You are on page 1of 43

RESUMEN DE PRESUPUESTO

LINEA DE TRANSMISION EN 138 KV SOCABAYA - PARQUE INDUSTRIAL

ITEM

DESCRIPCION

1.1
1.2
1.3

SUMINISTRO DE MATERIALES
TRANSPORTE DE SUMINISTROS (7.5% de 1.1.)
OBRAS CIVILES

1.4

MONTAJE ELECTROMECANICO

TRAMO AREO
(S/.)

COSTO DIRECTO

3,612,658.75
270,949.41
453,000.25

1,009,841.25
75,738.09
995,305.63

416,036.47

28,536.29

4,752,644.88

2,109,421.26

RESUMEN DE PRESUPUESTO
LINEA DE TRANSMISION EN 138 KV SOCABAYA - PARQUE INDUSTRIAL
TRAMO AREO DE 9,0 km
ITEM

DESCRIPCION

1.1
1.2
1.3

SUMINISTRO DE MATERIALES
TRANSPORTE DE SUMINISTROS (7.5% de 1.1.)
OBRAS CIVILES

1.4

MONTAJE ELECTROMECANICO

COSTO TOTAL
(S/.)
3,612,658.75
270,949.41
453,000.25
416,036.47

COSTO DIRECTO

4,752,644.88

RESUMEN DE PRESUPUESTO
LINEA DE TRANSMISION EN 138 KV SOCABAYA - PARQUE INDUSTRIAL
TRAMO SUBTERRNEO DE 0,92 km
ITEM

DESCRIPCION

1.1

SUMINISTRO DE MATERIALES

1.2
1.3

TRANSPORTE DE SUMINISTROS (7.5% de 1.1.)


OBRAS CIVILES

1.4

MONTAJE ELECTROMECANICO

COSTO DIRECTO

TRAMO
SUBTERRNEO
(S/.)

COSTO TOTAL
(S/.)
1,009,841.25
75,738.09
995,305.63
28,536.29
2,109,421.26

LINEA DE TRANSMISION EN 138 kV SOCABAYA - PARQUE INDUSTRIAL


TRAMO AREO DE 9,0 km
SUMINISTRO DE MATERIALES

ITEM

DESCRIPCION

1.0
1.1
1.1.1
1.2
1.2.1

Estructuras metlicas en celosa


Torre metlica tipo TR de 30 m
Patas+/- 0
Torre metlica tipo TR de 33 m
Patas +1

1.2.2
2.0
2.1
2.2
2.3

UNIDAD

CANTIDAD CANTIDAD
DEL
DE
METRADO REPUESTO

154,285.22
62,400.00
9,253.44
72,800.00

12

1,445.85
1,156.68

2,891.70
6,940.08

14

24,045.86
26,096.92

168,321.02
521,938.40

28,147.98
34,301.17
28,855.04
33,777.58
34,301.17

56,295.96
34,301.17
115,420.16
33,777.58
102,903.51

26,450.45
28,706.62
30,962.78
34,301.17

105,801.80
86,119.86
123,851.12
137,204.68

6
6
6
6

12
18
24
24

3
4

37,731.28
41,504.41

113,193.84
166,017.64

6
6

18
24

u
u
u

2
1
2

31,577.28
37,731.28
41,161.40

63,154.56
37,731.28
82,322.80

6
6
6

12
6
12

Postes de Acero para Armado A2M de 110'


Postes de Acero para Armado A2M de 120'
Postes de Acero para Armado A3M de 85'
Postes de Acero para Armado A3M de 100'
Postes de Acero para Armado A3M de 120'

u
u

2
1

45,277.54
49,805.29

90,555.08
49,805.29

6
6

12
6

u
u
u

1
1
1

35,230.85
41,161.40
49,805.29

35,230.85
41,161.40
49,805.29

6
6
6

6
6
6

Postes de Acero para Armado PTM de 85'


Aisladores
Aislador polimerico tipo line post
Aislador Polimerico tipo Tensin

35,230.85

140,923.40

12
224

2
8
2
2

Patas+/- 0
Estructuras de postes metlicos
Postes de Acero para Armado SM de 80'
Postes de Acero para Armado SM de 85'
Postes de Acero para Armado SM de 90'

u
u
u

5
20
2

2.4
2.5
2.6
2.7

Postes de Acero para Armado SM de 110'


Postes de Acero para Armado SMD de 80'
Postes de Acero para Armado SMD de 85'
Postes de Acero para Armado SMD de 100'

u
u
u
u

1
4
1
3

2.8
2.9
2.10
2.11

Postes de Acero para Armado A1M de 80'


Postes de Acero para Armado A1M de 85'
Postes de Acero para Armado A1M de 90'
Postes de Acero para Armado A1M de 100'

u
u
u
u

2
3
4
4

2.12
2.13

Postes de Acero para Armado A1M de 110'


Postes de Acero para Armado A1M de 120'

u
u

2.14
2.15
2.16

Postes de Acero para Armado A2M de 85'


Postes de Acero para Armado A2M de 90'
Postes de Acero para Armado A2M de 100'

2.17
2.18
2.19
2.20
2.21
2.22
3.0

Conductor de fase desnudo 240 mm AAAC


Cable OPGW de 70mm y 24 fibras

5.0
5.1
5.2

Accesorios de conductor y cables de guarda


Amortiguadores para conductor AAAC 240 mm2
Amortiguadores para cable OPGW

5.3
6.0

Caja de empalme para cable de fibra ptica


Ferreteria de Estructuras
Horquilla ojo
Grapa de suspensin para conductor 240 mm AAAC

6.4
6.5
6.6
6.7
6.8
6.9
6.10
6.11
6.12
6.13
6.14
6.15
6.16
6.17
6.18
6.19
6.20
7.0
7.1
7.2

2,355,836.69
2

257,664.30
u
u

192
224

km
km

28.35
9.45

u
u

84
28

un

9
10

351.50
799.20

70,651.50
187,012.80

8,133.79

230,592.95

6,750.00

63,787.50

72.40

6,660.80

68.75
687.50

2,062.50
4,125.00

Conductor y cables de guarda

4.1
4.2

6.1
6.2
6.3

COSTO PARCIAL COSTO TOTAL


(S/.)
(S/.)

31,200.00
1,156.68
36,400.00

u
u
u
u

3.1
3.2
4.0

COSTO
UNITARIO
(S/.)

Grapa de suspensin con accesorio de conexin de pararrayos a cond.


Grapa tipo pistola para conductor de 240 mm AAAC
Varilla de armar para conductor 240 mm2 AAAC
Suple metalico de 0.50 m de longitud
Grillete de ''A'' G''
Anillo bola
Eslabn Revirado
Grapa de suspensin para cable de fibra ptica OPGW.
Rotula ojal
Conector de AG de 2 vias para tierra del OPGW
Abrazadera Metlica de 1 hueco para poste terminal
Abrazadera Metlica de 3 hueco para poste terminal
Soporte para Terminal
Tensor de Corredera
Guarda cabo para cable tipo OPGW
Retensiones Preformadas para cable de guarda
Conector de una via de AG para conexin de cable PAT a poste
Manguito de empalme para conductor de 240mm
Sistema de Puesta a tierra
Conductor de cobre de 85 mm para puesta a tierra
Varilla de copperweld de 2,4m y 16 mm de diametro

294,380.45

12,848.30
8
2

70.02314815
700.2314815
95,337.81

19.25
85.00

3,888.50
17,170.00

19.60648148
86.57407407

100.00
85.00
45.00
82.50
11.65
22.00

1,200.00
19,720.00
9,090.00
16,665.00
4,042.55
5,104.00

101.8518519
86.57407407
45.83333333
84.02777778
11.86574074
22.40740741

19.25
41.25
19.25
19.25
60.00

2,136.75
1,567.50
500.50
789.25
240.00

19.60648148
42.01388889
19.60648148
19.60648148
61.11111111

75.00
180.00
33.00
20.63
56.56

900.00
2,160.00
2,607.00
1,629.77
4,468.24

76.38888889
183.3333333
33.61111111
21.01203704
57.60740741

19.25
59.00

750.75
708.00

28.67
220.00

34,404.00
6,380.00

19.60648148
60.09259259
0
29.20092593
224.0740741

8
2

6.99
7.00
5.00

13.98
588.00
70.00

7.119444444
7.12962963
5.092592593

u
u
u

192
192
12

10
10

u
u
u
u
u
u

222
192
192
332
222
106

10
10
10
15
10
5

u
u
u
u
u

36
24
39
4
12

2
2
2

u
u
u
u
u
u

12
74
74
74
39
12

m
u

1,200
27

5
5
5

41,385.98

7.3
7.4
7.5
8.0
8.1

Conector tipo perno partido para conductor de cobre de 85 mm


Conector bimetlico tipo Estructura-Conductor
Conector terminal de cobre para pararrayos
Terminales, Pararrayos y caja tripolar
Terminal de conexin areo subterraneo para 170 kV

u
u
u

2
76
12

12

13,000.00

156,000.00

8.2
8.3

Parrarayos tipo TLA para 138 kV


Caja tripolar de conexin de pantalla a tierra con limitador de tension (SVL)

u
u

12
6

15,860.00
9,100.00

190,320.00
54,600.00

COSTO TOTAL SUMINISTROS (S/.)

