on 11.01.2012 & 12.01.2012 chaired by Additional
Secretary (Coal) to review the progress of allocated coal/lignite blocks and associated
end use projects.
..
The undersigned is directed to enclose herewith the minutes of the Review
Meeting held on 11.01.2012 & 12.01.2012 under the Chairpersonship of Additional
Secretary (Coal) to review the progress of allocated coal/lignite blocks and associated
end use projects for information and necessary action.
Sd/(Sandeep Gupta)
Under Secretary to the Govt. of India
To
1.
The Secretary, Ministry of Power, Shram Shakti Bhawan, New Delhi.
2.
The Secretary, Ministry of Steel, Udyog Bhawan, New Delhi.
3.
The Secretary, Ministry of Commerce & Industry, Deptt. of Industrial Policy &
Promotion (Cement-II Section), Udyog Bhawan, New Delhi
4.
The Secretary, Ministry of Environment & Forests, Paryavaran Bhawan, CGO
Complex, Lodi Road, New Delhi.
5.
The Chairman, Coal India Ltd., 10-Netaji Subhas Road, Kolkata.
6.
The Director (Technical), Coal India Ltd., 10-Netaji Subhas Road,] Kolkata
700 001.
7.
The Chairman, Neyveli Lignite Corporation Limited, Block -1 , Neyveli
Lignite, Tamil Nadu- 607 801.
8.
The Coal Controller, Coal Controller Organisation, 1-Council House Street,
Kolkata.
9.
The Chairman-cum-Managing Director, CMPDIL, Gondwana Place, Kanke
Road, Ranchi 834 008.
10.
The Chairman-cum-Managing Director, SCCL. Kothagudem Collieries P.O.,
Dist. Khammam, Andhra Pradesh.
11.
The Chief Secretary, Govt. of Orissa, Secretariat, Bhubaneswar 751 001
(through the Office of Resident Commissioner, Govt. of Orissa, Borodolai Marg,
Chanakypuri, New Delhi).
12.
The Chief Secretary, Govt. of Chhattisgarh, Secretariat, Raipur (through the
Office of Resident Commissioner, Govt. of Chhattisgarh, 7 Sarsar Patel Marg,
Chankapuri, New Delhi).
13. The Chief Secretary, Govt. of Maharashtra, Secretariat, Mumbai (through the
Office of Resident Commissioner, Govt. of Maharashtra, Maharashtra Sadan, Near
Mandi House, Copernicus Marg, New Delhi).
14.
The Chief Secretary, Govt. of Jharkhand, Secretariat, Ranchi. (through the
Office of Resident Commissioner, Govt. of Jharkhand, B 5/2, Jharkhand House,
Safdarjung Enclave, New Delhi).
15.
The Chief Secretary, Govt. of Rajasthan, Secretariat, Jaipur (through the Office
of Resident Commissioner, Govt. of Rajasthan, Bikaner House, Pandara Road, New
Delhi 110003).
16.
The Chief Secretary, Govt. of West Bengal, Secretariat, Kolkata (through the
Office of Resident Commissioner, Govt. of West Bengal, A-2, State Emporia Building,
Baba Kharak Singh Marg, New Delhi 110 001).
17.
The Chief Secretary, Govt. of Andhra Pradesh, Secretariat, Hyderabad. (through
the Office of Resident Commissioner, Govt. of Andhra Pradesh, 1- Ashoka Road, New
Delhi 110003).
18.
The Chief Secretary, Govt. of Madhya Pradesh, Secretariat, Bhopal (through the
Office of Resident Commissioner, Govt. of Madhya Pradesh, B-8, State Emp. Building,
Baba Kharak Singh Marg, New Delhi 110003).
19.
The Chief Secretary, Govt. of Gujarat, Secretariat, Gandhinagar ( through the
Office of Resident Commissioner, Govt. of Gujarat, A/6 State Emporia Bldg., Baba
Kharak Singh Marg, New Delhi-110001).
20.
