Professional Documents
Culture Documents
B
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
Ban canh di
Bottom flange
Ban canh tren
Top flange
Ban canh ( mat cat I ,J hop )
Flange ( I , J box section )
Ban co khoet lo
Voided slab , hollow slab
Ban cua mau neo
Anchor plate
Ban mat cau
Deck slab , deck plate
Ban mat cau uc be tong tai cho
Cast-in-site concrete slab
Ban ghi chep tnh toan
Calculation note
Ban san
Floor slab
Ban nap hop
Top slab of box
Ban knh trong cua oan ng cong
Inside radius of curvature
Bao dng , duy tu
Maintenance
Bao ve cot thep chong g
Protection of reinforcement against corrison
Bang gang uc
... of cast iron
Bang thep can
... of laminated steel , rolled steel
Bat li
Unfavourable
Ban knh tac dung cua am dui
Reach ( of vitrator )
Be tong cot thep d ng lc trong
Internal prestressed concrete
Be tong cot thep d ng lc ngoai
External prestressed concrete
Be tong
Concrete
Be tong co trong lmg thong thng
Normal weight concrete
Be tong nhe
Light-weight concrete
Be tong nhe co cat
Sand light weight concrete
Be tong cot thep thng
Plain reinforced concrete
Be tong cot thep d ng lc
Prestressed concrete
Be tong thuy cong
Hydraulic concrete
Be tong ngheo
Lean concrete ( low grade concrete )
Be tong phun
Gunned sprayed concrete
Be mat tiep xuc
Contact surface
Be mat ngoai
Extenor face
Be mat van khuon
Form exterior face
Bien dang cua neo khi DUL truyen t
Anchorage seating
kch vao mau neo
Bien dang cua cac th tren mat cat
Strain of the fibre on the section
Bien dang co ngat tng oi
Unit shortening
Bien dang dan dai tng oi
Unit kengthening
Bien dang qua mc
Excessive deformation
Bo tr cac iem cat t cot thep doc cua dam Arrangement of longitudinal reinforcement cut-cut
Bieu o bien dang tuyen tnh
Linear deformation diagram
Bien dang do t bien
Deformation due to creep
Bien dang theo thi gian
Time-dependent deformation
Bien dang do co ngot
Shankage deformation
Be tong khong cot thep
Unreinforce concrete , plain concrete
Boc lp be tong bao ho
Removal of the concrete cover
Ban qua o
Transition slab
Be mong
Footing
Ban co sn
Ribbel slab
Ban co nhieu sn
Multi-rib slab
Bien dang do uon
Deformation due to bending
Bien dang do lc cat
Deformation due to shear
Ban ch nhat goi gian n tren 4 canh len cac dam
Rectangular slab simpliy supported along all four side by beams
Bo tr cot thep
Installation of reinforceceent
Ban co nhp theo mot hng (ban 2 canh)
One-way spanding slab (slab supported on two sides)
Ban co nhp theo 2 hng (ban 4 canh)
Two-way spanding slab (slab supported on four sides)
Ban phang
Flat slab
Bien dang tc thi
Immediate deflection
Bien dang vong len
Camber
Be tong uc tai cho
Cast-in-place concrete
Be mat chuen tiep
Transitional surface
Be tong uc san
Precast concrete
Be tong bao ho ( benngoai cot thep )
Concrete cover (Concrete protective layer)
Ban ve thi cong
Contruction drawing , working drawing
Bien dang dai
Long-term deformation
Bien oi theo thi gian cua
Variation in accordance with the times ...
Bieu o tac dung tng ho momen lc doc
Moment-Axial force interaction diagram
Bieu dien o th cua ,,,
Graphical representation
Bat li nhat
The most unfavourable , worst effect
Bang dnh
Join tape
Bo thiet b
Set
Bo noi cac oan cap d ng lc keo sau
Coupler divice for post-ensioned cable
Ban mat cau trc hung
Orthotropic deck
Be tong hoa cng nhanh
Early streng concrete
Be tong ti ( mi tron xong )
Fresh concrete
Be tong co qua nhieu cot thep
Over-reinforcement concrete
Be tong soi
Gravel concrete
Be tong nang
Heavy-weight concrete
Be tong cat
Sand concrete
250296172.xls.ms_office
1 -
VIET_ANH
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
Curing
Deviator
Perspective drawing
U form bolt
Bolt
To handle
Hammer
Single-acting stream hammer
Pigmen
Cover plate
Bed plate
Pump
Aspiring pump , extraction pump
Centerifugal pump , impeller pump
Submerged pump
Low-grade concrete
Cover steel plate
( at flanged part of steel girder )
Portland-cement concrete
General location of a bridge, General view of a bridge
Radius of curve
Anchor bolt
Salb reinfoced in both direction
Protection against scour
Splice plate , slab
Cap
Cap
Protection against abrasion
Hight strength concrete
Prestressing bed
Segregated concrete
Additional
Sealing
Hand-act water pump
Had-act oil pump
Seven-wire rope
Twist step of a straud
Lubrification
Sealing
Amplitude of stress
Bottom slab of box grider
Installation of prestressed reinforcement
Elastic strain , elastic deformation
C
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
Canh tay on
Cap thep d ng lc
Cap co cng o t chung thap
Cap xoan 7 si
Cau kien chu cat
Cau kien co ban canh
Cau kien co mat cat ch nhat
Cau kien lien hp
Cau kien lien khoi
Cau kien lien hiep chu uon
Cau kien cha nt
Cau kien hnh lang tru
Cau o to
Cau ng sat
Cau mang
Cau khung T co chot
Cau hang
Cau day xien
Cau d ng lc keo sau , duc BT tai cho
Cau lien tc c ghep t cac dam gian n
uc san
Cau ban
Cau ban lien tuc co hai nhp bang nhau
Cau hai tang
Cau dam lien hp
Cau co ng xe chay tren
Cau co ng xe chay di
Cau nhp ngan
Cau thang
Cau nhp ln
Cau trung
Cau cong vu
Cau cat , cau nang
250296172.xls.ms_office
Momen arm
Prestressing steel strand
Low relaxtion strand
7 wire strand
Member subjecct to shear
Fanged member
Rectangular member
Composite member
Monolithic member
Composite flexural member
Uncracked member
Prismactic member
Hghway bridge , road bridge
Railway bridge , rail bridge
Aqueduct
Rigid frame bridge with hanges
Cantilever bidge
Cable-stayed bridge
Cast-in-place , post-tensioned bridgr
Cotinuous span bridge composed of simple
span precast prestressed girders
Slab bridge
Two equal spans continuos slab bridge
Double deck bridge
Composite girder bridge
Deck bridge
Through bridge
Short span bridge
Straight bridge
Long span bridge
Medium span bridg
Service bridge
Hoist bridge , opening bridge
2 -
VIET_ANH
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
Cau vom
Cau BTCT thng
Cau cong
Cau gach-a xay
Cau co nh
Cau di ong trt
Cau nang-ha thang ng
Cau quay
Cau i bo
Cau tam
Cau cat
Cat khac
Cap ( cua be tong , cua thep )
Can bang tnh hoc
Cau nghieng
Cong trnh ky thuat cao
Cap treo xien ( cua he tro xien )
Chan oan
Can cau cong
Cung cap
Cot thep a b g
Chai sach
Chat lam cng , hoa cng
Cap gom cac bo si xoan boc trong chat deo
Cam bien e o bien dang
Cam bien e o ngsuat , o lc
Chem nut neo vao au neo cho chat
Chat boi trn cot thep DUL
Cot thep co o t chung bnh thng
Cot thep co o t chung thap
Chat lng mong muon
Cap phoi hat
Cap phoi hat lien tuc
Cap phoi hat khong lien tuc
Cat thuan tuy
Cng o chu moi
Che tao san
Ch dan tam thi
Chieu cao
Chieu cao toan bo cua cau kien
Chieu cao dam
Chieu cao co hieu qua
Chieu dai truyen lc nh dnh bam
Chieu dai kch khi khong hoat ong
Chieu dai uon doc
Chieu dai nhp
Chieu day cua ban canh ( cua ban bung )
Chieu day
Chieu rong co hieu qua cua ban canh
Chieu rong co hieu qua cua dam T
Chieu rong ban chu nen cua dam T
Chu ng c ma khong hong
Cho rong ( khoet rong )
Lap cho trong
Chong am cho be mat
Chot ( khp )
Cong tac keo cang cot thep
Cong trnh
Cong trng
Cong ty
Cong thc pha tron be tong
Co ngan cua be tong
Co ngan cua thep
Cot lieu ( soi a )
Cot thep ai ( dang thanh )
Cot thep ban canh
Cot thep trong ban mat cau
Cot thep chu keo
Cot thep chu nen
Cot thep DUL
Cot thep DUL co dnh bam vi BT
Cot thep thng ( khong DUL )
Cot thep doc
Cot thep trong sn dam
Cot thep at theo vong tron
Cot thep ngang
Cot thep thi cong
Cot thep tang cng them
Cot thep chu
Cot thep phan bo
250296172.xls.ms_office
Circled bridge
Plain reinforced concrete bridge
Bridge on curve
Mainsonry brdge
Fixed bridge
Slide bridge
Liftinf bridge
Pivot bridge , roller bridge
Predestrian bridge
Temporary bridge
Novable bridge
To notch , to nick
Grade ( of concrete ) Class ( of steel )
Static equilibrium bridge
Skew bridge
High-tech constuction
Stay cable
Diagnosis
Grantry crane
