You are on page 1of 32

SO100KTL/SO100K Grid-tied Inverter Installation Instruction

SO100KTL/SO100K Grid-tied Inverter


Installation Instruction








Samil Power Co.,Ltd.
SP-SO100-V1.0-CN

1

SO100KTL/SO100K Grid-tied Inverter Installation Instruction


Copyright Declaration
The copyright of this manual belongs to Samil Power Co., Ltd. Any corporation or
individual should not plagiarize, partially copy or fully copy it (including software,
etc.), and no reproduction or distribution of it in any form or by any means. All rights
reserved.
Samil Power reserves the right of final interpretation. This information is subject to
changes without notice. Please refer www.samilpower.com for the newest edition.











2

SO100KTL/SO100K Grid-tied Inverter Installation Instruction

Contents
1 NOTES ON THIS MANUAL........................................................................................................... 5
1.1 SCOPE OF VALIDITY ................................................................................................................... 5
1.2 TARGET GROUP.......................................................................................................................... 5
1.3 ABOUT THIS MANUAL ................................................................................................................ 6
1.4 SYMBOLS USED.......................................................................................................................... 6
1.5 VERSION RECORD...................................................................................................................... 6
2 IMPORTANT SAFETY INSTRUCTIONS.................................................................................... 7
2.1 OPERATION METHODS FOR INSTALLATION.................................................................................. 7
2.2 OPERATING PERSONNEL............................................................................................................. 7
2.3 CHECKING AND STORAGE .......................................................................................................... 7
2.4 TRANSPORTATION ..................................................................................................................... 8
2.5 INSTALLATION........................................................................................................................... 9
2.6 MAINTENANCE ........................................................................................................................ 10
2.7 PROTECTION LEVEL/EMC/NOISE LEVEL.................................................................................. 10
2.8 IMPORTANT NOTICE................................................................................................................. 11
3. PRODUCT DESCRIPTION.......................................................................................................... 11
3.1 PACKING INFORMATION................................................................................................................ 11
3.2 STORAGE ..................................................................................................................................... 12
3.3 MAIN COMPONENT....................................................................................................................... 13
3.4 PRODUCT NAMEPLATE.................................................................................................................. 14
3.5 DIMENSIONS AND WEIGHT............................................................................................................ 15
3.6 EXTERNAL COMPONENTS ............................................................................................................. 15
3.7 ELECTRICAL SCHEME DIAGRAM................................................................................................... 17
4. INSTALLATION REQUIREMENT............................................................................................. 18
4.1 GENERAL INSTALLATION REQUIREMENT...................................................................................... 18
4.2 ENVIRONMENT REQUIREMENT ..................................................................................................... 18
3

SO100KTL/SO100K Grid-tied Inverter Installation Instruction

4.3 INSTALLATION SEQUENCE............................................................................................................ 19
5 MECHANISM INSTALLATION .................................................................................................. 20
5.1 TOOLS AND PARTS NEED FOR MACHINE INSTALLATION................................................................ 20
5.2 SHIPMENT..................................................................................................................................... 20
5.3 FIELD INSTALLATION ................................................................................................................... 24
6 ELECTRICAL CONNECTIONS .................................................................................................. 25
6.1 INPUT/OUTPUT REQUIREMENTS .................................................................................................... 25
6.2 ELECTRICAL WIRING PREPARATION............................................................................................. 26
6.3 INSTALLATION CHECKLIST........................................................................................................... 29
7 COMMISSIONING........................................................................................................................ 30
7.1 RELATED REQUIREMENTS............................................................................................................. 30
7.2 CHECKING.................................................................................................................................... 31
7.3 POWER UP .................................................................................................................................... 32
7.4 RUNNING CHECK.......................................................................................................................... 32