The Chief Secretary, Govt. of Tamil Nadu, Secretariat Chennai. (through the
Offie of Resident Commissioner, Govt,. of Tamil Nadu, Tamil Nadu House, Kautilya
Marg, New Delhi 21).
22.
The Chief Secretary, Govt. of Arunachal Pradesh, Secretariat, Itanagar.
Minutes of the Meeting held on 11.01.2012. & 12.01.2012 at Scope Complex, Lodhi Road,
New Delhi Chaired by Additional Secretary (Coal) to review the progress of captive
blocks and the associated End Use Projects.
-----------------------------------------------------------------------------------------------------------------A meeting chaired by Additional Secretary (Coal) was held on 11th and 12th January,
2012 in Scope Complex, Lodhi Road, New Delhi to review the progress of development of
coal blocks allocated up to 31st Dec.2011 along with their associated end use projects.
List of participants is enclosed as Annexure.
At the outset, Chairperson welcomed all the officers representing different Ministries/
Departments of Central/ State Governments attending the meeting as well as different block
allocatees. Information was sought from each of the company representatives (block allocates)
on milestones achieved by them since the last review meeting held on 20th and 21st July,2010.
Committee also confirmed the minutes of last review meeting.
The status of allocated Coal Blocks was then reviewed. Out of a total of 218 Coal
blocks that have been allocated so far, 23 blocks have been deallocatted by Ministry of Coal till
Dec., 2011. The status of remaining coal blocks was reported as follows:
(i)
Net allocated coal blocks are 195
(ii)
39 blocks are allocated to Govt PSUs for commercial use. Out of these, some
blocks have been transferred to linked Power project for commercial use
within the State.
(iii)
Mining Plan approved for 126 coal blocks
(iv)
29 coal blocks have started coal production
(v)
3 coal blocks started coal production after the last review meeting.
(vi)
9 coal blocks have reached peak rated capacity of the mine.
Details of coal blocks allocated year wise are as follows:No of blocks to Govt. Companies
Year of
allocation
Till 2003
2004
2005
2006
2007
2008
2009
2010
2011(Dec.
2011)
Total:-
No of blocks to Private
Companies
De
Net
Gross alloca
allocated
Alloc
ted/
blocks as
atted surren
on date
dered
24
2
22
1
1
0
16
1
15
15
15
17
1
16
20
2
18
12
12
-
Gross
Allotted
De
allocated/
surrendered
Net
allocated
blocks as
on date
17
4
8
32
34
3
1
-
2
6
6
1
1
-
17
4
6
26
28
2
-
100
16
84
106
99
No of Blocks
to UMPP/for
Tariff based
bidding
Total Net
blocks for
the year
6
1
1
3
1
2
12
39
4
21
47
45
21
15
1
195
Government of Jharkhand assured all necessary assistance for speedy disposal of pending
issues at the state level. The target of coal production of 36.15 Mill tonnes for 2011-12 (the
terminal year of XIth five year plan) and 39.2 Mill tonnes for 2012-13 (the initial year of XIIth
five year plan) needs to be achieved.
Joint Secretary (Coal) advised all the allocatees to push their projects for early
clearance of pending milestones. He also requested Ministry of Power to closely monitor the
upcoming power projects as well as coal projects allotted for power generation. He also
advised the owner of those coal blocks which were rejected earlier for forest clearance by
Ministry of Environment and Forest because of No Go Categorisation to pursue their forest
clearance proposal with the State Forest Departments for further consideration. Coal Controller
was directed to give information on opening of Escrow Accounts and approval of Mine
Closure Plan of captive coal blocks from the next review meeting.
General Recommendations of the Committee:During the review of the progress of coal & lignite block the major issues causing delay and
action points for reducing the delay in various clearances were identified. The decisions/issues
and recommendations are categorized as below:(a) Issues relating to Environment & Forestry Clearances:
The decision taken by GoM in its meeting held on July, 2011 has not percolated to
field level.
MOEF may be requested to issue guidelines as per the decision of the GoMs meeting
held on July,2011 to the regional/field offices of MOEF on Go/No Go issues.
