Professional Documents
Culture Documents
Longitud
0.1
2800
ha
hd
Coeficiente de friccion de
manning (n)
0.01
Dimetro Nominal
Milmetros
Pulgadas
200
250
300
350
400
450
8
10
12
14
16
18
Presin dw trabajo
de la tubera
(kg/cm^2)
A20
A14
A10
A10
A10
Dimetro
nominal en
cm(d)
25
30
35
40
45
Gasto en
m^3/s (Q)
0.1
0.1
0.1
0.1
0.1
0.1
20670
328000
ha
hd
10
54
0.7
Velocidad
Longitud
en m^3/s
lineal en m
(V)
(L)
3.18
2800
2.04
2800
1.41
2800
1.04
2800
0.80
2800
0.63
2800
Q^2
0.01
0.01
0.01
0.01
0.01
0.01
Ea*d
516750
516750
516750
516750
516750
Ea-c*s
1394000
1394000
1394000
1394000
1394000
(Ea*d)/(Ea+c*s)
0.37
0.37
0.37
0.37
1394000
1+[(Ea*d)/(Ea+c*s)
]
1.37
1.37
1.37
1.37
1394001.00
Sobrepresin en m(h)
394.23
252.31
175.21
128.73
0.10
Otras perdidas
(5%hf)
7.7056
2.3440
0.8864
0.3896
0.1911
0.1020
Sobrepresin
por vlvula
(S.A.V.)
315.38
201.84
140.17
102.98
0.08
ha
hd
10
10
10
10
10
10
Carga dinamica Ht
54
54
54
54
54
54
225.82
113.22
82.62
72.18
68.01
225.82
113.22
82.62
72.18
68.01
66.14
Presin total
S.A.T.+C.N.O.
304.66
163.68
117.66
97.93
68.03
76*n
53.2
53.2
53.2
53.2
53.2
53.2
HP
424.468348
212.825848
155.292011
135.679112
127.845064
124.326125
velocidad V=
Q/A
3.18309142
2.03717851
1.4147073
1.03937679
0.79577285
0.6287588
CLASE: A 20
IMPORTE
$
$
$
$
$
$
356,133.12
$
$
$
25,585.28
$
133,196.00
$
66,177.89
$
112,007.28
$ 2,794,176.00
$ 3,487,275.57
RECIOS ESTAN EN CONAGUA
CLASE: A 14
IMPORTE
$
$
$
$
$
$
394,157.75
$
$
$
27,184.36
$
149,688.00
$
87,935.78
$
119,007.74
$ 2,570,400.00
$ 3,348,373.63
CLASE: A 10
IMPORTE
$
$
$
$
$
$ 434,037.24
$
$
$
28,783.44
$ 142,884.00
$ 111,671.66
$ 126,008.19
$ 2,741,200.00
$ 3,584,584.53
CLASE: A 10
IMPORTE
$
$
$
$
$
$
519,360.80
$
$
$
31,981.60
$
172,760.00
$
145,297.49
$
140,009.10
$ 3,488,800.00
$ 4,498,208.99
CLASE: A 10
IMPORTE
$
$
$
$
$
$
618,595.81
$
$
$
36,778.84
$
203,588.00
$
191,780.26
$
161,010.47
$
4,244,800.00
$
5,456,553.37
P.T.T.
(kg/2 )
A 20
Dimetro Nominal
mm
250
Pulg
10
1+
1+ 1
H.P.
K.W.H.
TABLA 1
Carga Anual de
Bombeo
Costo Total de
Conduccin
Cargo Anual de
Amortizacin
Costo Anual de
Bombeo
(4)=(3)*8760
(5).
(6)=(5)*ANUALIDAD
(7)=(4)+(6)
$ 1,874,092.34 $ 2,483,781.61 $
364,619.14 $ 2,238,711.48
8760 ES PARA UN AO
SI ES UN AO BICIESTO ES 8784
DIAMETRO (M)
CRECIMEINTO POBLACIONAL
COEFICIENTE DE RUGOSIDAD
0.25
2%
0.01
Ao
Gasto Q (L/S)
Perdidas de carga hf
(m)
1
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
3
74.30
75.79
77.30
78.85
80.43
82.03
83.68
85.35
87.06
88.8
90.57
92.38
94.23
96.12
98.04
100
26.9281
28.0118
29.1464
30.3262
31.5448
32.8265
34.1499
35.5320
36.9665
38.4548
40.0072
41.6256
43.3121
45.0597
46.8794
+
LONGITUD DE TUBERIA
CARGA ESTATICA
EFICIENCIA DE LA BOMBA
2800
64
70%
76*N
53.2 ha
hd
Carga de la bomba
H (m)
Potencia
(H.P)
1.35
1.40
1.46
1.52
1.58
1.64
1.71
1.78
1.85
1.92
2.00
2.08
2.17
2.25
2.34
92.27
93.41
94.60
95.84
97.12
98.47
99.86
101.31
102.81
104.38
106.01
107.71
109.48
111.31
113.22
131.46
135.73
140.22
144.90
149.75
154.88
160.20
165.79
171.62
177.70
184.08
190.77
197.80
205.13
212.83
10
54
Potencia (K.W.H)
7
8
COSTO DE CONSTRUCCION:
98.87
102.09
105.48
109.01
112.67
116.54
120.55
124.76
129.16
133.75
138.56
143.61
148.90
154.43
160.23