TEMPORARY EROSO! A!D
SEDME!T "O!TRO# P#A!
SR ***$$$$***
Stage ***$$$$***
(Name)
(SR ***$$$$*** to SR ***$$$$***)
MP ***$$$$*** to MP ***$$$$***
$AS%!&TO! STATE DEPARTME!T O'
TRA!SPORTATO!
!orthwest Re(ion
Seattle) $ashin(ton
(!a*e)) P+E+
Pro,ect En(ineer
Or
Prepared b-. (!a*e)
("o*pan-)
#orena En() P+E+
Re(ion Ad*inistrator
(Month) (Year)
TABLE OF CONTENTS
Page
1.0 PROJECT OVERVIEW.................................................................................................
1.1 site DESCRIPTION.............................................................................1
1.2 Scope of wo!.........................................................................................1
1." Ae#s i$p#cte%......................................................................................1
1.& E'ISTIN( CONDITIONS..................................................................1
1.) PER*ITS #+% #ssoci#te% epots.......................................................1
1.5.1 Permits.......................................................................................................1
1.5.2 Associated Reports....................................................................................1
2.0 TE*PORAR, EROSION AND SEDI*ENT CONTROL PLAN....................................
2.1 P-pose of P.#+......................................................................................1
2.2 Co+st-ctio+ po..-tio+ pe/e+tio+ te#$..............................................1
2." EROSION AND SEDIMENT CONTROL MINIMUM
REQUIREMENTS................................................................................1
2.3.1 St#0.i1#tio+ #+% Se%i$e+t T#ppi+2................................................1
2.3.2 delineate clearing and easement limits..............................................1
2.3.3 PROTECTION OF ADJACENT PROPERTIES..............................1
2.".& TI*IN( OF SEDI*ENT TRAPPIN( *EAS3RES...................1
2.3.5 CT AND FI!! S!OPES..................................................................1
2.3." CONTRO!!IN# OFF$SITE EROSION..........................................1
2.3.% STA&I!I'ATION OF CON(E)ANCE C*ANNE!S AND
OT!ETS...............................................................................................1
2.3.+ STOR, DRAIN IN!ET PROTECTION..........................................1
2.3.- NDER#ROND TI!IT) CONSTRCTION.............................1
2.3.1. CONSTRCTION ACCESS ROTES...........................................1
2.3.11 rem/0al /1 tem2/rar3 4m2S.............................................................1
2.3.12 de5atering c/nstr6cti/n sites...........................................................1
2.3.13 maintenance......................................................................................1
2.& te$po#4 eosio+ #+% se%i$e+t co+to. 0MPS...............................1
2.7.1 SORCE CONTRO! &,PS...................................................1
2.7.2 SEDI,ENT CONTRO! &,PS..............................................1
2.7.3 STRCTRA! EROSION CONTRO! &,PS......................1
2.7.7 E8PERI,ENTA! AND OT*ER &,PS................................1
".0 CONSTR3CTION INSTALLATION5 INSPECTION AND
*AINTENANCE SC6ED3LE...........................................................1
".1 W#te 7-#.it4 *o+itoi+2....................................................................1
/var/www/apps/conversion/tmp/scratch_4/247056140.doc, 10/10/2014,
10/10/2014
TESC PLAN March 24, 2003
SR xx
i
".2 Pe$#+e+t st#0i.i1#tio+ 8App.ic#0.e to WSDOT Co+st-cte%
po9ects o+.4:..........................................................................................1
"." VE(ETATION *ANA(E*ENT PLAN 8App.ic#0.e to WSDOT
Co+st-cte% po9ects o+.4:....................................................................1
&.0 SPILL PREVENTION CONTROL AND CO3NTER*EAS3RES 8SPCC:
RE73IRE*ENTS..........................................................................................................
Appendices16
Appe+%i; A< TESC *o+itoi+2 #+% $#i+te+#+ce c=ec!s=eets..............1
Appe+%i; B< TESC P.#+ S=eets #+% Det#i.s.............................................1
APPENDI' D< SPECIAL PROVISIONS................................................1
Appe+%i; E< WAC 1>"?201A.....................................................................1
Appe+%i; C< TESC 0$p CONSTR3CTION C6AN(E TRAC@IN(
FOR*....................................................................................................1
FI(3RES
Page
FI(3RE 1 ? VICINIT, *AP....................................................................................................
