You are on page 1of 24

11/ 22/ 05

Terang Sirasun Batur


Gas Development Project
Four Seasons Hotel
Jakarta, Indonesia
Tuesday, November 22, 2005
11/22/05
2
Location Map
Reserves
Geo-hazard Map
TSB Development View
Facilities Interface
Key Design Parameter
Introduction
Project Development Risk
Gas Production Profile Project Schedule
Company Expectation
Project Cost
Contents
Contents
TSB Development Strategy
11/22/05
3
Kangean PSC acquired by EMP from BP in August 2004
Terang field discovered in 1982, Sirasun in 1993 and Batur in
1995
The TSB reserves of 1.6 TCF were certified by D&M in May
1995
Kangean PSC Extension approved in December 2004
Development of TSB fields i s expected to deliver gas to East
Java market starting from 4
th
Q 2007
Development strategy: Phase-1 with target of production in
4
th
Q 2007 and Phase-2 with target of production in the 4
th
Q
2009.
Plan Of Development (POD) approved in October 2005
Front End Engineering Design completed in October 2005
Introduction Introduction
11/22/05
4
Kangean PSC Development Project
2
Iga ngan - 1
Pa ger ungan
3
1
2
4
Pal ung - 1
S. Sepanja ng -1
Sepap an - 1
JS 53A
0 20 Km.
SEPANJANG
5
E . Sa kala - 1
SAKALA
J S 53B - 1
115
o
00' 115
o
30' 116
o
00'
Arya - 1
1
S ir asun - 2
116
o
30'
KANGEAN
PALIAT
W. Kange an
1
2 3
Sid ula ng - 1
Sepanjang isl . - 1
Ki au - 1
JS 25 - 1
Sakala - 1
2
1
Kemi ri an - 1
600'
BNMP 0318a - E. Somantri
07
o
00'
07
o
30'
1000'
1500'
JS 50 - 1
Kubu - 1
PAG ER U N GA N
Batur
Teran g - 1
3000
PAGERUNGAN
DEPELOPMENT
TERANG -SIRASUN
AREA
South Saubi
Kar ang Takat
South Cel ukan
E. Sakal a
West Kangean
Sepanj ang
Isl and
JS53
East Spur
Pagerungan / TSB
Gas Discoveries
Oil Discoveries
Prospect & Leads
Pipeline
Proposed Pipeline
2
Iga ngan - 1
Pa ger ungan
3
1
2
4
Pal ung - 1
S. Sepanja ng -1
Sepap an - 1
JS 53A
0 20 Km.
SEPANJANG
5
E . Sa kala - 1
SAKALA
J S 53B - 1
115
o
00' 115
o
30' 116
o
00'
Arya - 1
1
S ir asun - 2
116
o
30'
KANGEAN
PALIAT
W. Kange an
1
2 3
Sid ula ng - 1
Sepanjang isl . - 1
Ki au - 1
JS 25 - 1
Sakala - 1
2
1
Kemi ri an - 1
600'
BNMP 0318a - E. Somantri
07
o
00'
07
o
30'
1000'
1500'
JS 50 - 1
Kubu - 1
PAG ER U N GA N
Batur
Teran g - 1
3000
PAGERUNGAN
OPTIMIZATION
TERANG -SIRASUN South Saubi
Kar ang Takat
South Cel ukan
E. Sakal a
West Kangean
Sepanj ang
Isl and
JS53
East Spur
Pagerungan / TSB
Gas Discoveries
Oil Discoveries
Prospect & Leads
Pipeline
Proposed Pipeline
DEVELOPMENT
11/22/05
5
Terang Sirasun Batur Fields Map
100 m ---------------------------------- 200 m < 100 m > 200 m Water Depth:
11/22/05
6
Terang 58%
Batur 4%
Sirasun 38%
30 km
12 km
% Reserve of Each
% Reserve of Each
Field
Field
11/22/05
7
Geohazard
Geohazard
Map
Map
Potential Geohazard:
Surface Fault
Seismic Activity
Landslide
Shallow Gas
11/ 22/ 05
TSB Well Trajectory Plan
11/22/05
9
0
50
100
150
200
250
300
2007 2009 2011 2013 2015 2017 2019 2021 2023 2025 2027 2029
G
a
s

