PROGRESIVA ALTURA BASE TALUD

AREA
GEOMALLA
(m2)
AREA
ACUMULADA
(m2)
50.00 1.00 1.50 1.80 0
60.00 1.73 2.60 3.12 26.61 26.61
80.00 2.88 4.32 5.19 85.11 111.72
100.00 2.93 4.40 5.28 106.74 218.46
120.00 2.85 4.28 5.14 106.20 324.66
140.00 2.78 4.17 5.01 103.50 428.15
160.00 2.75 4.13 4.96 101.69 529.85
180.00 2.62 3.93 4.72 98.81 628.66
200.00 2.73 4.10 4.92 98.45 727.10
220.00 2.62 3.93 4.72 98.45 825.55
240.00 2.37 3.56 4.27 91.96 917.51
260.00 1.99 2.99 3.59 80.60 998.11
280.00 1.92 2.88 3.46 72.49 1,070.60
300.00 1.99 2.99 3.59 72.49 1,143.09
320.00 2.52 3.78 4.54 83.31 1,226.40
340.00 2.76 4.14 4.98 97.19 1,323.58
360.00 2.87 4.31 5.17 103.50 1,427.08
380.00 2.81 4.22 5.07 104.40 1,531.48
400.00 2.70 4.05 4.87 101.33 1,632.81
420.00 2.49 3.74 4.49 95.56 1,728.37
440.00 2.29 3.44 4.13 88.17 1,816.55
460.00 2.14 3.21 3.86 81.86 1,898.41
480.00 2.11 3.17 3.80 78.62 1,977.03
500.00 1.45 2.18 2.61 66.18 2,043.20
520.00 1.24 1.86 2.24 50.49 2,093.70
540.00 1.77 2.66 3.19 56.26 2,149.96
560.00 2.22 3.33 4.00 73.93 2,223.89
580.00 2.53 3.80 4.56 87.63 2,311.53
600.00 2.84 4.26 5.12 98.81 2,410.33
620.00 2.75 4.13 4.96 102.78 2,513.11
640.00 2.92 4.38 5.26 104.22 2,617.33
660.00 2.72 4.08 4.90 103.68 2,721.00
680.00 2.63 3.95 4.74 98.45 2,819.45
700.00 2.48 3.72 4.47 94.12 2,913.57
720.00 2.32 3.48 4.18 88.53 3,002.11
740.00 2.18 3.27 3.93 83.12 3,085.23
760.00 2.00 3.00 3.61 77.36 3,162.59
780.00 1.85 2.78 3.34 71.41 3,234.00
800.00 1.73 2.60 3.12 66.54 3,300.53
820.00 1.36 2.04 2.45 57.71 3,358.24
840.00 0.93 1.40 1.68 43.28 3,401.52
860.00 0.79 1.19 1.42 33.01 3,434.53
880.00 0.68 1.02 1.23 28.50 3,463.03
METRADO DE GEOMEMBRANA DIQUE PRINCIPAL
900.00 0.65 0.98 1.17 25.98 3,489.01
PROGRESIVA ALTURA BASE TALUD
AREA
GEOMALLA
(m2)
AREA
ACUMULADA
(m2)
100.00 0.56 0.84 1.01 0
120.00 0.82 1.23 1.48 26.88 26.88
140.00 0.84 1.26 1.51 31.93 58.80
160.00 1.02 1.53 1.84 35.53 94.34
180.00 1.25 1.88 2.25 42.92 137.26
200.00 1.53 2.30 2.76 52.12 189.38
220.00 1.49 2.24 2.69 56.44 245.82
240.00 1.30 1.95 2.34 52.30 298.12
260.00 1.11 1.67 2.00 45.45 343.56
280.00 0.99 1.49 1.78 39.86 383.42
300.00 0.47 0.71 0.85 28.32 411.74
METRADO DE GEOMEMBRANA DIQUE NORTE
H O J A D E M E T R A D O S
PRESUPUESTO:
SUBPRESUPUESTO: Fundo Yotita
DESCRIPCION: ENROCADO DE PROTECCION
UBICACIN : Lambayeque-Ferreafe-Pitipo
FECHA: Setiembre 2014
Especificaciones
03
ENROCADO DE PROTECCION
03.01
EXCAVACION EN MATERIAL SUELTO
m3
Longitud 16.8
Excavacion para encofrado
Longitud 53.9
Excavacion para encofrado
Longitud 18.4
Excavacion para encofrado
03.02
ENCOFRADO Y DESENCOFRADO (3m Longitud)
m2
Longitud 16.8
N de Serchas
17.80
Longitud 53.9
N de Serchas
54.90
yotita
Partida N Unid-
Longitud 18.4
N de Serchas
19.40
03.03