In view of the decision of the GoM, cases which had stopped being processed due to
Go-No Go concept may be taken up by the block allottees again with the State Forest
Departments afresh and their pending applications may be processed by concerned
Forest Departments/MoEF without delay.
The block allocatees in the state of Jharkhand are facing a serious problem in forest
clearance issues at the State level as individual applicants are being asked to report on
the environmental impact on the entire forest belt in North Karanpura/Hazaribagh as a
whole. State Govt. representative was requested to take decision on forest clearance
proposals independently on a case to case basis. Impact on the forest belt as a whole
could be better assessed by State Forest Deptt.
State Government should adhere to the time schedule of 24 months or the time
schedule prescribed in allocation condition from the date of allocation for granting of
mining lease of captive coal blocks.
The block allocatees in the state of Orissa are facing a serious problem regarding land
acquisition and grant of mining lease due to the issue raised by Orissa Govt. for
supplying of 33% reject based free power to the State Govt. There is no clear cut
policy in this regard. Committee asked representative of Govt. of Orissa to issue
guidelines in the matter not to hold up clearances on this account till a policy is
formalized in consultation with Ministry of Power.
The block allocatees in the state of Jharkhand are facing a serious problem on law and
order issues. The representative of State was requested to look into the matter and to
ensure full security by deploying CRPF camp as and when requested.
As the block allocatees are facing serious problem regarding transfer of land from
subsidiary companies of CIL under CBA Act, Committee advised that subsidiary coal
companies of CIL should urgently transfer the land rights under CBA Act to State
Govt/ coal block allocatees. Necessary guidelines be issued, if necessary.
Transfer of surface right and mineral right of land acquired by subsidiary coal
companies of CIL to the block allocatees is sometimes a major cause of delay.
Committee urged Ministry of Coal to issue concrete guidelines in this regard.
Pending issues of Mine Plan approval and previous approval under section 5(1) of
MMDR Act in case of grant of mining lease on priority basis need to be cleared
expeditiously.
In a case from West Bengal, there is a problem due to overlapping of area for CBM
with coal block. Ministry of Petroleum and Natural Gas has accorded permission to
extract CBM from the allocated coal block and due to absence of any guidelines, the
coal block allocatees are unable to go ahead with the extraction of coal. Ministry of
Petroleum and Natural Gas may be requested to issue policy guidelines in order to
resolve the overlap issues.
Committee observed that some block owners are willfully delaying the achieving of
pending milestones of coal block and EUPs. Committee viewed it seriously and
recommended that deduction should be made from the Bank Guarantee corresponding
to slippage as per provisions contained in the allocation condition. In this regard
Ministry of Coal may consider framing policy guidelines regarding quantum of
deduction over period of delay.
Committee observed that every allocatee is required to open an Escrow Account with
Coal Controller for mine closure prior to opening of mines as per procedure laid down
in the guidelines of approved Mine Closure Plan. Compliance may be specifically
reported in the next review meeting.
One coal block in the state of West Bengal is facing a serious problem due to
construction of Aerotropolis /airport project within the coal block areas. Construction
of Aerotropolis is going on the coal block area though the matter is subjudice before
the Honble Court. Committee recommended that the State Govt. may be advised to
immediately stop construction of Aerotropolis and to intimate the court accordingly.
In order to sort out the problem faced by block allocatees, close monitoring with the
concerned State Govt. and MoEF at the level of Ministry of Coal /Coal Controller may
be initiated. Regular meetings with Coal Controller/Ministry of Coal and representative
of State and Central Govt may be organized every 3 months. Forming a monitoring
sub-committee in this regard at the Ministry level may be considered.
Joint venture companies formed by the joint allocates are required to submit a
compliance status of Coal Block and associated EUPs of individual allocates to CCO
by 5th of the next month after every quarter. Block allocates were advised to submit the
progress reports and renewed BG to CCO without any lapse.
All the allocatees were advised that BG should be submitted by the JVC in case of
jointly allocated coal blocks. Individual submission of BGs will not be accepted.
