You are on page 1of 13

MDB Data Center

References

Siemens AG 2009

Drivers for our Value offering

Siemens AG 2009
Seite 2

AutorMDB Data Centers

The Data Center


Siemens Technology & Solutions Inside
Uninterruptible
Power Supply
HV and MV
Power
Distribution

Transfer
Switch
Fire &
Life Safety

Switchgear

Cooling Controls
and Monitoring
Raised Floor
IT Rationalization

Power Monitoring
Security

Siemens AG 2009
Seite 3

AutorMDB Data Centers

Siemens Portfolio Components and


other relevant Solutions and Services
Data Center

Others

Construction

Cooling
Systems

Overall Engineering /
System Integration (EPC)

Chillers

Active Energy
Management

Liquid
Cooling

Virtual Enterprise
Computing

CRAC

IT Automation

Network
Studies

Service &
Maintenance

Project Management
(E-EPC)

Power
Distribution

Building
Technologies

IT Services

IT Equipment

Power
Quality

Tansformer
MV SWGR

Emergency
Power Supply

Power
Monitoring

LV SWGR
Bus Bar

Communications

Access
Control

Lighting

Storage

CCTV

Building
Automation

Fire and
Safety

Network

Outtasking
Outsourcing

Software R&D
Services

Racks
Server

Note: Illustrated portfolio components are not necessarily identical with Siemens sectors / divisions
SWGR = Switchgear
CRAC = Computer Room Air Conditioner
CCTV = Closed Circuit Television
EPC = Engineerin, Procurement, Construction

Seite 4

Datacenter
Outsourcing
Services

Building
Technologies
(see left)

Siemens Solutions

Other vendors

Siemens AG 2009
AutorMDB Data Centers

The MDB Data Center and IT-Services can Provide a Unique Value
Proposition
SIS
Active Energy
Management

I IS WT

I BT

Water Solutions

Building
Automation

Virtual Enterprise Electronic


Computing
Security/FS

Portfolio

Value
Proposition

Compelling
Event

IT Automation

Energy Efficiency

Outtaskin and
Outsourcing

Totally Integrated
Power

Software R&D
Services

Low-Voltage
Controls and
Distribution

I IS E&C
System
integrator for
complex projects

E D/Energy
Power
Transmission
Solutions
Power
Distribution
Solutions
Medium Voltage
Switchgear
Transformers
Renewables

Attractive Portfolio Range

E-EPC Services

Siemens Presence
One-Stop Maintenance

Holistic Network Studies


and Optimization Concepts

Integrated Protection
and Control Technology

Data Center
Transformation Solutions

SIEMENS engineers the solution according to the


ROI calculations and delivers the Business Value
Siemens AG 2009

Seite 5

AutorMDB Data Centers

Siemens EEP is a phase approach with detailed results at each


phase: Audit Capability on Sustainability
Analysis
Selection of
location

Process

Review
env. reporting
Data

Value

Energy
health check+

Focus on the most


promising sites
First internal
benchmark

Energy
analysis

Detailed
Analysis

Implementation

Preliminary Analysis

EA
Proposal

Comparable star
rating system
Energy benchmarking
internal & external for site /
company
Indication of savings &
investment potential per
areas
Discover best practices

EA
Report

PFC
Proposal

Holistic implementation
concept (Technology /
People / Production /
Infrastructure) to
achieve savings

EHC = Energy Health Check / EA = Energy Analysis / PFC = Performance Contracting

Seite 6

Performance
contracting

Executive Interview

EHC+
Report

Output

Implementation

Training

Performance
Assurance

Energy
Reports

User
Motivation
Program

Guaranteed sustainable results


Ongoing optimization
Training & awareness
campaign
Best practice exchange
Continuous benchmarking

Siemens AG 2009
AutorMDB Data Centers

KPN / Getronics DC Aalsmeer, Haarlem and Oude Meer.


Brown Field and Green Field

Total 8.800 m raised floor of which the power density is upgradable from 1500 W/m to 4000 W/m.
Most works were executed in a live datacenter environment (brown field)!