MANPOSTERIA DE PIEDRA CON CONCRETO SIMPLE
m3
Longitud 16.8
Longitud 53.9
Longitud 18.4
H O J A D E M E T R A D O S
Perimetro (m) Longitud (m) Ancho / Area Altura/ Espesor
45.00
Espesor 0.2
16.80 0.5 1.68
1.47 16.80 1.08 1 4.95
Excavacion para encofrado
16.80 0.12 2.02
Espesor 0.20
53.90 0.5 5.39
1.47 53.90 1.08 1 15.87
Excavacion para encofrado
53.90 0.12 6.47
Espesor 0.20
18.40 0.5 1.84
1.33 18.40 0.98 0.9 4.90
Excavacion para encofrado
18.40 0.12 2.21
35.77
7.02
Espesor 0.20
16.80 0.5 0.10
1.47 1.08 1 0.29
21.65
Espesor 0.20
53.90 0.5 0.1
1.47 1.08 1 0.29
yotita
Progresiva
Medidas
Parcial Total
7.10
Espesor 0.20
18.40 0.5 0.1
1.33 0.98 0.9 0.27
34.62
Espesor 0.2
16.80 0.5 1.68
1.47 16.80 1.08 1 4.95
Espesor 0.20
53.90 0.5 5.39
1.47 53.90 1.08 1 15.87
Espesor 0.20
18.40 0.5 1.84
1.33 18.40 0.98 0.9 4.90
H O J A D E M E T R A D O S
PRESUPUESTO:
SUBPRESUPUESTO: Fundo Yotita
DESCRIPCION: ENROCADO DE PROTECCION INTERSECCIONES
UBICACIN : Lambayeque-Ferreafe-Pitipo
FECHA: Setiembre 2014
Especificaciones
03
ENROCADO DE PROTECCION
03.01
EXCAVACION EN MATERIAL SUELTO
m3
Enrocado de Proteccion dren principal Entrada
Enrocado de Proteccion dren principal salida
Enrocado de Proteccion dren principal
Empalme
2
Dren secundario
Enrocado de Proteccion dren principal Entrada
Enrocado de Proteccion dren principal salida
Enrocado de Proteccion dren principal
Empalme
2
Dren secundario
yotita
Partida N Unid-
Enrocado de Proteccion dren principal Entrada
Enrocado de Proteccion dren principal salida
Enrocado de Proteccion dren principal
Empalme
2
Dren secundario
Enrocado de Proteccion dren principal Entrada
Enrocado de Proteccion dren principal salida
Enrocado de Proteccion dren principal
Empalme
1
1
Dren secundario
Enrocado de Proteccion dren principal Entrada
Enrocado de Proteccion dren principal salida
Enrocado de Proteccion dren principal
Empalme
1
Dren secundario
03.02
ENCOFRADO Y DESENCOFRADO (3m Longitud)
m2
Enrocado de Proteccion dren principal Entrada
2
2
Enrocado de Proteccion dren principal salida
2
2
Enrocado de Proteccion dren principal
2
2
Empalme
4
Dren secundario
2
2
Enrocado de Proteccion dren principal Entrada
2
2
Enrocado de Proteccion dren principal salida
2
2
Enrocado de Proteccion dren principal
Empalme
4
Dren secundario
2
2
Enrocado de Proteccion dren principal Entrada
2
2
Enrocado de Proteccion dren principal salida
2
2
Enrocado de Proteccion dren principal
2
2
Empalme
2
Dren secundario
2
2
Enrocado de Proteccion dren principal Entrada
2
2
Enrocado de Proteccion dren principal salida
2
2
Enrocado de Proteccion dren principal
2
2
Empalme
2
2
Dren secundario
2
2
Enrocado de Proteccion dren principal Entrada
2
2
Enrocado de Proteccion dren principal salida
2
2
