You are on page 1of 26
Peet patuatiy « Ebb pe Sill re bsin ase Inde eet Bendy Me Prt Bove ger nition Bo opr Bassi haw EELS (RET cominy 1 Concrete shal not be dropped feel pwoid segtegaton by more than a} 0 cm b) 75cm. 28) 100cm tow 1d) 150 em SP cnesee pKa ere > RSTO ee * Sere pa nenpirenatnn bolt to edge of concrete shallbe 6 Minimum les lance tom ae Form" gd a 215000 b)TSmm 7. Water Cement sig rrenstutal cores 0 303 bos gos, ‘atercomert ai fr stuctralconrae shat te nos Se pees 9 Concrete sutaces in contact withthe cemerlgtous gost shal be sauated with Clear wate for 8 inno a)6 hs Byars Qian ar S hes 10 Max cement content kgleubic mele forstuctual conciete is _ * @ 3)250ig )30Dkg”€)325Kg c) 380g. a7O kg 11 MinipyerZement conent gleubic mete fr.naa stulual concrete is Meg ong aa eat conte 4 + 12.\hen conctete pumps are used, ‘amp sou be checked at 2) Bach Pant "t) Tek Chto Schargng at cociete placement Satori above ECM ao a SH aoc se una ¥°¥ 1a atvinum TOS ag water sage” Tul et 2 PE ony eo0 14 Number of conctete cylinder test sgmles for checking stength shall be a2 3 ae 26 2 (19 Maximum pitor ming water shat be ais 6 oT ge gs 426 Minimum gt ormising water state hw ne oT 98 we ey. (wats) se eantites wen used 35 mineral addtive shall nl be less han by weight of ‘ementas replacement 8% m3% ae a7 aoe eee 20. Coreree delvered at a temperature in excess of tat besetting (67070). 2)2% 8) 30 er See os 21. Conse delivered aa minis of shalbe reeeted _ * 2)28 B26 zn G20 eae 4 22. Max sump alowed for concrete isin 2) 50 mm 875mm c) 100mm ay FGO426 e) 150 4-8 23, Minimum slump alowed for concrete is 3150 em 75mm c) 100mm a) 100225 &) 150 24 Wis bpe ol bolls are used fer siuctual steel connectors Ba by Sor PO NITY Nous 3 hyo cena an uncoated oyster vener line 3 thow “yy 2hours ey hours Gy ene 26 How many hours isa nutiest (aries cul on a coveced oily water sewer line is a) hours) 2€ hours) 28 howe a) SRE 27. Wat isthe bickness of sanbveusin 2 Pesina tech niman) bem ye te ag aces rina Eames Oe ete hina ices ol snd covers bute pe ina veneh y= 2) Sem") 109 nme) 19D fae Bee He 29 Hite height of head of naa for a ray tes ona ener tow 2) Rams eh Fg ey atm 20. What isthe working pressure of an. Aramco fte-ater main et eps ep saa Ia pe 31 What isthe colour of dje mixed inconcrete for eleetical duct bank Maen ue eres iy aca 32.What isthe colour of dye mixed in {oral lssommaiaton dc bork agrees ayblue cred ‘orange 39 How many 80/5 of war curing (Minium) is required fer acon ean, Bienes d2tuan ashes Tekyie Banh 24 Row my PP Hof Sas (maxi) is requied tor ctngwaier 3) 509 by 800 oa)“ ) 1200" e) 1500, footing 98 Movy 70. is minimom eed fr euing water ENTS cinoma aN IND av senn ee Atal the folowing tools used for moving concrete ina aro 2) vibrator 37. Congicfe shat be alowed to eure fora mieimum of ATT ays byt eays chat days ah 28 Saye ay porto coating 38 Seyerbipes in venches shall be covered by Alcan sant b) sweet Sande) gravel 39 Fer guncrete coating relative humicty sha be alae tat 75% — b)less nan 75% c] more tan 85 % ATES than 85 2 {0 Sa Aen ita Co Bee apy 9) 3600 psi b) 2000 psi <) 2000 ps) yaad pat eS 4 Tiga nga, Rae AP saenas 4 Desgn or aga concrete ater 28a pat te es PAB oe Sonne Sees Zt tee per Toca “Oren age 9b Spon Polat ps 43 Release senator Pre tessed Concrete Gioutthallbe > Spon s 7 - 500 ps1 0} 2500 pc} 3000 9a aR 000 pe 44 re sessing tendons shane 2) Epon ComtsaF ten Coated sonar gin!) 45, content for pre cast conccate shal be (minimum)-—» Ca¥ 46 Cement conte rp gash concate habe fatima 2) 389 bg/eu ©)300Kg/ cumt. e)250%grcuiM. 