You are on page 1of 5

Kingdom of Saudi Arabia

Ministry of Interior
Security planning and development Agency
KAP4 Project

Pag. 1/5
SOIL INVESTIGATION REVIEW (S.I.R.)
LOCATION ID AREA ID SITE ID
DATE:
DOC. Num:


CONTRACTOR: SUB- CONTRACTOR:

SECTION/STATUS A B C Note


Legend: A (approved/approved with minor comment) B (revise & resubmit) - C (rejected)

A (available &complete) - M (missing but not necessary) N/A (not available but required)





DATE: STATUS: CHECKED BY:
PM026-CS-SIR-03
1. SITE GENERAL INFORMATION



1.1 Site info (zone, gov, quarter)



1.2 Project information


Informations of the project, owner and
major scopes,
1.3 Site location with grid


Description site of work and adjacent
areas, not less than radius 10m from the
boundaries.
1.4 Google map and photographs


1.5 Site layout plan with building
footage/exploration data,


Indicate: north arrow, benchmarks,
boreholes &pits test locations; roads,
utilities lines,
1.6 Geological/environmental surface description
of the site and surrounding areas.



1.7 Site coordinates.





2. GENERAL SOIL DATA



2.1 Moisture content;



2.2 Dry unit weight



2.3 Soil density (specific weight)



2.4 Grain size distribution



2.5 Expansion index, Sec.2.3.2



2.6 Shear strength



2.7 soil Cohesion



2.8 Friction angle


2.9 Poissons coefficient/ratio


2.10 Compressibility



Kingdom of Saudi Arabia
Ministry of Interior
Security planning and development Agency
KAP4 Project

Pag. 2/5
SOIL INVESTIGATION REVIEW (S.I.R.)
LOCATION ID AREA ID SITE ID
DATE:
DOC. Num:


CONTRACTOR: SUB- CONTRACTOR:

SECTION/STATUS A B C Note


Legend: A (approved/approved with minor comment) B (revise & resubmit) - C (rejected)

A (available &complete) - M (missing but not necessary) N/A (not available but required)





DATE: STATUS: CHECKED BY:
PM026-CS-SIR-03
2.11 Plasticity index



2.12 Plastic limit



2.13 Liquid limit



2.14 Atterberg limits


Liquid limit, plastic limit, plasticity index,
shrinkage limit
3.1 Expansive soils index
if encountered, recommendation required.
2.15 Corrosion Test


percentage of soluble substances
(sulphates, chlorides, PH etc.)
2.16 Soil permeability


2.17 Elasticity modulus


2.18 shrink-swell factor

2.19 Collapse index, SBC 303, Sec. 2.3.3


2.20 soil resistivity

2.21 Endometric form


2.22 CBR ratio



3. GEOLOGY


3.2 slope instability analysis (if encountered,
recommendation required, sec. 3.4)



3.3 ground water table (if encountered,
recommendation required)



3.4 Liquefaction potential (if encountered,
recommendation required)



3.5 Sabkha soils(if encountered,
recommendation required)



3.6 Collapsible soils (if encountered,
recommendation required)



3.7 Permeability

Kingdom of Saudi Arabia
Ministry of Interior
Security planning and development Agency
KAP4 Project

Pag. 3/5
SOIL INVESTIGATION REVIEW (S.I.R.)
LOCATION ID AREA ID SITE ID
DATE:
DOC. Num:


CONTRACTOR: SUB- CONTRACTOR:

SECTION/STATUS A B C Note


Legend: A (approved/approved with minor comment) B (revise & resubmit) - C (rejected)

A (available &complete) - M (missing but not necessary) N/A (not available but required)





DATE: STATUS: CHECKED BY:
PM026-CS-SIR-03
3.8 Flooding


3.2 number of boreholes & depth (SBC 303 sec.
2.6)



3.3 Number of SPT pits test


3.4 Pits test depth/blow count
values





4. SEISMICITY &
CALCULATION OF See SBC301 sec. 9.4
GROUND MOTION



4.1 Site seismic contour map



4.2 Peak ground motions Spectral response:
Ss;
S1;




4.3 Design spectral response accelerations:
SDs (Ss);
SD1 (S1);



4.4 Site, peak ground acceleration Parameters
Map . SBC301, sec.9.4.



4.5 Site class (SDs;SD1) SBC 301,
Sec. 14.1.1



4.6 Seismic design category (Ss;S1),
SBC301. sec. 9.6





5. FOUNDATION



5.1 Type of foundation,
Recommendation required



5.2 Minimum depth of foundation.
Recommendation required



5.3 Maximum soil bearing capacity,
(recommendation on foundation required;
SBC303 sec. 4.2)



Kingdom of Saudi Arabia
Ministry of Interior
Security planning and development Agency
KAP4 Project

Pag. 4/5
SOIL INVESTIGATION REVIEW (S.I.R.)
LOCATION ID AREA ID SITE ID
DATE:
DOC. Num:


CONTRACTOR: SUB- CONTRACTOR:

SECTION/STATUS A B C Note


Legend: A (approved/approved with minor comment) B (revise & resubmit) - C (rejected)

A (available &complete) - M (missing but not necessary) N/A (not available but required)





DATE: STATUS: CHECKED BY:
PM026-CS-SIR-03
5.4 Maximum total and differential settlements
allowable.



5.5 Active/Passive earth pressure



5.6 Recommendation for walls
(if required)



5.7 Foundation/soil Assessment



5.8 Recommendation for piles (if required)



5.9 Recommendation for mats (if required)



5.10 Recommendation for lateral loads (if
required)



5.11 Recommendation for min. reinforcement
cover



5.12 Recommendation for combined
foundation, if required.







6. EARTHWORKS



6.1 slope limit stability



6.2 Quality of backfill materials



6.3 Bearing capacity of compacted soil



6.4 Soil treatment (if required)



6.5 De-watering (if required)






Kingdom of Saudi Arabia
Ministry of Interior
Security planning and development Agency
KAP4 Project

Pag. 5/5
SOIL INVESTIGATION REVIEW (S.I.R.)
LOCATION ID AREA ID SITE ID
DATE:
DOC. Num:


CONTRACTOR: SUB- CONTRACTOR:

SECTION/STATUS A B C Note


Legend: A (approved/approved with minor comment) B (revise & resubmit) - C (rejected)

A (available &complete) - M (missing but not necessary) N/A (not available but required)





DATE: STATUS: CHECKED BY:
PM026-CS-SIR-03

FINAL RESULT: (notation for review report)


A APPROVED
B RIVISE FOR DESIGN-
CONSTRUCTION PHASE
C REVISE AND RESUBMIT D REJECTED




Review comment

SECTION NOTES