73.74074074

400,920.00

3,612,658.75

LINEA DE TRANSMISION EN 138KV SOCABAYA - PARQUE INDUSTRIAL


TRAMO AREO DE 9,0 km
MONTAJE ELECTROMECANICO

ITEM

DESCRIPCION

Replanteo topogrfico de la lnea de 138KV(Socabaya-Parque Industrial)

1.1
2.0

Replanteo topogrfico de la lnea de 138KV


Instalacin de estructuras metlicas de celosa (torres)

2.1
2.2

Estructura de celosia tipo TR de 30m


Estructura de celosia de anclaje tipo TR de 33m

3.0
3.1

Instalacion de estructuras metlicas (postes)


Postes de Acero para Armado SM de 80'

3.2
3.3

Postes de Acero para Armado SM de 85'


Postes de Acero para Armado SM de 90'

3.4
3.5

Postes de Acero para Armado SM de 110'


Postes de Acero para Armado SMD de 80'

3.6
3.7
3.8

Postes de Acero para Armado SMD de 85'


Postes de Acero para Armado SMD de 100'
Postes de Acero para Armado A1M de 80'

3.9
3.10

Postes de Acero para Armado A1M de 85'


Postes de Acero para Armado A1M de 90'

3.11
3.12
3.13

Postes de Acero para Armado A1M de 100'


Postes de Acero para Armado A1M de 110'
Postes de Acero para Armado A1M de 120'

3.14
3.15

Postes de Acero para Armado A2M de 85'


Postes de Acero para Armado A2M de 90'

3.16
3.17
3.18
3.19
3.20
3.21
3.22
4.0
4.1
5.0
5.1
6.0
6.1
6.2
7.0
7.1
8.0
8.1
9.0
9.1
10.0
10.1
11.0
11.1

Postes de Acero para Armado A2M de 100'


Postes de Acero para Armado A2M de 110'
Postes de Acero para Armado A2M de 120'
Postes de Acero para Armado A3M de 85'
Postes de Acero para Armado A3M de 100'
Postes de Acero para Armado A3M de 120'
Postes de Acero para Armado PTM de 85'
Instalacin de conductor
Instalacin de conductor de tipo 240 mm2 AAAC , por fase
Instalacin de cables de guarda
Instalacion de Cable OPGW de 70mm y 24 fibras
Instalacin de aisladores
Aislador polimerico tipo line post
Aislador Polimerico tipo Tensin
Instalacin de terminales 145 kV
Instalacin de terminales 145 kV
Instalacin de Pararrayos
Instalacin de Parrarayos tipo TLA para 138 kV
Instalacin de Caja tripolar
Caja tripolar de conexin de pantalla a tierra con limitador de tension (SVL)
Instalacin de cajas de empalmes
Instalacin de cajas de empalmes para cable de fibra ptica
Instalacion de Accesorios de conductor y cables de guarda

12.1

CANTIDAD

km

9.77

u
u

COSTO
UNITARIO
(S/.)

COSTO PARCIAL
(S/.)

Amortiguadores para conductor AAAC 240 mm2


Amortiguadores para cable OPGW
Instalacin de Sistemas de Puesta a Tierra

4,191.82
429.05

4,191.82

2
2

3,370.65
3,376.12

6,741.30
6,752.24

u
u

5
20

2,029.17
2,029.17

10,145.85
40,583.40

u
u
u

2
1
4

2,233.24
3,253.61
2,396.50

4,466.48
3,253.61
9,586.00

u
u

1
3

2,396.50
2,996.02

2,396.50
8,988.06

u
u
u

2
3
4

2,396.50
2,396.50
2,233.24

4,793.00
7,189.50
8,932.96

u
u

4
3

2,996.02
3,253.61

11,984.08
9,760.83

u
u
u

4
2
1

3,253.61
2,029.17
2,233.24

13,014.44
4,058.34
2,233.24

u
u
u
u
u
u
u

2
2
1
1
1
1
4

2,996.02
3,253.61
3,416.29
2,396.50
2,996.02
3,904.33
2,435.00

5,992.04
6,507.22
3,416.29
2,396.50
2,996.02
3,904.33
9,740.00

km

28.35

2,627.30

74,483.96

km

9.45

3,185.79

30,105.72

u
u

192
224

126.82
90.33

24,349.44
20,233.92

28

324.61

9,202.69

12

551.25

6,615.00

437.36

2,624.16

437.36

2,624.16

84
28

61.14

5,135.76

72.07

2,017.96

13,493.54

176,338.69

74,483.96
30,105.72
44,583.36

9,202.69
6,615.00
2,624.16
2,624.16
7,153.72
u

19,174.20

Puesta a tierra tipo "PAT-1 " , incluye excavacin, instalacin, relleno y rotura de vereda,
desalojo de desmonte , resane y todo trabajo no especificado pero requerido para el
montaje
u

27

269.85

7,285.95

12.2.1 Con contrapeso de 10 m

23

12.2.2 Con contrapeso de 20 m


12.2.3 Con contrapeso de 25 m

u
u

17
1

214.36
263.13
275.49

4,930.28
4,473.21
275.49

u
u
u

3
2
2

231.21

693.63

353.19
404.63

706.38
809.26

gbl
gbl

1
1

20,363.85
5,081.60

20,363.85
5,081.60

12.1.1 Electrodo vertical


12.2

12.3
12.3.1
12.3.2
12.3.3
13.0
13.1
13.2

COSTO TOTAL
(S/.)

MONTAJE ELECTROMECANICO

1.0

11.2
12.0

UNIDAD

Puesta a tierra tipo "PAT-C " , incluye excavacin, instalacin, relleno y rotura de vereda,
desalojo de desmonte , resane y todo trabajo no especificado pero requerido para el
montaje

Puesta a tierra tipo "PAT-D y PAT-E" , incluye excavacin, instalacin, relleno y rotura de
vereda, desalojo de desmonte , resane y todo trabajo no especificado pero requerido para
el montaje
Con contrapeso en oposicin de 10 m
Con contrapeso en oposicin de 40 m
Con contrapeso en oposicin de 50 m
Varios

25,445.45

Ingenera de Detalle
Pruebas y Puesta en Servicio
COSTO TOTAL DE MONTAJE ELECTROMECANICO (S/.)

416,036.47

LINEA DE TRANSMISION EN 138KV SOCABAYA - PARQUE INDUSTRIAL


TRAMO AREO DE 9,0 km
OBRAS CIVILES

ITEM

II

DESCRIPCION

UNIDAD

CANTIDAD

1.00

COSTO
UNITARIO
(S/.)

COSTO PARCIAL
(S/.)

COSTO TOTAL
(S/.)

OBRAS CIVILES

1.0

Movilizacin y Desmovilizacin

1.1

Movilizacin y desmovilizacin

2.0

Obras Provisionales

3,328.73
3,328.73

3,328.73
4,279.01

LINEA DE TRANSMISION EN 138KV SOCABAYA - PARQUE INDUSTRIAL


TRAMO AREO DE 9,0 km
MONTAJE ELECTROMECANICO

ITEM

DESCRIPCION

UNIDAD

CANTIDAD

Global
Global

1.00
1.00

COSTO
UNITARIO
(S/.)

COSTO PARCIAL
(S/.)

3,043.09
1,235.92

3,043.09

124.39
124.39

9.07
23.16

1,128.22
2,880.87

m3
m3
m2

1,063.39
352.62
1,208.42

44.55

47,374.02
11,848.03
89,809.77

Concreto fc=100 para fundaciones


Concreto fc=210 para fundaciones

m3
m3

26.29
597.76

Acero de Refuerzo fy=4200 kg/cm2


Eliminacin de material excedente

kg
m3

15,061.35
941.62

2.1
2.2

Instalacin de Campamentos y Almacenes


Mantenimiento y operacin de campamentos

3.0

Cimentacin de las Estructuras

3.1
3.2

Demolicion de pavimento
Reposicin de pavimento

m2
m2

3.3
3.4
3.5

Excavacin manual en material suelto


Relleno compactado manual con material propio
Encofrado y desencofrado recto

3.6
3.7
3.8
3.9

COSTO TOTAL
(S/.)

1,235.92
445,392.51

COSTO TOTAL DE OBRAS CIVILES (S/.)

33.60
74.32
34.63
323.79
5.82
10.87

910.42
193,548.71
87,657.06
10,235.41
453,000.25

710.77

ANALISIS DE COSTOS UNITARIOS DE OBRAS ELECTROMECANICAS DE LINEAS DE TRANSMISION


PROYECTO:

LINEA 138 kV SOCABAYA - PARQUE INDUSTRIAL

PARTIDA : 1.1

Replanteo topogrfico de la lnea de 138KV

RENDIMIENTO :

2.5 km/dia
DESIGNACIN
MATERIALES

CUAD.

UNID.

Fierro
Cemento Portland tipo I en bolsa de 42,5 kg
Material consumible
Pintura esmalte sinttico

APORTE

COSTO U.

kg
bls
EST
gln

1.00
0.66
0.50
0.13

2.13
14.29
192.50
56.44

MANO DE OBRA
Topgrafo
Oficial
Pen

1.00
1.00
2.00

h-h
h-h
h-h

3.20
3.20
6.40

17.24
12.61
11.40

MAQUINARIAS Y EQUIPOS
Camioneta pick up 4 x 2 d.cab.
Rachet
Espintermetro
Herramientas manuales y equipos de proteccin

1.00
3.00
1.00

h-m
h-m
h-m
% m-o

2.42
7.27
2.42
7.00

45.42
3.50
38.50
168.49

COSTO DIRECTO TOTAL

ANALISIS DE COSTOS UNITARIOS DE OBRAS ELECTROMECANICAS DE LINEAS DE TRANSMISION

PROYECTO:

LINEA 138 kV SOCABAYA - PARQUE INDUSTRIAL

PARTIDA : 2.1

Estructura de celosia tipo TR de 30m

RENDIMIENTO :

1.2 Un/dia
DESIGNACIN
MATERIALES

CUAD.

Material consumible
MANO DE OBRA
Ingeniero de seguridad
Capataz en trabajos elctricos
Operario en trabajos elctricos
Oficial en trabajos elctricos
Pen
MAQUINARIAS Y EQUIPOS
Camin plataforma 4x2, 122 HP, 8 TON
Camin gra de 5 TON
Pluma de izaje
Tirfor 3 Ton
Winche de 3 Ton
Equipo de topografa (Teod,Nivel,etc)
Herramientas manuales y equipos de proteccin
COSTO DIRECTO TOTAL

UNID.

APORTE

COSTO U.