4970 kar cum 447 Select Fi material Shab hy a)90% 85cm ok ‘passing of sieve #5 VHBem — C)80% IESE — 4) 09% F# 3em -48.Concrete materiat shail be in accordance. " A)SAESH 1008) SAES COS pr SansSs CO? w 09 Satis ooo Steet Mares Sheets 2OUSHIS Ort) 09 SAMSS 100 ch tD Sales ae nao 150 Conciete cover for sab and walls and jist shal be minimuny in a}50mm —f25mm 7S mM HOM ae ch 51. Concrete cast against sol shat hayerminimum caver ot 150mm O)2mm. ar Fm dy eae $52 Concrete cove fo, foundations shal be minimum 2)80mm BIS mm caf FS rn ay 08 nam 53 Coptele cover or Columns antes habe atk Senns ne ear hat an Se I ue Coc) ) Toincrease workabity 1) Tomirimze intial setting ime on appinn 255 Platcizers ae used for 23) Increase ninital setting of ime b)Petiease minal setting time “To increase the workabily Supy Plastcizer ae used tor easing ia sleep Ste sting ne rise, (aon) pel ch ede 57. spistmeisa (kevensiries) reside byacceior a Pusteker Sper Posteve £8 Contetein parking ots shat have.ricumun ever a 2mm w)SOmm cepted ‘59 Fi beam shal have a minimapyeouer ot am b/S0mm eF7Smm — ) TO Mn 60 In se walls constugion joils sha provide at a maximurn of shan aegis prone ame 81 Riptim cement conontn git sat be ® ‘atage wage ° a : cam =-94) 152 Vige contort rotor rou sha se . ang b) a 4 (1 TE a ware 63 Matsa be used as cove forconcrete sha be Heroes a)cibesb) Sione paces war poy Se eEEL 54.Robton of RIAC. doy shall nese mee than when cached the te a ES at lst tan wht : Ben need ‘aim $14 Ses Conte yindarsybe pepe texstat peda betned Ml I Kan oh Seeley Sane Ng” en *“ waa b) Tdays 1/242 0) 28 days 1/2 ,9-ae 6 alnp in RM.C fs more han 10125 hen he ene shold be ayes wih ase Shyecdpies sti ated BYE” 6 corpcsonteston st stows Say Sete olen nim bortes nares safan cifemm supe 68, Density / Compaction ta be determined by aycea pyeor 7 69. Toimprove ine compaction at optimal moisture contert pit 70. Foriting of Concrete Panels he bar & for hook te oc cos SNM Haim tenn atom 20mm fer fe} ay on ©)20cm —g) 25 mm - Sa eset My Od Baie Gra minioum size of Coarse song stiuetr Concete shall be { oar Be ar 774 Ma Sino Aomegnr usd fe sees aye ae ay 75 Ansyaton of root shall be always PFflenbie— bYRigdc) Emher type 76, Tine otet ne teak test of eos ayens, byt2hws ce) 18s gets) 26s 77. Walsrpreoting membrane of ro! shall ve iv protecies—b) otrequited 7. Leancopretes reve ae ref Prooing) Te supper the stuctre provide a leveled surlace Ia foundation 79, UNV water prooting shat Be done in 3) 1eoat Coals c] coals 4) 4 coals 180. Each coating UN water proofing shal be ot tavern, 8) MO mic.) 200 mie.) SCO me. 470 mie.) 500 mic. %B1. Maygntin acid soluble chloride concentrate and S03 shall nol exceed by 025% B)OS% ehOIS%% ) M% 2382. Maximum Acid soluble chotde cencentiate & S03 shall no exceed by weight of 7 ari bem yam ay 10% 83. Corr tor ovndations si be aso bp 7Smn) 25 a 100) 84. Cove lor supporting pcess equipment shall be ays “Dien 28 a) 100 Fe ty 100 0 Covet beams and