Professional Documents
Culture Documents
Operating Instruction
Content
Pages
General and main performance parameters
System Principle Description
Characteristics and Designed Value
Preparation and adjustment before running
Debugging methods and working conditions
11
Maintenance and management
Appendix
13
15
17
18
19
20
Section 1 General and Main Performance Parameters
General
The main parts and components of this product will choose the hydraulic
products imported from Bosch Rexroth, Germany.
10Mpa / 18Mpa
21Mpa
continuous
pressure/theoretical capacity
3
Electric Motor
/
Power/ rotate speed
4
Capacity of oil tank
5
Environment
Ambient temperature
Environment humidity
6
Working medium
7
Grade of the system cleanness
8
Power supply
9
Control voltage
operation
20Mpa / 3.5mL/r
-1-
Three-phase
asynchronous motor
1.5KW / 1430rpm
30L
15-40
<50%
HM46
HM46
or
antiwear
three-wire
AC380V 50Hz
DC24V
800( ) X 550( ) X
10mm
Overall size of hydraulic unit
1050()
800(L) X550 (W) X 1050
(H)
11
Protection grade of equipment
IP54
Section
-2-
Description
of
System
Principles
M6
10
22
15
M7
Oil feeding state of accumulator means the M6 pressure is lower than the
setup value of it, hydraulic oil flow from the oil pump through the check valve
10, directional valve 22, and check valve 15 to perform the oil feeding to
accumulator until the activity stops when it reaches the M7.(Motor will also
stop.)
M3 M4, 21 ,
M3
21 M3
Automatic tension state means M3 pressure is lower than the set value
-3-
M4 and the electric controls the directional valve 21 to get power. Open the oil
control check valve at the outlet of accumulator and the oil enters into the oil
cylinder without pole to increase the tension pressure. When the M3 pressure
is higher than the set value, directional valve 21 will lose power and the M3
pressure will not raise to keep the set value. When the pressure of
accumulator is low, the motor pump will start and oil feeding can be
performed.
22 10
22
Maintain and repair the manual retraction and the motor pump will start,
so the directional valve 22 can get power. Hydraulic oil flows from the oil
pump through check valve 10 and directional valve 22 to oil cylinder with
pole. Meanwhile, open the check valve to release the load and oil cylinder
retraction can be finished.
-4-
Section 3 Characteristics and Designed Value
This system has many merits such as integration design, small volume
and easy for maintenance, with the structural features as follows:
The chain tension system of wet type slag conveyor is composed of oil
tank (hydraulic unit), accumulator hung outside and electric control cabinet.
1.
Semi-closed and dustproof cover structure is used for the oil tank to
prevent much dust and other substance from cone into the tank.
2.
Air filter has been set on the top of oil tank to make the oil tank feed oil
upwards through the filter.
3.
Level and temperature indicator has been provided in the face of oil tank
to be easy for watching the level and temperature in the oil tank.
4.
If the oil level is lower than the min. scale of level and temperature
indicator (or oil level can not be seen), it means the level is low.
(Abnormal)
5.
If the oil level is higher than the max. scale of level and temperature
indicator (or overflow of oil), it means the oil level is high. (Abnormal)
6.
70
The filter at the inlet of oil pump has been set on the oil tank and needs
to be replaced regularly.
valve and oil cylinder make the hydraulic spring to ensure the chain is on
the tension state for a long time.
9.
Piston rod withdrawal: press the button of this function on the control box
while the hydraulic station is in operation.
10. 0bar 200bar
System pressure is set by overflow valve with a value of 0bar no
more than 100bar
11.
Electric
control
includes
following
operation
the
control,
normal
take-up,
force,
low
fault
60bar
140bar
Accumulator liquid charging pressure and stop liquid
60bar
instead of on site.
Accumulator stop liquid charging pressure: 140bar set before delivery
instead of on site.
14. 45bar
Accumulator is installed hanging on-6-the wall with the air charging pressure
of 45bar. It is more convenient for inspection and replacement.
1MPa 10bar
Notepressure unit 1MPa 10bar
-7-
Section 4 Preparation and Adjustment before
Operation
The parts, joints and pipes inside of hydraulic station, oil cylinder device and
electric control cabinet shall be taken good care to avoid damage owing to
burden from outside force during hoist and transport.
2.
