Footing RCC Walls POOL P.ROOM Basement Ground Floor First Floor GF Slab & Beams FF Slab & Beams Roof Slab & Beams #3 Grade 40 DEF 100 - - - - 50 250 200 50 700 600 - #3 Grade 60 DEF 0 450 1,450 - - 0 50 50 200 1,450 1,400 400 #4 Grade 60 DEF 250 0 0 - - 50 150 150 100 1,250 1,000 150 #6 Grade 60 DEF 400 - - - - 0 350 250 0 1,400 650 150 #8 Grade 60 DEF 0 - - - - 0 0 0 0 250 0 - Total 750 100 800 650 350 5,050 3,650 700 Grand Total: 13,950 Kg (OR) 13.95 Ton GENERAL NOTES: i) Remove Slab and beams shuttering after completion of 28 days of concrete pouring and provide water curing for total of 28 days. ii) Use Grade 40 (billet) deformed steel having minimum yield strength of 40,000 psi for stirrups (rings) of beams. iii) For slab, beams, columns, RCC walls and footings' reinforcement use Grade 60 (billet) deformed steel having minimum yield strength of 60,000 psi and corresponding to ASTM A615 standards. iv) Use #3@12 spacing for binding all top (extra) reinforcement. v) All laps are 50 times the bar diamter. vi) Use concrete with minimum compressive strength of 3,000 psi at 28 days having 1:2:4 mix ratio for beams, slabs and RCC walls and footings. vii) For columns use concrete with minimum compressive strength of 4,000 psi at 28 days having 1:1.5:3 mix ratio. viii) Use following concrete cover: Slab top and bottom: 3/4" Beams' sides 1" Beams' top and bottom: 1.5" Columns: 1.5" Footings: 2" Retaining walls and water structures: 2" ix) Provide(upward) pre-camber to all beams and slabs using thumb rule: 1/2" for every 10ft (1" for every 20ft). And use steel plates as beam bottom shuttering. x) Use Steel shuttering for all slabs, beams and columns instead wooden shuttering. xi) All structural drawings should be read in conjunction with the relevant architectural and services drawings. LI ST OF DRAWI NGS: SLABS & BEAMS 1) BASEMENT GROUND FLOOR SLAB (1ST SLAB) --------- S-01 BEAMS' SECTIONS --------- S-01A 2) GROUND FLOOR FIRST FLOOR SLAB (2ND SLAB) --------- S-02 BEAMS' SECTIONS --------- S-02A 3) FIRST FLOOR ROOF SLAB (TOP SLAB) --------- S-03 BEAMS' SECTIONS --------- S-03A OHWT OVER HEAD WATER TANK --------- S-04 LINTELS BASEMENT LINTEL PLAN --------- L-01 GROUND FLOOR LINTEL PLAN --------- L-02 FIRST FLOOR LINTEL PLAN --------- L-03 LINTEL SCHEDULE --------- L-04 * The steel quantities provided herein are approximate only. The actual amount of steel needed/consumed at site may vary somewhat. TOTAL STEEL QUANTI TI ES Kg #3 Grade40 DEF 1,950 #3 Grade60 DEF 5,450 #4 Grade60 DEF 3,100 #6 Grade60 DEF 3,200 #8 Grade60 DEF 250 Total: 13,950 FHA Design Group Architects, Designers, Engineers 182-DD Commerical Phase IV, D.H.A Lahore Ph: 0423-5694431 Drawing No. S-00 STRUCTURAL DRAWINGS OHWT 1,900 Steel All Columns Summary of approximate Steel quantities* SLABS 478-G LINTELS RAFT SWIMMING POOL 0