eras a ae ee) 87. Coy Slibe and wal and Jets st be sae FO os a 10 ou i conncegees rng sae Saye mms yarns, 89. Cover between reinforcement and anchor tlanges- pipes shale e ae a artes 0 Teeter team cating sob mina See ee Oe ay 7e 91 Vapo bares oe ued bow bacGcrete sate ct ee ene eee Go a0 2, Water Gung shale cominuous ysl engin asteacnea eee ea a Sa esas, 28 Conte sutaces sate coveted 2) wprtirlaps only) seth plastic vapour batiers (Br barlape and vapour bares 98, Hot weather concreting 113. Base Malta should be compacted vat regis max ery densi % of 199 '3) 30% bss) 96% 0% .. 114, Thickness of compacted layer cl base coarse shbud nol daxiale more than Samm bydmm—c)Smm —ArSmm ec) Ema 115, Gaee Mattias of (Ka ‘a}Cass Acnly Claes Rand 8 ey blessA, 88 116. Class A BAe couker 12 ‘9) Nalyety occuring milo of st sand and the stone D)bAferm inture of crushed rock or crushed gravel Rogrogate miviae graded worm coarse i ine nee 117. cag 8 ste base pec ycccuing inte o sand andthe stone fantom tint of rstedstck ot cused grave Ch Agteole mature gated wily coarse ne 118. 100% passing of a6 base Male sha ie a? Be oa 9s pate 199 a0 passing ‘A ate shall be fiom geen wie OS 7 ¥ ane % be a 120, Passing ofeass A Base material fom sieve 2200 shall be ae Nt erase Greets . © (re, ss compan ste pve marae atest, Fann ate a ag a On i lat ~ 122 at ovkcompaconet Cs Bate matipicER ae shou te [ore ate Ses a0 So OS fen ftom shen eCame. 2 123. 4195% compaction of Class C Base material CBR value shat be £124 Thchness of Cyppacted 2)20min 8) 90 mine) YOON 0) Dain e740 mn sy ene gpraces aabraargsiat tee noeinan l AS THI» 125, aiouable deviation opt moisture coatent of base coarse is 265 tan a1 pHIS% cj «25% ea 126. CER volue ol tab compacies sampes of bare matesal shall be determined Sith soaked samples 0) wilh aot soaked sampas 127, Sahing of samples lor CAR of base material should be ater ayteay Bj2days pf 3.éay8 8) a days) Saays 126, _Alowable deviation on compassetlayer shall not bemoce than aj2nm bam mm} Brm BS HAUT * MAES 0.006 129. ete Coat's applied cn the op surface of 2ySibbase bE) base border coarse 7130. ek coat is appied on the top surtace of affuptase — bfbase border coarse 131, Prime coats an gsqfiaic materiatot “76°/ = ay Soweunng pyftesiomeuing <)Rapitcuing — | 9 132, Tack coat is an gsefatic materia of 2) Seow cuiing JoFifedium curing g}Rapid curing C¢) J 133. _Ainimum curing tie for prime coat 8s ‘)Shou's. Bb) Whours c) 1Zhours. ASA Nous B)RC 250 ep REGO per DS0 16 Tachestie oe 4 apc 2d pyrG 250 eyuc7a arKe 800 126. Temperature for prime coat MC 70 application shail b> &q“& = ¥O'C) 2) 80° ys 6 a) 120" . 2137. Temprature fr pie coat MC 26DApplcaton shall e(GSTC = 10.5 °C) eereoge Pee ee rio ses cat 420_Temuaie lor Tc cont C2608 RC B00 pptaion sat be e OO peste ee ease ee ose mae 128 Ratt appesien ol rne cat ta be en n)dashenna mete Vo sheny met @Gr= 1.18 CTH far”) jacstcied mete; yar” mae Tao. Hesing of aggregate temperature shall not exceee . 