Enrocado de Proteccion dren principal
2
2
Empalme
4
Dren secundario
2
2
03.03
MANPOSTERIA DE PIEDRA CON CONCRETO SIMPLE
m3
Enrocado de Proteccion dren principal Entrada
Enrocado de Proteccion dren principal salida
Enrocado de Proteccion dren principal
Empalme
2
Dren secundario
Enrocado de Proteccion dren principal Entrada
Enrocado de Proteccion dren principal salida
Enrocado de Proteccion dren principal
Empalme
2
Dren secundario
Enrocado de Proteccion dren principal Entrada
Enrocado de Proteccion dren principal salida
Enrocado de Proteccion dren principal
Empalme
2
Dren secundario
Enrocado de Proteccion dren principal Entrada
Enrocado de Proteccion dren principal salida
Enrocado de Proteccion dren principal
Empalme
1
1
Dren secundario
Enrocado de Proteccion dren principal Entrada
Enrocado de Proteccion dren principal salida
Enrocado de Proteccion dren principal
Empalme
2
Dren secundario
H O J A D E M E T R A D O S
Perimetro (m) Longitud (m) Ancho / Area Altura/ Espesor
13.00
Enrocado de Proteccion dren principal Entrada
Espesor 0.2
1.00 0.5 0.10
1.05 1.00 0.78 0.7 0.21
Enrocado de Proteccion dren principal salida
1 0.5 0.1
1.05 1.00 0.78 0.7 0.21
Enrocado de Proteccion dren principal
6.00 0.50 0.60
1.05 0.78 0.7 0.21
1.08 1.89 0.78 0.75 0.43
Dren secundario
1.50 2 0.6
1.47 1.50 1.08 1 0.44
Enrocado de Proteccion dren principal Entrada
Espesor 0.2
1.00 0.5 0.10
0.91 1.00 0.68 0.6 0.18
Enrocado de Proteccion dren principal salida
1 0.5 0.1
0.91 1.00 0.68 0.6 0.18
Enrocado de Proteccion dren principal
6.00 0.50 0.60
0.91 0.68 0.6 0.18
0.87 2.00 0.68 0.55 0.35
Dren secundario
1.50 2 0.6
0.77 1.50 0.58 0.5 0.23
yotita
Progresiva
Medidas
Parcial Total
Enrocado de Proteccion dren principal Entrada
Espesor 0.2
1.00 0.5 0.10
0.91 1.00 0.68 0.6 0.18
Enrocado de Proteccion dren principal salida
1 0.5 0.1
0.91 1.00 0.68 0.6 0.18
Enrocado de Proteccion dren principal
6.00 0.50 0.60
0.91 0.68 0.6 0.18
0.87 1.90 0.68 0.55 0.35
Dren secundario
1.50 2 0.6
0.77 1.50 0.58 0.5 0.23
Enrocado de Proteccion dren principal Entrada
Espesor 0.2
1.00 0.5 0.10
1.08 1.00 0.8 0.72 0.22
Enrocado de Proteccion dren principal salida
1 0.5 0.1
1.08 1.00 0.8 0.72 0.22
Enrocado de Proteccion dren principal
6.00 0.50 0.60
0.91 0.68 0.6 0.18
0.28 1.95 0.2 0.2 0.06
0.28 1.80 0.2 0.2 0.06
Dren secundario
1.50 2 0.6
0.62 1.50 0.48 0.4 0.19
Enrocado de Proteccion dren principal Entrada
Espesor 0.2
1.00 0.5 0.10
1.47 1.00 1.08 1 0.29
Enrocado de Proteccion dren principal salida
1 0.5 0.1
1.47 1.00 1.08 1 0.29
Enrocado de Proteccion dren principal
6.00 0.50 0.60
1.47 1.08 1 0.29
0.91 2.20 0.68 0.60 0.18
Dren secundario
1.50 2 0.6
0.91 1.50 0.68 0.6 0.27
22.97
Enrocado de Proteccion dren principal Entrada
Espesor= 0.2
0.5 0.20
