You are on page 1of 16

PROJECT: Mullo- Appartments

COMPILED BY:
FORWARDED TO:
Locaton!Element
"uerr#
Windows and Doors
What do you mean with steel casement window in timber frame
Why do we have aluminium doors, the steel windows
Plantek Consultants- Querry sheet
$%ame!Ttle&: Kitongo Eva QS
$%ame!Ttle&: Arc'( Sam
D1.0 !"00#$%00mm& in the washroom cannot have louvres in the
vents as shown on the section 10'
Mullo- Appartments
Date:)*!+,!)*
Date:
Reccommen-atons!Re.urements To Ta/e Acton
S(ecify the material to be used
We can use fi#ed glass light in the vents
)ou can s(ecify one ty(e of material to use
Plantek Consultants- Querry sheet
01nature:
01nature:
PROJECT: Commercal 0tructure
COMPILED BY: $%ame!Ttle&:
FORWARDED TO: $%ame!Ttle&:
Locaton!Element
"uer#
*+SE,E-.
/D 0122/
/D 0122/
/220 .an3 slab not included in D
/oof direction changes not included in D
/oof gutter changes not included in D
4ara(et walls heights not revised in D
S.+5/S
67return stair height does not match floor settings in D
S.+5/S
Straight run stair has aw3ward riser setting of 18'
Shouldn9t an alternative access be (rovided in the basement
for Emergency (ur(oses:
Shouldn9t an alternative access be (rovided on the rd floor
for Emergency (ur(oses:
Story heights for rd floor do not tally with wor3ing
drawings
Query sheet
Commercal 0tructure
Date:)*!+)!)2
Date:
Recommen-atons!Re.urements To Ta/e Acton
4lease ad;ust as desired
4lease (lace
4lease ad;ust
4lease ad;ust
4lease ad;ust
4lease ad;ust to multi(le of 8mm or $8mm settings
01nature:
01nature:
5t would be (rudent to (rovide an alternative e#it
route or elaborate on emergency esca(e
5t would be (rudent to (rovide an alternative e#it
route or elaborate on emergency esca(e
4lease (lace a((ro(riate gutter as shown in wor3ing
drawings in D model
Query sheet
Locaton "uerr#
+ S.+5/ <+SE i& missing (lan
ii& missing landing design
iii&&inconsistency in reinforcement bars no.
and bar lables
iv&unecessary variance in bar si=es
* <216,-S i& double column bases si=es seem
e#travagant
ii& contradicting endlevel of circular columns
< *E+,S >round beams along >rid > and ? beams si=e %80 # 00
vary in si=efrom all oter ground beams
Slab beam between grid @ and 5 aren9t of structural
significance
Plantek Consultants- Querry sheet
Locaton "uerr#
3E%ERAL
Plantek Consultants- Querry sheet
Plantek Consultants- Querry sheet
Reccommen-atons!Re.urements $as a1ree-&
(rovide staircace (lan
(rovide (lan and details for the 1st landing
labled bar no. should match the countedAshown no. of bars
ty(e of bars to be corrected!righty s(ecify ribbed,twisted and round&
(rovide one consistent bars si=e, revise s(acing
accordingly and bac3 u( with design calculations
review and revise base si=es
circular columns at ground to be terminated at second level
reviewed beam si=e and if measured loading factors allow
made uniform with all other ground beams
eliminate beam
Plantek Consultants- Querry sheet
Reccommen-atons!Re.urements $as a1ree-&
Plantek Consultants- Querry sheet
Plantek Consultants- Querry sheet
item Description Unit used previous qty
Plantek Consultants- ExtractionSheet
Plantek Consultants- ExtractionSheet
cummulative qty
Plantek Consultants- ExtractionSheet
Plantek Consultants- ExtractionSheet

You might also like