4

SO100KTL/SO100K Grid-tied Inverter Installation Instruction

1 Notes on This Manual
1.1 Scope of validity
This installation guide describes the installation and maintenance of SolarOcean
series inverters, including SO100KTLA1 and SO100KA1. Details please see
below contents:
Safety instruction
Safety instructions to be noticed when installation
System introduction
Including inverter structure and electrical characteristics
Installation design
Including inverter installation design of system configuration, installing
environment, electrical wiring and installing procedure
Installation procedure and inspection
Including inverter mechanical, electrical installation, communicating junction
and inspecting methods after installation
Commissioning guide
Including inverter commissioning operation, notice and partial exception
handling
Others
Including inverter technical data
1.2 Target group
This manual is for qualified personnel, including installation and maintenance,
system design and qualified technicians.
Keep this product manual for future reference. Please read it carefully before
installation or operation, or directly contact local dealer. More information
please see from www.samilpower.com.
5

SO100KTL/SO100K Grid-tied Inverter Installation Instruction

1.3 About this manual
We tried to be careful when editing this manual, but its unavoidable to have
some mistakes. Therefore Samil Power shall not be liable for any personnel
injury or property loss.
1.4 Symbols used

Danger
Danger indicates a hazardous situation which, if not avoided, will result
in death or serious injury.


Note
Note provides tips that are valuable for the optimal operation of your
product.


Warning
Warning indicates a hazardous situation which, if not avoided, could
result in death or serious injury.


Danger!
Danger indicates a hazardous situation which, if not avoided, will result
in death, serious injury or equipment accident.



1.5 Version record
Version no. Revision Revising date
SP-SO100-ICN01-V1.0 Initial version 12/2010


6

SO100KTL/SO100K Grid-tied Inverter Installation Instruction

2 Important safety instructions
2.1 Operation methods for installation
Install SO100KTL/SO100K correctly means following all instructions in this manual,
including inverter transportation, installation, electric-circuit connection and
commissioning. Any operation deviated from this manual shall be regarded as
incorrect operation. Samil Power shall not be liable for any damage resulted from
incorrect operation. Please also note:
* Note safety instructions here of and listed by following parts;
* Note product manual of SO100KTL/SO100K;
* Related technical data.
2.2 Operating personnel
Only electricians trained and authorized by power company could install and
commission inverter. Before installation, all installers and service personnel should be
trained and familiar with general safety regulations when operating electrical
equipment, they also shall be familiar with local demand, regulations, laws and safety
requirement.
2.3 Checking and storage
Please check the package and equipment upon delivery, also please compare to the
delivery documents. If any damage found or delivery documents unclear, please
contact Samil Power immediately.

Note!
Inverter could only be stored with package, please ensure its dustproof
and damp-proof. If stored for a relatively long time, it should be preserved
in dry conditions to be waterproof.

7

SO100KTL/SO100K Grid-tied Inverter Installation Instruction

2.4 Transportation
Transportation methods mentioned in this manual is the only one to be used (see
5.3 Transportation). Please note equipment weight and center of gravity. The
center of gravity is marked in the cover.

Warning!
Equipment is very heavy. Its center of gravity is not in center of inverter,
sometimes upper part is heavier; therefore, suitable lifter and personnel are
needed. Sometimes it could be up-right transported according to position
label. Place inverter upside down or horizontal-positioned transportation is
not allowed. If swinging up or transporting equipment is not correct, it will
result in serious injury, death or property loss.

Transporting damage
Please thoroughly check equipment upon delivery, also check all received goods
with delivery document list. If user find any damage to the packaging which
indicates that the inverter may be damaged, inform the responsible transport
company immediately to identify the equipment. If not inform immediately, user
would lose the right to claim for damage. If needed, user could also contact local
service center of Samil Power to ask for support. If equipment is damaged upon
transportation, please take below actions:
Damage upon transportation:
Receiver should take actions to reduce or limit damage range;
Keep original site of damage till responsible transport company or transport
insurer make decisions to solve. In this case, please be sure local Samil Power
employee in charge involves it as judge.
Record actual situation to transporting files which should be signed by ship
/railway carrier.
Send the equipment damage record to transport company and supplier.
8