The specific recommendations of the Review Committee regarding each coal block are as
follows:-
(I) The following 9 coal blocks have started coal production and have attained the
peak rated capacity.
Sl. No
1
2
3
4&5
6
7
8
9
Allotment year
1994
1996
1996
1996
1996
1996
2001
2003
*The allocattee has been issued a show cause for deviation of conditions of allocation. The
matter is subjudice.
(II) The following 20 coal blocks have started coal production and have not attained
the peak rated capacity. The allocatees are advised to attain the peak rated
capacity as per the approved mining plan.
Sl. No
1
2-3
4
5
6-11
12
13
14
15
16
17
18
19
20.
Allotment year
1993
1998
1999
2003
2003
2000
2003
2003
1996
2005
2005
2005
2004
2005
(III)
From the reported progress, it is seen that production from the few coal
blocks will be started in the year 2011-2012 or the near future as per the
indicated schedule. It is the recommendation of the Committee that the
allocatees of these coal blocks be advised to start mining/ coal production in
2011-12 or as per the indicated schedule of production failing which
appropriate action will be initiated.
Sl. No.
1.
2.
Khagra Joydev
3.
Sial Ghogri
4-5.
Allocation
date/Target dt of
production
14.1.05/ March.09
03.03.05/ Mar.08
22.05.07 (revised to
22.8.07)/ Feb.12
6.09.05/ Mar.09
Name of Allocatee
WBMTDCL.
(Govt PSU)
DVC (Govt. PSU)
Prism Cement Ltd (Private).
Utkal-C
29.5.98/ Nov.01
7-8
25.06.07/ Sept.12
Kanta Basan
Panchwara North
10
Durgapur II/Taraimar
11
12
Fatehpur East
23.1.08/ Oct.13
13
Ganeshpur
28.5.09/ Nov.13
14-15
Sahapur (East)
&
Sahapur (West)
25.7.07/
April,14
NMDC
16
Bicharpur
25.7.07/
April,14
17
2.8.06/ June,13
MSMCL
18
Andal East
3.7.09/ Apr.15
19.05.07/ Sept.12
26.04.05/ May.11
WBPDC Ltd.
6.11.07/Normative
date re fixed on
May,12
12.11.08/ May,12.
BALCO
The progress of the following blocks was not found to be satisfactory but it is
seen that these blocks were delayed due to Go/No Go categorization, location in
wildlife corridors, allocation to PFC for UMPPs and overlapping of coal bearing
area with CBM/Aerotropolis project. Committee expressed concern over unsatisfactory
progress and advised the allocattees whose blocks were held up due to location in
No-Go area to pursue their forest diversion proposals since Go/No-Go concept has
been done away with. The Committee advised the other allocattees to pursue their
cases with the concerned authorities and get the requisite forest clearances
expedited.
(IV)
Sl. No.
Allocation
date/Target dt of
production
14.08.2003/ Feb.07
1.
Tara
2-3.
Amelia &
Amelia North
12.1.06/ July,09
Mahan
12.04.06/ Oct.09
5-6
23.9.2004/ Mar.08
CSEB
Morga-I
02.08.06/ May,12
MPSMCL
Morga-II
02.08.06/ May,12
GMDC
Morga-III
25.7.07/ April,13
MPSMCL
10
Morga-IV
25.7.07/ April,13
MPSMCL
11
Vijay Central
12
Madanpur South
13-14
15
Madanpur North
13.1.06/ July,09
16
Sayang
6.11.07/ Aug.13
17
Rajgamar Dipside
14.10.11
18-19
Pindrakhi &
Puta Parogia
9.9.09/
March.13
01.11.2011 /May,15
13.1.06/ July,09
13.1.06 Refixed to
31.5.07/ Nov.10
Name of Allocatee
20
Patal East
6.11.07/ Aug.13
21
Mednirai
28.5.09/ Nov.12
22
Kerandari BC
23
Mourya OC
24
Mara II Mahan
02.08.06/ May.12
25
Semaria Piparia
25.7.07/ Jan.12
26
Mandla South
25.7.07/ Jan.12
-DO-
27
Rawanwara North
29.5.07/ Nov.11
28
Brahmpuri
01.08.07/ July,11
29
30
Thesgora/Rudrapuri
31
Chatrasal
5.08.08/ Feb.13
21.11.08/ Nov.12
26.10.06 (zero
dt.Aug.07)/ Feb.11
32
6.11.07/ May.11
33
Bander
29.5.09/ Nov.13
34
Bhivkund
17.7.08/ April,14
35
10.11.05/ May.09
MCL/NLC/Hindalco Industries
Ltd
36
Dulanga
25.1.06/ Sept.11
NTPC Ltd.