EST

0.50

192.50

0.10
1.00
2.00
2.00
10.00

h-h
h-h
h-h
h-h
h-h

0.67
6.67
13.33
13.33
66.67

52.50
20.45
17.24
15.13
11.40

1.00
0.50
1.00
2.00
1.00
1.00

h-m
h-m
h-m
h-m
h-m
h-m
% m-o

6.67
3.33
6.67
13.33
6.67
6.67
7.00

125.25
173.25
18.36
2.88
36.40
1363.00

ANALISIS DE COSTOS UNITARIOS DE OBRAS ELECTROMECANICAS DE LINEAS DE TRANSMISION


PROYECTO:

LINEA 138 kV SOCABAYA - PARQUE INDUSTRIAL

PARTIDA : 2.2

Estructura de celosia de anclaje tipo TR de 33m

RENDIMIENTO :

1.198 Un/dia
DESIGNACIN
MATERIALES

CUAD.

UNID.

Material consumible
MANO DE OBRA
Ingeniero de seguridad
Capataz en trabajos elctricos
Operario en trabajos elctricos
Oficial en trabajos elctricos
Pen
MAQUINARIAS Y EQUIPOS
Camin plataforma 4x2, 122 HP, 8 TON
Camin gra de 5 TON
Pluma de izaje
Tirfor 3 Ton
Winche de 3 Ton
Equipo de topografa (Teod,Nivel,etc)
Herramientas manuales y equipos de proteccin

APORTE

COSTO U.

EST

0.50

192.50

0.10
1.00
2.00
2.00
10.00

h-h
h-h
h-h
h-h
h-h

0.67
6.68
13.36
13.36
66.78

52.50
20.45
17.24
15.13
11.40

1.00
0.50
1.00
2.00
1.00
1.00

h-m
h-m
h-m
h-m
h-m
h-m
% m-o

6.68
3.34
6.68
13.36
6.68
6.68
7.00

125.25
173.25
18.36
2.88
36.40
1365.28

COSTO DIRECTO TOTAL

ANALISIS DE COSTOS UNITARIOS DE OBRAS ELECTROMECANICAS DE LINEAS DE TRANSMISION


PROYECTO:

LINEA 138 kV SOCABAYA - PARQUE INDUSTRIAL

PARTIDA : 3.1

Postes de Acero para Armado SM de 80'

RENDIMIENTO :

3 Un/dia
DESIGNACIN
MATERIALES

CUAD.

Material consumible
MANO DE OBRA
Ingeniero de seguridad
Capataz en trabajos elctricos
Operario en trabajos elctricos
Oficial en trabajos elctricos
Pen
MAQUINARIAS Y EQUIPOS
Camin plataforma 4x2, 122 HP, 8 TON
Camin gra de 5 TON
Camioneta pick up 4 x 2 d.cab.
Tirfor 3 Ton
Winche de 3 Ton
Equipo de topografa (Teod,Nivel,etc)
Herramientas manuales y equipos de proteccin

UNID.

APORTE

COSTO U.

EST

1.00

192.50

0.10
1.00
8.00
6.00
8.00

h-h
h-h
h-h
h-h
h-h

0.27
2.67
21.33
16.00
21.33

52.50
20.45
17.24
15.13
11.40

1.00
0.50
0.50
4.00
2.00
1.00

h-m
h-m
h-m
h-m
h-m
h-m
% m-o

2.67
1.33
1.33
10.67
5.33
2.67
7.00

125.25
173.25
45.42
2.88
36.40
921.71

COSTO DIRECTO TOTAL

ANALISIS DE COSTOS UNITARIOS DE OBRAS ELECTROMECANICAS DE LINEAS DE TRANSMISION

AS DE TRANSMISION
PARQUE INDUSTRIAL

UNIDAD:

km

C. PARCIAL SUB TOTAL


19.86
2.13
9.43
0.96
7.34
168.49
55.18
40.35
72.96
240.70
110.11
25.46
93.34
11.79
S/.

429.05

AS DE TRANSMISION

PARQUE INDUSTRIAL

UNIDAD:

Un.

C. PARCIAL SUB TOTAL


96.25
96.25
1363.00
35.00
136.32
229.92
201.76
760.00
1911.40
835.00
577.50
122.40
38.43
242.67
0.00
95.41
S/.

3370.65

AS DE TRANSMISION

PARQUE INDUSTRIAL

3m
UNIDAD:

Un.

C. PARCIAL SUB TOTAL


96.25
96.25
1365.28
35.06
136.55
230.30
202.10
761.27
1914.59
836.39
578.46
122.60
38.49
243.07
0.00
95.57
S/.

3376.12

AS DE TRANSMISION
PARQUE INDUSTRIAL

UNIDAD:

Un.

C. PARCIAL SUB TOTAL


192.50
192.50
921.71
14.00
54.53
367.87
242.11
243.20
914.95
334.00
231.00
60.56
30.74
194.13
0.00
64.52
S/.

AS DE TRANSMISION

2029.17

ANALISIS DE COSTOS UNITARIOS


OBRAS CIVILES LNEA AREA 138 KV SOCABAYA - PARQUE INDUSTRIAL
1.1

Partida

Movilizacin y desmovilizacin

Rendimiento

Glb/DIA

0.5500

Cdigo

Descripcin Recurso

EQ. 0.2208
Unidad

Costo unitario directo por : Glb


Cuadrilla

Mano de Obra
INGENIERO DE SEGURIDAD

hh

0.1000

INGENIERO ELECTRICISTA

hh

0.2000

CHOFER

hh

0.8000

OPERARIO

hh

1.0000

PEON

hh

4.0000

CAMIONETA PICK UP 4 X 4 DOBLE CABINA

hh

0.2000

CAMIN PLATAFORMA 4X2, 122 HP, 8 TON

hh

1.0000

HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN

%MO

Equipos

2.1

Partida

Instalacin de Campamentos y Almacenes

Rendimiento

Glb/DIA

0.6500

Cdigo

Descripcin Recurso

EQ. 0.6800
Unidad

Costo unitario directo por : Glb


Cuadrilla

Mano de Obra
INGENIERO DE SEGURIDAD

hh

0.1000

INGENIERO ESPECIALISTA EN LINEAS DE TRANSMISIN

hh

0.8000

CHOFER

hh

0.8000

PEON

hh

4.0000

ESTUCHE DE HERRAMIENTAS PARA MECANICO

hh

0.5000

CAMIONETA PICK UP 4 X 4 DOBLE CABINA

hh

0.2000

CAMIN PLATAFORMA 4X2, 122 HP, 8 TON

hh

1.0000

HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN

%MO

Equipos

2.2

Partida

Mantenimiento y operacin de campamentos

Rendimiento

Glb/DIA

0.6500

Cdigo

Descripcin Recurso

EQ. 0.6800
Unidad

Costo unitario directo por : Glb


Cuadrilla

Mano de Obra
INGENIERO DE SEGURIDAD

hh

0.1000

ALMACENERO

hh

1.0000

CHOFER

hh

0.5000

PEON

hh

4.0000

ESTUCHE DE HERRAMIENTAS PARA MECANICO

hh

0.5000

CAMIONETA PICK UP 4 X 4 DOBLE CABINA

hh

0.5000

HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN

%MO

Equipos

3.1

Partida

DEMOLICIN DE PAVIMENTO

Rendimiento

m2/DIA

50.0000

Cdigo

Descripcin Recurso

EQ. 50.0000
Unidad

Costo unitario directo por : m2


Cuadrilla

Mano de Obra
INGENIERO DE SEGURIDAD

hh

0.1000

CAPATAZ

hh

0.1000

PEON

hh

1.0000

COMPRESORA NEUMATICA 76 HP 125-175 PCM

hh

0.5000

MARTILLO NEUMATICO 21-24 KG

hh

1.0000

HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN

%MO

Equipos

3.2

Partida

REPOSICIN DE PAVIMENTO

Rendimiento

M2/DIA

50.0000

Cdigo

Descripcin Recurso

Unidad

INGENIERO DE SEGURIDAD

hh

COLOCACIN DE CARPETA ASFLTICA 2"

m2

COLOCACIN DE RIEGO ASFLTICO

m2

3.3

Partida

EQ.

Costo unitario directo por : M2

Cuadrilla

0.1000

Excavacin en suelo normal para cimentacin

Rendimiento

m3/DIA

10.0000

Cdigo

Descripcin Recurso

EQ. 10.0000
Unidad

Costo unitario directo por : m3


Cuadrilla

Mano de Obra
INGENIERO DE SEGURIDAD
PEON

0.1000
hh

Equipos
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN

%MO

4.0000

3.4

Partida

RELLENO CON MATERIAL PROPIO

Rendimiento

ml/DIA

45.0000

Cdigo

Descripcin Recurso

EQ. 45.0000

Unidad

Costo unitario directo por : ml

Cuadrilla

Mano de Obra
INGENIERO DE SEGURIDAD

hh

0.1000

CAPATAZ

hh

0.2500

OPERARIO

hh

1.0000

PEON

hh

2.0000

Camin plataforma 4x2, 122 HP, 8 TON

hm

1.0000

Compactadora vibrador tipo plancha 7 HP

hm

0.2000

HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN

%MO

Equipos

3.5

Partida

ENCOFRADO Y DESENCOFRADO RECTO

Rendimiento

m2/DIA

18.0000

Cdigo

Descripcin Recurso

EQ. 18.0000

Unidad

Costo unitario directo por : m2

Cuadrilla

Mano de Obra
INGENIERO DE SEGURIDAD

0.1000

CAPATAZ

hh

1.0000

OPERARIO

hh

1.0000

OFICIAL

hh

2.0000

PEON

hh

2.0000

Materiales
ALAMBRE

kg

CLAVOS PARA MADERA

kg

DESMOLDADOR PARA ENCOFRADO

gal

MATERIALES DIVERSOS

%MT

MADERA NACIONAL

p2

Equipos
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN

3.6

Partida

Rendimiento

m2/DIA

%MO

CONCRETO fc=100 kg/cm2 (solado)