SO100KTL/SO100K Grid-tied Inverter Installation Instruction

Ask transport company for written form paper.
Report to police if below damage is found:
Damage caused by stealing;
Damage caused by fire.
Notice time of Damage that cannot be identified at once (until opening
package)
Shipping company: 6 days
Railway/air carrier: 7 days
For above damage, user must report actual situation and send to shipping
company or railway/air carrier.
Transportation insurance
Transportation insurance means the insurance since ex-factory. Below
situation will not be included:
After initial transportation, equipment is transported from one place to
another.
Transportation within company (i.e.: non-public road transportation within
company)
2.5 Installation
When installation, please note that all information of SO100KTL/SO100K in this
manual is designed for indoor installation. With IP21 protection level, inverter should
be installed like this way.
Before installation, please read below information carefully:
Pre-installation
Check if inverter and package is damaged. Any questions, please contact local
supplier before installation.
Installation
To ensure safety, please comply with procedures introduced in this manual.
Please note that: inverter has two live ends, which are PV panel DC input side
and AC output to grid.
9

SO100KTL/SO100K Grid-tied Inverter Installation Instruction

2.6 Maintenance
Only when inverter completely disconnects with PV panel, grid and internal
power supply, and ensure they will not be connected again, user could operate
SO100KTL/SO100K inverters.
Only qualified technicians who are familiar with system operation could
operate.
Disconnect breaker
Disconnect AC grid, switch off PV panel DC input. Be sure inverter not be
reconnected. Use multimeter to test if inverter is disconnected and no voltage,
as it would still take high voltage with danger even disconnected with
grid/main power supply or PV panels. Please wait for at least 5 minutes after
disconnection, then continue to operate.
Maintenance and modification
Only authorized personnel could repair or modify the inverter. To ensure
personal safety, please use original accessories supplied by manufacturer. If not
original ones, electrical safety, EMC and inverter safety cannot be ensured if
complying with CE standard.
Function and safety parameter
Please do not change inverter parameter without authorization of local power
supply company or any indication from Samil Power. If changed in this
situation, it may result in damage or accident to personnel or inverter. Besides,
it will cause all inverter operation certificate of approval suspended.
2.7 Protection level/EMC/Noise level
EMC (Electromagnetic Compatibility) means electrical equipment could work
very well without any fault or error under certain electromagnetic environment, and
have no bad, unacceptable effect to environment. Therefore, EMC stands for quality
characteristics of electrical equipment.
anti- Electromagnetic function: Immunity to internal electrical noise;
10

SO100KTL/SO100K Grid-tied Inverter Installation Instruction

immunity to external Electromagnetic: Immunity to external system
electromagnetic noise;
Electromagnetic emission: Electromagnetic emission effect to environment
During equipment operation, it will have certain noise and electromagnetic radiation.
According to EMC radiation and noise level, inverter could be set or installed under
industrial environment. Therefore, all personnel are suggested not to be near to
inverter for a long time when its operating.
2.8 Important notice

Warning 1: Static electricity may cause inverter destroyed
Electrostatic discharge may cause unrecoverable damage.
When operating inverter, user should comply with electrostatic protection standard.
Warning 2: Limitation
The inverter cannot be directly connected with life auxiliary equipment or
armamentarium.
Warning 3: Tools
Before startup, installer should check all installing tools or other unnecessary goods
are taken out to avoid bringing harm to inverter or normal operation.
Warning 4: Maintenance
Before maintaining, please be sure inverter is disconnected and all electrified
components finish electric discharge, then inverter could be maintained.