37
Manoharpur
25.7.07/ Jan.11
OPGCL
38
Dipside Manoharpur
25.7.07/ April,13
39-40
Rampia
&
Dip side of Rampia
17.1.08/ Oct.13
13.9.06/ Mar.10
21.6.2010/ Nov.13
41-43
Menakshi,
44
Meenakshi-B
&
Deep side Meenakshi
Bankui
45
Biharinath
46
Moira Madhujore
47-48
49
Kotre Basantpur
&
Panchmo
Parsa
50
Fatehpur
6.2.08/ Nov.13
51
Bundu
25.4.06/ Oct.09
52
Chakla
20.2.07/ Aug.10
53
6.11.07/ Aug.13
54
Rohne
5.6.08/ Dec.11
55
13.1.06/ July,09
56
13.1.06/Jan.10
57
Dongri Tal-II
2.8.06/ May,12
58
11.4.08/ Oct.11
JSMDCL
20.2.07/ Feb.11
6.10.09/ April,13
11.8.05/ Feb.09
02.08.2006/ May,12
10
CSEB
(V) The progress of the following blocks was not found to be satisfactory. Committee expressed
concern over unsatisfactory progress and advised to expedite the development of the coal block and
be cautioned to be careful in future w.r.t the milestones stipulated. If they do not improve the
performance on the speedy development of the block further, action including deduction of BG/deallocation would be considered.
Sl.
No
.
1.
Name of Coal
Block
2.
Sitanala
9.4.07/ April,11
SAIL
Kosar
Dongergaon
20.2.07/ Feb11
Chaman Metallicks
Ltd.
Badam
3.11.03/ May.07
Tenughat Vidyut
Nigam Ltd.
5-6
Gangaramchak
&
Gangaramchak
Bhadulia
23.6.03/ Dec.06
WBPDC Ltd
Pakri Barwadih
Allocation
date/Target dt of
production
11.10.04/ April,08
Name of Allocatee
Status
NTPC Ltd.
11
Utkal-B1
29.9.03/ Mar.07
Jamkhani
12.11.03/ Nov.08
Tokisud North
7.1.02/ July,05
GVK Power
(Govindwal Sahib)
Ltd
1012
i) Brinda
ii) Sasai
iii) Meral
26.05.05/ Nov.08
Abhijeet
Infrastructure Ltd
13
Majra
29.10.03/ April,07
Gondwana Ispat
Ltd.
14
Mandakini-A
9.1.08/ July,11
12
15
Ardhagram
6.12.07/ June,11
16
Talaipalli
25.1.2006/ Mar.12
NTPC Ltd.
17
Sondiha
25.7.07/ April,13
CMDCL
18
Kesla North
5.8.08/ Feb.13
19
Rajgamar
Dipside (South of
Phulakdih nala)
3.6.09/Dec.13
20
Gondulpara
13.1.06/ July,09
TVNL + DVC
21
Amarkunda
Murgadangal
17.1.08/ Oct.13
13
22
Suliyari Belwar
25.7.07/ April,14
Andhra Pradesh
Mining Dev
Corporation Ltd.
23
Marki Bakra
25.7.07/ April,14
MPSMCL
24
Mandla North
17.9.07/ March.12
Jaipraksh
Associates Ltd
25
Bikram
12.08.08/ Feb.13
Birla Corporation
Ltd.