50.0000

EQ. 50.0000

Costo unitario directo por : m2

Cdigo

Descripcin Recurso

Unidad

Cuadrilla

Mano de Obra
INGENIERO DE SEGURIDAD

0.1000

CAPATAZ

hh

0.1000

OPERARIO

hh

1.0000

OFICIAL

hh

2.0000

PEON

hh

6.0000

Materiales
CEMENTO PORTLAND TIPO I

bls

ADITIVO

gal

ACEITE MOTOR GASOLINERO MULTIGRADO

gal

GASOLINA 84 OCTANOS

gal

AGUA

m3

AGREGADO

m3

Equipos
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN

%MO

MEZC. DE CONCRETO TIPO TAMBOR 18 HP 7 Pie 3

hm

3.7

Partida

1.0000

CONCRETO f'c=210 kg/cm2

Rendimiento

m3/DIA

15.0000

Cdigo

Descripcin Recurso

EQ. 15.0000

Unidad

Costo unitario directo por : m3

Cuadrilla

Mano de Obra
INGENIERO DE SEGURIDAD

0.1000

CAPATAZ

hh

0.5000

OPERARIO

hh

1.0000

OFICIAL

hh

1.0000

PEON

hh

10.0000

Materiales
CEMENTO PORTLAND TIPO I

bls

ADITIVO

gal

ACEITE MOTOR GASOLINERO MULTIGRADO

gal

GASOLINA 84 OCTANOS

gal

AGUA

m3

AGREGADO

m3

Equipos
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN

%MO

VIBRADOR DE CONCRETO 4 HP 1.50"

hm

MEZC. DE CONCRETO TIPO TAMBOR 18 HP 7 11-13 Pie 3

hm

1
1

3.8

Partida

ACERO DE REFUERZO fy=4200 kg/cm2

Rendimiento

kg/DIA

200.0000

Cdigo

Descripcin Recurso

EQ. 200.0000

Unidad

Costo unitario directo por : kg

Cuadrilla

Mano de Obra
INGENIERO DE SEGURIDAD

0.1000

CAPATAZ

hh

0.2000

OPERARIO

hh

1.0000

OFICIAL

hh

2.0000

Materiales
ALAMBRE

kg

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60

kg

Equipos
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN

3.9

Partida

%MO

ELIMINACIN DE MATERIAL EXCEDENTE

Rendimiento

m3/DIA

350.0000

Cdigo

Descripcin Recurso

EQ. 350.0000
Unidad

Costo unitario directo por : m3


Cuadrilla

Mano de Obra
INGENIERO DE SEGURIDAD

hh

0.1000

CAPATAZ

hh

0.2000

PEON

hh

2.0000

Equipos
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN

%MO

CAMION VOLQUETE 10 m3

hm

2.0000

QUE INDUSTRIAL

Costo unitario directo por : Glb

3,328.73

Cantidad

Precio S/.

Parcial S/.

1.4545

52.50

76.36

2.9091

52.50

152.73

11.6364

12.60

146.62

14.5455

14.92

217.02

58.1818

11.70

680.73
1,273.45

2.9091

49.61

144.32

14.5455

125.25

1,821.82

7.0000

1,273.45

89.14
2,055.28

Costo unitario directo por : Glb

3,043.09

Cantidad

Precio S/.

Parcial S/.

1.2308

52.50

64.62

9.8462

52.50

516.92

9.8462

12.60

124.06

49.2308

11.70

576.00
1,281.60

6.1538

1.32

8.12

2.4615

49.61

122.12

12.3077

125.25

1,541.54

7.0000

1,281.60

89.71
1,761.49

Costo unitario directo por : Glb

1,235.92

Cantidad

Precio S/.

Parcial S/.

1.2308

52.50

64.62

12.3077

11.70

144.00

6.1538

12.60

77.54

49.2308

11.70

576.00
862.15

6.1538

1.32

8.12

6.1538

49.61

305.29

7.0000

862.15

60.35
373.77

Costo unitario directo por : m2

9.07

Cantidad

Precio S/.

Parcial S/.

0.0160

52.50

0.84

0.0160

17.37

0.28

0.1600

11.70

1.87
2.99

0.0800

64.18

5.13

0.1600

4.61

0.74

7.0000

2.99

0.21
6.08

Costo unitario directo por : M2

23.16

Cantidad

Precio S/.

Parcial S/.

0.0160

52.50

0.84

1.0000

17.60

17.60

1.0000

4.72

4.72
23.16

Costo unitario directo por : m3

44.55

Cantidad

Precio S/.

0.0800

52.50

4.20

3.2000

11.70

37.44

Parcial S/.

41.64
7.0000

41.64

2.91
2.91

Costo unitario directo por : ml

33.60

Cantidad

Precio S/.

Parcial S/.

0.0178

52.50

0.93

0.0444

17.37

0.77

0.1778

14.92

2.65

0.3556

11.70

4.16
8.52

0.1778

125.25

22.27

0.0356

21.10

0.75

7.0000

8.52

2.06
25.08

Costo unitario directo por : m2

74.32

Cantidad

Precio S/.

Parcial S/.

0.0444

52.50

2.33

0.4444

17.37

7.72

0.4444

14.92

6.63

0.8889

12.97

11.53

0.8889

11.70

10.40
38.61

0.3000

4.15

1.25

0.3000

4.15

1.25

0.0500

81.13

4.06

8.0000

46.86

3.75

6.0000

3.63

21.78
32.08

10.0000

38.61

3.86
3.63

Costo unitario directo por : m2

34.63

Cantidad

Precio S/.

Parcial S/.

0.0160

52.50

0.84

0.0160

17.37

0.28

0.1600

14.92

2.39

0.3200

12.97

4.15

0.9600

11.70

11.23
18.89

0.3600

17.10

6.16

0.0050

35.10

0.18

0.0040

50.20

0.20

0.2400

9.82

2.36

0.0200

9.00

0.18

0.1300

32.00

4.16
13.23

7.0000

18.89

1.32

0.1600

7.44

1.19
2.51

Costo unitario directo por : m3

323.79

Cantidad

Precio S/.

Parcial S/.

0.0533

52.50

2.80

0.2667

17.37

4.63

0.5333

14.92

7.96

0.5333

12.97

6.92

5.3333

11.70

62.40
84.71

10.0000

17.10

171.00

0.1230

35.10

4.32

0.0067

50.20

0.34

0.5000

9.82

4.91

0.2500

9.00

2.25

1.3250

32.00

42.40
225.21

7.0000

84.71

5.93

0.5333

5.30

2.83

0.5333

9.58

5.11

13.87

Costo unitario directo por : kg

5.82

Cantidad

Precio S/.

Parcial S/.

0.0040

52.50

0.21

0.0080

17.37

0.14

0.0400

14.92

0.60

0.0800

12.97

1.04
1.98

0.0900

4.15

0.37

1.0500

3.17

3.33
3.70

7.0000

1.98

0.14
0.14

Costo unitario directo por : m3

10.87

Cantidad

Precio S/.

Parcial S/.

0.0023

52.50

0.12

0.0046

18.37

0.08

0.0457

12.37

0.57
0.77

5.0000

0.77

0.04

0.0457

220.00

10.06
10.10

LINEA DE TRANSMISION EN 138KV SOCABAYA - PARQUE INDUSTRIAL


TRAMO SUBTERRNEO DE 0,766 km
SUMINISTROS DE MATERIALES
COSTO
UNITARIO
(S/.)

ITEM

DESCRIPCION

UNIDAD

CANTIDAD
TOTAL

Cable de energia unipolar para una tensin nominal de 138 kV entre fases y mxima de servicio de 145
kV, seccin de 240 mm Cu con aislamiento XLPE,.

2412.90

412.50

995,321.25

880.00

16.50

14,520.00

Cable de Fibra Optica tipo ADSS para 24 fibras

COSTO TOTAL DE SUMINISTROS S/.

COSTO TOTAL
(S/.)

1,009,841.25

LINEA DE TRANSMISION EN 138KV SOCABAYA - PARQUE INDUSTRIAL


TRAMO SUBTERRNEO DE 0,766 km
MONTAJE ELECTROMECNICO

ITEM

CANTIDAD
TOTAL

COSTO
UNITARIO
(S/.)

COSTO TOTAL
(S/.)

DESCRIPCION

UNIDAD

1.1

Cable XLPE de 138 kV 1x240 mm2 Cu, incluye la preapracin para el tendido, el transporte de las bobinas
del cable, la instalacin del winche del jalado, el tendiod del cable guia de acero, y la colocacin de los
respectivos polines de fibra y de metal

2,412.90

8.28

19,978.81

1.2

Cable de Fibra Optica tipo ADSS para 24 fibras,ncluye la preapracin para el tendido, el transporte de las
bobinas del cable, la instalacin del winche del jalado, el tendiod del cable guia de acero, y la colocacin
de los respectivos polines de fibra y de metal

880.00

7.87

6,925.60

2.0
2.1

OBRAS EN POSTE TERMINAL


muro de proteccin

4.00

407.97

1,631.88

1.0

I. MONTAJE ELECTROMECANICO
TENDIDO DE CABLE SUBTERRNEO

COSTO TOTAL MONTAJE ELECTROMECANICO (S/.)

28,536.29

LINEA DE TRANSMISION EN 138KV SOCABAYA - PARQUE INDUSTRIAL


TRAMO SUBTERRNEO DE 0,766 km
OBRAS CIVILES

ITEM

DESCRIPCION

UNIDAD

CANTIDAD
TOTAL

COSTO
UNITARIO
(S/.)

COSTO TOTAL
(S/.)