3) 150" Byte eo a6 eH (149 163") M41. Tolerance in asphat content snalte > ay20% 202% 109% af TOa 142. Hesing of asphat cement shal be a) 135-150" by ta0"- 160") TSS = 16S gy TSS 163 149. Anos temperate al he eof placing oseha const sh be nt ess te a 144, Temperature of asphalt mixing tue at pacing spot stall not be less ena 312" by 135" 39" a) 150" \fay- 13) 145, Asphaltrmixing omperature in pute at placing spot shall nol exceed 3150" by 160" fea a) 165" Compacted layer of asphalt mix thickness (minimum) shal be 20mm FS0mm —c)S5irm— J) mm e) 60mm 147. Compacted layer of asphalt mix thickness (maximum) shgs be a}somm 0) 50mm comm a 70mm eTBOmm — em — % ines 148 Minimum acceptable compaction fr aspal, 990% B)S2% cj 95% aye rcteleshall be 2) 97% 149. Wher ponding in paved are shall nat exceed move than a2 BN cS) BH nd Ingipaved area depression shall nat be mote than Adm b)1Smm. 120mm a) 25mm 151. Forgoferete surface coating, percentage of moisture checked by arficotieterb)Psychmeter 152. Mosture content of cere ta be coated sholl have a mae of ae OMB 98 153. Ouing sutace preparation humidity should ys 220% B70 CBO pres 154 peat tami on afelco iteter |b) Psychmetes 155, Sutace temperalré af concrete shall be not fess than ave Hore IC a}20C 156. Supsifate temperature must be greater than the dew point mec ec EC 157 ng and coating must done apetore sealing ter sean 158, Pier seater shallbe of Siow molecular weght 6) medum molecular nemht ftugh molecular weight 159 ls and cracks ol ontte utc ese baw sabe th SyPimer b)Sealer cj grout ef epoxy grout TED eg te ene aye nae hn TSS a esope 7 Grkeope 26008 161. Tensie suenginJofheavy taht surface shall be not ess than Disa ps Bitrsps! )260psi a) 180 ps1 162 wee of conctele subject to coating i chemically contaminated imam wt yrashed with clean water b) cleaned by ai blast (6) fshould be neutralized 163. Long petiod contaminated susfac for coating shallbe neutaizedby soaking aids b)1Shrs TO SELECT A FIXED PROPORTION OF THE INGREDIENTS (HAVING LIMITING VALUES OF THEIR PROPERTIES AFTER LABORATORY TESTS), WHEN MIXED MECHANICALLY TO GIVE THE DESIRED SPECIFICATION OF THE CONCRETE FOR A PARTICULAR USAGE 2. WHAT IS A WATER TO CEMENT RATIO? “//© 48 IT IS THE RATIO OF QUANTITY OF MIXING WATER TO QUANTITY OF CEMENT 3. WHAT HAPPENS WHEN WATER TO CEMENT RATIO INCREASES? ac! CONCRETE BECOMES MORE WORKABLE (HIGH SLUMP) BUT DECREASES IN THE STRENGTH 4. WHAT HAPPENS WHEN WATER TO CEMENT RATIO DECREASES? ‘CONCRETE MIX BECOMES DRIER BECAUSE OF LOWER WATER CONTENT) [AND INCREASES IN STRENGTH, | 5. HOW ISTHE WATER TO CEMENT RATIO DETERMINED? he BY CALCULATING THE TOTAL WEIGHT OF WATER TO WEIGHT OF CEMENT. 6. A GREATER WATER TO CEMENT RATIO MEANSGREAT CONTENT OR WATER CONTENT? ANSWER: GREATER THE WATER CONTENT 7. WHAT ARE THE FACTORS THAT AFFECT THE WORKABILITY OF MIX Har ak ANSWER: RATIO OF COURSE AND FINE AGGREGATE. / & WHATIS AN IMPORTANT FACTOR IN THE STRENGTH INCREASE OF AMX DESIGN?, en ANSWER: WATER CEMENT RATIO, SIZE OF COARSE AGGREGATE, GRADING OF FINE AGGREGATE, 9. BY ADDING CH INCREASE OR DECREASE THE STREN TAY TEST RESULT pMICALS (ADMINTURES) IS IT POSSIBLE TO ‘OF CONCRETE FOR3 AND ANSWER: HIGH EARLY STRENGTHS (3-DAY RESULTS) CAN BE ACHIEVED BY ADDING ADMIXTURES, (tepen pcre 10, WHAT IS THE EFFECT OF AIR VOIDS? ANSWER: THEY INCREASE PERMEABILITY OF WATER AND THAT MAKES THE CONCRETE WEAK. 1, WHY IS TENSILE STRENGTH OF CONCRETE CHECKED? Jus CONCRETE IS NOT EXPECTED TO RESIST HIGH DIRECT TENSILE STRESSES BECAUSE OF ITS LOW TENSILE STRENGTH AND BRITTLE NATURE. TENSILE STRENGTH IS OF