You are on page 1of 2

Right of Way - City of Pittsburg, California http://www.ci.pittsburg.ca.us/Pittsburg/Government/Departments/Enginee...

HOME | ABOUT | | | CITY | SITE


PITTSBURG GOVERNMENT GENERAL RESOURCES MAP

Engg. Deptt. Home Page | Capital Improvements | Development/Records | Traffic

Engineering Department Engineering Construction Permit


Information

Development Fee Summary

Development/Records Records Management

Project Information
PITTSBURG MUNICIPAL CODE
Title 12 STREETS, SIDEWALKS AND UTILITIES
Chapter 12.01 ENCROACHMENTS WITHIN PUBLIC RIGHTS OF WAY

12.01.080 Conditions of permit approval.

The city engineer, in issuing an encroachment permit, may impose reasonable


requirements or conditions upon the use of the permit as may be necessary to
insure the adequate and safe use of the public right-of-way and as may be
necessary to insure public property is restored to a condition equal to or better
than that which existed prior to the encroachment. When existing paved streets
are permitted to be open cut, the permittee may be required to seal coat or
overlay with asphalt concrete a section of roadway each side of the excavation.
The limits of seal coating or overlay shall be as approved by the city engineer
and as is sufficient to ensure the excavated area visually blends into the existing
street area and provides a smooth riding surface. (Ord. 778 (part), 1979.)

12.01.150 Revocation of permit.

A. Any encroachment permit may be revoked at any time at the option of the
city engineer, whenever:

1. It appears to him that the continuing allowance of the


encroachment, whether because of changed conditions or otherwise,
interferes with full, adequate or safe public use of the right-of-way
involved; or

2. The permittee fails to comply with or violates any city


ordinance, city standards, safety regulations, or any condition of the
issuance of the permit.

B. Upon revocation of the permit, the permittee shall immediately restore the
public right-of-way to a condition as required by the city engineer. If the
restoration is not completed within the time specified by the city engineer, the
city may take any and all necessary action so required to restore the right-
of-way. Any and all costs incurred by the city for enforcement of this section
shall be at the expense of the permittee. Cost incurred by the city will be
deducted from any deposits posted by the permittee and if necessary recovered
by legal action.

(Ord. 778 (part), 1979.)

1 of 2 11/29/2009 3:15 AM
Right of Way - City of Pittsburg, California http://www.ci.pittsburg.ca.us/Pittsburg/Government/Departments/Enginee...

Economic Development | Housing Authority | Golf Course | Marina | Parks & Recreation | Current Bid Opportunities

Chamber of Commerce | CDBG/Housing Rehab | Redevelopment Agency | Pittsburg Power Company


This site is best viewed at 1024 x 768 resolution and with Internet Explorer 5.0 and above. Disclaimer Contact Us

2 of 2 11/29/2009 3:15 AM

You might also like