Project Set Up
Asia
57m
~ -7.1mPD
43m
~ -5.9mPD
Asia
43m
~ +4.0mPD
Retaining Wall
Asia
Asia
Victoria Harbour
Fill
Rock Fill
Sand Fill
Marine Deposits
Alluvium
CDG
Existing Salt
Water PS
Fill
Marine Deposits
Alluvium
CDG
Asia
Asia
Asia
10/10/06
30/9/06
20/9/06
10/9/06
31/8/06
21/8/06
0.000
Settlement (m)
-0.100
SS Markers on Seawall
SS1
SS2
-0.200
SS3
SS4
10/10/06
30/9/06
20/9/06
10/9/06
31/8/06
21/8/06
-0.300
0.000
GS20
GS21
GS24
GS25
Settlement (m)
-0.100
-0.200
Asia
Design Considerations
Reclamation Site
Asia
Design Methodology
Lateral Stability
Base Stability
Hydraulic Stability
Dewatering
Structural Capacities
Asia
Asia
10
Asia
11
12
Penetration
(T.A.M.) Grout
Jet Grout
Sheetpile
(not shown for clarity)
Elevation of Wall D
(Showing Grouting Ground Improvement)
Asia
Culvert
East
West
Fill
Marine Deposit
Alluvium
CDG
Grout A
Grout B
Asia
13
max = 115mm
max = 60mm
East Wall
West Wall
Asia
max = 18mm
max = 82mm
West Wall
East Wall
Asia
14
max = 102mm
max = 88mm
South Wall
North Wall
Asia
max = 53mm
max = 75mm
South Wall
North Wall
15
Seawater
Fill (Sand)
Seawall
Tilt = 1/650
Fill (Rock)
Exaggeration scale: 30
Deformation of Seawall
Asia
Asia
16
Principal Instrumentation :
- Ground settlement markers (SS, GS, SA)
- Inclinometers (IN, INX)
- Standpipe Piezometer (SP, PZ, PP)
- Building Tilt Marker
North Wall
West Wall
East Wall
Asia
17
0.050
Excavation
0.000
-0.050
Pile Cap
Settlem
ent (m
)
-0.100
-0.150
-0.200
SS Markers on Seawall
01-Jan-08
01-Nov-07
01-Dec-07
01-Oct-07
01-Sep-07
01-Aug-07
01-Jul-07
01-Jun-07
01-M
ay-07
01-Apr-07
01-M
ar-07
SS 4
01-Feb-07
01-Sep-06
SS1
01-Jan-07
S S2
01-Oct-06
SS 3
01-Aug-06
-0.350
01-Dec-06
-0.300
01-Nov-06
-0.250
D ate
-0.100
Settlem
ent (m
)
-0.200
-0.300
-0.400
01-Jan-08
01-Dec-07
01-Nov-07
01-O
ct-07
01-Sep-07
01-Aug-07
01-Jul-07
01-Jun-07
01-M
ay-07
01-Apr-07
01-M
ar-07
01-Feb-07
01-Jan-07
GS20
01-Dec-06
01-Nov-06
GS24
01-O
ct-06
01-Sep-06
01-Aug-06
GS23
-0.600
D ate
Asia
0.000
Excavation
-0.050
Pile Cap
-0.100
Settlement (m )
-0.150
-0.200
-0.250
-0.300
-0.350
-0.400
-0.450
GS31
GS34
GS28
01-Jan-08
01-Dec-07
01-Nov-07
01-Oct-07
01-Sep-07
01-Aug-07
01-Jul-07
01-Jun-07
01-May-07
01-Apr-07
01-M ar-07
01-Feb-07
01-Jan-07
01-Dec-06
01-Nov-06
01-Oct-06
01-Sep-06
01-Aug-06
-0.500
Date
Asia
18
GS31 (9.6m)
GS28 (6.2m)
GS34 (15.6m)
0.000
-0.010
-0.030
-0.040
-0.050
-0.060
SS13
SS9
SS10
SS14
01-Jan-08
18-Dec-07
04-Dec-07
23-Oct-07
20-Nov-07
09-Oct-07
06-Nov-07
25-Sep-07
11-Sep-07
28-Aug-07
31-Jul-07
14-Aug-07
17-Jul-07
03-Jul-07
19-Jun-07
05-Jun-07
22-May-07
24-Apr-07
08-May-07
10-Apr-07
27-Mar-07
13-Mar-07
30-Jan-07
27-Feb-07
13-Feb-07
16-Jan-07
02-Jan-07
19-Dec-06
05-Dec-06
21-Nov-06
24-Oct-06
07-Nov-06
10-Oct-06
26-Sep-06
12-Sep-06
29-Aug-06
15-Aug-06
-0.070
01-Aug-06
Settlement (m)
-0.020
Date
Asia
19
Displacement (mm)
5
10
15
4.0
2.0
0.0
-2.0
Elevation (mPD)
-4.0
-6.0
-8.0
-10.0
-12.0
-14.0
-16.0
-18.0
Jet grouting
Asia
Jet grout cuts insitu soft clay and mixes that with
injected cement
20
Asia
1. Set up rig
4. Commence Jetting
3. Test jetting
Ref. : CNCEC
21
= 1500 2000 mm
= 300 400 bars
= 8 - 12 bars
= 13 to 15 min/m
= 6 7 rev/step
= 600 kPa
= 150 MPa
Asia
Asia
22
Asia
Asia
23
Asia
24
Hole S2
Hole S5
Asia
Asia
25
Asia
Asia
26
Asia
27
Asia
28
Asia
29
Asia
30
Excavation in progress
Asia
Disposal by barge
Asia
31
Excavation completed
Asia
32
Concreting in progress
Asia
Concreting in progress
(3 concrete pumps & 13 concrete trucks)
Asia
33
Foundation Completed
Asia
Asia
34
Before Commencement
After Completion
Ref. : DSD
Asia
Summary
Issues to be considered in ELS design
Site history
Site characterization
Design parameters (drained or undrained)
Design objective and constraints
Retaining wall installation effects
Economy and construction programme
Asia
35
Acknowledgement
Asia
Thank You !
Asia
36