Project Details
Responsible for:
- Project Management (Main Electrical Vendor)
- Feasibility study, Basic design and Detailed
Engineering
- Medium Voltage distribution, 10 kV (43 MV cubicles)
- Low voltage distribution, 400V, 3200A (260 LV
cubicles)
- 3.900 m busbar trunking systems (400V) ranging from
1100A to 4000A
- 13.000 m busbar trunking (400V) system ranging from
160A to 315A (functioning as PDU)
- 2.200 tap-off units ranging from 16A to 250A
- HVAC Control
- Building management system
- Power monitoring system
- Installation
- Commissioning
- Total grid connection: 75 MVA

Total contract value 18 million


Siemens AG 2009
Seite 7

AutorMDB Data Centers

Volker Wessels Telecom Datacenter Almere Fase 1

Total 5.000 m raised floor of which the power density is upgradable from 1500 W/m to 2000 W/m.
Works were executed in a Green Field environment

Project Details
Responsible for:
- Project Management (Main Electrical Vendor)
- Feasibility study, Basic design and Detailed
Engineering
- Medium Voltage distribution, 10 kV (15 MV cubicles)
- Low voltage distribution, 400V, 3200A (90 LV cubicles)
- 3.000 m busbar trunking systems ranging form 1100A
to 4000A
- 5.000 m busbar trunking system ranging from 250A
(functioning as PDU)
- 800 tap-off units ranging from 16A to 800A
- HVAC Control
- Power monitoring system
- Installation
- Commissioning
- Total grid connection: 60 MVA

Total contract value 8,5 million


Siemens AG 2009
Seite 8

AutorMDB Data Centers

Referenzen RD Bayern (von 40 10.000m)


2008

Eurodata

2008

NRZ Karlsruhe

2007

Miwe

2006

Knig und Bauer

2006

RZ Sd, Bayr. LKA

2006

Siemens Business Services

2005

Linde

2005

b.i.t.s. / Schrghuber Gruppe

2005

Siemens VDO

2004

Europ. Assistance

2004

Mnchner Rck

2004

Sachsenmilch

2003

e-shelter

2003

Glaxo, Smith, Kline

2003

Hupmann

2003

Infineon

2003

Micronas

2003

Siemens Erlangen

2003

Europische Assistance

2002

Berufsfrderungswerk

2002

DiBa

2002

equant

2002

e-shelter

2002

Essener Systemhaus

2002

Osram

2002

Wittur

2002

Mller Milch

2002

WWK

2001

Mnchener Verein Versicherung

2001

Media Professionals

2000

Hamburgische Landesbank

2000

Klinikum Grohadern

2000

Mnchener Verein

1999

Bay. Versicherungskammer

1999

NEC Deutschland
Siemens AG 2009

Seite 9

AutorMDB Data Centers

References Spain
Data Center (ITA)
Customer : Instituto Tcnico Agrario de Castilla y Le
Len
Activity :

Supply and installation of equipments and devices

Location :

Valladolid

Date :

March - 2006

New ICM Installations


Customer : Inform
Informtica de la Comunidad de Madrid (ICM)
Activity :

Retrofit of rooms and supply of constructive equipment, air

conditioning

and security for the new installations of the customer.


Location:

Madrid

Date :

October - 2006

New CPD of Hospitals


Customer :

Consejer
Consejera Sanidad Comunidad de Madrid

Activity :

Retrofit of rooms and supply of constructive equipment, air

conditioning

and security for the new Data Centers.


Location :

Tres Cantos

Date :

October-2006

Siemens AG 2009
Seite 10

AutorMDB Data Centers

References Spain
Data Center
Customer :

DAIKIN

Activity :

Redesigning for the new construction of IT Zone

Location :

Madrid

Date :

November 2006

Data Center in Cornella


Customer : Siemens S.A.
Activity :

Design, engineering, construction, electrical installation, air

conditioning,

security and fire protection for new redundant DC.


Location :

Madrid

Date :

Running

Technical Zone of Data Center


Customer :

ONO

Activity :

Electrical installations, communications and constructive modifies of

the

Technical Zone of Data Center


Location :

Madrid

Date :

running

Siemens AG 2009
Seite 11

AutorMDB Data Centers

References Spain
Recovery CPD of Hospitals
Customer :

Consejer
Consejera Sanidad Comunidad de Madrid

Activity :

Design, engineering, construction, electrical installation, air

conditioning,

security and fire protection for a new recovery DC.


Location :

Getafe

Date :

November-2007

Data Center in Mlaga Airport


Customer : AENA
Activity :

Works of room conditioning, civil construction, electrical installation, air


conditioning,

Location :

Mlaga

Date :

January - 2008

security and fire protection for new DC.

New Data Center


Customer :

itaCyL

Activity :

Design, engineering, room conditioning, construction, electrical

cabinets and wires,

air conditioning for a new DC.


Location :

Valladolid

Date :

January - 2008

Siemens AG 2009
Seite 12

AutorMDB Data Centers

References: Datacenter Huizingen in Cooperation between Spain


and Belgium

DC Building Huizingen

HVAC Filter

Fire Protection

Power Cable from DGU

Diesel Generator Unit

Power Cable to Building

Siemens AG 2009
Seite 13

AutorMDB Data Centers

You might also like