Supply
corroded reinforcement
Tobrush , To clean
Hardener
Plastic coated greased strand cable
Deformation gauge
Captor
Sliding agent
Normal relaxation reinforced steel
Low relaxation reinforced steel
Expected quality
Grading granulometry
Continuous granulometry
Discontinuous granulometry
Pure shear
Fatigue srength
Precast , Prefabricated
Interim instructions
Depth
Overrall depth of member
Depth of beam
Effective depth
Bond transfer length
Closed length
Buckling length
Span length
Flange thickness ( web thickness )
Thickness
Effective flange width
Effective width 9 of T girder )
Compression flange width of T girder
To stand without failure
Hollow , void
To disppear into the void
Surface water protection
Hinge
Tensioning ( tensioning operation )
Construction , work
Construction site , building site
Company , corporation
Concrete proportioning
Concrete shortening
Reinforcement shortening
Aggregate
Stirrup , link , lateral tie
Flange reinforcement
Slab reinforcrment
Tensile reinforcement
Compression reinforcement
Prestessed reinforcement
Bonded tendon
Non-prestressed reinforcement
Longitudinal reinforcement
Web reinforcement
Hoop reinforcement
Transversal reinforcement , lateral reinforcement
Erection reinforcement
Strengthening reinforcement
Principal reinforcement
Distribution reinforcement
3 -
VIET_ANH
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
250296172.xls.ms_office
4 -
VIET_ANH
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
Precast pile
Unfilled steel pipe pile
Prestressed concrete pile
Spiral reinforcement
Shrinkage
Grade of reinforcement
Rubber
Elastomer , plastic
Natural plastic
Synthetic plastic
Plastifying agent
Activator
Accelerant
Protecting agent
Pylone
Automatic design sofeware programme
Technology transfer
Distribution reinforcement
Top reinforcement
Bottom reinforcement
Skin reinforcement
Plain round bar
Deformed reinforcement
Elastic shortening
Concrete tonsile strength at 28 day-age
Compressive strength at 28 day-age
Elastic strength of reinforcement in tension
Elastic strength of reinforcement in compression
Flexural strength
Ultimate strength
Exposed reinforcement
Automatic calculated design program
Portal bridge
Viaduct
To subject , to load , to withstand
Cube strength
Characteristic strength
Bent-up bar
Straight reinforcement
Deformed bar , deformed reinforcement
Perimeter of bar
Anchorage length
Inclined bar
Shear reinforcement
Grade of concrete
Trasmussion length of pretensioning
Precast member , prefabricated member
Loading cycle
Fendage
Concrete hinge
Relative rotation replacement
Test planning
Displacement
Short cable tensioned at one end
Long cable tensioned at two ends
To shorten , shortening
Compression member
D
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
D van khuon
Day thep buoc
Dai phan cach
Dung sai
Dam bien , dam ngoai cung
Dam tan inh
D lieu ( so kieu ban au )
D lieu ve lu lut a xay ra
Dong nc chay
Dam pha trong
Dam ngang mat cau
Dam doc phu
Dam ban
Dien tch cot thep
Dan ban thep
Dch vu sau khi ban hang
Dam tam e lao cau , gia lao cau
D ng kc ngoai
D lieu e tnh toan
250296172.xls.ms_office
Demoulding
Ligature tie
Separate lane
Tolerance
Edge beam , exterior girder
Riveted girder
Data
Past flood data
Stream flow , Stream current
Interior girder
Floor beam , cross beam
Supplementary stringer
Supporting beam
Area of reinforcement
Gluing of steel plate
After sale service
Temporary girder for bridge launching
External prestressing
Calculation data
5 -
VIET_ANH
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
Dung cu o , may o
Dam chu uon
D oan
D toan
Tong d toan
a va ( Chan va he tren cau )
au neo hnh tru co lo khoan
au nhp
au noi e noi cac cot thep DUL
ac trng cac vat lieu
o an
ac iem vat lieu
iem au cot thep c keo cang bang kch
o BT , viec o BT
o am , o am tng oi
o lech tam
o dai di chuyen c cua pitong cua kck
o am tng oi bnh quan hang nam
o ben lau
o on nh
o on nh hnh dang
o m rong vet nt
o vong
o vong ngc
o BT theo nhieu giai oan
ong chat
oan ong loe au mau neo
ot , oan ( cua ket cau )
uc BT tai cho
ng cong thc nghiem
ng knh danh nh
o dan dai cua cot thep
ieu kien dng ho BT
oan tau th ( e th cau )
oan tau chay thng xuyen tren tuyen
iem can o cao o
at tai th len cau
ng ap au cau
at nen ben di mong
o dan dai tng oi
o co ngan tng oi
o cong
o chnh xac ( th nghiem )
o ben chu la
am dui ( e am BT )
o rong vet nt
o manh
o nht
o trt trong mau neocua au cot thep
Dam
Dam goi gian n
Dam li6n tuc
Dam hop nhieu ot
Dam ch T
Dam hop
Dam ngang
Dam ngang trong nhp
Dam chu uon thuan tuy
Dam dang hnh hoc cua mat cat
Dien tch bao ( khong ke thu hep do lo )
Dien tch mat cat
Dien tch tnh oi
Dnh bam
Dung moi
D ng lc
D ng lc theo hng ngang
Du ng suat co hieu sau moi mat mat
Dng ho BT mi o xong
Dam ngang au nhp
Dam BTCT
Dung cu e th nghiem nhanh
Dai han ( tai trong dai han )
Dam ch c cot thep chu keo
Dam co ca co thep chu keo va chu nen
Dam chu tai trong dai eu
Dam hang
Di anh hng cua
D an s bo ( o an s bo )
D ng lc ung tam
D ng lc lech tam
250296172.xls.ms_office
Testing device
Flexural beam
Forecast
Cost estimate
General cost estimate
Curb
Perforated cylindrical anchor end
Span end
Coupler
Material characteristics
Project
Material properties
Jacking end
To cast , casting
Humidity ( relative )
Eccentricity
Maximum stroke ) of piston )
Annual amblient relative humidity
Durability
Stability
Shape stability
Crack width
Deflection
Camber
To cast in many steps ( stages )
Homogenity
Trumpet
Segment
Cast in place
Test curve ( strain-stress )
Nominal diameter
Steel elongation
Condition of curing
Test train
Trainseving the line
Leveling point
Test loading on bridge
Embankment
Foundation soil
Percentage elongation
Unit shortening
Curbature
Accuracy ( of test )
Fire resistance
Hand-poker vibrator
Crack width
Slenderness
Viscosity
Anchor sliding
Girder , beam
Simply supported beam , simple span
Continuous beam
Segmental box girder
T-beam , T-girder
Box girder
Diaphragm
Intermediate diaphragm
Pure flexion beam
Section geometry
Gross area
Area of cross section ( cross section area )
Transformed area
Bond
Solvent
Prestressing force
Tranverse prestressing
Effective prestress after losses
To cure , curing
End diaphragm
Reinforced concrete beam
Rapid testing kit
LOng-term ( load )
Beam reinforved in tension only
Beam reinforved in tension and compression
Uniformly load beam
Cantilever beam
Under the effect of ...
Prelminary design
Centred restressing
Non-centred restressing
6 -
VIET_ANH
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546
547
548
549
250296172.xls.ms_office
Poisitive up-ward
Prestress
Voided beam
Welded plate girder
Through plate girder
Deck plate girder
Nominal area
Beam of constant depth
Pretensioned beam
Posttensioned beam
Bearing area
Nominal
Contact area
To uses
Representative curve of ...
Cable trace
Cable trace with segmental line
Parabole cable trace
Force representative points ( on the curve )
Structural integrity
Location of the concrete compressiveresultant
Key block segment
Stream locomotive
Diesel locomotive
Activity of cement
Location of resultant
Mechanical characteristics
Inspection
Bidding
Settlement
Adjustment , to adjust
Alluvion
Pile cap
Preliminary project
Cofferdam
Crushed stone
Clasp nail
Compaction
Collar
Envelope curve
Counterprise , counter balance
Famper
Vibrating famper
Hardness degree
Scaffold , scaffolding
Evaluation , estimation
Tightness ( water tightness )
Cramp
Clearance , play
Cobble , stone
Frick
Capital repair , major repair
Tire-fond
Segment
Internal vibrator
Surface vibrator
Form vibrator , external vibrator
Permeability
Slump of cone of concrete mix
Curve
Rivet
Flange rivet
Waterway
Earthquake
Bridge end
Loading on ...
Dynamic
Overload provision
Truck train
Traffic lane unit
Cantilever dimension
Measured perpendicular to ...
Measured paralled to ...