3. Product description
3.1 Packing information
Table-1 Product Packing Information
S/N Description Unit QTY Remark
1
SO100KTL/SO100K PCS 1
Including inverter cabinet
key, DC/AC connector and
other accessories
2
Installation Instruction PCS 1
3
Operation Manual PCS 1
11

SO100KTL/SO100K Grid-tied Inverter Installation Instruction

4
Qualification certificate PCS 1
5
OT terminal PCS 8
6
CD PCS 1
System monitoring
software
3.2 Storage
After checking inverter, if it cannot be installed and operated at once, please
note below points when storing:
Keep package original state;
Keep dryer inside
keep ventilating and damp-proof when storage and no water
storage temperature: -2055, storage humidity: 095%;
please note and adapt to all harsh environment, such as shock cooling,
shock heating, collision, etc. to avoid causing damage to inverter;
regular inspection: Generally once a week to check if package is in perfect
condition, to avoid vermin bite and snap, if damage found, please change
package at once;
if storage time is more than half a year, please open package to check and
repack it.

Note!
Not store without package
Please keep product away from direct sunlight
Do not keep inverter tilted or overlapped.

Note!
After a long time storage, before installation please open inverter cabinet
and check if its in good condition. If necessary, please ask professional
personnel to test and then install it.
12

SO100KTL/SO100K Grid-tied Inverter Installation Instruction


3.3 Main component

1
2
8
3
7
4
6
5

Figure-1 Component layout chart

Table-1 Component name
S/N Description S/N Description
1 Inverter model 5 Lightning protection model
2
BUS capacitor
copper bar
6 AC output connector
3 DC switch 7 Fuse
13

SO100KTL/SO100K Grid-tied Inverter Installation Instruction

4 DC input connector 8 AC breaker
3.4 Product nameplate
SO100KTL/SO100K inverter, in its side, is stacked with one mark, including
inverter type and other important technical data.

Figure-2 Equipment nameplate

Table-1 Nameplate
S/N Information
A
Samil Power LOGO, product name
B
Identification of certificate authority
C
product parameter
D
Company name, website, production site

14

SO100KTL/SO100K Grid-tied Inverter Installation Instruction

3.5 Dimensions and weight

Figure-3 Dimensions of SO100KTL/SO100K

Table-2 SO100KTL/SO100K weight
Inverter model SO100KTL SO100K
Weight (kg) 500 800

3.6 External components
See figure 4, external components of SO100KTL/SO100K include: LED
indicator light, LCD faceplate and press key, emergency stop button, DC
switch, AC switch, etc.

15

SO100KTL/SO100K Grid-tied Inverter Installation Instruction


Figure-4 External components

Table-3 SO100KTL/SO100K appearance and connector description
Description Instruction
Touch screen LCD
Display inverter operation information, execution
of control command, parameter setting, etc.
DC SWITCH
When switched on, inverter is connected with PV
panel; when switched off, inverter stop working.
AC SWITCH
When switched on, inverter AC output is
connected with grid; when switched off, inverter
stop working.
Emergency stop

Press this button, inverter stop working; you can
restart inverter through Touch Screen LCD after
16

SO100KTL/SO100K Grid-tied Inverter Installation Instruction

unlocking.
LED Indicate inverter current operating status.


Figure-5 SO100KTL/SO100K external interface
Connection instruction
DC+/DC-: + and - of PV arrays connect separately to inverter DC input;
AC output: AC output connects to L1, L2 and L3 of three-phase grid via
three-phase breaker;
Grounding: ground SO100KTL/SO100K through copper terminal to ensure
inverter cover no electricity.
3.7 Electrical scheme diagram
SO100K

17

SO100KTL/SO100K Grid-tied Inverter Installation Instruction

SO100KTL

4. Installation requirement
4.1 General installation requirement
To ensure inverter normal working, please see below installation environment and
request:
SO100KTL/SO100K protection level is IP21, it needs to be waterproof.
indoor installation, keep it away from direct sunlight and rain
good ventilation
clean and tidy installation environment
during operation it will have some noise, please choose the installation site away
from place of residence;
be sure installing site not shaking, supporting surface needs to meet inverter load
bearing request.
be sure to leave enough space to maintains and for heat dissipation.
be sure surrounding temperature is in -25C ~50C.
4.2 Environment requirement
SO100KTL/SO100K inverter needs to be installed in distribution room,
where floor, space, cable ditch, wind-hole, ventilating equipment and all
protective measures should be strictly designed and meet below requests:
Base request
18