1.0

II. OBRAS CIVILES


OBRAS PRELIMINARES Y PROVISIONALES

1.1
1.2
1.3

Traslado de Equipos y Maquinas


Guardiana
Alquiler local

Glb
Glb
Glb

1.00
1.00
1.00

3,678.11
5,500.00
13,750.10

1.4
1.5

Comunicaciones propias (RPM; radios , celulares)


Sealizacin y elementos de seguridad (Vallado de proteccin)

Glb
Glb

1.00
1.00

2,800.00
3,240.00

2,800.00
3,240.00
28,968.21

SUB-TOTAL 1 :

3,678.11
5,500.00
13,750.10

2.0
2.1
2.2

ZANJA
Demolicin de pavimento
Reposicin de Pavimento

m2
m2

733.11
733.11

9.07
23.16

6,649.31
16,978.83

2.3
2.4

Excavacin en material suelto


Eliminacin de material excedente

m3
m3

2,038.27
1,880.01

44.55
10.87

90,804.93
20,435.71

2.5
2.6

Compactacin y nivelacin de fondo de zanja de 1,85 m de profundidad y 1,3 m de ancho


Encofrado y desencofrado

ml
m2

706.26
2,445.92

56.30
74.55

39,762.44
182,343.34

2.7
2.8

Concreto f'c=100 kg/cm2 solado e=0,10m


concreto (f'c = 210 kg/cm2)

m2
m3

1,045.26
574.89

34.63
323.79

36,197.35
186,143.63

2.9
2.10

Relleno con material de prestamo


Relleno con material propio

m3
m3

418.66
627.99

2.11
2.12

Reposicin de jardines
Cinta de sealizacin, comprende el suministro e instalacin

m2
m

15.00
952.83

42.13
33.60
121.11

17,638.15
21,100.46
1,816.65

2.13
2.14

Tubo PVC 6" Clase 5. incluye suministro e instalacin


Tubo PVC 3" Clase 5. incluye suministro e instalacin

m
m

3,390.05
1,130.02

8.23
26.27

7,841.79
89,056.61

16.80

SUB-TOTAL 2 :

18,984.34
735,753.54

3.0
3.1

CAMARAS DE PASO
Demolicin de pavimento

m2

155.00

9.07

1,405.85

3.2
3.3

Reposicin de Pavimento
Excavacin en material suelto

m2
m3

155.00
385.00

23.16
44.55

3,589.80
17,151.75

3.4
3.5

Eliminacin de material excedente


Encofrado y desencofrado

m3
m2

515.00
470.00

10.87
74.55

5,598.05
35,038.50

3.6
3.7

Concreto f'c=100 kg/cm2 solado e=0,10m


Concreto fc=210 kg/cm2

m2
m3

155.00
165.00

34.63
323.79

5,367.65
53,425.35

3.8
3.9

Armadura de refuerzo de fy = 4200 Kg/cm2.


Tapa de fg D=0,80m

kg
und

15,600.00
16.00

5.82
120.00

90,792.00
1,920.00
214,288.95

4.0

Varios

4.1

Ingenieria de Detalle (Cmaras de paso y recorrido subterrneo)

Glb

1.00

16294.93

16,294.93

SUB-TOTAL 3 :

COSTO TOTAL OBRAS CIVILES (S/.)

995,305.63

LINEA SUBTERRANEA:OBRAS ELECTROMECANICAS

ANALISIS DE COSTOS UNITARIOS DE OBRAS ELECTROMECANICAS DE LINEAS DE TRANSMISION

LINEA 138 kV SOCABAYA - PARQUE INDUSTRIAL

PROYECTO:
PARTIDA : 1.1

Tendido del Cable XLPE de 138 kV 1x400mm2 Cu

RENDIMIENTO :
DESIGNACIN
MATERIALES

0.7 km/dia
CUAD.

Material consumible

UNID.
EST

UNIDAD:
APORTE

COSTO U. C. PARCIAL

1.00

192.50

192.50

MANO DE OBRA
Ingeniero de seguridad

0.10

h-h

0.32

52.50

16.80

Capataz en trabajos elctricos

1.00

h-h

11.43

20.45

233.69

Operario en trabajos elctricos

8.00

h-h

91.43

17.24

1576.59

Oficial en trabajos elctricos

6.00

h-h

68.57

15.13

1037.62

10.00

h-h

114.29

11.40

1302.86

1.00

h-h

11.43

17.00

194.29

Estuche de herramientas para mecnico

1.00

h-m

11.43

1.32

15.09

Camin plataforma 4x2, 122 HP, 8 TON

0.75

h-m

8.57

125.25

1073.57

Camin volquete 4x2 120-140 HP 4m3

1.00

h-m

11.43

112.37

1284.23

Camioneta pick up 4 x 2 d.cab.

0.50

h-m

5.71

45.42

259.54

Tirfor 3 Ton

1.00

h-m

11.43

2.88

32.94

Winche de 3 Ton

1.00

h-m

11.43

36.40

416.00

Tecle 2 Ton

0.50

h-m

5.71

Polines

0.50

h-m

5.71

0.35

2.00

Caballete alzabobina

1.00

h-m

11.43

1.32

15.09

Equipo de tendido

1.00

h-m

11.43

0.00

Equipo de topografa (Teod,Nivel,etc)

0.50

h-m

5.71

0.00

Radio Walkie Talkie

8.00

h-m

91.43

3.50

320.00

% m-o

7.00

4361.85

305.33

Pen
Chofer

MAQUINARIAS Y EQUIPOS

Herramientas manuales y equipos de proteccin

COSTO DIRECTO TOTAL

0.00

S/.

ANALISIS DE COSTOS UNITARIOS DE OBRAS ELECTROMECANICAS DE LINEAS DE TRANSMISION


PROYECTO:
PARTIDA : 1.2
RENDIMIENTO :

LINEA 138 kV SOCABAYA - PARQUE INDUSTRIAL


tendido, el transporte de las bobinas del cable, la instalacin del winche del
jalado, el tendiod del cable guia de acero, y la colocacin de los respectivos
polines de fibra y de metal
0.78 km/dia
UNIDAD:

DESIGNACIN
MATERIALES

CUAD.

Material consumible

UNID.

APORTE

COSTO U. C. PARCIAL

EST

1.00

192.50

192.50

53.85

MANO DE OBRA
Ingeniero de seguridad

0.10

h-h

1.03

52.50

Capataz en trabajos elctricos

1.00

h-h

10.26

20.45

209.72

Operario en trabajos elctricos

8.00

h-h

82.05

17.24

1414.89

Oficial en trabajos elctricos

6.00

h-h

61.54

15.13

931.20

10.00

h-h

102.56

11.40

1169.23

1.00

h-h

10.26

17.00

174.36

Estuche de herramientas para mecnico

1.00

h-m

11.43

1.32

15.09

Camin plataforma 4x2, 122 HP, 8 TON

0.75

h-m

8.57

125.25

1073.57

Camin volquete 4x2 120-140 HP 4m3

1.00

h-m

11.43

112.37

1284.23

Camioneta pick up 4 x 2 d.cab.

0.50

h-m

5.71

45.42

259.54

Tirfor 3 Ton

1.00

h-m

11.43

2.88

32.94

Winche de 3 Ton

1.00

h-m

11.43

36.40

416.00

Tecle 2 Ton

0.50

h-m

5.71

0.00

0.00

Polines

0.50

h-m

5.71

0.35

2.00

Caballete alzabobina

1.00

h-m

11.43

1.32

15.09

Equipo de tendido

1.00

h-m

11.43

0.00

0.00

Equipo de topografa (Teod,Nivel,etc)

0.50

h-m

5.71

0.00

0.00

Radio Walkie Talkie

8.00

h-m

91.43

3.50

320.00

% m-o

7.00

4361.85

305.33

Pen
Chofer

MAQUINARIAS Y EQUIPOS

Herramientas manuales y equipos de proteccin

COSTO DIRECTO TOTAL

S/.

ANALISIS DE COSTOS UNITARIOS DE OBRAS ELECTROMECANICAS DE LINEAS DE TRANSMISION


PROYECTO:
PARTIDA : 2.1
RENDIMIENTO :
DESIGNACIN
MATERIALES

LINEA 138 kV SOCABAYA - PARQUE INDUSTRIAL


muro de proteccin
4.00 u/da
CUAD.

UNIDAD:

UNID.

APORTE

COSTO U. C. PARCIAL

Material consumible

EST

0.10

192.50

19.25

Concreto F'c = 210 kg/cm2

m3

0.90

227.15

204.44

Pintura esmalte sinttico

gln

1.00

56.44

56.44

10.50

MANO DE OBRA
Ingeniero de seguridad

0.10

h-h

0.20

52.50

Capataz

0.10

h-h

0.20

17.04

3.41

Operario

0.50

h-h

1.00

14.37

14.37

Pen

4.00

h-h

8.00

11.40

91.20

MAQUINARIAS Y EQUIPOS

Herramientas manuales y equipos de proteccin

% m-o

7.00

119.48

COSTO DIRECTO TOTAL

8.36

S/.

ANALISIS DE COSTOS UNITARIOS DE OBRAS ELECTROMECANICAS DE LINEAS DE TRANSMISION

LINEA 138 kV SOCABAYA - PARQUE INDUSTRIAL

PROYECTO:
PARTIDA : 3.2
RENDIMIENTO :
DESIGNACIN
MATERIALES

#REF!
1.3 Glb/dia
CUAD.

Material consumible

UNID.

UNIDAD:
APORTE

COSTO U. C. PARCIAL

EST

0.10

192.50

19.25

MANO DE OBRA
Ingeniero de seguridad

0.10

h-h

0.62

52.50

32.31

Ing. Especialista en Lineas de transmisin

1.00

h-h

6.15

80.00

492.31

Capataz en trabajos elctricos

1.00

h-h

6.15

20.45

125.83

Operario en trabajos elctricos

1.00

h-h

6.15

17.24

106.12

Pen

6.00

h-h

36.92

11.40

420.92

Estuche de herramientas para mecnico

1.00

h-m

6.15

1.32

8.12

Camioneta pick up 4 x 4 Doble Cabina

0.20

h-m

1.23

49.61

61.06

Megger

1.00

h-m

6.15

5.50

33.85

MAQUINARIAS Y EQUIPOS

Herramientas manuales y equipos de proteccin

% m-o

7.00

1177.49

COSTO DIRECTO TOTAL

82.42

S/.

ANALISIS DE COSTOS UNITARIOS DE OBRAS ELECTROMECANICAS DE LINEAS DE TRANSMISION


PROYECTO:
PARTIDA : 4.1
RENDIMIENTO :
DESIGNACIN
MATERIALES

LINEA 138 kV SOCABAYA - PARQUE INDUSTRIAL


Ingenieria de Detalle (Cmaras de paso y recorrido subterrneo)
0.025 Glb/dia
CUAD.

Material consumible

UNID.

UNIDAD:
APORTE

COSTO U. C. PARCIAL

EST

0.10

192.50

19.25

MANO DE OBRA
Ing. Especialista en Lineas de transmisin

0.50

h-h

160.00

80.00

12800.00

Dibujante

0.30

h-h

96.00

11.40

1094.40

0.15

h-m

48.00

49.61

2381.28

MAQUINARIAS Y EQUIPOS
Camioneta pick up 4 x 4 Doble Cabina

COSTO DIRECTO TOTAL

S/.

