You are on page 1of 13

VENDOR VENDOR

No Material Item TOTAL PRICE TOTAL PRICE


STANDARD ELEVATED 1 M
A. GENSET FOUNDATION G STD G E1
TOTAL A Rp 6,578,336 Rp 10,865,691
B. MONTHLY / BULK TANK FOUNDATION CAPACITY 1000 L T1 STD T1 E1
TOTAL B Rp 3,213,908 Rp 6,277,564
C. MONTHLY / BULK TANK FOUNDATION CAPACITY 3000 L T3 STD T3 E1
TOTAL C Rp 6,717,189 Rp 12,289,342
D. MONTHLY / BULK TANK FOUNDATION CAPACITY 5000 L T5 STD T5 E1
TOTAL D Rp 6,717,189 Rp 12,289,342
E. DOUBLE GENSET FOUNDATION DG STD DG E1
TOTAL E Rp 10,459,065 Rp 17,694,286
GRAND TOTAL (A+B+C+D+E) Rp 33,685,686 Rp 59,416,225
VENDOR
TOTAL PRICE
ELEVATED 2 M
G E2
Rp 8,250,152
T1 E2
Rp 5,769,607
T3 E2
Rp 11,388,229
T5 E2
Rp 11,388,229
DG E2
Rp 11,997,701
Rp 48,793,918
BOQ - FOUNDATION - GENERAL DESIGN
sites 1
16-Apr 16-Apr
No Material Item TYPE TYPE
A. GENSET FOUNDATION QTY QTY
G STD G E1
1 Site Preparation
a Site Clearing and grubbing, removal of scrubs, grass, and soft trees, 1.00 1.00
b Leveling & benchmark setting 1.00 1.00
2 Foundation Structure
a Soil Excavation & Compaction 6.60 12.71
b Sand fill (Thickness 150 mm) 0.56 0.45
c Aanstamping 1.11 1.29
d Stone masonry 3.44 8.30
e Concrete Floor (K-225) 1.65 1.83
f Land fill (compacted) 1.72 2.48
g Concrete layer (50mm) - -
h Stair (stone masonry) - -
i Finishing with cement plaster & black painting 14.05 19.85
TOTAL A - PER SITE
TOTAL
B. MONTHLY / BULK TANK FOUNDATION CAPACITY 1000 L
1 Foundation Structure
a Soil Excavation & Compaction 3.70 6.34
b Sand fill (Thickness 150 mm) 0.26 0.31
c Aanstamping 0.79 0.92
d Stone masonry 1.41 4.75
e Concrete Floor (K-225) 1.20 1.35
f Land fill (compacted) 1.23 2.42
g Concrete layer (50mm) - -
h Stair to shelter (stone masonry) - -
i Finishing with cement plaster & black painting 8.00 13.00
TOTAL B - PER SITE
TOTAL
C. MONTHLY / BULK TANK FOUNDATION CAPACITY 3000 L
1 Foundation Structure
a Soil Excavation & Compaction 6.97 11.95
b Sand fill (Thickness 150 mm) 0.50 0.58
c Aanstamping 1.49 1.74
d Stone masonry 2.66 8.96
e Concrete Floor (K-225) 2.80 2.95
f Land fill (compacted) 2.32 7.12
g Concrete layer (50mm) - -
h Stair to shelter (stone masonry) - -
i Finishing with cement plaster & black painting 17.12 24.92
TOTAL C
TOTAL
D. MONTHLY / BULK TANK FOUNDATION CAPACITY 5000 L
1 Foundation Structure
a Soil Excavation & Compaction 6.97 11.95
b Sand fill (Thickness 150 mm) 0.50 0.58
c Aanstamping 1.49 1.74
d Stone masonry 2.66 8.96
e Concrete Floor (K-225) 2.80 2.95
f Land fill (compacted) 2.32 7.12
g Concrete layer (50mm) - -
h Stair to shelter (stone masonry) - -
i Finishing with cement plaster & black painting 17.12 24.92
TOTAL D
TOTAL
E. DOUBLE GENSET FOUNDATION
1 Foundation Structure
a Soil Excavation & Compaction 9.07 15.55
b Sand fill (Thickness 150 mm) 0.65 0.76
c Aanstamping 1.94 2.27
d Stone masonry 6.80 14.58
e Concrete Floor (K-225) 2.94 3.46
f Land fill (compacted) 3.83 10.24
g Concrete layer (50mm) - -
h Stair to shelter (stone masonry) - -
i Finishing with cement plaster & black painting 22.40 32.58
TOTAL E
TOTAL
GRAND TOTAL (A+B+C+D+E)
TERMS OF PAYMENT

CUBE TEST/MASTER MIX DESIGN


WARRANTY SERVICE
DELIVERY TERM
DELIVERY TIME
UNIT PRICE STANDARD FOUNDATION ELEVATED 1M FOUNDATION
16-Apr 1 1 1
TYPE Unit VENDOR VENDOR VENDOR
QTY UNIT PRICE TOTAL PRICE TOTAL PRICE
G E2 G STD G E1
S1 S1
1.00 ls Rp 3,189 Rp 3,189 Rp 3,189
1.00 ls Rp 739,200 Rp 739,200 Rp 739,200