26
Urtan North
12.1.09/ April, 14
27
Warora
28
Khappa
Extension
29
Bijahan
30
Radhikapur
(West)
20.7.07/ Jan.12
MSMCL
29.5.09/ Nov.13
13.1.06/ Nov.10
25.4.06
(reallocated on
21.12.09)/ June,13
14
31
Ramchandi
Promotional
Block
27.2.09/ Nov.14
32
North of
Arkhapal
27.2.09/Nov.14
Strategic Energy
Tech. System Ltd.
RE block.
40,000-45,000 mts drilling is required.
Depends on viability of reserves.
Applied for exploration license.1200 Ha
land. 33% rejecst based free power
issue is there. Middings generated to be
used in JSPL plant.
RE block.
DFO has cleared forest proposal for
drilling. PL is not yet granted. Coal
quantity to be ascertained for
gasification. 10 Sq. km. area is under
proved category.
(VI)
The progress of the following blocks was not found to be satisfactory. The Committee
expressed concern over the progress and recommended that the allocatees be served with show-cause
notice to explain why the block should not be de-allocated .
2-3
Tubed
(i)
Chinora
Allocation
date/Target dt of
production
1.08.07/ Feb.11
Name of
Allocatee
Status
Hindalco
Industries & Tata
Power Ltd.
8.10.03/ Oct.06
16.8.99/ Feb.03
(ii)
Warora
Southern Part
Utkal B2
15
Gare Palma
Sector -I
02.08.06/ May,12
CMDC
Gare Palma
Sector-II
02.08.06/ May,12
Shankar
Pur/Bhatgaon II
& Extn
25.7.07/ Jan.11
CMDCL
Durgapur
II/Sariya
6.11.07/ May,11
DB Power Ltd.
Sugia Closed
mine
30.1.06/ July,09
JSMDCL
16
10
Utkal-D
19.12.03/ June,07
OMDC (Govt
Disp.)
11
Utkal-E
27.8.04/ Feb.08
12
Bhaskarpara
21.11.08/
May,12
13
Rauta Closed
mine
30.1.06/ Oct.11
JSMDCL
14
Burakhap small
patch
30.1.06/ Oct.11
JSMDCL
15
Gomia (deep UG
mine)
2.8.06/ May.13
MMTC Ltd.
16
Prindra-DebipurKhaowatand
2.8.06/ May.12
JSMDC
17
Latehar
2.8.06/ May.12
JSMDCL
18
Saria Koiyatand
02.08.06/ May.12
BRKBN Ltd.
19
02.08.06/ May,12
TVNL
20
Urma Paharitola
25.7.07/ April, 13
JSEB &
BSMDCL
21
Patratu
25.7.07/ April,13
JSMDCL
NALCO
Electrotherm
(India) Ltd,
Grasim Industries
Ltd
17
22
Rabodih OCP
25.7.07/ Jan.11
JSMDCL
23
Bramhadih
26.2.96/ Aug.99
24
Lalgarh North
8.7.05/ Jan.09
Castron Mining
Ltd.(formerly
Castron Tech.
Ltd.)
Domco Pvt Ltd
25
North Dhadu
13.1.06/ July,09
26
Jitpur
20.2.07/ Aug.10
27
Seregarha
9.1.08/ Oct.13
28
Mahuagarhi
9.1.08/Oct.13
Electro
Steel
Casting
Ltd,
Jharkhand
Ispat
Pvt Ltd, Pawanjay
Steel & Power
Ltd,
Adhunik
Alloys & Power
Ltd.
JSPL
FC (Sgt-I), ML, LA are pending.
Queries raised by State Govt. has been
replied. Mine Closure plan approved.
Forest clearance application made in
2008. Stg-I clearance is pending at State
level. Process to set up End use power
plant of 2x600 MW is going on. Land
and water tied up. MOU signed with
State Govt. 139 ha forest land for which
money has been deposited.65 acres are
tenancy land and 365 acres Pvt land.
