Gasco
COMBUSTION,PROCESS&
THERMALENGINEERING
KEYPRODUCTS
Flares
HRSGs
Water Bath Heater
Regeneration Gas Heaters
Heat Exchanger
Pressure Vessel
Thermal Oxidiser
Terminals
RTO (Toyota)
GASCOKEYCUSTOMERS
TOYO
KOREA
AnInconvenientTruth!
Over60%ofallindustrialenergyconsumptionends
upaswasteheat
Asignificantproportionofthiswasteheatis
consideredeitherdifficulttorecoveror
irrecoverable
Applications
WHRUsrecoverenergyfromexhaustof
turbine/engine/otherprocess
Energyisrecoveredbyheatingasecondary
fluid
Secondaryfluidprovidesprocessheattoplant
orcanbeusedtogeneratepower
Applications
Typicalwasteheatsources:
Secondaryfluid:
Furnaces
Boilers
Kilns
Turbinesandengines
Steam
Thermaloil&Synthetics
Water
Water/glycol
Gases
TypesofHeatRecoveryEquipment
Shell&Tube
CoilType
Serpentinecoil
Helicalcoil
HeatRecoverySteamGenerators(HRSG)
Singledrum
Bidrum
Heatpipe
TypesofHeatRecoveryEquipment
ShellandTubeType
TypesofHeatRecoveryEquipment
Serpentine Coil Type
SerpentineCoilType
HeatExchangerConstruction
Manifold
Liquid
in
Liquid
out
Ubends
Finned
tube
TurbineExhaust
Gases
TypesofHeatRecoveryEquipment
Helical coil
TypesofHeatRecoveryEquipment
HRSG
Heat Recovery
Boiler
TheHeatPipe ANewWeaponin
theWaronWasteHeat
ThermalSuperconductors
1000timesmorethermallyconductivethancopper
FirstdevelopedbyNASAin60stodealwithcoolingofnuclear
powergenerationinspace
MostefficientwayoftransferringheatfromAtoB
Widelyusedinspecialistexoticandmicroapplications
Nowdevelopedforuseinindustrialwasteheatrecoveryby
Econotherm
Addressesallofthevulnerabilitiesofconventionalheat
recoverytechnology
PotentialtorecovermuchoftheIrrecoverable
Econotherm has broken the cost viability barrier for Heat Pipes
HEATPIPES
Gascoisexclusivedistributorfor
ECONOTHERM heatpipesfromUK
HarnessingECONOTHERMtechnologyand
experiencefordifferentheatrecovery
applications
HeatpipesimportedfromUK;restlocal
fabrication
InstallationandservicesupportfromGasco
Australia
ECONOTHERMPrincipleofOperation
HeatPipes
Preheatedwaterreturn
toboiler
Cooledexhaust
Waterfrom
installation
Separationplate
Watertightsystem
Hotexhaust
Exposedareainwater
Inspectionplate
Exposedareainhotexhaust
ECONOTHERM principleofoperation
HeatPipes
Inspection
plate
Up to
350C
From
-30C
Up to
1000C
e.g.
120C
Multiple Redundancy
Each pipe operates independently so
unit is not vulnerable to a single pipe
failure
Low Fouling
Smooth pipes permits use in high
particulate or oily applications
Isothermal Operation
No Hot or Cold spots - Eliminates condensation
Allows greater energy recovery
Better longevity for thermal oil
More Efficient
Usually smaller and/or lighter than
conventional exchangers
Reactivity
Fast reaction time, offers different control
options and suitable for sensitive
apparatus: does not require preheating
WideRangeOfApplications
GastoAir
Furnaces
Kilns
Backtoprocess
GastoWater
Boilers
Incinerators
ElectricityGeneration
GastoThermalOil
Incinerators
ElectricityGeneration
SteamGenerators
Anysource
Backtoprocess
SECTOR
APPLICATION
ENERGY
RECOVERED
PAYBACK (months)
US
Auto
Combustion air
500 kW
16
IN
Ceramics
Combustion air
600 kW
15
IT
Clothing
Process Steam
1000 kW
<3
UK
Energy
750 kW
IE
Food
440 kW
IT
Food
520 kW
12
US
Incinerator
760 kW
CA
Fracking water
2200 kW
UK
940 kW
Gas to Air
Exhaust Temp In/Out
400 C/266 C
30 C/293 C
Energy Recovered
528 KW
Recovered Energy
$155K p/a
Project Cost
$150K
Payback Period
16 Months
$/KW recovered
$123 (76)
Multi
Redundancy
Robust Material
Low Fouling
Working
Temperatures
Efficient
Cleaning &
Maintenance
Low Pressure
Drop
Scalable &
Customisable
Reactivity
Isothermal
Operation
Gas to Air Unit, Antique Ceramics, Horizontal Roller Kiln, India 2010
Gas to Air
Exhaust Temp In/Out
316 C/ 122 C
35 C/ 215 C
Weight
8000 kg
Pressure drop
392 Pa
Energy Recovered
606 KW
Recovered Energy
RS 4.5m p/a
Project Cost
RS 6m
Multi
Redundancy
Robust Material
Low Fouling
Working
Temperatures
Efficient
Cleaning &
Maintenance
Low Pressure
Drop
Scalable &
Customisable
Reactivity
Isothermal
Operation
