Professional Documents
Culture Documents
by (team name)
Table of Contents
Introduction................................................................................................................................................................. 4
Instructions ................................................................................................................................................................. 4
Introduction
Congratulations for having made it to the Approach Note Phase of the Driverless Car Challenge. Only
shortlisted applicants will be required to fill in an Approach Note.
The Approach Note is a detailed description of your innovation and will help the jury evaluate your
participation in further rounds. This is the first opportunity for you to show the jury the clarity of your
thought process and wherewithal to stay the course and complete the Driverless Car Challenge.
The submission period for the Approach Note is 14 th April 2014 to 9thJanuary 2015. Please take time
and make the documents clear and comprehensive as you can, and submit it only after you are sure
it is complete in all respect and to your satisfaction.
Note that there are no extra points for early submissions!
A few points that we would urge you to keep in mind are:
1. Ensure that your Approach Note is properly structured and includes all the key elements
required to present your thinking clearly and effectively
2. Ensure that the data and calculations in relevant sections are correct and accurate
3. Ensure that you provide supporting data wherever applicable and remember to state all your
assumptions clearly
4. Ensure that the Approach Note flows logically, reads well and is free of grammatical and
spelling errors
5. Ensure that you read through the set of instructions below carefully before you develop your
Approach Note
Instructions
1. The Approach Note phase will commence on14thApril 2014
4. A confirmation email will be sent to the team leader from the mail id brand@mahindra.com.
Teams are requested to write to brand@mahindra.com in case they do not receive a confirmation
mail two working days after submitting
6. For easy identification, teams are required to name their Approach Notes in the following
format: [Team Name_Approach_Note_Driverless_Car_Challenge.Pdf]
7. Please use ARIAL font and maintain a font size of 11 or 12, with a line spacing of 1.5.
8. Update the Table of Contents once you have completed the Approach Note
9. Attachments, including engineering drawings, can be provided as annexures at the end of the
document or embedded in the document. In case teams attach extra documents as separate
files,
please
save
them
using
the
format:
[TeamName_FileName_Approach
Note_Driverless_Car_Challenge.Pdf].
10. In case the teams wish to attach a video showcasing a working model / simulations of their
concept, they can upload the same on YouTube and a link for the same has to be provided in
the Approach Note.
11. Any documents related to IP / any large file (other than the Approach Note) can be submitted
by uploading the same on Sendspace / Wetransfer. However, Mahindra will not be responsible
for loss of documents and/or protection of IP
12. The evaluation period will be 2nd June 2014 to 16thFebruary 2015
13. We will intimate progress into the live presentation phase in an e-mail to the team leader within
45 working days of submission of the Approach Note
14. Teams are encouraged to check with Mahindra if they do not receive an email by the 48th
working day after submission
15. Any changes to your Approach Note, post submission, that need to be incorporated in the
document will have to be e-mailed to brand@mahindra.com. The acceptance of the modified
document is completely at the discretion of Mahindra.
16. Teams are encouraged to submit, as credentials, any research paper(s) authored by them,
participation in other challenges, mentors advising the team and anything else that can add to
the team credentials
17. If the team is officially representing an Institution or Organisation, please attach a letter of
authorization (appropriately signed and sealed by a competent authority) as a separate
document
Executive Summary
(A 1-2 page summary on the key technical, financial and operational aspects of the approach that is covered in this
document)
Objective 1
Description
Ease of use
Case Scenarios
Objective 2
Description
India Centricity
Objective 3
Description
Level of autonomy
Objective 4
Description
Feasibility
Commercial aspects must be considered while drawing up a roadmap for product evolution.
Market Readiness how soon can the first systems that have reasonable market applications be
commercialized? What is the roadmap post that for wider market/segments/ use-cases applicability?
Objective5
Description
Objective 6
Description
Innovation
Objective 7
Description
Affordability
Objective 8
Description
Multi-Functionality
Description
Description
Maintenance
Team Details
Team Name
Team Type (Institution/Organization/Private)
Name of Institution/Organization (If Applicable)
Name
Role
Expertise
Highest Education
Current/Relevant
Work Profile
Example
Rahul Mukherjee
Leader
Gears &
Transmissions
Leader
Deputy
Member
Member
Member
Member
Member
Member
Member
10
Member
11
Member
12
Member
13
Member
14
Member
15
Member
16
Member
17
Member
18
Member
19
Member
20
Member
PHD Tribology
Technical Analyst
XYZ Corp
List of Mentors/Sponsors/Consultants/Partners
No.
1
2
3
4
5
Name
Nature of Support
Expertise
Remarks, if any