Requisite amount deposited for Govt
and Pvt land. Location of EUP is 10-20
Kms away from pit head.
Arcelor Mittal
RE block. Company informed that 50%
India Ltd & GVK drilling completed. M/s. Naresh Kr &
Power (G.Sahib)
Co is the drilling agency.PL signed in
Ltd.
March 2011. Difficult in setting up of
steel plant.
CESC Ltd & Jas
RE block. Company informed that TOR
Infrastructure Ltd
received. Drilling is continuing. Assured
to expedite exploration. Law and order
is main issue to be resolved.
18
29
Choritand Tailaya
14.5.08/ Nov.11
30
Macherkunda
5.8.08/ Feb.13
31
Rajhara North
(Central &
Eastern)
20.11.08/ Nov.11
32
Tadicherla-I
06.12.05/ Dec.08
Andhra Pradesh
Power Generation
Co. Ltd.
33
Nerad
Malegaon
13.1.06/ Jan.10
34
Gondkhari
21.11.08/ Nov.12
35
Dahegaon
Makardhokra
IV
17.6.09/ Dec.13
3637
Mahanadi &
Machakata
6.2.06/ Dec.11
Maharastra
Seamless
Ltd,
Dharial
Infrastructure Ltd
&
Kesoram
Industries Ltd
IST Steel & Power
Ltd, Gujarat
Ambuja Cements
Ltd & Lafarg
India Ltd.
MSEB & GSEB
19
Mining
38
Naugaon Telisahi
2.8.06/ May.12
OMC &
APMDCL
3940
Chendipada &
Chendipada-II
25.7.07/ Jan11
(Chendipada)
Apr.13
(Chendipada-II)
UPRVUNL
CMDC
MPGCL
41
Baitarni West
25.7.07/ Jan.11
KSEB, OHPGCL
& GPCL
42
Mandakini-B
25.7.07/ April,13
43
Naini
25.7.07/ April, 13
Assam State
Mineral Dev Corp.
Ltd, Meghalaya
State Mineral Dev
Corp. Ltd, Tamil
Nadu Electricity
Board & Orissa
Mining Corp. Ltd
GMDC, PIPDCL
44
Utkal-A &
Gopalprasad
29.11.05/ May.09
MCL/JSW/JTPL/J
indal Stainless
Ltd/ Shyam
Metallics Pvt Ltd
45
New Patrapara
13.1.06/ July,09
(revised to
15.12.2010)
20
46
Radhikapur
(East)
7.2.06/ Aug.09
47
Ichapur
2.8.06/ May.12
WBMDTC Ltd.
48
Kulti
2.8.06/ May.12
WBMDTC Ltd.
49
Jaganathpur-A
20.7.07/ Dec.14
WBMDTC Ltd.
50
Jaganathpur-B
20.7.07/ Dec.14
WBMDTC Ltd.
51
Sitarampur
27.12.07/ Sept.14
WBMDTC Ltd.
52
Gourangdih ABC
10.7.09/ Jan13
Himachal EMTA
Power Ltd & JSW
Steel Ltd
5354
13.09.06 (zero
dt.Aug.07)/ Feb.11
21
55
Moitra
13.5.05/ Nov.08
56
Lohari
24.8.05/ Aug.08
57
Chitarpur
58
Dumri (explored)
Jayaswal Neco
Ltd.
2.09.05/ March.09
13.1.06/ July,09
LIGNITE BLOCKS
(I)
The following lignite blocks have started coal production. The Committee advised the
allocattees of the lignite blocks which have not attained the peak rated capacity to attain
the same as per the approved mining plan at the earliest.
Name of Allocatee/JV
Sl.
No
Year of allotment
1.
Giral
Sonari
28.8.2004
3.
Kapurdih
13.11.2006
4.
Matasuk
26.7.2002
RSMML
5.
Mata-No- Madh
6.
Panandhro
2.
22
GMDCL
7.
Tadkeswar
5.12.2001
GMDCL
8.