The oil cylinder shall be installed with a strict restriction on its linearity to
prevent the oil cylinder moving improperly or bearing load of cross directions.
3.
After installation and connections, all fasteners such as bolts, screws, flanges
and pipe joints shall be rechecked to make sure of the firmness and reliability
of the seal.
2
Arrangement, Installation and Flush of Hydraulic Piping
1.
150mm
Welding of pipes shall be performed in gas shielded way. All welds should be
polished and checked.
3.
-8Pipes shall be performed with direct butt weld.
4.
If there are welding for pipelines, it is supposed to treat the pipelines with acid
bath, neutralization, passivation, phosphorization and flushing in sequence
after tubing, then apply the anti-corrosion paints.
5.
All pipelines shall be properly fixed or supported in some positions, especially
the front and back of bend along the pipeline, and the place before hoses to
be connected.
6.
7m/s 60
Pipelines shall be flushed separately with the washing oil at a minimum speed
of 7m/sturbulent flowand a temperature of 60. In case there is no way
to do the washing, it is recommended to clean with silk and such kind of lintfree wipes after being dipped into coal oil or diesel oil until there is no
sundries visible on the wipes.
7.
All welds, bends and connections shall be stricken with wooden or copper stick
while flushing.
NAS9
Attention: The cleanliness of pipelines should be up to NAS9 at least.
inspected by standard measuring unit
3
Preparation and Adjustment before Debugging
1.
25m
-10-
Section 5 Debugging and Status Instruction
1.
2MPa
2.
valve of
&
automatic
take-up
to
Meanwhile,
make
the
oil
80%
Accumulator charge: put the two external shut-off valves, shut-off valve of
accumulator opening, release valve of accumulator at the shut-of state.
When charging, the pressure should be not more than 80% of the minimum
When the accumulator starts to charge and stops, the relay has been set.
Keep off!
5.
-11-
Safety valve (unloading, protection of taut cylinder) has been set. Keep off!
6.
18MPa
Take-up pressure setting: put the two external shut-off valves, shut-off
valve of accumulator opening, release valve of accumulator at the cut-off
state. Push the button of operation control and automatic take-up; set the
pump pressure to 10MPa; adjust the take-up pressure and set the pressure
relay to the required value. (It can be observed from the pressure gauge.)
7.
18MPa
Accumulator charging: put the two external shut-off valves, shut-off valve
of opening of accumulator, release valve of accumulator at the cut-off
state. Push the button of operation control and automatic take-up; set the
pump pressure to 10MPa; open the shut-off valve of accumulator opening;
charge; it will end with the motor stopping.
8.
9.
tension;
-12-
Section
Attentions and Fault Handling
6Maintenance,
check
valve
Overflow valve
Check valve
1
Load relief
valve
21 Directional valve
21
22 Directional valve
It is very important to carry out the daily maintenance and the detailed
22
Intervals
connected parts
Cleaning of filter
Oil quality
Cleaning of oil tank
Oil-drain
Inspection point
Oil level; oil temperature
and pressure
Noise
Leakage
Lose
condition
Date
Wee
Mont
Seaso
Half
Year
Stop
of
Yes
Yes
Yes
Yes
10
Generally speaking, if there is something wrong with hydraulic system, it is
caused by the uncleanness of oil or the disqualified oil, so pay much attention
-13-
to the storage and protection of oil. Frequently, the oil is often boxed up in the
sustaining pressure chamber, so it is suggested that updating the oil
reciprocating program be performed every season. (Ten times to change the
oil in the sustaining pressure chamber.)
Attentions:
Check the liquid level and be sure to keep it near the middle of level
indicator. If it is below the minimum level, stop charging at once.
It is forbidden to change the designed systemic value at will. If required, it
should be checked and performed by the professionals.
After the equipment has being put into operation for two months, be sure to
change the oil or filter elements.
Once there is a fault alarm, power off the equipment immediately and
inspect whether there is overload for filter or motor. If the filter is blocked,
it should be replaced as soon as possible for fear that the system
elements are blocked, worn or damaged.
Provided that the system is always in the state of low pressure alarm,
please inspect all the pressure values (at the outlet of pump and
accumulator), leakage and oil temperature immediately and power off the
machine. Contact with our company if necessary.
2
Fault handling:
No.