Center line
Pilling
Rock , stone
Cohesive soid
Incohesive soid , granular material
Earth , soil
7 -
VIET_ANH
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
at a set
at chat
at set
at phu sa , at boi tch
ieu kien at
ng knh ngoai
ieu kien can bang ng bien
o cng
o cng chong uon
o cng chong xoan
ap ng cac yeu cau
e mau neo DUL
e hnh loa cua mau neo DUL
o nhay cam
o tut cua nut neo trong lo neo
( sau khi a ong chat nut neo )
at vao trong khung cot thep
ong ho o ap lc
ieu kien kh hau bat li
o co ngot cuoi cung tong cong
o chat
o xop rong ( cua BT )
ieu kien moi trng
ap , at ap , nen ap
Loam
Compact earth
Clay
Alluvival soil
Soil condictions
Outside diameter
Balanced strain condiction
Stiffness
Flexural stffness
Torsional stiffness
To meet the requirements
Bearing plate
Trumplate , cast-guide
Sensitiveness
Anchor sliding
Put in the reinforcement case
Manometer
Unfavourable climatic condiction
Total shrinkage
Compactness
Porosity ( of concrete )
Enviromental conditions
Embankment
E
574
575
576
577
Ep mat cuc bo
Ep va
Cap a ep va
Cap tam khong ep va
Located pressure
Gront , gronting
Gronted cable
Temporaly non-gronted cable
G
578
579
580
581
582
583
584
585
586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
250296172.xls.ms_office
Basic assumption
Design assumption
Load stage
Expanse
Free expansion
Course
Elastic limit
Time-limit of the prestressed steel
Angle of interior friction
Rubber bearing , neoprene bearing
Thermal gradient
Interruption of traffic
Supervision of construction
Keep the line operating
Bearing
Implementation successive stages
Trasition stage
Intermediate support
End support
Caisson
Cast-in-place concrete caisson
Production cost
Construction cost
Conventional elasticity limit
Cast iron
Fixation
Fixation on the form
Point , turn out
Fixed bearing
Movable bearing
Approximate
Floating caisson
Air caisson
Bracing
Definitive evaluation
Laminate timber
Connection
Rib
Abrasive paper
Pile driver
Bentonite lubricaated caisson
Caisson on temporary
Shear limit
Maintenance cost
8 -
VIET_ANH
622
623
624
625
626
627
628
629
630
631
632
Replacement cost
Mechamical bearing
Roller bearing
Slipping bearing
Ply wood
Guided sliding bearing
Laminated elastonmeric bearing
Technical solution
Tetron bearing
To block the reinforcement end
Launching girder ( fruss type )
H
633
634
635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656
657
658
659
660
661
662
663
664
665
666
667
668
669
670
671
672
673
674
675
676
677
678
679
680
681
682
683
684
685
K
686
687
688
689
690
691
692
693
250296172.xls.ms_office
9 -
VIET_ANH
694
695
696
697
698
699
700
701
702
703
704
705
706
707
708
709
710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731
732
733
734
735
736
737
738
739
740
741
742
743
744
745
746
747
748
749
750
751
752
753
754
755
756
757
758
759
760
761
762
763
764
765
766
767
768
769
770
771
772
773
250296172.xls.ms_office
10 -
VIET_ANH
774
775
776
777
778
779
780
781
782
783
784
Anchorage block
Jack with front gripper
Jack with back gripper
Partial pretensioning
Pretensioning by stages
Acceptance control
Production supervision
Dimension in mm
Spacing between cross beams
Starting of the construction
Pure tension
L
785
786
787
788
789
790
791
792
793
794
795
796
797
798
799
800
801
802
803
804
805
806
807
808
809
810
811
812
813
814
815
816
817
818
819
820
821
822
823
824
825
826
827
828
829
830
831
832
833
834
835
836
837
838
839
840
841
842
843
844
845
846
847
848
849
250296172.xls.ms_office
Railing
Launching by sliding
Spiral core in the steel
Male cone , edge
Grout hole
Mortise
Protective concrete cover
Water proofing layer
Sidewalk cover
Application field
Shear force
Factored shear force
Horizontal shear
Vetical shear
Axial force
Earthquake force
Jacking force
Lateral force
Concentrated force
Reinforcement mesh
Weided wire fabrie , weided wire mesh
Tensile force
Beam theory
Semi probability theory
Semi probability theory of safety
Theory of liner creep
Joint , conection , splice
Local compression
Sliding joint
Radial force
Impact
Rolling impact
Impact due to track irregularity
Lane , traffic lane
Design lane
Shear carried by concrete
Shear due to deal load ( live load )
Hole
Cable passing
Conic hole
Erection
Bolt tightening force
Eccentric
Installation
Bridge launching
Rigid connection
Flexible connection
Monolithic
Layer
Water layer
Lower reinforce layer
Pushing force lateral
At kilometre
Zine covering
Design flow
Centrifugal force
Flood
Historical flood
Longitudinal force
Overturning force
Thermal force
Force due to stream , current on piler
Design flood
Buoyancy
11 -
VIET_ANH
850
851
852
853
854
855
856
857
858
859
860
861
Lay mau th
Lien ket bu long
Lam cham lai
Lap ke hoach thi cong
Lc va ngang cau ( doc song )
Lc va doc cau ( ngang song )
Lun ( s lun , o lun )
Li toa o quoc gia
Long cot thep
Lu lng xe tren ng
Lc tnh
Lc ong
Sampling
Bolted connection
To retard
Work planning
Frontal impact force
Lateral impact force
Settlement
National coordinate grid
Reinforcement cage
Traffic volume
Statical force
Dynamic force
M
862
863
864
865
866
867
868
869
870
871
872
873
874
875
876
877
878
879
880
881
882
883
884
885
886
887
888
889
890
891
892
893
894
895
896
897
898
899
900
901
902
903
904
905
906
907
908
909
910
911
912
913
914
915
916
917
918
919
920
921
922
923
924
925
250296172.xls.ms_office
12 -
VIET_ANH
926
927
928
929
930
931
932
933
934
935
936
937
938
939
940
941
942
943
944
945
946
947
948
949
950
951
952
953
954
955
956
957
958
959
960
961
962
963
964
965
966
967
968
969
970
Mong coc
Moi noi hien trng
Moi noi hien trng bang bu long
cng o cao
Moi
Mat cat co momem cc ai
Mat cat vuong
Momem lat o
Momem gi chong lat o
Ma sat trt
Momem khang uon cua mat cat
Momem khang uon th tren cung oi vi
trong tam mat cat
Mat cat c xet
Moi noi cap DUL keo sau
Mong sau
Mong nong
Mu coc , em au coc
Mui luyen , o khum
Mat bch , cai bch noi cong
Mat tt
May o ghi dao ong
Mai doc
Mat bang , ke hoach
Mat bang v tr cong trnh
Mat ngoai cong trnh
Ma ken , lp ma kem
Mc nc tan suat 1%
Mao dan
Mau th khoi vuong BT
May nen th BT
Mat cat ngang dong nc
Mep hang cua ban
Mat cat a chat
Mui coc
Mo kieu trong lc
Mat mat d ng suat do bien dang tc thi
cua BT khi keo cang cac cap lan lt
May khuay
Moun bien dang doc tc thi cua BT
(moun young)
Mau th e kiem tra trong qua trnh thi cong
Momem khang uon cua mat cat oi vi
th tren cung ( di cung )
Moi noi hp long ( oan hp long )
Pile foundation
Field conection
Field connection use high strength bolt
Fatigue
Section of maximum moment
Square section
Overturning moment
Righting moment
Sliding frictin
Section modulus
Section modulus of top fiber referred to of
gravity
Cosidered section
Coupler
Deep foundation
Footing , shallow foundation
Pile
Camber
Cylinder base
Mastic
Oscillograph
Slop
Plan
Engineering site plan
Outer view of construction
Zinc covering
Water level of return period 100 years
Capillarity
Concrete cubic sample
Concrete sample compressive machine
Stream cross section
Cantilevering edge of the slab
Geological profile
Pier tip
Gravity abutment
Loss due to concrete instant deformation since
non simultaneous prestressing of strands
Agitator , shaker
Modulus of concrete instant longitudinal
deformation
Control sample during the construction
Section bending modulus with respect to top
(bottom) fibers
Closure joint
N
971
972
973
974
975
976
977
978
979
980
981
982
983
984
985
986
987
988
989
990
991
992
993
994
995
996
997
998
999
1000
1001
250296172.xls.ms_office
To lift (lifting)
Pure compression
Active anchorage
Vertical rod anchorage type for joining the
two different reinforced concrete parts
Exterior anchor
Internal anchor (submerge)
Passive anchor
Anchor by adherence
Rock base
Clear span
Reinforcement group
Plant supplier
Internal force
To connect by hinge
Successive
Cause for deterioration
Drawback , shortcoming
Minimum safety margin
Severe cracking
Simply supported span
Short-term (short load)
Linear interpolation
Local crushing
Preliminary study
External force
Stud shear connector
Acceptance
Connection strand by strand
To accept tenders
13 -
VIET_ANH
1002
1003
1004
1005
1006
1007
1008
1009
1010
1011
1012
1013
1014
1015
1016
1017
1018
1019
1020
1021
1022
1023
1024
1025
1026
1027
1028
1029
1030
1031
Owner (Party A)
Contractor (Party B)
Connector
Anchoring
Corner connection
Stud connector
Excavated embankment
Embankment
Mix
Joint steelve
Hot galvanization , to galvanize
Labour , labour cost
Node
Overlap-lap
Span
Surface water
Ground water
Curing temperature