/var/www/apps/conversion/tmp/scratch_4/247056140.doc, 10/10/2014,
10/10/2014
TESC PLAN March 24, 2003
SR xx
ii
1.0 Po9ect o/e/iew
he emporar! "rosion and #ediment $ontro% &"#$' P%an descri(es the meas)res to (e )sed
d)ring constr)ction to protect *aters o+ the #tate +rom degradation d)e to sediment transport
or water po%%)tion. hese meas)res ma! inc%)de the )se o+ temporar! ,est -anagement
Practices &,-Ps'
.ie%d conditions d)ring constr)ction ma! re/)ire additiona% temporar! ,-Ps or a change in
p%acement o+ the temporar! ,-Ps. he $ontractor "rosion and #ediment $ontro% &"#$' 0ead
and *#12 Pro3ect 2++ice 4nspectors sha%% modi+! this p%an i+ necessar! to meet +ie%d
conditions.
1.1 SITE DESCRIPTION
&4nc%)de a 5icinit! -ap that shows the right6o+6wa! %imits, e7isting roadwa!s, proposed
roadwa!s, drainage (asins, +%ow direction, %ocation o+ near(! or ad3acent constr)ction activities,
and sensitive areas &wet%ands, streams, receiving water (odies, etc'.
1.2 SCOPE OF WOR@
his pro3ect invo%ves the constr)ction o+ ***$$$$*** +rom ***$$$$*** to ***$$$$***
and ***$$$$*** &1escri(e the overa%% pro3ect activities and where the! wi%% occ)r'. he wor8
activities wi%% inc%)de ***$$$$*** &e.g., c%earing and gr)((ing, grading, roadwa! e7cavation
and em(an8ment, constr)cting storm sewers, paving with aspha%t concrete, constr)cting
temporar! ,-Ps, constr)cting permanent stormwater detention and in+i%tration ponds, widening
one (ridge, adding two t)rn %anes, constr)cting c)r( and g)tter, %andscape p%anters, sidewa%8s,
constr)ction o+ a ()s p)%%o)t, +encing, pavement mar8ings, i%%)mination, signa%i9ation, tra++ic
contro%, etc.' $a%% o)t the constr)ction p%an sheets and detai%s &e.g. #ee :ppendi7 ***$$$$***
+or constr)ction p%an sheets and detai%s.)
he deve%opment o+ this 0ight "#$ P%an has (een +)%%! coordinated with -s/-r. ***$$$$***
o+ ***$$$$*** $onstr)ction 2++ice. &:pp%ica(%e to *#12 $onstr)cted Pro3ects 2n%!.'
1." AREAS I*PACTED
ota% area o+ new impervio)s s)r+ace added ***$$$$*** #. or acres
ota% area o+ dist)r(ed soi% ***$$$$***
1.& E'ISTIN( CONDITIONS
his section presents the e7isting conditions on and s)rro)nding the pro3ect site. 4nc%)ded are
descriptions soi%s, drainage, o++6site water, o)t+a%%s, sensitive areas, e7isting water /)a%it!, *;4:,
ad3acent constr)ction and a++ected )ti%ities.
1.7.1 S/ils /r S6r1ace C/nditi/ns
he ma3or soi% t!pe identi+ied a%ong the pro3ect as identi+ied in the #oi% #)rve! o+ ***$$$$***
County is ***$$$$***. 2ther soi% t!pes identi+ied a%ong the pro3ect, and ran8ed (! re%ative
/var/www/apps/conversion/tmp/scratch_4/247056140.doc, 10/10/2014,
10/10/2014
TESC PLAN March 24, 2003
SR xx
1
predominance are ***$$$$***, and ***$$$$***. &#oi% 4n+ormation is avai%a(%e thr) the
<*; =!dra)%ic >ro)p and a starting point is 206.440.4?04'
1.7.2 Drainage
Ste#$s #+% Ste#$ Cossi+2s 80ist stream names, %ocations, drainage pathwa!s, and
receiving water (odies.:
1.7.3 O11$Site 9ater
here ***$$$$*** the potentia% +or o++6site water to enter the pro3ect %imits. &#tate whether there is or is
not the potentia% +or o++6site water. 4+ app%ica(%e, 4nc%)de a disc)ssion a(o)t the so)rces and
waterwa!s o+ o++6site water that ma! enter the pro3ect site and descri(e meas)res to (e ta8en, i+
an!, to 8eep o++6site water +rom mi7ing with on6site r)no++. he site sho)%d (e visited on a
rain! da! to veri+! conditions.'