SO100KTL/SO100K Grid-tied Inverter Installation Instruction

SO100KTL/SO100K inverter needs to be installed on flat floor or steel
bracket with fireproofing materials. Be sure floor no sinking or tilting, base
solid, safe and reliable. Base should have load bearing capacity. Therefore,
when choosing installing position, please consider its weight capacity
seriously.
Space request
When installing inverter, be sure to leave enough space between wall or other
equipment to meet requirements for min. maintenance channel, escape route
and ventilation.
Please leave 1.2m space before the installing position of
SO100KTL/SO100K, 0.1m space back side, minimal 0.6m upper side
Cable ditch design
SO100KTL/SO100K cable should be both in and out from down side,
inverter is suggested to line out from cable ditch, which could be easy for
installation and maintenance.
4.3 Installation sequence
State Detail Reference
Installation
requirement
Work must be prepared before
installing:
Accessories are complete
Tools are enough
4 Installation
requirement
Mechanism
Installation
Mechanism installation include
shipment and movement the inverter
installation and fix the inverter
5 Mechanism
Installation
Electrical
connections
Electrical connections include:
open the front door
DC side connection
AC side connection
grounding connection
communication connection
6 Electrical
connections
Installation checklist
Checklist include:
Machinery installation check
6.3 Installation
19

SO100KTL/SO100K Grid-tied Inverter Installation Instruction

Electrical installation check
others
checklist
Power up and
commissioning
Commissioning include
examination before commissioning
preparation before power up
steps should be took when
commissioning
running check
7 Commissioning
5 Mechanism Installation
Check all the parts of facility completely according to the installation manual.
5.1 Tools and parts need for machine installation
Tools and parts need:
cranes, forklifts or trucks (be sufficient for loading capacity)
spanner
screwdriver
plier
axial compression
drier
socket head hexagon wrench
magger and multimeter
5.2 shipment
announcements
Inverter adopts whole mode of transportation, the user can lift it from the
bottom up by forklift, or through mobile cranes,
Caution 1: Inverter as a whole solid, whether when transportation or
installation shall not be separated. Modified without Samil Power authorized
may cause fault, which is out of warranty.
Caution 2: During transportation shall not make inverters tilting moves or
sudden stress, such as sudden down or raise.
20

SO100KTL/SO100K Grid-tied Inverter Installation Instruction

Caution 3: Read carefully and choose appropriate ways of transport
and storage locations, Users are suggested to use forklift to move
inverter.

Note!
Before inverter cabinet moving to a reserved position, DC and AC main
power cable should be laying first. Because these cables are fairly thick, the
cables operation will be difficult after inverter cabinet installation.

Transportation with package
In order to make a better protective state, the transportation should be with
packaging, and follow the packaging printing to transport it.

Unpackaging inverters can use forklifts, cranes or trucks. Pay attention to the
packing mark weight and ensure the equipment adequate supporting capacity
when its moving. Equipment gravity centered in the lower part of the location,
transportation should be reasonable arrangement of support or hook-on point.
Forklift truck transportation is a standard method of transportation. Pay attention
to the gravity mark. Inverter size is quite large that may block pilots vision,
assistant personnel is needed. Shifting method (see figure 6) is below.
21

SO100KTL/SO100K Grid-tied Inverter Installation Instruction


Figure-6 Forklift(with package)
During Lifting transportation, it is recommend using both head of buckle flexible
belts and make the condole belt balance stress, see figure - 7

Figure-7 transportation (with package)
Inverters without packing shift
Unpacking shipment is mainly used for move to final installation location, the
inverter which has been disassembled package can use forklift truck, crane,
slippery course to move it.
22

SO100KTL/SO100K Grid-tied Inverter Installation Instruction

If the final installation location is far away from the remove packaging site, put a
wood tray in bottom then use forklift to transport it. See figure-8