Assumed temperature at the time of erection
Air temperature
Uplift
Continuos span
Group of piles
Splice
Ground anchor (for tunnel , retaining wall)
Suspended span
Anchoring plug
Preblock plug
Submerged anchor intergrated in the concrete
O
1032
1033
1034
1035
1036
1037
1038
1039
1040
1041
1042
P
1043
1044
1045
1046
1047
1048
1049
1050
1051
1052
1053
1054
1055
1056
1057
1058
1059
1060
1061
1062
1063
1064
1065
1066
1067
1068
1069
1070
1071
1072
1073
Pha hoai
Phan lc
Phan bo lai noi lc
Phan tch thanh phan hat cua vat lieu
Phan ng xe chay
Phong th nghiem
Phong thiet ke
Phu tung
Phun BT kho
Phun BT t
Phng phap keo cang sau khi o BT
Phng phap keo cang trc khi o BT
Phng phap thi cong hang
Phng phap xay dng
Phng phap kiem tra bang tham chat mau
Phng phap kiem tra bang t trng
Phng phap kiem tra bang dong xoay
Phng phap th bang sieu am
Phng phap kiem tra bang tia phong xa
Phng phap kiem tra bang phat quang
Pham vi
Phng phap th co pha huy mau
Phng phap th khong pha huy mau
Phun va lap long ong cha CT DUL
Phng phap phan tch thong ke
Pham vi ap dung
Pham vi an toan
Phan bo tai trong
Phng phap thc nghiem
Phu gia
Phu gia chong tham
250296172.xls.ms_office
Failure
Reaction
Force redistribution
Material grading , size grading
Roadway , carriageway
Laboratory
Design office
Accessories , spare parts
Dry guniting
Wet guniting
Post-tensioning method
Pre-tensioning method
Canlilevering construction method
Method of construction
Dye penetrant examination
Magnetic particle examination
Eddle current testing
Utrasonic testing
Radiography method
Fluorescent method
Scope , field
Destructive testing method
Non-destructive testing method
Grouting
Statistical method of analysis
Field of application
Safety field
Load distribution
Empirical method , experimental method
Admixture , additive
Waterproofing admixture
14 -
VIET_ANH
1074
1075
1076
1077
1078
1079
1080
1081
1082
1083
1084
1085
1086
1087
1088
1089
1090
1091
1092
Q
1093
1094
1095
1096
1097
1098
1099
Qui trnh
Qua mc (bien dang qua mc)
Qyi trnh , qui tac
Qua bua
Qua tai
Quay
Quay t do tren goi
Specifications , code
Excessive (excessive deflection)
Specifications
Ram
Over load
Rotation
On-bearing free rotation
R
1100 Ranh thoat nc
1101 Ro be mat
Open channel
Surface void
S
1102
1103
1104
1105
1106
1107
1108
1109
1110
1111
1112
1113
1114
1115
1116
1117
1118
1119
1120
1121
1122
1123
1124
1125
1126
1127
1128
1129
1130
1131
1132
1133
1134
1135
1136
1137
1138
1139
1140
Sau khi nt
Si n le
S bien oi s o tnh hoc
S bien oi nhiet o
S boi trn
S bo tr cot thep
S co ngan
S dan n
S at tai lech tam
S lien ket , s noi
S pha huy
S phan bo lc gia
S phan bo theo chieu doc cua banh xe
S phan tch an hoi ( oi vi ket cau)
S keo cang qua mc
S tap trung ng suat
S noi cot thep DUL
Sc chu moment danh nh
Sn (ban bung cua mat cat I,T hop)
Sn tang cng ng cua dam
Sn
Sai sot (khong chnh xac) trong thi cong
Sai so cho phep (dung sai) trong thi cong
So lieu th nghiem
Sn cng doc (nam ngang)
Sn cng ngang (thang ng)
S dung
So le
S bo tr
San nen , don mat bang
Sieu cao
Soi
Soi nho , soi ap vun
Sa thach
Sieu tnh
Sn lot
Sung bat nay e th cng o BT
So bat nay tren sung th BT
Set
250296172.xls.ms_office
After cracking
Single wire , individual wire
Change of statical schema
Temperature change
Lubrication
Installation of reinforcement
Shortening
Expansion
Eccentric loading
Connection , joining
Failure
Force distribution between
Longitudinal distribution of wheel loads
Elastic analysis
Overtension
Stress concentration
Coupling
Nominal momemt strength of a section
Web
Vertical stiffener
Painting
Inaccuracy in construction
Allowable tolerance in construction
Test data
Longitudinal stiffener
Transverse stiffener
Use
Alternate
Arrangment
Scrape , to grade
Superelevation
Coarse gravel
Fine gravel , grit
Sandstones
Hyperstatical
Inpression
Concrete test hammer
Rebound number
Clay
15 -
VIET_ANH
1141
1142
1143
1144
Ageing
Product
Production
After anchoring
T
1145
1146
1147
1148
1149
1150
1151
1152
1153
1154
1155
1156
1157
1158
1159
1160
1161
1162
1163
1164
1165
1166
1167
1168
1169
1170
1171
1172
1173
1174
1175
1176
1177
1178
1179
1180
1181
1182
1183
1184
1185
1186
1187
1188
1189
1190
1191
1192
1193
1194
1195
1196
1197
1198
1199
1200
1201
1202
1203
1204
1205
1206
1207
1208
1209
1210
1211
1212
1213
1214
1215
1216
Tieu chuan
Code , standard , specification
To hp tai trong
Load combination
To hp c ban (chnh)
Basic combination
To hp tai nan (ac biet)
Accidental combination
To hp hiem
Unusual combination
To hp thng xuyen
Frequent (permanent) combination
To hp hau nh thng xuyen
Quasi-premanent combination
Tnh tai bo sung sau
Additional deal load
Trang thai gii han
Limit state
Trang thai gii han khai thac
Serviceability limit state
Trang thai gii han cc han
Ultimate limit state
Trong lng oan (ot ket cau)
Segment weight
Trong lng ban than
Seft weight , own weight
Trong lng rieng cua BT
Concrete unit weight , density of concrete
Trong tam
Center of gravity
Trong tam tnh cho mot n v dien tch
Surface weight
Trong qua trnh keo cang cot thep
During stressing operation
T trung
Relaxation
Truc trung tam
Center line
Tru cau
Pier , intermediate support
Tng chan
Retaining wall
Tang
Turn-buckle
Tai trong tc thi
Instant load
Ty le ham lng CT thng trong mat cat
Ratio of non-prestressing tension reinforcement
Ty le CT DUL
Ratio of prestressing steel
Th trong phong th nghiem
Laboratory testing
Th nghiem ve va ap
Impact testing
Th nghiem ve moi
Fatigue testing
Tnh trang bao dng duy tu kem
Poor state of maintenance
Tac nghen hoat ong tren tuyen
Operational bottlenecks on the line
Thanh phan BT
Concrete composition
Theo trnh t u tien
In order of priority
Thay the khan cap
Immediate replacement
Tnh toan bang tay
Hand caculation
Ty le pha tron hon hp BT
Mix proportion
Ty trong cua vat lieu
Density of material
Tuoi at tai
Age of loading
Tng chan at
Retaining wall
Tng canh (vuong goc)
Side wall
Tng canh (xien goc)
Wing wall
Trang thai cha nt
Uncracked state
Tng thch bien dang gia thep va BT
Compatibility of strains between steel and concrete
Trang thai a co vet nt
Cracked state
Tnh toan theo ng suat cho phep
Allowable stress design
Tnh toan theo trang thai gii han
Limit state design
Ty le chieu dai nhp tren chieu cao dam
Span length ratio
Trang thai gii han ve m rong vet nt
Cracking limit state
Trang thai gii han khai thac ve m rong vet ntServiceability limit state state of cracking
Tr so trung gian
Average value , intermediate value
Ty so cua cac mo un an hoi thep BT
Ratio of reinforced-concrete elastic modulus
Th nghiem ket cau
Structural testing
Th nghiem tren mo hnh
Model testing
Thc nghiem
Experiment
Th nghiem khong pha hoai
Nondestructive testing
Th nghiem en luc pha hoai
Testing to failure
Trt
Glissement , sliding
Tac ong cua kh hau
Climate effect
Trang thai gii han ve bien dang
Deformation limit state
Trang thai gii han cc han ve on nh hnh dangShape stability ultimate limited state
Trng hp thong thng
Current case
Th nghiem nhanh
Accelerated test
Thi han thi cong thc te
Actual construction time
Tut trt au CTDUL trong mau neo
Anchor sliding
Thep co o t chung thong thng
Normal relaxation steel
Thep co o t chung rat thap
Low relaxation steel
Tam nen
Centre of pressure
Tai trong bien oi t
Load of little variation
Ty le gia tnh tai va hoat tai
Dead to live load ratio
Tong tai trong len mot truc xe
Total load on all axies
Tai trong dai
Lane loading , lane load
Tai trong xe o to van tai
Truck loading , truck load
Tai trong truc
Axle loading , axle load
250296172.xls.ms_office
16 -
VIET_ANH
1217
1218
1219
1220
1221
1222
1223
1224
1225
1226
1227
1228
1229
1230
1231
1232
1233
1234
1235
1236
1237
1238
1239
1240
1241
1242
1243
1244
1245
1246
1247
1248
1249
1250
1251
1252
1253
1254
1255
1256
1257
1258
1259
1260
1261
1262
1263
1264
1265
1266
1267
1268
1269
1270
1271
1272
1273
1274
1275
1276
1277
1278
1279
1280
1281
1282
1283
1284
1285
1286
1287
1288
1289
1290
Structural steel
Amospheric corrosion resisting steel
Weathering steel (need not be painted)
Prestressing steel
Abac , abacus
Arch action
Action , effect
Abrasive action , wearing action
Delayed action
Local action
Surface action
Gravity retaining wall
Counterfort wall
Buttressed wall
Stem front wall of retaining wall
Hydraulic analysis
Hydrologic analysis
Drainage , sewage
Transverse drainage of the roadway
Longitudinal drainage
Load test
Concentrated load
Parapet
Infrequent heavy load
Design speed of vehicle
Service load design
Load factor design
Wind load on structure
Wind load on live load in accordance with ...