IMPORTANCE WITH REGARD TO CRACK FORMATION, GNS EXCEED 400 pie 8p ac CAN STRENG ANSWER: THERE ARE HIGH STRENGTH CONCRETE MIX DESIGNS USED FOR. THE FOUNDATIONS OF HEAVY MACHINERY AND FQUIPMENT. H OF CONCRETE MIX DESI 13, WHAT IS THE REASON OF TEMPERATURE RISE IN CONCRETE AND HOW IT IS CONTROLLED? ANSWER: CHEMICAL REACTION RESULTING HYDRATION CAUSES THE RISE. IN TEMPERATURE AND IT IS CONTROLED BY USING CHILLED WATER OR HCE (yer eines ated om a/panri] Poop. © 2m x00) )PERPLASTICIZER IN CONCRETE MIX: WHAT IS THE FUNCTION OF s SOME COMMERCIAL BRANDS 14, WHAT IS THE SIZE OF A CONCRETE TEST CYLINDER? ANSWER: 15 CM DIAMETER X 30 CM HEIGHT \ -- 1S. WHAT IS THE HEIGHT OF SLUMP MEASURING CONE? ANSWER: 300M, 16. IF A SLUMP IS MORE OR LESS THAN THE S MIX DESIGN, WHY IS IT REJECTED? ECIFIED ALLOWABLE ANSWER: IT EXCEEDED MIX NOMINAL PROPORTIONS RELATIVE TO WATER. TO CEMENT RATIO AS PER THE APPROVED MIX DESIGN, ry 17. WHAT IS THE ALLOWABLE TIME GAP IN CONCRETE POURING, APTER A DISCONTINUED POUR? ANSWER: ALLOWABLE TIME GAP IS EQUIVALENT TC INITIAL SETTING. TIME OF CONCRETE, APTER THE ELAPSE OF THE TIME LIMIT, A COLD JOINT WILL OCCUR, 18, WHAT IS THE. LARGEST SIZE OF COARSE AGGREGATE USED FOR 'SL FOR REINFORCED CONCRETE FOR NORMAL MIX DESIGN IN ARAMCO? “ANSWER: 34 INCHES 20 mm) 19, WHAT IS THE SMALLEST SIZE OF COARSE AGGREGATE, REINFORCED CONCRETE OF 4000 PSI? ANSWER: 38 INCHES (10 mm) 20, WHAT IS THE EFFECT OF INCREAS! AGGREGATE TO & CONCRETE MIX DESIGN? ANSWER: IF IT IS MORE THEN THE DESIGNED SIZE IT AFFECTS THE WORKABILITY AND CAUSES SEGREGATION, CONCRETE? 2! Peat penny % 7 yee ey | ANSWER: 4000 PSI HAS LESS OF A WATER TO CEMENT RATIO CONCRETE INGREDIENTS ARE MIXED BY WEIGHT OR BY VOLUME, IN A READY MIX CONCRETE PLANT? 9 (ey Seg? Pa teGng O77 7) oe ANSWER: VOLUME BATCHING AS PER 09-SAMSS-097 IS NOT ALLOWED. ve ARAMED ALLOWS THE CONCRETE MNGBY WEIGITIOR READYARKED gs" ge CONCRETE PLANTS, ote \ ye nar e ige [wear appnnane JE DETERMINED: (er : nouime / [252 23. HOW IS INITIAL SETTING TH ANSWER: THERE IS THE TEST TO DETERMINE THE INTIAL SEP (OF CEMENT BY USE OF VIKATS APPARATUS, 24, WHY CURING IS REQUIRED FOR MINIMUM 7 DAVS FOR 4” STRUCTURAL CONCRETE? ANSWER: PER ACI CODE 305 R, ACI 308 & SAES QOD! SEC 10.1, A MINIMUM 7 DAYS OF CURING IS REQUIRED WITH MAXIMUM TDS VALUE AS 1000 PPM, Peco a gps concrete gene ci anehf gt Sf am pablge cx | aA 25, WHY FRE OWED MORE. THEN 100 or b PAL CONCRETE IS NOT A ANSWER: IT. CAUSES SEGRIGATION, 26, WHY MUST VIBRATORS BE USED? ANSWER: VIBRATOR IS USED FOR CONSOLIDATION OF CONCRETE TO. MINIMIZE AIR VOIDS. 27, WHAT IS THE FORM OF CHLORIDE AND SULFATE FOUND IN AGGREGATE? ANSWER: CALCIUM SULFATE AND SODIUM CHLORIDE ARE THE COMMON FORMS OF SULATE AND CHLORIDE FOUND IN AGGREGATE, 28. WHERE AND WHEN ARE TYPE 1 AND TYPES CEMENT useD? 7 ') 7Y/* ANSWER: PER THE REQUIRMENTS OF EXPOSURE 1 T05. FOR DETAILS REFER TO TABLE | OF SAES Q 001 29, DOFS CONCRETE WITHOUT REBAR GET ATTACKED BY CHEMICALS? ANSWER: YES—PRESENSE OF CHEMICAL CAUSES EXPANSION IN CONCRETE MASS -CRACKING THE STRUCTURE, 30, WHAT ARE THE DIFFERENT TYPES OF CEMENT? ANSWER: RAPID HARDENING CEMENT, LOW HEAT CEMENT, HIGH ‘ALUMINA CEMENT, QUICK SETTING CEMENT. EXPANDING CEMENT, WHITE PORTLAND CEMENT, COLOURED CEMENT, SUPERSULPHATED CEMENT, POZZOULANIC CEMENT, SULPHATE