DE TRANSMISION

NDUSTRIAL

km
SUB TOTAL
192.50

4361.85

3723.78

8278.13

DE TRANSMISION

NDUSTRIAL

cin del winche del


de los respectivos
km

SUB TOTAL
192.50

3953.25

3723.78

7869.53

DE TRANSMISION

NDUSTRIAL

u
SUB TOTAL
280.13

119.48

8.36

407.97

DE TRANSMISION

NDUSTRIAL

Glb
SUB TOTAL
19.25

1177.49

185.45

1382.19

DE TRANSMISION

NDUSTRIAL

Glb
SUB TOTAL
19.25

13894.40

2381.28

16294.93

ANALISIS DE COSTOS UNITARIOS


OBRAS CIVILES LNEA SUBTERRANEA 138 KV SOCABAYA - PARQUE INDUSTRIAL
Partida

1.1

TRASLADO DE EQUIPOS Y MAQUINAS

Rendimiento

Glb/DIA

Cdigo

Descripcin Recurso

0.2000

EQ. 0.2000
Unidad

Costo unitario directo por : Glb

3,678.11

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

Mano de Obra
INGENIERO DE SEGURIDAD

hh

0.1000

4.0000

52.50

210.00

INGENIERO ELECTRICISTA

hh

0.2000

8.0000

52.50

420.00

CHOFER

hh

0.8000

32.0000

12.60

403.20

OPERARIO

hh

1.0000

40.0000

14.37

574.80

PEON

hh

4.0000

160.0000

11.40

1,824.00
3,432.00

Equipos
CAMIONETA PICK UP 4 X 4 DOBLE CABINA

hh

0.2000

8.0000

49.61

CAMIN PLATAFORMA 4X2, 122 HP, 8 TON

hh

1.0000

40.0000

125.25

5.13
0.74

HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN

%MO

7.0000

3,432.00

240.24
246.11

Partida

1.2

GUARDIANA

Rendimiento

Glb/DIA

Cdigo

Descripcin Recurso

EQ.

Costo unitario directo por : Glb


Unidad

Cuadrilla

5,500.00

Cantidad

Precio S/.

Parcial S/.

1.0000

5,500.00

5,500.00

Mano de Obra
GUARDIAN

Glb

5,500.00
Partida

1.3

ALQUILER LOCAL

Rendimiento

Glb/DIA

Cdigo

Descripcin Recurso

EQ.

Costo unitario directo por : Glb


Unidad

Cuadrilla

13,750.10

Cantidad

Precio S/.

Parcial S/.

1.0000

13,750.10

13,750.10

Materiales
ALQUILER DE LOCAL

Glb

13,750.10
Partida

1.4

COMUNICACIONES PROPIAS (RPM; RADIOS , CELULARES)

Rendimiento

Glb/DIA

Cdigo

Descripcin Recurso

EQ.

Costo unitario directo por : Glb


Unidad

Cuadrilla

2,800.00

Cantidad

Precio S/.

Parcial S/.

1.0000

2,800.00

2,800.00

Materiales
RPM,RADIOS Y CELULARES

Glb

2,800.00
Partida

1.5

SEALIZACIN Y ELEMENTOS DE SEGURIDAD (VALLADO DE PROTECCIN)

Rendimiento

Glb/DIA

Cdigo

Descripcin Recurso

EQ.

Costo unitario directo por : Glb


Unidad

Cuadrilla

3,240.00

Cantidad

Precio S/.

Parcial S/.

CERCO CALADO DE SEALIZACIN Y RESTRICCIN AL TRNSITOGlb

1.0000

1,200.00

1,200.00

CARTELES SEALIZADORES DE OBRA

2.0000

1,020.00

2,040.00

Materiales

Glb

3,240.00
Partida

2.1, 3.1

Rendimiento

m2/DIA

SZ-11-327

DEMOLICIN DE PAVIMENTO
50.0000

EQ. 50.0000

Costo unitario directo por : m2

9.07

28 de 43

ANALISIS DE COSTOS UNITARIOS


OBRAS CIVILES LNEA SUBTERRANEA 138 KV SOCABAYA - PARQUE INDUSTRIAL
Cdigo

Descripcin Recurso

Unidad

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

Mano de Obra
INGENIERO DE SEGURIDAD

hh

0.1000

0.0160

52.50

0.84

CAPATAZ

hh

0.1000

0.0160

17.37

0.28

PEON

hh

1.0000

0.1600

11.70

1.87
2.99

Equipos
COMPRESORA NEUMATICA 76 HP 125-175 PCM

hh

0.5000

0.0800

64.18

5.13

MARTILLO NEUMATICO 21-24 KG

hh

1.0000

0.1600

4.61

0.74

HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN

%MO

7.0000

2.99

0.21
6.08

Partida

2.2, 3.2

REPOSICIN DE PAVIMENTO

Rendimiento

M2/DIA

Cdigo

Descripcin Recurso

Unidad

INGENIERO DE SEGURIDAD

hh

COLOCACIN DE CARPETA ASFLTICA 2"

m2

COLOCACIN DE RIEGO ASFLTICO

m2

50.0000

EQ.

Costo unitario directo por : M2

23.16

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

0.1000

0.0160

52.50

0.84

1.0000

17.60

17.60

1.0000

4.72

4.72
23.16

Partida

2.3,3.3

EXCAVACION MANUAL EN MATERIAL SUELTO

Rendimiento

m3/DIA

Cdigo

Descripcin Recurso

10.0000

EQ. 10.0000
Unidad

Costo unitario directo por : m3

44.55

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

0.1000

0.0800

52.50

4.20

4.0000

3.2000

11.70

37.44

Mano de Obra
INGENIERO DE SEGURIDAD
PEON

hh

41.64
Equipos
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN

%MO

7.0000

41.64

2.91
2.91

Partida

2.4,3.4

ELIMINACIN DE MATERIAL EXCEDENTE

Rendimiento

m3/DIA

Cdigo

Descripcin Recurso

350.0000

EQ. 350.0000
Unidad

Costo unitario directo por : m3

10.87

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

Mano de Obra
INGENIERO DE SEGURIDAD

hh

0.1000

0.0023

52.50

0.12

CAPATAZ

hh

0.2000

0.0046

18.37

0.08

PEON

hh

2.0000

0.0457

12.37

0.57
0.77

Equipos
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN

%MO

CAMION VOLQUETE 10 m3

hm

2.0000

5.0000

0.77

0.04

0.0457

220.00

10.06
10.10

Partida

2.5

COMPACTACIN Y NIVELACIN DE FONDO DE ZANJA

Rendimiento

ml/DIA

Cdigo

Descripcin Recurso

10.0000

EQ. 10.0000

Unidad

Costo unitario directo por : ml

56.30

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

Mano de Obra
INGENIERO DE SEGURIDAD

SZ-11-327

0.1000

0.0800

52.50

4.20

CAPATAZ

hh

0.1000

0.0800

17.37

1.39

OPERARIO

hh

0.2000

0.1600

14.92

2.39

29 de 43

ANALISIS DE COSTOS UNITARIOS


OBRAS CIVILES LNEA SUBTERRANEA 138 KV SOCABAYA - PARQUE INDUSTRIAL
PEON

2.0000

1.6000

11.70

18.72
26.70

Equipos
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN

%MO

CAMION VOLQUETE 10 m3

hm

1.0000

5.0000

26.70

1.33

0.1333

212.00

28.27
29.60

Partida

2.6,3.5

ENCOFRADO Y DESENCOFRADO RECTO

Rendimiento

m2/DIA

Cdigo

Descripcin Recurso

18.0000

EQ. 18.0000

Unidad

Costo unitario directo por : m2

74.55

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

Mano de Obra
INGENIERO DE SEGURIDAD

0.1000

0.0444

52.50

2.33

CAPATAZ

hh

1.0000

0.4444

17.37

7.72

OPERARIO

hh

1.0000

0.4444

14.92

6.63

OFICIAL

hh

2.0000

0.8889

12.97

11.53

PEON

hh

2.0000

0.8889

11.70

10.40
38.61

Materiales
ALAMBRE

kg

0.3000

4.15

1.25

CLAVOS PARA MADERA

kg

0.3000

4.15

1.25

DESMOLDADOR PARA ENCOFRADO

gal

0.0500

81.13

4.06

MATERIALES DIVERSOS

%MT

8.0000

46.86

3.75

MADERA NACIONAL

p2

6.0000

3.63

21.78
32.08

Equipos
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN

%MO

10.0000

38.61

3.86
3.86

Partida

2.7, 3.6

CONCRETO fc=100 kg/cm2 (solado)