Figure-8 Forklift transportation (without package)
Before using forklift to move inverter, remove the base plate first, and make
barycenter in the middle of forklift, then transport it. Laying guide will make
inverter push to eventually installation position. See picture-9

Figure-9 Forklift moves inverter
If use cranes for movement, see picture -10. Use cranes need to ensure the angle
must 70 and note inverter gravity center position.
23

SO100KTL/SO100K Grid-tied Inverter Installation Instruction


Figure-10 cranes moves inverter
5.3 Field installation
Dismantle equipment packing
Please follow the steps below to disassemble equipment packing.
Step 1: Remove the woodiness side and roof board of packing case.
Step 2: Remove the shielding materials of inverter.
Step 3: Remove the anchor components which make inverter fixed in the
transport plate.
Remove the base cover plate for front and back.
Unscrew the wood tray fixed nut of the bottom.
Take down screws. It will separate inverter and wood tray.
Inverter must be installed in foundation or foundation board. Therefore, before
installation fixed point (wall anchor bolt) must be in proper position,
installation procedure as follows.
Step 4: Remove the front and back of bottom cover plate of cabinet.
Step 5: Use accessories bolt holes through waist of the base to make inverter
fixed in channel, or on the ground.
24

SO100KTL/SO100K Grid-tied Inverter Installation Instruction

6 Electrical connections
6.1 Input/output requirements
Warning !
The inverters work in high voltage!
Only professional electrician can only work on equipment.
All the equipment connect operation, must be in no voltage state.
wrong connection may damage inverter.
Without accordance with this warning message, it may cause death,
serious bodily injury or significant damage
Photovoltaic array
Photovoltaic array's open-circuit voltage should be no more than 880V,
otherwise, it will damage equipment.

Model SO100KTLA1 SO100KA1
Photovoltaic array power
recommended
110KW
Photovoltaic array
open-circuit voltage
limitation
880V

Three-phase power grid
SO100KTL/SO100K will continue monitor the grid to ensure that voltage
and frequency, the following conditions is three-phase power grid limit.
Before installation the grid inverter power supply should get the local power
sector's approval.
Wire Cable requirement

25

SO100KTL/SO100K Grid-tied Inverter Installation Instruction

Wire CableCu Line diameter size requirement(mm
2
)
Photovoltaic array DC+ AT least two road input each road 50 mm
2
Photovoltaic array DC- At least two road input each road 50mm
2
Grounding wire 70 mm
2
to 85 mm
2

Communication wire 0.75 mm
2

power grid L1 70 mm
2
to 85 mm
2

power grid L2 70 mm
2
to 85 mm
2

power grid L3 70 mm
2
to 85 mm
2


6.2 Electrical wiring preparation
Users need to open the front door of SO100KTL/SO100K before connection,
Specific steps as follows:
Step 1: Turn AC/DC switch to the off position. See Figure-11

Figure-11 Main switch of AC/DC
Step 2: Open the front door. Unlock motioned figure-12 shown
26

SO100KTL/SO100K Grid-tied Inverter Installation Instruction


Figure-12 Equipment cupboard door switch

Attention: All wiring best from external through inverter's connection
hole to access terminals.

Warning!
Photovoltaic array open-circuit voltage should be no more than 880V!
Otherwise it will damage the equipment! Using a multimeter to measure
photovoltaic array when connected.


Warning!
The positive and negative of voltage for photovoltaic array can not be
reversed, using a multimeter to measure it.
Disconnect the DC switch to guarantee the dc side wiring uncharged
Using multimeter to measure the open-circuit voltage guarantee photovoltaic
array open voltage should be no more than 880V
27

SO100KTL/SO100K Grid-tied Inverter Installation Instruction


Figure-13 DC input line

AC wiring
Connect AC power grid

Warning!
When connect ac power grid, turn off the AC switch which ensure
terminal uncharged.

