You are on page 1of 4

Bill of quantities

Construction of
S.No.

1
2
3
4
5
6
7
8
9
10
a
b
c
d
e
f
g
h
I
11
12
13
14
15
16
17
18

Description

Civil Works
Foundation trenches up to 3'-6"
For Basement up to 5'-6" depth.
Termite proofing.
P.C.C 1:4:8 in foundation.
Brick work in foundation (1:6)
Brick work in Super Structure 9"thick(1:5)
Brick work 4-1/2" in Super Structure (1:4)
D.P.C. 1-1/2" to 2" thick (1:2:4) Horizontal
D.P.C. 3/4' thick (1:4) Vertical
RCC WORKS
Rcc footing.
Rcc slab on grade.
RCC Slab 1:2:4
RCC Beams and lintels 1:2:4
RCC Retaining Wall 1:1.5:3
RCC columns 1:1.5:3
Stair wast slab and steps.
Rcc ramp slab.
Parapet wall.
Steel reinforcement.
Plaster to ceiling and soffits 1/2"(1:3)
Plaster internal walls 1/2" to 3/4" (1:4)
Plaster External walls 1/2" to 3/4" (1:4)
Dry brick ballast under floor 3" thick
PCC 1:2:4 -2" thick under floor
Terrazzo flooring with CS. (1:3) gray
Terrazzo skirting.

Quantity

Rate Unit

Amount Rs

7500
13000
6000
1800
2650
9000
900
1050
250

2.50
4.50
4.50
45.00
50.00
53.00
30.00
28.00
18.00

Cft
Cft
sft.
Cft
Cft
Cft
Sft
Sft
Sft

18,750.00
58,500.00
27,000.00
81,000.00
132,500.00
477,000.00
27,000.00
29,400.00
4,500.00

650
250
2800
350
1200
80
150
200
275
18000
7140
20500
6500
7140
2250
4900
750

90.00
90.00
100.00
110.00
120.00
120.00
100.00
110.00
110.00
28.00
12.00
12.00
13.00
15.00
20.00
42.00
20.00

Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Kg.
Sft
Sft
Sft
Sft.
Sft.
Sft
Rft

58,500.00
22,500.00
280,000.00
38,500.00
144,000.00
9,600.00
15,000.00
22,000.00
30,250.00
504,000.00
85,680.00
246,000.00
84,500.00
107,100.00
45,000.00
205,800.00
15,000.00
2,769,080.00

374.20

Bill of quantities
Construction of
S.No.

1
2
3
4
5
6
7
8
9
10
11
12
13
a
b
c
d
e
f
g
h
I
14
15
16
17
18
27

Description

Quantity

Civil Works
Foundation trenches up to 3'-6"
For Basement up to 5'-6" depth.
Termite proofing.
P.C.C 1:4:8 in foundation.
Brick work in foundation (1:6)
Brick work in Super Structure 9"thick(1:5)
Brick work 4-1/2" in Super Structure (1:4)
Plaster to ceiling and soffits 1/2"(1:3)
Plaster internal walls 1/2" to 3/4" (1:4)
Plaster External walls 1/2" to 3/4" (1:4)
D.P.C. 1-1/2" to 2" thick (1:2:4) Horizontal
D.P.C. 3/4' thick (1:4) Vertical
RCC WORKS
Rcc footing.
Rcc slab on grade.
RCC Slab 1:2:4
RCC Beams and lintels 1:2:4
RCC Retaining Wall 1:1.5:3
RCC columns 1:1.5:3
Stair wast slab and steps.
Rcc ramp slab.
Parapet wall.
Steel reinforcement.
Dry brick ballast under floor 3" thick
PCC 1:2:4 -2" thick under floor
Terrazzo flooring with CS. (1:3) gray
Terrazzo skirting.
Roof water proofing.
Total for civil work
Civil Work
Plumbing Work
Electrical work

Rate Unit

Amount Rs

7500
13000
6000
1800
2650
9000
900
7140
20500
6500
1050
250

2.50
4.50
4.50
45.00
50.00
53.00
30.00
12.00
12.00
13.00
28.00
18.00

Cft
Cft
sft.
Cft
Cft
Cft
Sft
Sft
Sft
Sft
Sft
Sft

18,750.00
58,500.00
27,000.00
81,000.00
132,500.00
477,000.00
27,000.00
85,680.00
246,000.00
84,500.00
29,400.00
4,500.00