14.83 m3 Rp 30,916 Rp 204,043 Rp 392,937


0.50 m3 Rp 165,150 Rp 92,484 Rp 74,318
1.24 m3 Rp 321,907 Rp 356,351 Rp 415,743
- m3 Rp 680,065 Rp 2,342,145 Rp 5,646,241
4.59 m3 Rp 1,572,000 Rp 2,593,800 Rp 2,878,725
3.70 m3 Rp 26,580 Rp 45,809 Rp 65,905
- m3 Rp 165,150 Rp - Rp -
- m3 Rp 680,065 Rp - Rp -
26.02 m2 Rp 100,080 Rp 1,406,124 Rp 1,986,588
Rp 7,783,145 Rp 12,202,846
SITES Rp 7,783,145 Rp 12,202,846
T1 STD T1 E1

6.34 m3 Rp 30,916 Rp 114,264 Rp 195,881


0.30 m3 Rp 165,150 Rp 43,600 Rp 50,866
0.90 m3 Rp 321,907 Rp 254,951 Rp 297,442
- m3 Rp 680,065 Rp 957,532 Rp 3,231,670
3.73 m3 Rp 1,572,000 Rp 1,886,400 Rp 2,122,200
3.42 m3 Rp 26,580 Rp 32,747 Rp 64,217
- m3 Rp 165,150 Rp - Rp -
- m3 Rp 680,065 Rp - Rp -
20.00 m2 Rp 100,080 Rp 800,640 Rp 1,301,040
Rp 4,090,133 Rp 7,263,317
SITES Rp 4,090,133 Rp 7,263,317
T3 STD T3 E1

14.04 m3 Rp 30,916 Rp 215,544 Rp 369,503


0.70 m3 Rp 165,150 Rp 82,245 Rp 95,952
2.10 m3 Rp 321,907 Rp 480,929 Rp 561,084
- m3 Rp 680,065 Rp 1,806,253 Rp 6,096,104
7.04 m3 Rp 1,572,000 Rp 4,401,600 Rp 4,637,400
8.19 m3 Rp 26,580 Rp 61,772 Rp 189,356
- m3 Rp 165,150 Rp - Rp -
- m3 Rp 680,065 Rp - Rp -
40.12 m2 Rp 100,080 Rp 1,713,370 Rp 2,493,994
Rp 8,761,712 Rp 14,443,394
SITES Rp 8,761,712 Rp 14,443,394
T5 STD T5 E1

14.04 m3 Rp 30,916 Rp 215,544 Rp 369,503


0.70 m3 Rp 165,150 Rp 82,245 Rp 95,952
2.10 m3 Rp 321,907 Rp 480,929 Rp 561,084
- m3 Rp 680,065 Rp 1,806,253 Rp 6,096,104
7.04 m3 Rp 1,572,000 Rp 4,401,600 Rp 4,637,400
8.19 m3 Rp 26,580 Rp 61,772 Rp 189,356
- m3 Rp 165,150 Rp - Rp -
- m3 Rp 680,065 Rp - Rp -
40.12 m2 Rp 100,080 Rp 1,713,370 Rp 2,493,994
Rp 8,761,712 Rp 14,443,394
SITES Rp 8,761,712 Rp 14,443,394
D STD D1 E1

16.24 m3 Rp 30,916 Rp 280,466 Rp 480,799


0.82 m3 Rp 165,150 Rp 107,017 Rp 124,853
2.46 m3 Rp 321,907 Rp 625,788 Rp 730,086
- m3 Rp 680,065 Rp 4,627,164 Rp 9,915,351
7.09 m3 Rp 1,572,000 Rp 4,621,680 Rp 5,434,797
10.47 m3 Rp 26,580 Rp 101,908 Rp 272,232
- m3 Rp 165,150 Rp - Rp -
- m3 Rp 680,065 Rp - Rp -
43.20 m2 Rp 100,080 Rp 2,241,792 Rp 3,260,606
Rp 12,605,814 Rp 20,218,725
SITES Rp 12,605,814 Rp 20,218,725
Rp 42,002,516 Rp 68,571,675
ELEVATED 2M FOUNDATION 1.65
1
VENDOR
TOTAL PRICE
G E2
S1
Rp 3,189
Rp 739,200

Rp 458,478
Rp 82,575
Rp 398,360
Rp -
Rp 7,219,017
Rp 98,452
Rp -
Rp -
Rp 2,604,082
Rp 11,603,353
Rp 11,603,353
T1 E2

Rp 195,881
Rp 49,545
Rp 289,716
Rp -
Rp 5,867,490
Rp 90,797
Rp -
Rp -
Rp 2,001,600
Rp 8,495,030
Rp 8,495,030
T3 E2

