Professional Documents
Culture Documents
Proyecto:
06.00.00
CERCO PERIMETRICO
06.01.00
06.01.01
TRABAJOS PRELIMINARES
Limpieza del terreno manual
Ubicacin
CERCO PERIMETRICO
Zona Norte
Fachada Zona Este
Zona Sur
Zona Oeste
06.01.02
06.02.00
06.02.01
06.02.02
06.03.00
06.03.01
Dpto: PUNO
MOVIMIENTO DE TIERRAS
Excavacion para cimientos y zapatas
Ubicacin
Zona Norte
Fachada Zona Este
Zona Sur
Zona Oeste
Zapatas
Zapatas para puerta vehicular de ingreso
Eliminacion de material excedente (D= 5 km)
Ubicacin
CONCRETO SIMPLE
Solado cemento hormigon 1:10 e=10 cm
Ubicacin
Zapatas
Zapatas
m2
Cant.
largo
ancho
79.05
73.00
79.05
66.35
1.00
1.00
1.00
1.00
largo
297.45
ancho
0.80
111
2
largo
79.05
73.00
79.05
66.35
0.80
0.80
m3
Cant.
m2
Cant.
m2
Cant.
1
m3
Cant.
113.00
altura
Area
79.05
73.00
79.05
66.35
Sub total
TOTAL
297.45
297.45
altura
Area
Sub total
237.96
237.96
TOTAL
237.96
ancho
0.50
0.50
0.50
0.50
0.80
0.80
altura
0.90
0.90
0.90
0.90
1.10
1.10
TOTAL
largo
ancho
altura
Comp-2
256.09
largo
ancho
0.80
0.80
altura
0.05
Area
3.62
Sub total
3.62
213.40
TOTAL
3.62
Proyecto:
06.03.02
Dpto: PUNO
m3
Cant.
largo
ancho
altura
79.05
73.00
79.05
66.35
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
TOTAL
19.76
18.25
19.76
16.59
74.36
06.03.03
06.03.04
06.04.00
06.04.00
largo
297.45
Encofrado en sobrecimientos
Ubicacin
CIMIENTO CORRIDO (CERCO PERIMETRICO)
m2
Cant.
1.00
largo
297.45
m3
Cant.
193.00
largo
0.90
CONCRETO ARMADO
Zapatas - Concreto f'c=210 kg/cm2
Ubicacin
Zapatas
06.04.02
06.04.03
m3
ancho
0.15
TOTAL
31.23
ancho
altura
0.70
Area
Sub total
416.43 416.43
TOTAL
416.43
ancho
0.90
TOTAL
78.17
kg.
m3
Cant.
197
1,550.27
largo
ancho
altura
3.05
rea
Sub total
0.05
27.04
TOTAL
27.04
06.04.04
m2
Cant.
197
largo
ancho
0.60
altura
2.75
Area
1.65
Sub total
325.05
TOTAL
325.05
06.04.05
06.04.06
m3
Cant.
m2
Cant..
06.04.07
kg.
5,258.95
largo
517.90
ancho
0.15
altura
0.10
largo
517.90
517.90
ancho
altura
0.10
0.10
Area
51.79
51.79
Sub total
TOTAL
7.77
TOTAL
103.58
06.04.08
06.05.00
06.05.01
MUROS
Muro
Ubicacin
1
CERCO PERIMETRICO
kg.
m3
Cant.
86.00
9,917.59
largo
3.50
ancho
TOTAL
602.00
Proyecto:
Dpto: PUNO
Proyecto:
Dpto: PUNO
Proyecto:
Dpto: PUNO
Proyecto:
Dpto: PUNO
Proyecto:
Dpto: PUNO
Proyecto:
Dpto: PUNO
Dpto: PUNO
ZAPATAS
ELEMENTO
N ELEM.
IGUALES
LARGO
ANCHO
DESCRICION
ALTURA
LONG
N PIEZAS
IGUALES
0.90 m
0.90 m
1/2
0.75
5.00
1/2
0.75
5.00
1/4"
3/8"
1/2"
5/8"
3/4"
0.25
0.58
1.02
1.60
2.26
738.23
0.50 m
193
SUB TOTAL
DESPERDICIOS
METRADO TOTAL
738.23
0.00
0.00
0.00
0.00
1476.45
73.82
0.00
0.00
0.00
0.00
1550.27
Kg
COLUMNAS
COLUMNA
CANTID. DE
ELEMENTOS
LARGO
ANCHO
DESCRICION
ALTURA
LONG
N PIEZAS
IGUALES
1/4"
3/8"
1/2"
5/8"
3/4"
0.25
0.58
1.02
1.60
2.26
3134.66
0.00
0.00
156.73
0.00
0.10
Columna C-1
(0.25 x 0.25) Cerco
Perim.
197
Estribos C-1
197
3.55
1/2
3.90
4.00
3/8
0.82
20.00
3134.66
0.25
0.24
ganchos= 0.08 m.
0.09
SUB TOTAL
DESPERDICIOS (5%)
1873.86
0.00
0.00
1873.86
93.69
METRADO TOTAL
0.00
5258.95
Kg
VIGA
CANTIDAD
ELEMENT.
DESCRICION
LONG
N PIEZAS
IGUALES
1/4"
3/8"
1/2"
5/8"
3/4"
0.25
0.58
1.02
1.60
2.26
3.50
VIGA V-1
136
####################################
0.10
3.50
0.10
3/8
7.40
2.00
1167.42
3/8
6.40
2.00
14.85
3/8
5.40
2.00
12.53
3/8
3.20
2.00
7.42
1/4
0.30
43.00
#################################
3.00
VIGA V-1
####################################
0.10
3.00
0.10
#################################
2.50
VIGA V-1
####################################
0.10
2.50
0.10
#################################
1.40
VIGA V-1
####################################
0.10
1.40
0.10
2556
estribos
#################################
0.3
ganchos= 0.08 m.
SUB TOTAL
DESPERDICIOS (5 %)
METRADO TOTAL
8243.10
8,243.10
1,202.22
412.16
60.11
9917.59
Kg
METRADO DE ACERO
Proyecto:
Ubicacin:
Descripcion
Dpto: CUSCO
Diseo
del
fierro
BEBEDERO DE AGUA
Parte posterior (espaldar)
Refuerzo Tranversal
N de
elemtos.
iguales
N de
piezas x
elemento
Long.
Por
pieza
1/4"
3/8"
0.250
0.580
Peso
3/4"
1"
1.050
1.560
2.240
3.973
kg
0.05
1.60
3/8"
10
1.70
34.0
-
19.720
3/8"
1.90
34.2
19.836
3/8"
10
1.07
10.7
6.206
3/8"
10
0.72
7.2
4.176
3/8"
0.40
1.6
0.928
3/8"
2.80
19.6
11.368
3/8"
2.40
16.8
9.744
0.05
1.90
0.42
0.20
0.42
0.20
0.10
0.40
0.25
0.20
0.20
1.90
0.25
0.25
1.90
1.90
3/8"
1.90
1.9
1.102
2.30
3/8"
2.30
4.6
2.668
0.55
3/8"
0.55
2.2
1.276
0.12
3/8"
12
1.37
16.4
9.535
0.10
3/8"
1.25
11.3
6.525
3/8"
0.45
4.1
2.349
Sub-Total
(+ 5% DESPERDIC.)
95.433
100.205
0.70
0.45
Componente - 1
Componente - 2
TOTAL
200.41 kg
100.20 kg
300.61