Surka (North)
5.12.2001
GMDCL
9.
5.12.2001
10.
Vastan
GIPCL
11.
Khadsaliya
Not available
GHCL
12.
Gurha East
1.7.2005
13.
Mongrol Valia
9.3.2000
GMDCL
The progress of the following blocks was not found to be satisfactory. Committee expressed
(II)
concern over unsatisfactory progress and advised to expedite the development of the lignite block
and be cautioned to be careful in future w.r.t the milestones stipulated. If they do not improve the
performance on the speedy development of the block further, action including deduction of
BG/de-allocation would be considered
Sl.
No.
Allocation date
Name of Allocatee
1.
Kaparion Ki Dhani
7.2.2007
2.
Gurha West
1.7.2005
RSMML
3.
Jalipa
13.11.2006
RSMML
4-5.
Shivkar Kurla
&
Sacha Sauda
13.11.2006
RSMML
The progress of the following lignite blocks was found to be cause of concern. Committee
(III)
expressed concern over the progress and recommended that the allocatees be served with showcause notice to explain why the block should not be de-allocated .
(IV)
Sl.
No.
Allocation date
Name of Allocatee
1.
Mokhala
14.7.2003
RSMML
2.
Merta Road
7.02..2007
Regarding the progress of the following blocks, the Committee noted the position as
stated by the allocatees and advised accordingly.
23
Sl.
No.
Name of Lignite
Block
1.
Mandal Charan
2-3
Allocation
date
Name of
Allocate
7.2.2007
Khadsaliya-II
&
Surka-III
6.9.2005
GIPCL
4.
Akrimota
Not
available
GMDC
5.
Indwar
7.2.2007
Nandlal
Enterprises Pvt
Ltd.
6.
Nimbri Chandawatan
7.2.2007
Binani Cements
Ltd.
--------------
24
Names of representatives of Ministry of Coal who attended the Review meeting held
on 11.01.2012 and 12.01.2012
Sl.No.
1
2.
3
4
5.
6.
25
11
12
13
14
15
26
Ministry/Deptt/Organsiation
Director (Technical), CMPDI
Ministry of Power
Neyveli Lignite Corporation Ltd
Ministry of Steel
General Manager (Geology), CIL
Coal India Limited
Government of Jharkhand
CMPDI
Office of Coal Controller, Kolkatta
Commerce and Industries Department,
Government of West Bengal
Ministry of Steel
Government of Orissa
Government of Odiha
Government of Meghalaya
CMPDI
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
Sh Subhash Jetly
Sh Chanakya Chaudhary
Sh Vijay Kachroo
Sh. R.P. Goyal
Sh B Akla
Sh Shashi Kant N Mehta
Sh V.R. Kochar
Nandita Singh
Sh Aditya Verma
Sh R.N. Choubey
Sh Viren K Mital
Sh C.S. Moorthi
Sh Arindam Mukherjee
Sh Amitabh Chatterjee
28
48
49
50
51
52
53
54
55
56
57
58
59
-do
A.K. Gupta
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
Lalit Beniwal
S.C. Khera
M.B. Mathur
A.K. Giri
M.A.N. Srivastava
B.S. Sinha
Radhakrishan K.S.
S.S. Puri
N.K. Purohit
A.K. Makadia
Deepak Lal
Prem P Srivastava
-doS.K. Goswami
S.K. Gupta
S.S. Dang
S.C. Jain
S.C. Wahie
P. Girish
Amitabh S. Mudgal
M.K. Sinha
Sanjay Jain
Amitabh Chatterjee
Devinder Arora
Deepti Singh
K. Kasturi
Sanjay Mkupawat
A.K. Thakur
U. Chatterjee
R.K. Agarwal
Robin Bose
Piyush Srivastava
Punit Gupta
Dr. V. Madri
Abani P Mishra
A.K. Samal
K.P. Agrawal
97
98
99
100
101
102
Pradeep Mittal
Subhash Jetly
A.K. Tooley
R. Bose
A.C. Sharma
M.S. Cheema
******
31