Turn off the AC switch, use multimeter to confirm it.
connect AC output L1 to grid L1
connect AC output L2 to grid L2
connect AC output L3 to grid L3
Please confirm wiring firmly
28

SO100KTL/SO100K Grid-tied Inverter Installation Instruction


Figure-14 AC output line
Grounding connection
The ground wire in SO100KTL/SO100K connect firmly to cable.

Figure -15 AC output line
6.3 Installation checklist
Before puting inverter into operation, it needs to check the installation first.
At least two workers is needed to follow up the items listed below to ensure
the correctness of installation.

Machinery installation check
Inverter has no deformation and damages
Inverter must be fixed, stable and reliable
29

SO100KTL/SO100K Grid-tied Inverter Installation Instruction

Enough spaces around inverter
Environment temperature, humidity, ventilated condition accord with
the requirements
Cooling air smooth flow
The seal protection for cabinet is complete reliable.
Electrical installation check
Inverter grounding completely and firmly
The grid voltage and inverter unit rated voltage matching
Grid connections sequence correctly, tighten torque meet requirement
The polarity of DC input connection is correct. Tighten torque meet
requirements
Communications connect correctly, and keep distance to other cables
Cable number mark correctly and clearly
Insulation cover completely reliable, dangerous warning label clear and
firm
Inverter grounding completely and firmly
The grid voltage and inverter unit rated voltage matching
Phase sequence correct, tighten torque meet requirements
Other inspection
All live part must tie with insulating cable
Tools, parts, conductive dust or other materials cannot be left in the
cabinet
No condensing and freezing in the cabinet

7 Commissioning
7.1 Related requirements
Before commissioning A completely check should be took. Whether DC and
AC voltage meets the requirement, and the polarity is right. Check the system
connection is already in compliance with relevant standards requirements.
And the system grounding well, Grounding resistance for the whole system
security has decisive significance, so it must be sure that grounding
resistance comply with the requirements before commissioning.


30

SO100KTL/SO100K Grid-tied Inverter Installation Instruction


Note!
Be sure that all the switches are at off position both at ac/dc side,
before commissioning.

7.2 Checking
PV modules
Check each PV string voltage. PV voltage will be changed as PV modules
temperature variable. When parallel with other strings, voltage change will
harm to the strings when the parallel ones voltage is not the same, so record
the voltage is very important. Accurately record all values (voltage,
temperature and radiation) will be very useful to maintenance. Ensure correct
polarity. Wrong polarity can also lead to module seriously damaged. Use
megger to measure the insulation resistance at the input cable of the inverter.

Danger !
Be careful, High voltage on DC input may harm to person!

Inverter check
Please check as the following steps before power up the inverter:
step1follow 6.3 Installation checklist;
step2be sure both DC and AC switch off;
step3be sure emergency stop button release
Voltage check
check the grid voltage
-Be sure phase sequence correct;
-Be sure each phase of grid voltage is in range, and make the record.
-Measure the grid THD (Total harmonic distortion), and make the record.
check the DC input voltage
31

SO100KTL/SO100K Grid-tied Inverter Installation Instruction

32

DC input should be connect from combiner box or distribution cabinet
- Be sure the DC polarity correct.
- Measure each PV string voltage and make the record, be sure the string
voltage no more than 880V.
7.3 Power up
Power up SO100KTL/SO100K for the first time, follow the steps below:
Step 1 Turn the AC switch to position ON
Step 2 Turn the DC switch to position ON
Step 3 It will take 10 second to start work. It will display Initialization on
LCD, and turn on the POWER light.
Step 4 If DC voltage is below 450V, it will display Waiting on LCD. Or the
inverter will go to self test state.
Step 5 If self test is OK, the inverter will go to normal state, and turn on the
OPERATION light.
7.4 Running check
After commission check the below steps:
Step 1: check the noise, the heat, the smell and the smoke
Step 2: check the voltage, the frequency and the THD
Step 3: set and change the parameter though LCD, check if the function is OK
That is all for installation and commissioning.