Rendimiento

m2/DIA

Cdigo

Descripcin Recurso

50.0000

EQ. 50.0000

Unidad

Costo unitario directo por : m2

34.63

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

Mano de Obra
INGENIERO DE SEGURIDAD

0.1000

0.0160

52.50

0.84

CAPATAZ

hh

0.1000

0.0160

17.37

0.28

OPERARIO

hh

1.0000

0.1600

14.92

2.39

OFICIAL

hh

2.0000

0.3200

12.97

4.15

PEON

hh

6.0000

0.9600

11.70

11.23
18.89

Materiales
CEMENTO PORTLAND TIPO I

bls

0.3600

17.10

6.16

ADITIVO

gal

0.0050

35.10

0.18

ACEITE MOTOR GASOLINERO MULTIGRADO

gal

0.0040

50.20

0.20

GASOLINA 84 OCTANOS

gal

0.2400

9.82

2.36

AGUA

m3

0.0200

9.00

0.18

AGREGADO

m3

0.1300

32.00

4.16
13.23

Equipos
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN

%MO

MEZC. DE CONCRETO TIPO TAMBOR 18 HP 7 Pie 3

hm

1.0000

7.0000

18.89

1.32

0.1600

7.44

1.19
2.51

Partida

SZ-11-327

2.8,3.7

CONCRETO f'c=210 kg/cm2

30 de 43

ANALISIS DE COSTOS UNITARIOS


OBRAS CIVILES LNEA SUBTERRANEA 138 KV SOCABAYA - PARQUE INDUSTRIAL
Rendimiento

m3/DIA

15.0000

Cdigo

Descripcin Recurso

EQ. 15.0000

Unidad

Costo unitario directo por : m3

323.79

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

Mano de Obra
INGENIERO DE SEGURIDAD

0.1000

0.0533

52.5000

2.8000

CAPATAZ

hh

0.5000

0.2667

17.3700

4.6320

OPERARIO

hh

1.0000

0.5333

14.9200

7.9573

OFICIAL

hh

1.0000

0.5333

12.9700

6.9173

PEON

hh

10.0000

5.3333

11.7000

62.4000
84.71

Materiales
CEMENTO PORTLAND TIPO I

bls

10.0000

17.10

171.00

ADITIVO

gal

0.1230

35.10

4.32

ACEITE MOTOR GASOLINERO MULTIGRADO

gal

0.0067

50.20

0.34

GASOLINA 84 OCTANOS

gal

0.5000

9.82

4.91

AGUA

m3

0.2500

9.00

2.25

AGREGADO

m3

1.3250

32.00

42.40
225.21

Equipos
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN

%MO

7.0000

84.71

5.93

VIBRADOR DE CONCRETO 4 HP 1.50"

hm

1.0000

0.5333

5.30

2.83

MEZC. DE CONCRETO TIPO TAMBOR 18 HP 7 11-13 Pie 3

hm

1.0000

0.5333

9.58

5.11
13.87

Partida

2.9

RELLENO CON MATERIAL DE PRESTAMO

Rendimiento

ml/DIA

Cdigo

Descripcin Recurso

45.0000

EQ. 45.0000

Unidad

Costo unitario directo por : ml

42.13

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

Mano de Obra
INGENIERO DE SEGURIDAD

hh

0.1000

0.0178

52.50

0.93

CAPATAZ

hh

0.2500

0.0444

17.37

0.77

OPERARIO

hh

1.0000

0.1778

14.92

2.65

PEON

hh

2.0000

0.3556

11.70

4.16
8.52

Materiales
RELLENO COMPACTADO PROPIO PARA ZANJA

m3

1.0000

10.00

10.00
10.00

Equipos
CAMIN PLATAFORMA 4X2, 122 HP, 8 TON

hm

1.0000

0.1778

125.25

22.27

COMPACTADORA VIBRADOR TIPO PLANCHA 7 HP

hm

0.2000

0.0356

21.10

0.75

HERRAMIENTAS MANUALES Y EQUIPOS DE PROTECCIN

%MO

7.0000

8.52

0.60
23.61

Partida

2.10

RELLENO CON MATERIAL PROPIO

Rendimiento

ml/DIA

Cdigo

Descripcin Recurso

45.0000

EQ. 45.0000

Unidad

Costo unitario directo por : ml

33.60

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

Mano de Obra
INGENIERO DE SEGURIDAD

hh

0.1000

0.0178

52.50

0.93

CAPATAZ

hh

0.2500

0.0444

17.37

0.77

OPERARIO

hh

1.0000

0.1778

14.92

2.65

PEON

hh

2.0000

0.3556

11.70

4.16
8.52

Equipos

SZ-11-327

Camin plataforma 4x2, 122 HP, 8 TON

hm

1.0000

0.1778

125.25

22.27

Compactadora vibrador tipo plancha 7 HP

hm

0.2000

0.0356

21.10

0.75

31 de 43

ANALISIS DE COSTOS UNITARIOS


OBRAS CIVILES LNEA SUBTERRANEA 138 KV SOCABAYA - PARQUE INDUSTRIAL
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN

%MO

7.0000

8.52

2.06
25.08

Partida

2.11

REPOSICIN DE JARDINES

Rendimiento

m2/DIA

Cdigo

Descripcin Recurso

30.0000

EQ. 30.0000

Unidad

Costo unitario directo por : m2

121.11

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

Mano de Obra
INGENIERO DE SEGURIDAD

hh

0.1000

0.0178

52.50

0.93

CAPATAZ

hh

0.2500

0.0444

17.37

0.77

OPERARIO

hh

1.0000

0.1778

14.92

2.65

PEON

hh

2.0000

0.3556

11.70

4.16
8.52

Materiales
GRASS BLOCK MODELO TIPO MICHI O TIPO 8

m3

1.0000

112.00

112.00
112.00

Equipos
HERRAMIENTAS MANUALES Y EQUIPOS DE PROTECCIN

%MO

7.0000

8.52

0.60
0.60

Partida

2.12

CINTA DE SEALIZACIN, COMPRENDE EL SUMINISTRO E INSTALACIN

Rendimiento

m/DIA

Cdigo

Descripcin Recurso

36.0000

EQ. 36.0000

Unidad

Costo unitario directo por : m

8.23

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

Mano de Obra
INGENIERO DE SEGURIDAD

hh

0.1000

0.0222

52.50

1.17

CAPATAZ

hh

0.1000

0.0222

17.37

0.39

OPERARIO

hh

0.1000

0.0222

14.92

0.33

PEON

hh

2.0000

0.4444

11.70

5.20
7.08

Materiales
CINTA SEALIZADORA

m3

1.0000

0.65

0.65
0.65

Equipos
HERRAMIENTAS MANUALES Y EQUIPOS DE PROTECCIN

%MO

7.0000

7.08

0.50
0.50

Partida

2.13

TUBO PVC 6" CLASE 5. INCLUYE SUMINISTRO E INSTALACIN

Rendimiento

m/DIA

Cdigo

Descripcin Recurso

33.0000

EQ. 33.0000

Unidad

Costo unitario directo por : m

26.27

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

Mano de Obra
INGENIERO DE SEGURIDAD

hh

0.1000

0.0242

52.50

1.27

CAPATAZ

hh

0.1000

0.0242

17.37

0.42

OPERARIO

hh

0.1000

0.0242

14.92

0.36

PEON

hh

2.0000

0.4848

11.70

5.67
7.73

Materiales
TUBO PVC 6"CLASE5

m3

1.0000

18.00

18.00
18.00

Equipos
HERRAMIENTAS MANUALES Y EQUIPOS DE PROTECCIN

%MO

7.0000

7.73

0.54
0.54

Partida

SZ-11-327

2.14

TUBO PVC 3" CLASE 5. INCLUYE SUMINISTRO E INSTALACIN

32 de 43

ANALISIS DE COSTOS UNITARIOS


OBRAS CIVILES LNEA SUBTERRANEA 138 KV SOCABAYA - PARQUE INDUSTRIAL
Rendimiento

m/DIA

33.0000

Cdigo

Descripcin Recurso

EQ. 33.0000

Unidad

Costo unitario directo por : m

16.80

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

Mano de Obra
INGENIERO DE SEGURIDAD

hh

0.1000

0.0242

52.50

1.27

CAPATAZ

hh

0.1000

0.0242

17.37

0.42

OPERARIO

hh

0.1000

0.0242

14.92

0.36

PEON

hh

2.0000

0.4848

11.70

5.67
7.73

Materiales
TUBO PVC 3"CLASE5

m3

1.0000

8.53

8.53
8.53

Equipos
HERRAMIENTAS MANUALES Y EQUIPOS DE PROTECCIN

%MO

7.0000

7.73

0.54
0.54

3.8

Partida

ACERO DE REFUERZO fy=4200 kg/cm2

Rendimiento

kg/DIA

200.0000

Cdigo

Descripcin Recurso

EQ. 200.0000

Unidad

Costo unitario directo por : kg

5.82

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

Mano de Obra
INGENIERO DE SEGURIDAD

0.1000

0.0040

52.50

0.21

CAPATAZ

hh

0.2000

0.0080

17.37

0.14

OPERARIO

hh

1.0000

0.0400

14.92

0.60

OFICIAL

hh

2.0000

0.0800

12.97

1.04
1.98

Materiales
ALAMBRE

kg

0.0900

4.15

0.37

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60

kg

1.0500

3.17

3.33
3.70

Equipos
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN

%MO

7.0000

1.98

0.14
0.14

3.9

Partida

TAPA DE F G D=0,80 m

Rendimiento

und/DIA

EQ.

Costo unitario directo por : und

Cdigo

Descripcin Recurso

Unidad

TAPA DE F G DIAMETRO =0,80M

und

Cuadrilla

120.00

Cantidad

Precio S/.

Parcial S/.

1.0000

120.00

120.00
120.00

SZ-11-327

33 de 43

PLANILLA DE ESTRUCTURAS (LINEA AEREA)


PROYECTO : LINEA 138KV SOCABAYA - PARQUE INDUSTRIAL
Hipotesis : MAXIMA TEMPERATURA

Tipo
N
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38

Tipo

Cable de

Comunicaci
Armado N estruc. Conductor
n
PORTICO
TR
TR
SMD
SMD
SMD
SMD
SMD
A3M
A2M
SMD
A2M
A1M
A1M
A1M
A1M
A1M
SMD
SMD
TR
TR
A2M
A1M
A1M
A1M
A1M
A1M
SM
A1M
SM
SM
SM
SM
SM
SM
SM
SM
SM
SM

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240

OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70

Progresiva

Cota

(m)

(m)

0.00
50.00
174.07
302.03
453.16
576.26
807.34
906.70
991.88
1074.00
1171.37
1309.12
1678.28
2060.97
2205.34
2385.25
2580.01
2767.98
3056.93
3268.45
3652.80
3878.56
3907.39
4035.92
4214.69
4321.87
4426.45
4539.84
4664.81
4756.09
4866.09
4966.73
5067.37
5168.01
5268.65
5369.33
5445.77
5545.14
5644.51

2382.65
2382.65
2384.15
2389.30
2394.00
2395.00
2377.14
2376.17
2369.10
2364.00
2362.45
2310.00
2302.15
2293.40
2292.14
2289.10
2283.60
2279.00
2268.70
2265.90
2255.81
2254.00
2255.90
2257.31
2259.50
2261.50
2264.13
2265.56
2271.32
2272.13
2273.44
2275.39
2275.77
2276.87
2278.67
2280.87
2282.16
2284.72
2286.09