RESISTING CEMENT. AIR. ENTRAINING CEMENT 31, HOW WILL TRUCKS BE CHECKED ON SITE WHEN RECEIVING CONCRETE FOR ARAMCO PROJECT WORK? ANSWER: Revolution Counter, Ticket checked for Concrete signature & slump value at Plant, Shamp Test, Temperature Test 32C Maximum @ site, Assure Third Party Inspectors preset at site and performs testing, 4 Cylinders (1 set) shouldbe taken per every 76 cubic yards (set minimum) Tom) gait c 74 | 32. WHAT ISTHE EFFECT OF FOREIGN CHEMICALS IN AGGREGATE? | ANSWER: CHEMICAL REACTION CAN CAUSE EXPANSION & CRACKING, \ gO ostbapomnrmannt bee sith 008 Bw Ory imi Orr ; ©) shop boop 105 D frag) sachs oo ig tacts a 38. HOW CAN CONCRETE G1 "7 ATTACKED BY CHEMICAL ANSWER: ‘+ IT COULD BE DUE TO CONTAMINATION OF SURROUNDING BACKFILL MATERIAL FOR UNDERGROUND FOUNDATIONS + THE WATER TABLE MAY HAVE CHEMICAL CONTAMINATION WIND BLOWN DUST IN HOT CLIMATES MAY CARRY CHEMICALS. THESE ITEMS SHOULD BE COVERED IN A GEOTECH REPORT PRIOR TO. WORK BEFORE DETERMINATION OF MIX DESIGN, 34. WHAT IS THE FUNCTION OF SUPER PLASTICIZERS? ANSWER: ACCELERATION IN GAINING STRENGTH AT EARLY AGES. IMPROVED WORKABILITY, REDUCED WATER CEMENT RATIO, REDUCED PERMEABILITY OF CONCRETE, IMPROVED COHESION AND MINIMIZED SEGREGATION AND BLEEDING. dos. No, Curing must be performed per SAES-Q-O01 & ACI 301, 2days minimum, 5 Semi es cats ae ‘toy Top elevation of bolts? +-3mm ~ atin = 6.13, What bottom cover is required for ALL foundations at SA? 75mm ~ © 15. What SA STD covers coating requirements for congyste surfaces SAFS-H-003 © 16, What SA STD covers coating requirement selostion? SAES-H-001 1 esac Cenc na eb pnlication? Always ensure moval of tance pio o coating application. Vistsl tI General Information E ‘What isan Inspection & Test Plan’? mandatory item inthe Quality Plan that guides and asses quality ina specific typeof work in a spevitic sequence of QC activity steps ‘What isa Quality Control procedure? A document that deals he specie steps needed 10 fulfill the QC aetvity inthe TTP i * ‘What isa Quality Control Form? A writen documentation desing a specie activity in thc ITP & QC Procedure - {§ What references willbe found in TPs? SA specitieations| & What isa specification? A spostiation is a guideline to assure that minimum quality standards are met ; (© What 4 types of Inspection Action points are found in the ITP! TTok, Wit Surillance, Review ~ (@. Explan the sifferences betwen the 4 ypes of Inspection pons? Deal answer and ensure a cleat understanding by cade TDs, Procedures and eode references, ‘What was the biggest rework to date on Civil Work? mast serious Safety incident related to exeavation? a4: horace hy. Jee simee wh % yooe af 8) pe CIVIL INSPECTION TEST - 2 nave: ARIEL D.GARCIA.. oaretesten : AUGUST 02,2008 1. Thema lar cor ot ents by Sab Aramco? = teem L En fem a 2. Wate minunla puritan sn wo laces fear rapectve heaetelt «gam i 2 Ben & Sinn 8. SaulAranc standard saa wis! the olwing types of specu canbe Set pp eioceant a, Seal atie an epson Bese elt a par, %% Concrete saddles and spacers. 4. Alot the above 4, Saudi Aramco apecifis that al structural concrete must be @rinimum of BE © Be 5.___ What fg the madmum watorcementtious ratio alowed for structural concrel, ‘according 19 08-SANSS.077 © 38 6045 6 080 / @ What Js the minimum and maximum csment content allowed in structura ‘onerete in socordonce with 08-SANSS 07? 