Average
Field test
Approximate value
To carry out
Test load
Pile test
Change
Temperature change
Penetration
Water penetration
Chloride penetration
Earth quake effect
Mix
Construction equipment
Durability , life time
Launching equipment
Design , conception
Installtion
Adaptation , to adapte
Equipment for the distribution of concrete
Strengthening of bridges
To strengthen , strengthening
To carry out without interrupting traffic flow
on the bridge
Monolithism
Anchor slipping
Before anchoring
After anchoring
Contract price
Concrete age at prestressing time
Conventional value
Optimization
Measure equipment
Water/cement ratio
Crushing test
Crushing test by splitting (after the diameter)
Short-term load
Long-term load
Loading time
Decompression limit state
Cracking limit state
State condition
Coordinate
Scale
U
1291 U chuyen hng
1292 U neo ngoai at them
250296172.xls.ms_office
Deviator
Blister
17 -
VIET_ANH
1293
1294
1295
1296
1297
1298
1299
1300
1301
1302
1303
1304
1305
1306
1307
1308
1309
1310
1311
1312
1313
1314
1315
1316
1317
1318
1319
1320
1321
1322
1323
1324
1325
1326
1327
1328
1329
Pure flexure
Calculation force
Shear stress
Permissible shear stress
Effective stress
Initial stress
Thermal stress
Elastic stress of prestressing steel
Allowable stress , permissible stress
Compressive stress
Tensile stress
Main tensile stress
Working stress
Cracking stress
Stress at anchorages after steating
Average stress
Instant stress
Steel stress at jacking end
Bond stress
Bursting concrete stress
Concrete stress at prestressed leved
Estimated losses
Guaranteed rupture stress
Bending stress
Shrinkage stress
Stress due to desd load
Bearing stress under anchor plates
Required stress of tendon
Theorettical estimation
Stress
Stress , unit stress
Combined dead , live load and impact
Design stress
Calculation stress
Normal stress
V
1330
1331
1332
1333
1334
1335
1336
1337
1338
1339
1340
1341
1342
1343
1344
1345
1346
1347
1348
1349
1350
1351
1352
1353
1354
1355
1356
1357
1358
1359
1360
1361
1362
1363
1364
1365
1366
1367
1368
250296172.xls.ms_office
Movable form
Bottom form
Form , mould
Covering material
Homogenous material
Coating material to protect prestressing steel from
corrosion or reduce friction when tension
Cracking development
Developing crack
Passive crack
Through crack
Stable crack
Micro crack
Sidewalk footway
Galvaning
Grout vent
Under condition of
Anchorage zone
End none of the member
Mortar
Compressed concrete zone
High strength material
Brusting in the region of end anchorage
Grout
Diaphragm
Arch
Chamfer
Scale
Tap , faucer
Washer
Grower's washer
Rising grade
Lime
Bridge location , bridge site
Impact
Metal shell , steel sheath
Foundation material
Bending crack
Shearing crack
18 -
VIET_ANH
1369
1370
1371
1372
1373
Va khong co ngot
Va xi mang cat e phut
Vo boc polyethylen o cao cua cap d
ng lc
V du tnh toan
X
1374
1375
1376
1377
1378
1379
1380
1381
1382
1383
1384
1385
1386
1387
1388
1389
1390
1391
1392
1393
1394
1395
1396
Xa lo
Xac nh s bo kch thc
Xac suat
Xam thc cua moi trng
Xi mang
X nghiep
Xoan
X ly be mat BT
X ly nhiet cho BT
X nghiep duy tu
Xa mu ( cua tru , mo )
X ly so lieu
Xi mang n
Xoi l
Xoi chung
Xoi cuc bo
Xoi nc e ha coc
Xam thc
Xi mang Pooclan
Xep hoat tai ( bo tr hoat tai )
Xe tai
Xe tai keo smi r moc
Xuyen vao
250296172.xls.ms_office
Highway
Dimensioning , to dimension
Probability
Environment agressive
Cement
Enterprise
Torsion
Concrete suface treatment
Concrete thermal treatment
Maintenance enterprise
Cap beam
Data processing treatment
Expanding cement
Scour
General scour
Local scour
Pile driving by using to wash away the ground
Agressive
Portland cement
Disposition of live load
Truck
Tractor truck
Penetration go though
19 -
VIET_ANH
- 20 -
A
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
Abac , abacus
Abrasive action , wearing action
Abrasive paper
Abutment , end support
Accelerant
Accelerated test
Accelerator , earlystrength admixture
Acceptance
Acceptance control
Accessories , spare parts
Accidental combination
Accuracy ( of test )
Action , effect
Activator
Active anchorage
Activity of cement
Actual construction time
Adaptation , to adapte
Additional
Additional deal load
Adjustment , to adjust
Admixture , additive
After anchoring
After anchoring
After cracking
After sale service
Age of loading
Ageing
Agggressive corrosive agent
Aggregate
Aggregate content dose
Agitator , shaker
Agressive
Air caisson
Air temperature
Allowable stress , permissible stress
Allowable stress design
Allowable tolerance in construction
Alloy
Alluvion
Alluvival soil
Alternate
Amospheric corrosion resisting steel
Amplitude of stress
Anchor
Anchor block
Anchor bolt
Anchor by adherence
Anchor plate
Anchor sliding
Anchor sliding
Anchor sliding
Anchor slipping
Anchorage block
Anchorage length
Anchorage region , anchorage zone
Anchorage seating
Anchorage zone
Anchored end block
Anchoring
Anchoring plug
Angle of interior friction
Annual amblient relative humidity
Apparent defect
Application field
Approach viaduct
Approximate
Approximate value
Aqueduct
Arch
Arch action
Area of cross section ( cross section area )
Area of reinforcement
Arrangement of longitudinal reinforcement cut-cut
Arrangment
Aspiring pump , extraction pump
Assumed temperature at the time of erection
At flanged part of steel girder
At kilometre
At mid span
Atttachment , connection
Automatic calculated design program
250296172.xls.ms_office
Toan o
Tac ong mai mon
Giay rap
Mo cau
Chat lam tang nhanh qua trnh
Th nghiem nhanh
Phu gia tang cng nhanh BT
Nghiem thu
Kiem tra e nghiem thu
Phu tung
To hp tai nan (ac biet)
o chnh xac ( th nghiem )
Tac dung , tac ong
Chat hoat hoa
Neo chu ong
o hoat hoa cua ximang
Thi han thi cong thc te
Thch ng vi , thch nghi vi
Bo xung , them vao
Tnh tai bo sung sau
ieu chnh,can chnh cho ung
Phu gia
Sau khi neo xong CT DUL
Sau khi neo CTDUL
Sau khi nt
Dch vu sau khi ban hang
Tuoi at tai
Suy thoai (lao hoa)
Chat xam thc
Cot lieu ( soi a )
Ham lng cot thep
May khuay
Xam thc
Gieng chm hi ep
Nhiet o khong kh
ng suat cho phep
Tnh toan theo ng suat cho phep
Sai so cho phep (dung sai) trong thi cong
Hp kim
at boi,phu sa
at phu sa , at boi tch
So le
Thep chong r do kh quyen
Bien o bien oi ng suat
Mau neo
Khoi neo
Bu long neo
Neo nh lc dnh bam
Ban cua mau neo
o trt trong mau neocua au cot thep
o tut cua nut neo trong lo neo
Tut trt au CTDUL trong mau neo
Tut lui cua nut neo
Khoi neo , au neo
Chieu dai oan neo gi cua cot thep
Khu vc neo
Bien dang cua neo khi DUL truyen t kch vao mau neo
Vung at mau neo , vung neo
Khoi au neo
Neo quai , neo vong (dam BTCT)
Nut neo (chem trong mau neo DUL)
Goc ma sat trong
o am tng oi bnh quan hang nam
Khuyet tat lo ra ( trong thay c )
Lnh vc ap dung
Cau dan
Gan ung
Tr so gan ung
Cau mang
Vm
Tac ong vom , hieu ng vom
Dien tch mat cat
Dien tch cot thep
Bo tr cac iem cat t cot thep doc cua dam
S bo tr
Bm hut
Nhiet o gia nh luc lap rap
phan ban canh dam thep
Ly trnh ( ly trnh X )
gia nhp
Cau kien lien ket
Chng trnh tnh toan t ong
ANH_VIET
83
84
85
86
87
88
89
B
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
C
148
149
150
151
152
153
154
155
156
157
Cable passing
Cable trace
Cable trace with segmental line
Cable-stayed bridge
Caisson
Caisson on temporary
Calculated bearing capacity
Calculation data
Calculation force
Calculation note
250296172.xls.ms_office
ANH_VIET
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
Calculation stress
Camber
Camber
Camber
Canlilevering construction method
Cantilever
Cantilever beam
Cantilever bidge
Cantilever dimension
Cantilevering edge of the slab
Cap
Cap
Cap beam
Capillarity
Capital repair , major repair
Captor
Carry , bear , resist , subject
Cast in place
Cast in situ structure (beam,slab,column)
Cast iron
Cast-in-place , post-tensioned bridgr
Cast-in-place concrete
Cast-in-place concrete caisson
Cast-in-place concrete pile
Cast-in-site concrete slab
Cause for deterioration
Cement
Cement content dose
Cement-stand grout
Center line
Center line
Center of gravity
Centerifugal pump , impeller pump
Centre of pressure
Centred restressing
Centrifugal force
Centrifugal hollow pile
Chamfer
Change
Change of statical schema
Characteristic strength
Checking concrete quality
Chloride penetration
Circled bridge
Circular section
Clasp nail
Class of loading
Clay
Clay
Clear span
Clear span
Clearance , play
Climate effect
Closed length
Closure
Closure joint
Coarse gravel
Coating material to protect prestressing steel from
Cobble , stone
Code , standard , specification
Coeffcient of sliding friction
Coefficient of continuity of spans
Coefficient of reduction of steel section
Coefficient of reduction of strength capacity
Coefficient of safety
Coefficient of thermal expansion
Coefficient of utilization
Cofferdam
Cohesive soid
Collar
Columm
Combined dead , live load and impact