1.05 0.78 0.7 0.42
Enrocado de Proteccion dren principal salida
0.5 0.20
1.05 0.78 0.7 0.42
Enrocado de Proteccion dren principal
0.50 0.20
1.05 0.78 0.7 0.42
1.08 0.78 0.75 0.87
Dren secundario
2 0.8
1.47 1.08 1 0.59
Enrocado de Proteccion dren principal Entrada
Espesor 0.2
0.5 0.20
0.91 0.68 0.6 0.36
Enrocado de Proteccion dren principal salida
0.5 0.2
0.91 0.68 0.6 0.36
Enrocado de Proteccion dren principal
6.00 1.20
0.50 0.10
0.91 0.68 0.6 0.18
0.87 0.68 0.55 0.70
Dren secundario
2 0.8
0.77 0.58 0.5 0.31
Enrocado de Proteccion dren principal Entrada
Espesor 0.2
0.5 0.20
0.91 0.68 0.6 0.36
Enrocado de Proteccion dren principal salida
0.5 0.2
0.91 0.68 0.6 0.36
Enrocado de Proteccion dren principal
6.00 1.20
0.50 0.20
0.91 0.68 0.6 0.36
0.87 0.68 0.55 0.35
Dren secundario
2 0.8
0.77 1.50 0.58 0.5 0.31
Enrocado de Proteccion dren principal Entrada
Espesor 0.2
0.5 0.20
1.08 0.8 0.72 0.43
Enrocado de Proteccion dren principal salida
0.5 0.2
1.08 0.8 0.72 0.43
Enrocado de Proteccion dren principal
6.00 1.20
0.50 0.20
0.91 0.68 0.6 0.36
0.28 0.2 0.2 0.11
0.28 0.2 0.2 0.11
Dren secundario
2 0.8
1.50 0.48 0.4 0.60
Enrocado de Proteccion dren principal Entrada
Espesor 0.2
0.5 0.20
1.47 1.08 1 0.59
Enrocado de Proteccion dren principal salida
0.5 0.2
1.47 1.08 1 0.59
Enrocado de Proteccion dren principal
6.00 1.20
0.50 0.20
1.47 1.08 1 0.59
0.91 0.68 0.60 0.73
Dren secundario
2 0.8
0.91 0.68 0.6 0.36
19.95
Enrocado de Proteccion dren principal Entrada
Espesor 0.2
1.00 0.5 0.10
1.05 1.00 0.78 0.7 0.21
Enrocado de Proteccion dren principal salida
1 0.5 0.1
1.05 1.00 0.78 0.7 0.21
Enrocado de Proteccion dren principal
6.00 0.50 0.60
1.05 6.00 0.78 0.7 1.26
1.08 1.89 0.78 0.75 0.82
Dren secundario
1.50 2 0.6
1.47 1.50 1.08 1 0.44
Enrocado de Proteccion dren principal Entrada
Espesor 0.2
1.00 0.5 0.10
0.91 1.00 0.68 0.6 0.18
Enrocado de Proteccion dren principal salida
1 0.5 0.1
0.91 1.00 0.68 0.6 0.18
Enrocado de Proteccion dren principal
6.00 0.50 0.60
0.91 6.00 0.68 0.6 1.09
0.87 2.00 0.68 0.55 0.70
Dren secundario
1.50 2 0.6
0.77 1.50 0.58 0.5 0.23
Enrocado de Proteccion dren principal Entrada
Espesor 0.2
1.00 0.5 0.10
0.91 1.00 0.68 0.6 0.18
Enrocado de Proteccion dren principal salida
1 0.5 0.1
0.91 1.00 0.68 0.6 0.18
Enrocado de Proteccion dren principal
6.00 0.50 0.60
0.91 6.00 0.68 0.6 1.09
0.87 1.90 0.68 0.55 0.66
Dren secundario
1.50 2 0.6
0.77 1.50 0.58 0.5 0.23
Enrocado de Proteccion dren principal Entrada
Espesor 0.2
1.00 0.5 0.10
1.08 1.00 0.8 0.72 0.22
Enrocado de Proteccion dren principal salida
1 0.5 0.1
1.08 1.00 0.8 0.72 0.22
Enrocado de Proteccion dren principal
6.00 0.50 0.60
0.91 6.00 0.68 0.6 1.09
0.28 1.95 0.2 0.2 0.06
0.28 1.80 0.2 0.2 0.10
Dren secundario
1.50 2 0.6