Rp 434,055
Rp 115,605
Rp 676,005
Rp -
Rp 11,073,168
Rp 217,624
Rp -
Rp -
Rp 4,015,210
Rp 16,531,666
Rp 16,531,666
T5 E2

Rp 434,055
Rp 115,605
Rp 676,005
Rp -
Rp 11,073,168
Rp 217,624
Rp -
Rp -
Rp 4,015,210
Rp 16,531,666
Rp 16,531,666
D1 E2

Rp 501,946
Rp 135,258
Rp 790,926
Rp -
Rp 11,144,301
Rp 278,293
Rp -
Rp -
Rp 4,323,456
Rp 17,174,179
Rp 17,174,179
Rp 70,335,895
No Material Item Vol Unit Unit Price Total Price
1 Site Preparation

a Site Clearing and grubbing, removal of scrubs,


grass, and soft trees, 1.00 ls Rp 3,189 Rp 3,189
b Leveling & benchmark setting 1.00 ls Rp 739,200 Rp 739,200
2 Foundation Structure
a Soil Excavation & Compaction 2.52 m3 Rp 30,916 Rp 77,907
b Sand fill (Thickness 50 mm) 0.18 m3 Rp 165,150 Rp 29,727
c Aanstamping 0.54 m3 Rp 321,907 Rp 173,830
d Stone masonry 1.68 m3 Rp 680,065 Rp 1,142,510
e Back filling with compaction 1.60 m3 Rp 30,916 Rp 49,465
f Concrete Floor (K-225) 0.27 m3 Rp 1,729,200 Rp 466,884
i Finishing with cement plaster & black painting 3.81 m2 Rp 100,080 Rp 381,305
TOTAL Rp 3,064,016
No Material Item Vol Unit Unit Price Total Price
1 Site Preparation

a Site Clearing and grubbing, removal of scrubs,


grass, and soft trees, 1.00 ls Rp 3,189 Rp 3,189
b Leveling & benchmark setting 1.00 ls Rp 739,200 Rp 739,200
2 Foundation Structure
a Soil Excavation & Compaction 2.44 m3 Rp 30,916 Rp 75,434
b Sand fill (Thickness 150 mm) 0.48 m3 Rp 165,150 Rp 79,272
c Aanstamping 0.91 m3 Rp 321,907 Rp 292,936
d Stone masonry 2.88 m3 Rp 680,065 Rp 1,958,588
e Concrete Floor (K-225) 0.92 m3 Rp 1,572,000 Rp 1,440,974
f Land fill (compacted) 1.28 m3 Rp 26,580 Rp 34,022
g Finishing with cement plaster & black painting 7.81 m2 Rp 100,080 Rp 781,375

Total Rp 5,404,989
1.65

0.91665

2.4444 1.8333

6.6 4.95

7.8075
BOQ - CUSTOM FOUNDATION 2x1,5m FOR HCPT

No Material Item QTY Unit UNIT PRICE TOTAL PRICE


1 Site Preparation

a Site Clearing and grubbing, removal of scrubs,


grass, and soft trees, 1.00 ls Rp 3,189 Rp 3,189

b Leveling & benchmark setting 1.00 ls Rp 739,200 Rp 739,200


2 Foundation Structure

a Soil Excavation & Compaction 2.64 m3 Rp 30,916 Rp 81,617

b Sand fill (Thickness 50 mm) 0.22 m3 Rp 170,000 Rp 37,740

c Aanstamping (Thickness 150 mm) 0.67 m3 Rp 340,000 Rp 226,440

d Stone masonry 1.21 m3 Rp 710,000 Rp 857,680

e Concrete Floor (K-225) 1.16 m3 Rp 1,572,000 Rp 1,815,660

f Land fill (compacted) 0.54 m3 Rp 26,580 Rp 14,460

g Finishing with cement plaster & black painting 4.28 m2 Rp 100,080 Rp 428,342

Total Rp 4,204,328
HPP PG 135KVA 2,2m x 4,8m

No Material Item QTY Unit UNIT PRICE TOTAL PRICE


1 Site Preparation

a Site Clearing and grubbing, removal of scrubs,


grass, and soft trees, 1.00 ls Rp 3,189 Rp 3,189

b Leveling & benchmark setting 1.00 ls Rp 739,200 Rp 739,200


2 Foundation Structure

a Soil Excavation & Compaction 8.45 m3 Rp 30,916 Rp 261,175

b Sand fill (Thickness 50 mm) 0.42 m3 Rp 170,000 Rp 71,400

c Aanstamping (Thickness 150 mm) 1.26 m3 Rp 380,000 Rp 478,800

d Stone masonry 2.27 m3 Rp 741,000 Rp 1,683,552

e Concrete Floor (K-225) 3.38 m3 Rp 1,572,000 Rp 5,312,102

f Land fill (compacted) 4.50 m3 Rp 26,580 Rp 119,504

g Finishing with cement plaster & black painting 11.96 m2 Rp 100,080 Rp 1,196,957

Total Rp 9,865,879

You might also like