Qty
10
11
12
13
Description
Oil tank
Service cover
Air filter
Motor
Clock-shaped hood
Coupling
Gear pump
Check valve
Overflow valve
Passage
Manufactur
er
Remar
k
Dade
YWZ-100T
Li Ming
DIC01-15,6
Dade
DN10
Dade
QUQ1
Li Ming
-6-
Model
30L
DBH-A90L-Z2.4
Dade
DC-A90L-Z2.4
Dade
Z2.4
Hawe
DCV179-1X/1
Hawe
DPRV179-1X/200
Hawe
A pair
with the
same
precise
casting
Italy
Italy
Italy
DSF01
li Ming
Dade
QA 90L 4P
DD070802501
ABB
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
Integration valve
Check valve
Overflow valve
Throttle valve
Pressure measuring
joint
Solenoid directional
valve
Solenoid directional
valve
Accumulator
Bracket unit of
accumulator
Fill-air
Check valve
Pressure gauge
Hose assembly
Pressure relay
Hose assembly
External cabinet
DD070802502
Dade
DSC-CXDA-XCN
Rexroth
US
DSC-CKCB-XCN
Rexroth
US
DSC-RDDA-LAN
Rexroth
US
DSC-FTV
Rexroth
KHP06
Hydac
US
Germany
SMK20
Stauff
Germany
3WE6A6X/EG24N9Z4
Rexroth
Germany
4WE6D6X/EG24N9Z4
-15-
Rexroth
DA-B10-S10-M1111M60
Pu Marde
Dade
Hydac
KHM12
Hydac
Hangzhou
Germany
Italy
Germany
Germany
Hawe
Germany
Germany
Stauff
Schneider
Germany
France
YN63 PN25
SMS20-XX-1000A
DG365
SMS20-12-1000A
-16-
Stauff
-17-
D ade
-18-
~220V
Three-phase Power
Motor Connection
FU3
L1
T02
TC
T04
Motor Control
DC Power
FU1
Overload of Motor or
Blockage of Filter
Low Pressure
Automatic Tension
KA1
101
Manual
N o r m a l T e n s i o n M a k e - u p T e n s i o nC o n t r a c t i o n
DCS
To DCS
005
L2
~380V
SB1
QF1
FU2 T01
L3
-19-
Equipment Interface
KA3
QF1
DC
V1
W1
QF1
SF1
KA1
KM1
KA4
009
017
HL1
015
SP3
013
YV2
KA5
KA2
027
SP2
011
KA1
025
019
SP1
KA3
KA5
021
HL4
HL3
SB4
007
003
M
KA2
SP2
023
T03
U1
SB2
KA5
105
001
KA4
103
24V+
AC
SB3
YV1
029
KA4
KA3
HL2
KA5
031
KM1
SP1
HL1
HL1
HL2
SP1
SP2
M1
3~
SP2
2.2kW 5A
SP3
SP3
SF1
SF1
Tension Pressure Switch
Control Switch of Accumulator Charging
Switch of Accumulator Charging Off
Blockage Alarm Switch of Filter
SB1
SB1
Sudden Stop
SB2
SB2
Power Supply (Startup Button)
SB3
SB3
Automatic Tension
SB4
SB4 Manual Contraction
Hydraulic Failure Indication Overload of Motor or Blockage of Filter
E le c t r ic S c h e m a t ic D ia g r a m o f
H y d r a u lic P r e s s u r e T e n s io n
XT1
C a bl e s t o b e pr e p a r ed b y us e r
4 15 V , 3K W
T o t h re e - p ha s e 3 8 0 V p o w er f r e qu e n c y ,3 K W
Ha s be e n c o n ne c t e d b e f o re l e a vi n g th e f a c t or y
T o m ot o r o f o i l p u m p
H a s b e e n co n n e c te d b e fo r e l e av i n g t h e f ac t o r y
L1
L2
L3
U
V
W
021
24V+
1
2
3
4
5
6
7
8
S w i tc h f or b l o c ka g e a la r m of f i l t er
007 9
011 10
013 11
Ha v e b ee n c o n ne c t e d b e f o r e l e a vi n g t h e f a c to r y
DCS
To DCS
015
017
019
M
12
13
14
15
025
027
029
031
16
17
18
19
Sy ste m F ail u re Al ar m
El e c t r i c Co n ne c t i o n Di a g r am o f
Hy d r au l i c Pr es s u r e Te n s i o n
-20-