0.62 1.50 0.48 0.4 0.19
Enrocado de Proteccion dren principal Entrada
Espesor 0.2
1.00 0.5 0.10
1.47 1.00 1.08 1 0.29
Enrocado de Proteccion dren principal salida
1 0.5 0.1
1.47 1.00 1.08 1 0.29
Enrocado de Proteccion dren principal
6.00 0.50 0.60
1.47 6.00 1.08 1 1.77
0.91 2.20 0.68 0.60 0.80
Dren secundario
1.50 2 0.6
0.91 1.50 0.68 0.6 0.27
H O J A D E M E T R A D O S
PRESUPUESTO:
SUBPRESUPUESTO: Fundo Yotita
DESCRIPCION: ALCANTARILLA
UBICACIN : Lambayeque-Ferreafe-Pitipo
FECHA: Setiembre 2014
Especificaciones
03
MOVIMIENTO DE TIERRAS
03.01
EXCAVACION EN MATERIAL SUELTO
m3
excavacion de caja de alcantarilla
1
Escavacion de para encofrado
2
04.01.03
RELLENO COMPACTADO CON MATERIAL SUELTO
m3
Viene de la partida, Excavacion para Encofrado
04.02.02.01
ELIMINACION DE MATERIAL EXCEDENTE
m3
Viene de Excavacion en material suelto - Relleno Compactado con materia suelto
yotita
Partida N Unid-
70.85 72.52 70.48 70.80
Concreto fc=210 kg/cm2
Concreto fc=210 kg/cm2
Sol ado e =0.1m
Enboqui l l ado depiedracon
Concreto fc=175 kg/cm2
Enboqui l l ado depiedracon
Concreto fc=175 kg/cm2
Enboqui l l ado depiedracon
Concreto fc=175 kg/cm2
Enboqui l l ado depiedracon
Concreto fc=175 kg/cm2
Concreto fc=210 kg/cm2 Sol ado e = 0.1m
MS
MS
0.5
1.0
0.5
1.0
Concreto fc=210 kg/cm2 Sol ado e = 0.1m
MS
MS
0.5
1.0
0.5
1.0
04.02.03
CONCRETO ARMADO
04.02.03.01
ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURA
m2
Cara Lateral
6.00
4.00
6.00
Losa superior
2.00
04.04.01.01
CONCRETO SOLADO e= 0.10 m
m3
04.04.03
CONCRETO fc = 210 kg/cm2
m3
Losa superior e inferior
2.00
Muros verticales
3.00
04.05.02.01
ACERO DE REFUERZO
04.05.02.02
ACERO DE REFUERZO fy=4200 Kg/cm2
m2
Concreto fc=210 kg/cm2
Concreto fc=210 kg/cm2
Sol ado e =0.1m
Enboqui l l ado depiedracon
Concreto fc=175 kg/cm2
Enboqui l l ado depiedracon
Concreto fc=175 kg/cm2
Enboqui l l ado depiedracon
Concreto fc=175 kg/cm2
Enboqui l l ado depiedracon
Concreto fc=175 kg/cm2
Concreto fc=210 kg/cm2 Sol ado e = 0.1m
MS
MS
0.5
1.0
0.5
1.0
Concreto fc=210 kg/cm2 Sol ado e = 0.1m
MS
MS
0.5
1.0
0.5
1.0
Concreto fc=210 kg/cm2 Sol ado e = 0.1m
MS
MS
0.5
1.0
0.5
1.0
H O J A D E M E T R A D O S
Perimetro (m) Longitud (m) Ancho / Area Altura/ Espesor
79.80
10.00 3.00 1.7 51.00
10.00 0.90 1.6 28.80
28.80
28.80
51.00
yotita
Progresiva
Medidas
Parcial Total
Concreto fc=210 kg/cm2
Concreto fc=210 kg/cm2
Sol ado e =0.1m
Enboqui l l ado depiedracon
Concreto fc=175 kg/cm2
Enboqui l l ado depiedracon
Concreto fc=175 kg/cm2
Enboqui l l ado depiedracon
Concreto fc=175 kg/cm2
Enboqui l l ado depiedracon
Concreto fc=175 kg/cm2
51.00
123.84
10.00 1.60 96.00
3.00 0.2 2.40
0.20 1.20 1.44
10.00 1.20 24.00
3.00
10.00 3.00 0.10 3.00
19.20
10.00 3.00 0.20 12.00
10.00 0.20 1.20 7.20
0.00