3000 450 280 10 370 3 ese & Be 7 maximum allowable total dissolved solids (TDS) in concrete ming water? 1000p 5: S00ppm $500p5m 260ppm 8. When compacting standard (150mm x 200mm) oyinder specimens by rodding how many time Is each layer rodded accerdng to SAES-0.001? 25 times Do tenos 8. 15tmes &.— 30times 9, When anew sites to be excavated, how deep must tbe cleared and grubbed? ® ‘610mm (24nches) 5 153mm (8 inches) 915mm (96 inches) 306mm (12ncnes) 40. During earthy works what is the purpose of sloping and benching sides ¢ ‘excavation? 2, To make compaction salar BL Tomake it eaber to cmp i and cut of tha trenches. @ _opmenthe wee on sey ‘To make backfling ess ata later date, 411, Whatis the maximum allowable size of SELECT fl material 0mm (24) ‘308mm (12°) 200mm (@°) ‘Foomm (6) tier TeLroaetesror peeessren 060 0° e3 ‘sa. When making two inch mertar cubes for testing how many times must each layer ‘be tamped? a 2 B20 a © * 13. When performing an actual constucton evaluation of masonry mertar how mary ‘batohes must be tested? &.Snyonebate $Me sStoatie tare 2B Bhebacht ano BM Eenshebegmnns ane one tach t een. ‘Asphalt Gemantand aggregates are both heated to what temperature before being mixed together? : - 163 z 250-825 deg. C taq- 1 @ meme | 180-105deg. 6 118-180dep. 6 45. Which of the folowing asphalt viscosity grades are generally used in Saud arabia? a ACS b, RO-Z0 & AC80 seccssé 48, Whatis the maximum amount of water permisabe in Bitumen (RO-260)? 22% & oom 20% a 12% 47. Whatis the minimum perrissile curing ime by Sausi Aramco Standards forthe ime coat? Seren a T2Hours B48 Hours 2 ahow 18, Whatls the optimum moiture content tolerance when compacting the sub-base courses? 2 @ Psapp 13% 2 Pas of Minus 35, © Plus or Minus 24% & PunorMinas 05% 48, The sub-grade compaction should nol laave the surface davition in excess of whan using a3 meter straight edge. ® oi Sam é Som “20, Cutbacks are asphalt cements that have which of the following propertiee? . © Sepa tbe story nan tempers ‘Gapable of being lad during wet or foggy consltions, \& Capable of belng ld at iow ferperatures. 2. Allofthe above. 21, Limes edded to mortar forthe folowing reason. Eller b, Piastcser @ Arata soo Apozzoian 22, — Mortar samples for compressive strength test cylinders or cubes are takan ei whic of he following tras? Immodiataly after the mectar is mibed end at each 18 minutos theraafter fra total of 3 samples. mmodiatsly ater the mortar fs mixed and at each 5 minutes thereafar fora sal of samples. tS minutes afer ne meta Is placed in the ring. 2) immediatly efter the mortars mixed, ‘What Soudl Aramoo organization issues work permits for earthworks? © Facies planning department. Operations deparrent Engineering departmont Production department Who removed or stakes underground tity easoments? ener Orgran responsi fo fees faces Feailties planning department “The prime coat when apailed toa previcusly untraaiod base or wearing surface serves whic ofa folowing purposes? ‘Serves fo consoldat the surface Promole an adhesion or bord between the bee and wearing surface, 8 treat Ite rio of cepa metre it the wearing artace. Aloft above.

You might also like