Medical gas system T&C
Compound lighting rectification work - "RFI"
Lift controller shematic drawing
T&C comment, reply and rectification work done
Maklumbaas pemerhatian/kecacatan awal
sistem elektrikal, mekanikal dan biomedikal
10/4/2014 T&C for ACMV
15/4/2014 AHU system (internal) T&C, CSB Level 1 AH/L1/01
to AH/L1/07
17/4/2014 Outstanding T&C and defect rectification works
21/4/2014 Outstanding T&C and defect rectification works
21/4/2014 CSB Level 3 open office ACMV T&C on supply and
return air flow volume
22/4/2014 T&C fire alarm system lift and hydrotheraphy
pool
23/4/2014 T&C exhaust fan CSB Level 1 to Level 4
24/4/2014 T&C FCU system functionality for BMS Level 1 to
Level 4
25/4/2014 T&C for D.B. and lighting CSB Level 1 and Level 2
26/4/2014 ACMV as built drawing and T&C at CSB Level 1
Zone "A" and "B" supply and return air flow
volume
30/4/2014 T&C functionality for BMS system (Electrical DB)
Level 3, 4 and LMR
2/5/2014 T&C for water suction pump and domestic
circulation pump
2/5/2014 T&C medical gas system on flow test (AGSS) and
H2O test (compressor air system)
2/5/2014 Outstanding defect work as per site instruction SI
001 to JA(M)1330/SI153
5/5/2014 CSB Level 1 Zone "B" ACMV T&C on supply and
return air flow volume
8/5/2014 Postponement of ACMV for operation theatre
and medical gas system on MA4 water content
14/5/2014 T&C ACMV supply air flow volume and relative
humidity(RH) high CSB Level 1
15/5/2014 Hydrotheraphy pool system grounding for
butterfly bath system
15/5/2014 Insulation of transformer 5 and 6 at bus bar and
neutral
15/5/2014 Compressed air system water content test
16/5/2014 CSB Level 4 Zone "A" and"B" ACMV T&C supply
and return air flow volume
20/5/2014 ELCB test at OT aborted
20/5/2014 CSB Level 2 Zone "A" EPS S.S.O at close proximity

J&A SITE M&E


J&A SITE M&E/001
J&A SITE M&E/002
J&A SITE M&E/003
J&A SITE M&E/004
J&A SITE M&E/005
J&A SITE M&E/006
J&A SITE M&E
J&A SITE M&E/008
J&A SITE M&E/009
J&A SITE M&E/010
J&A SITE M&E/011
J&A SITE M&E/012
J&A SITE M&E/013
J&A SITE M&E/014
J&A SITE M&E/015
J&A SITE M&E/016

J&A SITE M&E/017


J&A SITE M&E/018
J&A SITE M&E/019
J&A SITE M&E/020
J&A SITE M&E/021
J&A SITE M&E/022
J&A SITE M&E/023
J&A SITE M&E/024
J&A SITE M&E/025
J&A SITE M&E/026
J&A SITE M&E/027
J&A SITE M&E/028
J&A SITE M&E/029

SITE MEMO TO J&A HEADQUARTERS(HQ) CLINICAL SERVICES BLOCK(CSB)

30
31

21/5/2014
21/5/2014

32
33
34
35
36

21/5/2014
22/5/2014
26/5/2014
29/5/2014
6/6/2014

37
38

9/6/2014
9/6/2014

39

12/6/2014

40

13/6/2014

to sink tap
T&C report for "chiller auto mode"
CSB Level 3 Zone "C" open office sound level 63
BA
T&C report for "chiller auto mode"
OT4 & OT5 electrical testing
M&E outstanding work
M&E defects list reinspection
Highlights at CPC meeting & status of M&E
Defect Rectification Works
Inspection for distribution boards (CSB)
Medical gas copper pipe in contact with power
cable and cavity wall steel frame
CSB Level 2 Zone "B" Corridor bundle of
temporary power cable suspended by strap
above ceiling
CSB Level 3 Zone "B" Open office noise level
rectification works

J&A SITE M&E/030


J&A SITE M&E/031
J&A SITE M&E/032
J&A SITE M&E/033
J&A SITE M&E/034
J&A SITE M&E/035
J&A SITE M&E/036
J&A SITE M&E/037
J&A SITE M&E/038
J&A SITE M&E/039

J&A SITE M&E/040

You might also like