Compact earth
Compacted sand
Compaction
Compactness
Company , corporation
Compatibility of strains between steel and concrete
Competition
Completion work
Composite flexural member
Composite girder bridge
Composite member
Composite prestressed structure
Composite section
Composite steel
250296172.xls.ms_office
ANH_VIET
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
Composite structure
Compressed concrete zone
Compression flange width of T girder
Compression member
Compression reinforcement
Compressive strength at 28 day-age
Compressive stress
Concentrated load
Concentrated force
Concret-filled pipe pile
Concrete
Concrete age at prestressing time
Concrete composition
Concrete cover ( Concrete protective layer )
Concrete cubic sample
Concrete hinge
Concrete ohardening
Concrete proportioning
Concrete sample compressive machine
Concrete shortening
Concrete stress at prestressed leved
Concrete suface treatment
Concrete test hammer
Concrete thermal treatment
Concrete tonsile strength at 28 day-age
Concrete unit weight , density of concrete
Condition of curing
Cone for testing slump of concrete
Conic hole
Connection
Connection , joining
Connection strand by strand
Connector
Constant along the span
Constant engineer
Construction , work
Construction cost
Construction equipment
Construction site , building site
Contact area
Contact surface
Content , dosage
Continuos span
Continuous beam
Continuous granulometry
Continuous slad structure
Contrac , agreement
Contract price
Contractor (Party B)
Control , checking
Control sample during the construction
Contruction drawing , working drawing
Conventional elasticity limit
Conventional value
Coordinate
Corner connection
corroded reinforcement
corrosion or reduce friction when tension
Corrosive environment
Corrosive fatigue
Cosidered section
Cost estimate
Cotinuous span bridge composed of simple
Counterfort wall
Counterprise , counter balance
Coupler
Coupler
Coupler divice for post-ensioned cable
Coupling
Course
Cover plate
Cover steel plate
Cover-meter , rebar locator
Covering material
Crack width
Crack width
Cracked concrete section
Cracked state
Cracking development
Cracking limit state
Cracking limit state
Cracking moment
Cracking stress
Cramp
Crane
Cross section
250296172.xls.ms_office
ANH_VIET
- 24 -
330
331
332
Crushed stone
Crushing test
Crushing test by splitting (after the diameter)
a dam
Th nghiem nen v
Th nghiem nen v che oi (theo ng knh)
333
334
335
336
337
338
339
340
341
342
343
344
345
Cube strength
Culvert
Culvert
Culvert head
Curb
Curbature
Curing
Curing temperature
Current case
Curve
Cutting machine
Cylinder , test cylinder
Cylinder base
D
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
250296172.xls.ms_office
ANH_VIET
410
411
412
413
414
415
416
417
Duct
Durability
Durability , life time
During stressing operation
Dust-stand
Dye penetrant examination
Dynamic
Dynamic force
E
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
F
250296172.xls.ms_office
ANH_VIET
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546
547
548
549
550
551
552
G
553
554
555
556
557
558
559
560
561
562
563
564
565
Galvaning
Galvanized strand
General cost estimate
General scour
General view
Genneral location of a bridge ( Genneral view of a bridge )
Geological profile
Girder , beam
Girder spacing
Glissement , sliding
Gluing of steel plate
Grade ( of concrete ) Class ( of steel )
Grade of concrete
250296172.xls.ms_office
Viec ma kem
Cap c ma ken
Tong d toan
Xoi chung
Hnh ve tong the
Bo tr chung cau
Mat cat a chat
Dam
Khoang cach gia cac dam
Trt
Dan ban thep
Cap ( cua be tong , cua thep )
Cap cua BT
ANH_VIET
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585
586
587
588
Grade of reinforcement
Grading granulometry
Grantry crane
Graphical representation
Gravel concrete
Gravity abutment
Gravity retaining wall
Gront , gronting
Gronted cable
Gross area
Ground anchor (for tunnel , retaining wall)
Ground water
Group of piles
Grout
Grout hole
Grout mixer
Grout pump
Grout vent
Grouting
Grower's washer
Guaranteed rupture stress
Guided sliding bearing
Gunned sprayed concrete
H
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
622
623
624
625
626
627
628
629
630
631
I
632
633
634
635
636
637
638
639
640
Immediate deflection
Immediate replacement
Impact
Impact
Impact due to track irregularity
Impact testing
Implementation dossites
Implementation successive stages
In order of priority
250296172.xls.ms_office
ANH_VIET
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656
657
658
659
660
661
662
663
664
665
666
Inaccuracy in construction
Inclined bar
Incohesive soid , granular material
Incremental launching method
Infrequent heavy load
Initial stress
Inpression
Inside radius of curvature
Inspection
Installation
Installation of prestressed reinforcement
Installation of reinforceceent
Installation of reinforcement
Installtion
Instant load
Instant stress
Interim instructions
Interior girder
Intermediate diaphragm
Intermediate support
Internal anchor (submerge)
Internal force
Internal prestressed concrete
Internal vibrator
Interruption of traffic
Inverted T section
J
667
668
669
670
671
672
673
674
675
Jack
Jack with back gripper
Jack with front gripper
Jacking end
Jacking force
Join tape
Joint
Joint , conection , splice
Joint steelve
Kch
Kch co bo ngam gi cap pha sau
Kch co bo ngam gi cap pha trc
iem au cot thep c keo cang bang kch
Lc kch ( e keo cang cot thep )
Bang dnh
Khe noi
Lien ket , noi
Noi ong
K
676
677
678
L
679
680
681
682
683
684
685
686
687
688
689
690
691
692
693
694
695
696
697
698
699
700
701
702
703
704
705
706
707
708
709
710
Laboratory
Laboratory testing
Labour , labour cost
Laminate timber
Laminated elastonmeric bearing
Land mark
Lane , traffic lane
Lane loading , lane load
Lap joint
Large diameter pile
Lateral force
Lateral impact force
Lateral tied columm
Laterl distribution of the wheel axle load
Launching by sliding
Launching equipment
Launching girder ( fruss type )
Layer
Lean concrete ( low grade concrete )
Levei
Leveling point
Levelling
Levelling instrument
Liftinf bridge
Ligature tie
Light-weight concrete
Lime
Limit state
Limit state design
Linear deformation diagram
Linear distribution
Linear friction coefficient
250296172.xls.ms_office
Phong th nghiem
Th trong phong th nghiem
Nhan cong , tien cong th
Go ep
Goi bang chat deo can
Cot moc
Lan xe
Tai trong dai
Moi noi chong len nhau cua cot thep
Coc ng knh ln
Lc tac dung t pha ben ( lc hong )
Lc va doc cau ( ngang song )
Cot co cot ai vuong goc vi truc
Phan bo ngang cua tai trong banh xe
Lao ra bang cach trt
Thiet b lao lap cau
Gia 3 chan e lao cau ( dang dan )
Lp
Be tong ngheo
Cao o , cao trnh
iem can o cao o
Cao ac
May cao ac ( may thuy bnh )
Cau nang-ha thang ng
Day thep buoc
Be tong nhe
Voi
Trang thai gii han
Tnh toan theo trang thai gii han
Bieu o bien dang tuyen tnh
Phan bo mot cach tuyen tnh
He so ma sat tren oan thang
ANH_VIET
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731
732
733
734
735
736
737
738
739
740
741
742
743
744
745
746
747
748
749
750
751
752
753
754
755
756
757
758
759
760
761
Linear interpolation
Live load
Live load moment
Load capacity , bearing capacity
Load combination
Load combination coefficient ( for ... )
Load distribution
Load factor
Load factor design
Load of little variation
Load stage
Load test
Load-bearing reinforcement
Loaded length ( in meters )
Loading cycle
Loading on ...
Loading time
Loam
Local action
Local compression
Local crushing
Local scour
Located pressure
Location of resultant
Location of the concrete compressiveresultant
Long cable tensioned at two ends
Long span bridge
Long-term ( load )
Long-term deformation
Long-term load
Longitudinal distribution of the wheel axle load
Longitudinal distribution of wheel loads
Longitudinal drainage
Longitudinal force
Longitudinal reinforcement
Longitudinal section
Longitudinal stiffener
Loss at the anchor , loss due to anchor slpping
Loss due to concrete instant deformation since
Loss due to concrete shrinkage
Loss due to elastic shortening
Loss due to relation of prestressing steel
Loss due to relaxation of concrete
Loss of prestress (prestress losses)
Low relaxation reinforced steel
Low relaxation steel
Low relaxtion strand
Low-grade concrete
Lower reinforce layer
Lubrication
Lubrification
M
762
763
764
765
766
767
768
769
770
771
772
773
774
775
776
777
778
779
780
781
782
783
784
785
786
787
788
789
790
791
250296172.xls.ms_office
ANH_VIET
792
793
794
795
796
797
798
799
800
801
802
803
804
805
806
807
808
809
810
811
812
813
814
815
816
817
N
818
819
820
821
822
823
824
825
826
827
828
829
830
831
832
833
834
835
836
837
838
839
840
O
841
842
843
844
845
846
847
848
849
850
851
852
853
854
855
856
857
858
859
860
861
862
863
864
865
250296172.xls.ms_office
ANH_VIET
- 31 -
P
866
867