S
a
l
e
s
,

M
M
S
C
F
D
Daily Contract Quantity
Gas Production
Gas Production
Profile
Profile
11/22/05
10
(-100 m)
(-200 m)
TSB Development
TSB Development
Overview
Overview
11/22/05
11
Low Pressure Reservoir
98+% Methane, no H
2
S, min. CO
2
Design Life 15 yrs
Facility Design Capacity 330 MMscfd
Fit for Purpose and Proven Design
High Reliability & Availability
Min. suction pressure 150 psig & discharge
pressure 1300 psig
Compliance with International Standards/Codes
For Phase-I: Water depth at Terang is 100 meter
Key Design Parameters
Key Design Parameters
11/22/05
12
Phase-1
Phase-2
EPC Hull & Mooring
PO Compressor
PO Subsea System
EPCI Subsea Facilities
& Integration
EPCI Topside Facility
TSB Development
TSB Development
Strategy: Phase-I
Strategy: Phase-I
Drill 5 Wells
Hot Tap
11/22/05
13
Scope :
Supplies the following :
Subsea Wellhead & Trees
Subsea control system
Dynamic & Static Umbilical
Manifold
Topside Control Equipment
PO Subsea System
PO Subsea System
11/22/05
14
FUTURE
Scope :
Two units Gas Turbine Compressors c/w Turbine Control System.
HPC1
HPC2
HP Header
MP Header
Prod Separator
P-1 P-2
V-1 V-2
Gas
To
Dehyd
LP Header
P-4
V-4
V-3
MPC 1
MPC2
LLP Header
LPC 1
LPC 2
V-5
PO Turbine
PO Turbine
Compressor
Compressor
11/22/05
15
Hull Structural Plan
EPC Hull & Mooring System
EPC Hull & Mooring System
11/22/05
16
Process Flow Diagram
EPCI Topside
EPCI Topside
Facility
Facility
11/22/05
17
Terang
Batur
Sirasun
Subsea Production Facilities Lay-out
EPCI Subsea Facility
EPCI Subsea Facility
11/22/05
18
Subsea Control System Layout
EPCI Subsea Facility
EPCI Subsea Facility
11/22/05
19
SCOPE
EPCI
' TOPSIDE'
EPC ' HULL
& MOORING' PO ' COMPR.'
EPCI
' SUBSEA'
PO
' SUBSEA'
COMPRESSOR
X X
PROCESS EQUIPMENT
X X
HULL
X X
MOORING SYSTEM
X X
SUBSEA CTRL SYSTEM
X X X
TOPSIDE SUBSEA CTRL EQUIPMENT
X X X
SUBSEA FLOWLINE SYSTEM X X
Interface Matrix of
Interface Matrix of
Facility
Facility
11/22/05
20
Manageability
React
Influence
R
i
s
k
L
o
w
M
e
d
H
i
g
h
Med Low High
Legend:
1. Project
Organization
7. GOI Approval.
10. Bidders participation
5. Interface Offshore
Installation (Fac vs. Drilling)
11. availability of
local fabricator
3. Inter departmental
communication
/support
4. Project/ Contract Integration
Legal Standing
8. Rig Availability
Risk &
Discipline
competency
External
relationshi
p
EMP Culture
& I nternal
Relationship
2. Comp policy &
procedures
6. Contractor
competency
/capacity
9. EJGP Integrity
Project Development
Project Development
Risk
Risk
11/22/05
21
Project Schedule
Project Schedule
11/22/05
22
Project
Project
Cost
Cost
Total Estimated Cost: USD 400 million
Phase-I Estimated Cost: USD 275 million
Phase-II Estimated Cost: USD 125 million
11/22/05
23
Company Expectation
Company Expectation
No LTA
Gas-in before December 2007
Project executed within approved budget
Facility performance meets design requirement
Appreciate local content
Maximize gas recovery
11/22/05
24
THANK YOU

You might also like