Gas to Water
Exhaust Temp In/Out
454 C/ 180 C
50 C/ 90 C
28,567/14,470 Kg/h
14,470 Kg/h
Weight of unit
5,100 Kg
750 Pa
Energy Recovered
1,200 KW
180K p/a
45K
Multi
Redundancy
Robust Material
Low Fouling
Working
Temperatures
Efficient
Cleaning &
Maintenance
Low Pressure
Drop
Scalable &
Customisable
Reactivity
Isothermal
Operation
Client indicates they will order many more once first is proven
Gas to Water
816 C/ 150 C
5 C/ 16 C
11,016/180,000 Kg/h
Weight of unit
3,600 Kg
800 Pa
Energy Recovered
2,260 KW
360K p/a
65K
Payback Period
<3 Months
27
Multi
Redundancy
Robust Material
Low Fouling
Working
Temperatures
Efficient
Cleaning &
Maintenance
Low Pressure
Drop
Scalable &
Customisable
Reactivity
Isothermal
Operation
440 C/ 371 C
75 C/ 98 C
Weight of unit
1,556 Kg
850 Pa
Energy Recovered
750 KW
175K p/a
16,675K
Payback Period
1 Month
17
Multi
Redundancy
Robust Material
Low Fouling
Working
Temperatures
Efficient
Cleaning &
Maintenance
Low Pressure
Drop
Scalable &
Customisable
Reactivity
Isothermal
Operation
Italy 2012
490 C/ 119 C
Weight of unit
1,500 Kg
800 Pa
Energy Recovered
1023 KW
180K p/a
20K
Payback Period
<3 Months
18 (15)
Multi
Redundancy
Robust Material
Low Fouling
Working
Temperatures
Efficient
Cleaning &
Maintenance
Low Pressure
Drop
Scalable &
Customisable
Reactivity
Isothermal
Operation
Higher than expected / better performance than heat exchanger previously installed: Primary Smoke Ti = 525 C T = 154 C Q = 7314 kg /
h; Secondary hot water Ti = 115 C T = 117.5 CQ = 300,000 kg / h., Energy Potential = 871 kW
We have found in the field to the new heat exchanger the following data: Primary Smoke Ti = 490 C T = 119 C range not measured;
Secondary hot water Ti = 112 C T = 116 CQ = 220,000 kg / h; Energy Potential = 1023 kW
From the above it can be seen that we have improved the performance of the system, increasing the recovered heat by 15% and for this we
about the construction company Spirax-Sarco.
Replaced much larger shell and tube system
Italy 2012
MultistageSteamGenerator
andWaterPreHeater
420 C/ 160 C
Weight of unit
1852 Kg
700 Pa
Energy Recovered
520 KW
19K p/a
19K
Payback Period
12 Months
36
Multi
Redundancy
Robust Material
Low Fouling
Working
Temperatures
Efficient
Cleaning &
Maintenance
Low Pressure
Drop
Scalable &
Customisable
Reactivity
Isothermal
Operation
USA
Waterorthermaloilfor
ORCenergygeneration
Mobile thermal oxidiser for use in forestry and other mobile applications
Process - or for ORC energy generation - hot water or thermal oil
Range of capacities
High temperature
950 C/ 600 C
Weight of unit
4320 Kg
450 Pa
Energy Recovered
760 KW
140K p/a
25K
Payback Period
<3 Months
32
Multi
Redundancy
Robust Material
Low Fouling
Working
Temperatures
Efficient
Cleaning &
Maintenance
Low Pressure
Drop
Scalable &
Customisable
Reactivity
Isothermal
Operation
UK 2011
1000 C/ 250 C
135 C/ 280 C
Weight of unit
1,800 Kg
650 Pa
Energy Recovered
940 KW
150K p/a
25K
Payback Period
3 Months
23
Multi
Redundancy
Robust Material
Low Fouling
Working
Temperatures
Efficient
Cleaning &
Maintenance
Low Pressure
Drop
Scalable &
Customisable
Reactivity
Isothermal
Operation
Oil Cooler
Indirect Cooling
Exhaust Temp In/Out
1000 C/ 250 C
135 C/ 280 C
Weight of unit
1,800 Kg
650 Pa
Energy Recovered
940 KW
150K p/a
25K
Payback Period
3 Months
23
Multi
Redundancy
Robust Material
Low Fouling
Working
Temperatures
Efficient
Cleaning &
Maintenance
Low Pressure
Drop
Scalable &
Customisable
Reactivity
Isothermal
Operation
HEATRECOVERYAPPLICATIONS
Power generation
AUSTRALIASLEADINGPROCESS
ANDTHERMALENGINEERINGCOMPANY
Summary
WasteHeatRecoveryUnitsreduceglobalenergy
requirements,pollutionandenergycostsandcontributeto
cleaningtheenvironment.
GascoexpertiseinWasteHeatRecoveryUnitsprovideshigh
efficiencywasteheatrecoveryincompactmaintenance
friendlymodules.
Gascotrackrecordillustratesourcapabilityinwasteheat
recoveryunitsforawiderangeofapplications.
THNKYOU
FORYOURTTENTION
Upcomingactivities
www.energyefficiencyassist.com.au