868
869
870
871
872
873
874
875
876
877
878
879
880
881
882
883
884
885
886
887
888
889
890
891
892
893
894
895
896
897
898
899
900
901
902
903
904
905
906
907
908
909
910
911
912
913
914
915
916
917
918
919
920
921
922
923
924
925
926
927
928
929
930
931
932
933
934
935
936
937
938
939
940
941
942
943
944
945
946
947
Painting
Panel
Parabole cable trace
Parapet ( bao ve tren cau ; tay vn lcan cau )
Partial pretensioning
Partial safety factor
Passive anchor
Passive crack
Past flood data
Penetration
Penetration go though
Percentage elongation
Perforated cylindrical anchor end
Perimeter of bar
Period of vibration
Permeability
Permissible shear stress
Perspective drawing
Pier , intermediate support
Pier tip
Pigmen
Pile
Pile
Pile cap
Pile columm , pipe pile
Pile driver
Pile driving by using to wash away the ground
Pile foundation
Pile test
Piler spacing
Pilling
Pin
Pipe pile
Pivot bridge , roller bridge
Plain reinforced concrete
Plain reinforced concrete bridge
Plain round bar
Plain section
Plan
Plant supplier
Plastic coated greased strand cable
Plastifying agent
Ply wood
Point , turn out
Point-bearing pile
Poisitive up-ward
Poisson's ratio
Poisson's ratio
Poor state of maintenance
Porosity ( of concrete )
Portal bridge
Portland cement
Portland-cement concrete
Post-tensioning method
Posttensioned beam
Pre-tensioning method
Preblock plug
Precast , Prefabricated
Precast concrete
Precast concrete pile
Precast deck panel
Precast member , prefabricated member
Precast pile
Predestrian bridge
Preliminary project
Preliminary study
Prelminary design
Pressure distribution
Prestessed reinforcement
Prestress
Prestressed concrete
Prestressed concrete pile
Prestressed pile
Prestressing bed
Prestressing force
Prestressing jack
Prestressing steel
Prestressing steel strand
Pretensioned beam
Pretensioning by stages
Principal reinforcement
Prismactic member
250296172.xls.ms_office
Sn
Khoang
ng truc cap dang parabole
Thanh nam ngang song song cua rao chan
Keo cang cot thep tng phan
He so an toan tng phan
Neo thu ong
Vet nt thu ong
D lieu ve lu lut a xay ra
Tham , tham nhap
Xuyen vao
o dan dai tng oi
au neo hnh tru co lo khoan
Chu vi thanh cot thep
Chu ky dao ong
o tham thau , o tham
ng suat cat cho phep
Ban ve phoi canh
Tru cau
Mui coc
Bot mau ( e pha sn )
Coc
Mu coc , em au coc
em au ,coc
Cot ong
Gia bua ong coc
Xoi nc e ha coc
Mong coc
Th nghiem coc
Khoang cach gia cac tru cau
ong coc
Cot thep gam ( e truyen lc cat trt nh neo )
Coc ong
Cau quay
Be tong cot thep thng
Cau BTCT thng
Cot thep tron trn
Mat cat ac
Mat bang , ke hoach
Nguon cung cap vat t , may moc
Cap gom cac bo si xoan boc trong chat deo
Chat hoa deo
Go dan
Ghi cua ng sat
Coc chong
Dau dng lay hng len tren
He so poat xong
He so poat-xong
Tnh trang bao dng duy tu kem
o xop rong ( cua BT )
Cau khung chan xien
Xi mang Pooclan
Be tong xi mang Pooclan
Phng phap keo cang sau khi o BT
Dam DUL keo sau
Phng phap keo cang trc khi o BT
Nut neo a c chem san trong mau neo thu ong
Che tao san
Be tong uc san
Coc be tong uc san
Khoi ban mat cau uc san
Cau kien uc san
Coc uc san , coc che san
Cau i bo
o an phac thao s bo
Nghien cu s bo trc
D an s bo ( o an s bo )
Phan bo ap lc
Cot thep DUL
D ng suat
Be tong cot thep d ng lc
Coc BTCT DUL
Coc d ng lc
Be e keo cang coyt hep d ng lc
D ung lc
Kch e tao DUL
Thep du ng suat
Cap thep d ng lc
Dam DUL keo trc
Keo cang cot thep theo tng giai oan
Cot thep chu
Cau kien hnh lang tru
ANH_VIET
948
949
950
951
952
953
954
955
956
957
958
959
960
961
962
963
964
965
966
967
968
969
970
971
972
973
Probability
Product
Production
Production cost
Production supervision
Project
Protecting agent
Protection against abrasion
Protection against scour
Protection of cast iron
Protection of laminated steel , rolled steel
Protection of reinforcement against corrison
Protective concrete cover
Pump
Pure compression
Pure flexion beam
Pure flexure
Pure mechanics , theorical mechanics
Pure shear
Pure tension
Pushing force lateral
Pushing jack
Pushing machine
Put in the reinforcement case
Puzzolanic admixtur , puzzolanic material
Pylone
- 32 Xac suat
San pham
San xuat
Gia thanh che tao
Kiem tra trong qua trnh san xuat
o an
Chat bao ve
Bao ve chong mai mon
Bao ve chong xoi
Bao ve bang gang uc
Bao ve bang thep can
Bao ve cot thep chong g
Lp BT bao ho
Bm ( may bm )
Nen thuan tuy
Dam chu uon thuan tuy
Uon thuan tuy
C hoc ly thuyet
Cat thuan tuy
Keo thuan tuy
Lc ay , lc ay ngang
Kch ay
May ay cap vao trong ong cha cap
at vao trong khung cot thep
Phu gia pozulan
Cot thap ( cua he treo )
Q
974
Quasi-premanent combination
R
975
976
977
978
979
980
981
982
983
984
985
986
987
988
989
990
991
Radial force
Radiography method
Radius of curve
Railing
Railway bridge , rail bridge
Railway overpass
Ram
Rapid testing kit
Ratio of non-prestressing tension reinforcement
Ratio of prestressing steel
Ratio of reinforced-concrete elastic modulus
Reach ( of vitrator )
Reaction
Rebound number
Rectangular member
Rectangular section
Rectangular slab simpliy supported along all for side by beams
Lc hng tam
Phng phap kiem tra bang tia phong xa
Ban knh cong ( ban knh oan ng cong )
Lan can tren cau
Cau ng sat
Cau vt qua ng sat
Qua bua
Dung cu e th nghiem nhanh
Ty le ham lng CT thng trong mat cat
Ty le CT DUL
Ty so cua cac mo un an hoi thep BT
Ban knh tac dung cua am dui
Phan lc
So bat nay tren sung th BT
Cau kien co mat cat ch nhat
Mat cat ch nhat
Ban ch nhat goi gian n tren 4 canh len cac dam
992
993
994
995
996
997
998
999
1000
1001
1002
1003
1004
1005
1006
1007
1008
1009
1010
1011
1012
1013
1014
1015
1016
1017
1018
1019
1020
1021
Redistribution
Reinforced concrete beam
Reinforcement cage
Reinforcement group
Reinforcement mesh
Reinforcement shortening
Relative rotation replacement
Relaxation
Removal of the concrete cover
Repair method
Replacement cost
Representative curve of ...
Representative specimen
Required stress of tendon
Retaining wall
Retaining wall
Retarder
Rib
Ribbel slab
Righting moment
Rigid connection
Rigid frame bridge with hanges
Rising grade
River training work
Rivet
Riveted girder
Roadway , carriageway
Roadway width , carriage width
Rock , stone
Rock base
Phan bo lai
Dam BTCT
Long cot thep
Nhom cot thep
Li cot thep
Co ngan cua thep
Chuyen v quay tng oi
T trung
Boc lp be tong bao ho
Phng phap sa cha
Gia thanh thay the
ng cong bieu dien o th cua...
Mau th ai dien
ng suat yeu cau (cua cap DUL)
Tng chan
Tng chan at
Phu gia lam cham hoa cng BT
Gan , sn ( cua ban )
Ban co sn
Momem gi chong lat o
Lien ket cng
Cau khung T co chot
Vut cua dam
Chnh tr dong song
inh tan
Dam tan inh
Phan ng xe chay
Chieu rong phan xe chay
a
Nen a
250296172.xls.ms_office
ANH_VIET
1022
1023
1024
1025
1026
1027
1028
Roller bearing
Rolling impact
Rotation
Round , plain type reinforcement
Round steel tube , pipe
Rubber
Rubber bearing , neoprene bearing
S
1029
1030
1031
1032
1033
1034
1035
1036
1037
1038
1039
1040
1041
1042
1043
1044
1045
1046
Safety field
Salb reinfoced in both direction
Sample taken out from the actual structure
Sampling
Sand
Sand concrete
Sand light weight concrete
Sandstones
Scaffold , scaffolding
Scale
Scale
Scope , field
Scour
Scrape , to grade
Sealing
Sealing
Secondary moment due to prestressing
Section bending modulus with respect to top ( bottom ) fibers
1047
1048
1049
Section geometry
Section modulus
Section modulus of top fiber referred to of gravity
Pham vi an toan
Ban at cot thep 2 hng
Mau th lay ra t ket cau that
Lay mau th
Cat
Be tong cat
Be tong nhe co cat
Sa thach
a giao, gian giao
Ty le ( trong ban ve )
Vay kim loai
Pham vi
Xoi l
San nen , don mat bang
Bt kn . lap kn
Bao phu mau neo DUL
Momen th cap do DUL
Momem khang uon cua mat cat oi vi th tren cung (
di cung )
Dam Dang hnh hoc cua mat cat
Momem khang uon cua mat cat
Momem khang uon th tren cung oi vi trong tam mat cat
1050
1051
1052
1053
1054
1055
1056
1057
1058
1059
1060
1061
1062
1063
1064
1065
1066
1067
1068
1069
1070
1071
1072
1073
1074
1075
1076
1077
1078
1079
1080
1081
1082
1083
1084
1085
1086
1087
1088
1089
1090
1091
1092
1093
1094
1095
1096
1097
1098
1099
1100
250296172.xls.ms_office
ANH_VIET
1101
1102
1103
1104
1105
1106
1107
1108
1109
1110
1111
1112
1113
1114
1115
1116
1117
1118
1119
1120
1121
1122
1123
1124
1125
1126
1127
1128
1129
1130
1131
1132
1133
1134
1135
1136
1137
1138
1139
1140
1141
1142
1143
1144
1145
1146
1147
1148
1149
1150
1151
1152
1153
1154
1155
1156
1157
1158
1159
1160
1161
1162
1163
1164
1165
1166
1167
1168
1169
1170
1171
1172
1173
1174
1175
1176
1177
1178
1179
1180
1181
1182
1183
1184
1185
1186
Skin reinforcement
Slab bridge
Slab reinforcrment
Slab supported on four sides
Slab supported on two sides
Slenderness
Slide bridge
Sliding agent
Sliding frictin
Sliding jack on teflon
Sliding joint
Slipping bearing
Slop
Slump of cone of concrete mix
Soil condictions
Solvent
Spacing , distance