Vrtice

Angulo

Vano

Altura de

Deflexin Adelante(m soporte


)
V0
V1

-4050'16.02"
1543'23.98"

V2
V3

904'34.99"
-4645'15.00"

V4
V5
V6
V7
V8
V9
V10
V11
V12
V12A
V13
V14

4642'38.99"
729'50.00"
-1647'10.02"
1020'1.03"
-140'56.98"
-1344'55.00"
-055'47.97"
-023'35.97"
244'9.99"
-8314'1.00"
-3340'22.98"
1322'10.00"

V15
V16
V17

67'50.98"
-1415'29.00"
-624'36.01"

V18

636'21.01"

50.00
124.07
127.96
151.13
123.10
231.08
99.36
85.18
82.12
97.36
137.75
369.16
382.69
144.37
179.91
194.76
187.97
288.95
211.52
384.35
225.76
28.83
128.53
178.77
107.18
104.58
113.39
124.97
91.28
110.00
100.64
100.64
100.64
100.64
100.68
76.44
99.37
99.37
99.37

12 m
30 m
30 m
80 pies
85 pies
80 pies
80 pies
80 pies
120 pies
100 pies
100 pies
120 pies
120 pies
120 pies
100 pies
90 pies
80 pies
100 pies
100 pies
33 m
33 m
110 pies
110 pies
90 pies
120 pies
120 pies
100 pies
110 pies
85 pies
85 pies
85 pies
85 pies
80 pies
85 pies
85 pies
80 pies
80 pies
85 pies
85 pies

Vano

Vano Amortig. Amortig.

Viento(m
Peso(m)
)
-11.08
116.86
156.07
76.13
183.23
255.32
91.07
59.04
201.00
1.31
442.86
-41.64
379.68
283.98
150.52
200.53
132.94
291.34
198.33
348.87
291.14
145.24
33.89
125.58
168.50
130.33
69.22
155.48
86.80
105.70
101.82
117.55
79.84
105.80
107.46
83.46
73.93
114.52
97.77

25.00
87.04
126.01
139.54
137.12
177.09
165.22
92.27
83.65
89.74
117.56
253.46
375.92
263.53
162.14
187.34
191.36
238.46
250.23
297.93
305.06
127.30
78.68
153.65
142.98
105.88
108.98
119.18
108.12
100.64
105.32
100.64
100.64
100.64
100.66
88.56
87.91
99.37
99.37

CP

CG

0
0
6
0
6
0
0
0
0
0
6
6
0
6
6
6
6
6
6
6
0
0
6
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
0
2
2
0
2
2
2
2
2
2
2
0
0
2
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Resist.

Puesta a tierra

prom (ohmm)

Tipo

long.
Cont

N
varillas

PAT-E
PAT-E
PAT-D
PAT-C
PAT-C
PAT-C
PAT-1
PAT-1
PAT-1
PAT-1
PAT-1
PAT-C
PAT-D
PAT-C
PAT-C
PAT-C
PAT-C
PAT-C
PAT-E
PAT-E
PAT-E
PAT-1
PAT-1
PAT-1
PAT-1
PAT-C
PAT-C
PAT-C
PAT-C
PAT-C
PAT-C
PAT-C
PAT-C
PAT-C
PAT-C
PAT-C
PAT-C
PAT-C

50
50
40
20
10
10
10
40
25
20
10
10
10
10
10
10
10
10
10
10
10
20
20
20
20
20
20
20
20

1
1
1
1
1
1
1
1
1
-

600
600
500
300
160
75
50
50
50
50
20
125
500
350
220
110
80
70
72
38
30
20
20
25
25
80
95
110
150
175
225
240
250
255
260
270
270
260

Volumen de
Tipo de
Cimentacin
suelo
(m3)
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I

18.07
18.07
7.75
8.41
7.75
7.75
7.75
14.99
10.78
10.78
14.99
14.99
14.99
10.78
9.14
7.75
10.78
10.78
22.20
22.20
12.68
12.68
9.14
12.68
12.68
10.78
12.68
8.41
8.41
8.41
8.41
7.75
8.41
8.41
7.75
7.75
8.41
8.41

SM

1
2
3
4
5
6
7
8
9
10
11
12
13
14

A1M
6-30

20

Aislador polimerico tipo line post


Aislador polimerico tipo Suspensin
Horquilla ojo
Grapa de suspensin tipo perno para conductor 375 mm2 AAAC
Grapa de Anclaje tipo comprensin para conductor de 375 mm2 AAAC
Varilla de armar para conductor 375 mm2 AAAC
Suple metalico de 0.50 m de longitud
Grillete de ''A'' G''
Anillo bola
horquilla bola
Alargaderas Horquilla
Horquillas bola paralela
Abrazadera Metlica
Eslabn revirado
Grapa de suspensin para cable de fibra ptica OPGW.
Extensin Metlica para cable de Guarda.
Perno Ojo
Plancha de ''A'' G''
Bola Ojo
Rotula ojal
Aislador Polimerico tipo Tension
Conector a Tierra
Sujetador y Guardacabo
Conector de 2 vias
Amarre preformado de retencion
Alargador ojo Horquilla
Terminal 138KV
Abrazadera Metlica de 1 hueco
Abrazadera Metlica de 3 hueco
Oreja para conexin
Tensor de Corredera
Guarda cabo para OPGW
Retensiones Preformadas

3
3
0
3
3
1
0
0
0
0
0
1
1
0
0
0
0

3
3
0
3
3
1
0
0
0
0
0
1
1
0
0
0
0

3
6
3
3
6
3
3
8
6
0
0
0
0
2
0
0
0
0
0

Conector de una via de AG para conexin de cable de puesta a tierra a poste

2
2
2
1

84
0
84
84
0
84
84
28
0
0
0
0
0
28

SDM
24
0
24
24
0
24
24
8
0
0
0
0
0
8

CANTIDAD
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36

SDM
0-5
28

Conector bimetlico de puesta a tierra


Manguito
TOTAL POR ARMADO
Aislador polimerico tipo line post
Aislador polimerico tipo Suspensin
Horquilla ojo
Grapa de suspensin tipo perno para conductor 375 mm2 AAAC
Grapa de Anclaje tipo comprensin para conductor de 375 mm2 AAAC
Varilla de armar para conductor 375 mm2 AAAC
Suple metalico de 0.50 m de longitud
Grillete de ''A'' G''
Anillo bola
horquilla bola
Alargaderas Horquilla
Horquillas bola paralela
Abrazadera Metlica
Eslabn revirado

SM

A1M
60
120
60
60
120
60
60
160
120
0
0
0
0
40

15
16
17
18
19

Grapa de suspensin para cable de fibra ptica OPGW.


Extensin Metlica para cable de Guarda.
Perno Ojo
Plancha de ''A'' G''
Bola Ojo

28
0
0
0
0

8
0
0
0
0

0
0
0
0
0

20
21
22
23
24
25

Rotula ojal

Aislador Polimerico tipo Tension


Conector a Tierra
Sujetador y Guardacabo
Conector de 2 vias
Amarre preformado de retencion

0
0
0
0
0

0
0
0
0
0

0
0
0
20
0

26
27
28
29
30
31
32
33
34
35
36

Alargador ojo Horquilla


Terminal 138KV
Abrazadera Metlica de 1 hueco
Abrazadera Metlica de 3 hueco
Oreja para conexin
Tensor de Corredera
Guarda cabo para OPGW
Retensiones Preformadas

0
0
0
0
0
0
0
0
0
Conector de una via de AG para conexin de cable de puesta a tierra a poste
Conector bimetlico de puesta a tierra
0
Manguito
0
#VALUE!

0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
40
40
40
20
0
0

A2M
31-60

A3M
61-90

PTM

TR
T. TENS

3
6
3
3
6
3
3
8
6
0
0
0
0
2
0
0
0
0
0

0
6
0
0
6
0
0
8
6
0
0
0
0
2
0
0
0
0
0

0
3
0
0
3
0
0
4
3
0
0
0
0
2
0
0
0
0
0

2
2
2
1

A2M

2
2
2
1

A3M
24
48
24
24
48
24
24
64
48
0
0
0
0
16

3
1
3
0
1
1
1
1
0
PTM

0
18
0
0
18
0
0
24
18
0
0
0
0
6

0
12
0
0
12
0
0
16
12
0
0
0
0
8

PORTICO
4

6
0
0
8
6
0
0
0
0
0
0
0
0
0
0
6
0
0
1
0
0

2
2
2
1

TR. TENS
0
24
0
0
24
0
0
32
24
0
0
0
0
0

0
0
0
3
3
6
3
3
7
0
6
0
0
0
1
1
1
1
1
0
0
3
0
0
0
0
0
0
0
0
0
0
0
2
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Unid

TOTAL
P.Metal
192
198
192
192
198
192
192
300
198
0
0
0
0
106
36
0
0
0
0
0
0

TOTAL
TOTAL
P.concreto
TR
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

0
24
0
0
24
0
0
32
24
0
0
0
0
0
0
0
0
0
0
24
0
0

PARTE SUBTERRANEA
FASE
8.51
32.45
56.61
143.37
15.2
27.71
71.65
69.58
170.14
42.77
36.18

C.GUARDA
8.56
30.37
56.52
143.19
12.23
26.48
71.54
69.47
169.93
42.7
36.11

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

24

0
0
0
8
0

0
0
0
3
0

0
0
0
4
0

0
0
0
4
0

0
0
0
0
0

TOTAL

28.68
23.12
23.91
23.37
719.95

2267.8425

28.63
23.08
23.86
17.97
760.64

0
0
0
0
0
16
16
16
8
0
0

0
0
0
0
0
6
6
6
3
0
0

0
12
4
12
0
4
4
4
4
0
0

0
0
0
0
0
8
8
8
4
0
0

0
0
0
0
0
0
0
0
0
0
0

CONDUCTORES
Descripci Cantidad(m)
AAAC-375
9530.63
OPGW-76 9650.758
TOTAL :
19310.13

2387.8425

AAAC-375
OPGW-76

8810.68

8.811

8810.68

8.811