650
250
2800
350
1200
80
150
200
275
18000
7140
2250
4900
750
3570

90.00
90.00
100.00
110.00
120.00
120.00
100.00
110.00
110.00
28.00
15.00
20.00
42.00
20.00
60.00

Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Kg.
Sft.
Sft.
Sft
Rft
Sft

58,500.00
22,500.00
280,000.00
38,500.00
144,000.00
9,600.00
15,000.00
22,000.00
30,250.00
504,000.00
107,100.00
45,000.00
205,800.00
15,000.00
214,200.00
2,983,280.00

7400
7400
7400

403.00
25.00
35.00
463.00

2,982,200.00
185,000.00
259,000.00
3,426,200.00

Bill of quantities
S.No.

Description

Quantity

Rate Unit

Amount Rs

Civil Works
1
2
3
4
5
6
7
8
9
10
11

Foundation trenches up to 3'-6"


For Basement up to 5'-6" depth.
P.C.C 1:4:8 in foundation.
Brick work in foundation (1:6)
Brick work in Super Structure 9"thick(1:5)
Brick work 4-1/2" in Super Structure (1:4)
Plaster to ceiling and soffits 1/2"(1:3)
Plaster internal walls 1/2" to 3/4" (1:4)
Plaster External walls 1/2" to 3/4" (1:4)
D.P.C. 1-1/2" to 2" thick (1:2:4) Horizontal
D.P.C. 3/4' thick (1:4) Vertical

13
a
b
c
d
e
f
g
h
I
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29

RCC WORKS
Rcc footing.
Rcc slab on grade.
RCC Slab 1:2:4
RCC Beams and lintels 1:2:4
RCC Retaining Wall 1:1.5:3
RCC columns 1:1.5:3
Stair wast slab and steps.
Rcc ramp slab.
Parapet wall.
Steel reinforcement.
Dry brick ballast under floor 3" thick
PCC 1:2:4 -2" thick under floor
Terrazzo flooring with CS. (1:3) gray
Terrazzo skirting.
Ceramic tile flooring with CS. (1:3)
Ceramic tile walls with CS. (1:3)
Marble flooring 12"x12"x1/2" with CS. 1:3
Marble skirting.
Stair and ramp railing MS pipe.
Aluminum glazed windos
Aluminum glazed doors.
Flush doors.
Roof water proofing.
Vinyle emulsion paint for ceiling.
Plastic emulsion paint for walls.

Civil Work
Plumbing Work
Electrical work

7500
13000
1800
2650
9000
900
7140
20500
6500
1050
250

2.50
4.50
45.00
50.00
53.00
30.00
12.00
12.00
13.00
28.00
18.00

Cft
Cft
Cft
Cft
Cft
Sft
Sft
Sft
Sft
Sft
Sft

18,750.00
58,500.00
81,000.00
132,500.00
477,000.00
27,000.00
85,680.00
246,000.00
84,500.00
29,400.00
4,500.00

650
250
2800
350
1200
80
150
200
275

90.00
90.00
100.00
110.00
120.00
120.00
100.00
110.00
110.00

Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft

58,500.00
22,500.00
280,000.00
38,500.00
144,000.00
9,600.00
15,000.00
22,000.00
30,250.00

18000
7140
2250
4900
750
500
600
1750
180
250
550
150
950
3570
6000
11500

28.00
15.00
20.00
42.00
20.00
80.00
85.00
75.00
30.00
450.00
215.00
300.00
275.00
50.00
9.00
9.00

Kg.
Sft.
Sft.
Sft
Rft
Sft
Sft
Sft
Rft
Rft.
Sft
Sft
Sft
Sft
Sft
Sft

504,000.00
107,100.00
45,000.00
205,800.00
15,000.00
40,000.00
51,000.00
131,250.00
5,400.00
112,500.00
118,250.00
45,000.00
261,250.00
178,500.00
54,000.00
103,500.00
3,842,730.00

7400
7400
7400

519.29
25.00
35.00
579.29

3,842,730.00
185,000.00
259,000.00
4,286,730.00