Spacing between cross beams
Spacing of anchors
Spacing of prestressing steel
Spacing of stirrups in the web
Spacing of wheel axle
Spacing of wheels
Span
Span end
Span flexibility coefficient
Span length
Span length ratio
Span precast prestressed girders
Span structure
Specifications
Specifications , code
Spiral core in the steel
Spiral reinforced columm
Spiral reinforcement
Splice
Splice plate , slab
Spot-weld
Square section
Stability
Stable crack
Standard dossites directions
Starting of the construction
Starting of the construction
State condition
Static equilibrium bridge
Static moment of prestressing
Static systerm
Statical force
Statical moment of cross section above or belong
Statistical method of analysis
Stay cable
Steel elongation
Steel H pile
Steel percentage in reinforced concrete
Steel pile
Steel pipe filled with concrete
Steel pipe pile , tubular steel pile
Steel reinforced part at pile tip
Steel stress at jacking end
Stem front wall of retaining wall
Stiffness
Stirrup , link , lateral tie
Straight bridge
Straight reinforcement
Strain of the fibre on the section
Strairs
Stream cross section
Stream flow , Stream current
Stream locomotive
Strengthening of bridges
Strengthening reinforcement
Stress
Stress , unit stress
Stress at anchorages after steating
Stress concentration
Stress distribution
Stress due to desd load
strnd
Structural defect
Structural integrity
Structural steel
Structural testing
Stuctural analysis
Stud connector
Stud shear connector
250296172.xls.ms_office
ANH_VIET
1187
1188
1189
1190
1191
1192
1193
1194
1195
1196
1197
1198
1199
1200
1201
1202
1203
1204
1205
1206
1207
1208
1209
1210
T
1211
1212
1213
1214
1215
1216
1217
1218
1219
1220
1221
1222
1223
1224
1225
1226
1227
1228
1229
1230
1231
1232
1233
1234
1235
1236
1237
1238
1239
1240
1241
1242
1243
1244
1245
1246
1247
1248
1249
1250
1251
1252
1253
1254
1255
1256
1257
1258
1259
1260
1261
1262
1263
1264
1265
1266
T-beam , T-girder
Tap , faucer
Technical solution
Technology transfer
Temperature change
Temperature change
Temporaly non-gronted cable
Temporary bridge
Temporary construction for erection
Temporary girder for bridge launching
Temporary live load
Tensile force
Tensile reinforcement
Tensile stress
Tensile test machine
Tension zone in concrete
Tensioning
Tensioning ( tensioning operation )
Test curve ( strain-stress )
Test data
Test load
Test loading on bridge
Test pile
Test planning
Test sample
Test train
Testing device
Testing method
Testing to failure
Tetron bearing
the level being considered for shear about the
The most unfavourable , worst effect
The most unfavourable solicited section
Theorettical estimation
Theory of liner creep
Thermal expansion
Thermal force
Thermal gradient
Thermal stress
Thickness
Through bridge
Through crack
Through plate girder
Tightness ( water tightness )
Time-dependent deformation
Time-limit of the prestressed steel
Tire-fond
To accept tenders
To adjust
To block the reinforcement end
To bore , boring
To carry out
To carry out without interrupting traffic flow on the bridge
To cast , casting
To cast in many steps ( stages )
To connect by hinge
250296172.xls.ms_office
Dam ch T
Voi nc
Giai phap ky thuat
Chuyen giao cong nghe
S bien oi nhiet o
Thay oi nhiet o
Cap tam khong ep va
Cau tam
Cong trnh phu tam e thi cong
Dam tam e lao cau , gia lao cau
Hoat tai tam thi
Lc keo
Cot thep chu keo
ng suat keo
May th keo
Khu vc chu keo cua BT
Keo cang
Cong tac keo cang cot thep
ng cong thc nghiem
So lieu th nghiem
Tai trong th
at tai th len cau
Coc th
Chng trnh th nghiem
Mau th e kiem tra
oan tau th ( e th cau )
Dung cu o , may o
Phng phap th
Th nghiem en luc pha hoai
Goi tetron
hoac ben di cua th ang xet chu cat
Bat li nhat
Mat cat chu lc bat li nhat
c lng bang ly thuyet
Ly thuyet t bien tuyen tnh
Co dan do nhiet
Lc do nhiet
Gradien nhiet
ng suat do nhiet
Chieu day
Cau co ng xe chay di
Vet nt xuyen
Dam ban co ng xe chay di
o kht kn khong ro nc
Bien dang theo thi gian
Gii han pha huy cua cot thep DUL
inh tia r phong
Nhan thau
Hieu chnh
Gi co nh au cot thep
Khoan
Tien hanh , thc hien
Thi cong ma khong lam ngng thong xe qua cau
o BT , viec o BT
o BT theo nhieu giai oan
Noi khp
ANH_VIET
1267
1268
1269
1270
1271
1272
1273
1274
1275
1276
1277
1278
1279
1280
1281
1282
1283
1284
1285
1286
1287
1288
1289
1290
1291
1292
1293
1294
1295
1296
1297
1298
1299
1300
1301
1302
1303
1304
1305
1306
1307
1308
1309
1310
1311
1312
1313
1314
1315
1316
1317
1318
To cure , curing
To disppear into the void
To extend reinforecement
To handle
To lift (lifting)
To meet the requirements
To mix
To notch , to nick
To retard
To shorten , shortening
To stand without failure
To strengthen , strengthening
To subject , to load , to withstand
To uses
Tobrush , To clean
Tolerance
Top flange
Top reinforcement
Top slab of box
Topography
Torsion
Torsion member
Torsional moment
Torsional stiffness
Total load on all axies
Total shrinkage
Tractor truck
Traffic lane unit
Traffic volume
Trainseving the line
Transformed area
Transition slab
Transitional surface
Transversal reinforcement , lateral reinforcement
Transverse distribution , lateral distribution
Transverse drainage of the roadway
Transverse stiffener
Tranversal distribution coefficient
Tranverse prestressing
Trasition stage
Trasmussion length of pretensioning
Truck
Truck loading , truck load
Truck train
Trumpet
Trumpet , guide
Trumplate , cast-guide
Turn-buckle
Twist step of a straud
two different reinforced concrete parts
Two equal spans continuos slab bridge
Two-way spanding slab
- 36 Dng ho BT mi o xong
Lap cho trong
Keo dai cot thep
Boc xep hang
Nang len (s nang len)
ap ng cac yeu cau
Khuay tron
Cat khac
Lam cham lai
Co ngan lai
Chu ng c ma khong hong
Tang cng
Chu tai
Dung
Chai sach
Dung sai
Ban canh tren
Cot thep ben tren ( cua mat cat )
Ban nap hop
Khao sat a hnh
Xoan
Cau kien chu xoan
Momen gay xoan
o cng chong xoan
Tong tai trong len mot truc xe
o co ngot cuoi cung tong cong
Xe tai keo smi r moc
n v lan xe
Lu lng xe tren ng
oan tau chay thng xuyen tren tuyen
Dien tch tnh oi
Ban qua o
Be mat chuen tiep
Cot thep ngang
Phan bo ngang
Thoat nc ngang ng o to
Sn cng ngang (thang ng)
He so phan bo ngang
D ng lc theo hng ngang
Giai oan chuyen tiep
Chieu dai truyen DUL keo trc
Xe tai
Tai trong xe o to van tai
oan xe tai
oan ong loe au mau neo
Ong neo cua mau neo trong ket cau DUL keo sau
e hnh loa cua mau neo DUL
Tang
Bc xoan cua si thep trong bo xoan
phan BTCT khac nhau
Cau ban lien tuc co hai nhp bang nhau
Ban co nhp theo 2 hng
U
1319
1320
1321
1322
1323
1324
1325
1326
1327
1328
1329
1330
1331
1332
1333
1334
1335
1336
1337
1338
1339
1340
1341
1342
U form bolt
Ultimate limit state
Ultimate moment
Ultimate strength
Unbonded tedon
Uncracked concrete section
Uncracked member
Uncracked state
Under condition of
Under the effect of ...
Unfavourable
Unfavourable climatic condiction
Unfilled steel pipe pile
Uniformly distributed
Uniformly load beam
Unit kengthening
Unit shortening
Unit shortening
Unreinforce concrete , plain concrete
Unusual combination
Uplift
Upward
Use
Utrasonic testing
Bu long hnh ch U
Trang thai gii han cc han
Momen cc han
Cng o chu keo
Cot thep DUL khong dnh bam vi BT
Mat cat BT cha b nt
Cau kien cha nt
Trang thai cha nt
Vi ieu kien rang...
Di anh hng cua
Bat li
ieu kien kh hau bat li
Coc ong thep lap long
Mot cach rai eu
Dam chu tai trong dai eu
Bien dang dan dai tng oi
Bien dang co ngat tng oi
o co ngan tng oi
Be tong khong cot thep
To hp hiem
Nho bat len
Hng len pha tren
S dung
Phng phap th bang sieu am
V
250296172.xls.ms_office
ANH_VIET
1343
1344
1345
1346
1347
1348
1349
1350
1351
1352
1353
1354
1355
W
1356
1357
1358
1359
1360
1361
1362
1363
1364
1365
1366
1367
1368
1369
1370
1371
1372
1373
1374
1375
1376
1377
1378
1379
Washer
Water layer
Water level of return period 100 years
Water penetration
Water proofing layer
Water/cement ratio
Waterproofing admixture
Waterway
Waterway opening
Weathering steel (need not be painted)
Web
Web reinforcement
Weided wire fabrie , weided wire mesh
Welded plate girder
Welded structure
Wet guniting
Wet sand ( staturated )
Widening of web
Wind direction
Wind load on live load in accordance with ...
Wind load on structure
Wing wall
Work planning
Working stress
Vong em , rong en
Lp nc
Mc nc tan suat 1%
Tham nc
Lp phong nc ( lp cach nc )
Ty le nc / xi mang
Phu gia chong tham
ng thuy
Khau o thoat nuc
Thep chu thi tiet ( khong can sn )
Sn (ban bung cua mat cat I,T hop)
Cot thep trong sn dam
Li cot thep si han
Dam ban thep han
Ket cau c lien ket bang han
Phun BT t
Cat t ( am nc )
M rong cua sn dam
Hng gio
Tai trong gio tac dung len hoat tai tuy theo
Tai trong gio tac dung len ket cau
Tng canh (xien goc)
Lap ke hoach thi cong
ng suat khai thac
Z
1380
1381
Zinc covering
Zine covering
250296172.xls.ms_office
Ma ken , lp ma kem
Lp ma kem
ANH_VIET