he 1esign 2++ice ***$$$$*** aware o+ an! i%%icit connections to the state drainage s!stem
within the pro3ect %imits. &#tate whether there is or is not an i%%icit connection which discharges
within the pro3ect %imit.'
1.7.7 O6t1alls
he *#12 2)t+a%% 4nventor! %ists o)t+a%%s a%ong state ro)tes and is ran8ed &=igh, -edi)m, or
0ow' (! retro+it priorit!. :t this time, =igh6ran8ing o)t+a%%s are strong%! enco)raged +or retro+it
and -edi)m6ran8ing o)t+a%%s sho)%d (e considered. he *#12 2)t+a%% 4nventor! indicates
***$$$$*** o)t+a%%s within this pro3ect area. &4nc%)de a ta(%e %isting -P, condition, and
ran8ing o+ each o)t+a%% within the pro3ect area. 4+ o)t+a%% ran8ed medi)m to high, state i+ it wi%%
(e retro+itted, or wh! not.'
&4+ !o) need assistance to determine the retro+it priorit! ran8ing o+ the o)t+a%%s within !o)r
pro3ect, p%ease contact the *ater @)a%it! >ro)p or cons)%t the posting entit%ed A:ccessing the
2)t+a%% 4nventor!B in the *ater @)a%it! P)(%ic .o%der in "7change.'
:%so, descri(e an! s)spected i%%icit connections or discharges within the pro3ect %imits, or stateC
he 1esign o++ice is not aware o+ an! i%%icit connections or discharges to the state drainage
s!stem within the pro3ect %imits.
1.7.5 Sensiti0e Areas
&#)mmari9e wet%and report, areas o+ critica% ha(itat, sensitive areas speci+ied in (asin p%ans, etc.
4+ app%ica(%e re+erences +ig)re'.
1.7." E:isting 9ater ;6alit3
&his section sho)%d inc%)de the *:$ 17D6201: #)r+ace *ater $%assi+ication +or a%% near(!
water (odies, and in+ormation on impaired water (odies +rom "co%og!Es D0Dd assessment %isting.
4nc%)de the appropriate *:$ 17D6201: water /)a%it! standards as :ppendi7 ". he "co%og!
%isting can (e accessed at the +o%%owing 4nternet siteC
http://www.ecy.wa.gov/programs/wq/303d/1998/1998_by_wrias.htm'
Example text is as follows:
/var/www/apps/conversion/tmp/scratch_4/247056140.doc, 10/10/2014,
10/10/2014
TESC PLAN March 24, 2003
SR xx
2
-i%% $ree8 is c%assi+ied (! the *ashington #tate 1epartment o+ "co%og! &"co%og!' as $%ass :
&e7ce%%ent' &*:$ 17D6201:'. :%% discharges wi%% need to meet $%ass : water /)a%it! standards
with no mi7ing 9one a%%owed. Fnder the D0Dd :ssessment %ist prepared (! "co%og!, -i%% $ree8
has had %eve%s o+ +eca% co%i+orm, temperat)re, and disso%ved o7!gen o)tside the standards.
&P%ease contact the *ater @)a%it! >ro)p +or assistance in determining the water /)a%it!
c%assi+ication o+ the water (odies a++ected (! the pro3ect as we%% as potentia% monitoring
re/)irements. Pre6constr)ction monitoring +or t)r(idit!, p=, temperat)re, and disso%ved o7!gen
ma! (e re/)ired in sensitive areas and +or "co%og!Es D0Dd %isted water (odies.'
1.7.% A11ected tilities
&his section sho)%d inc%)de an! )ti%ities within the right o+ wa! o+ the proposed constr)ction
activities, which ma! (e impacted (! this constr)ction pro3ect.'
1.) PER*ITS AND ASSOCIATED REPORTS
1.).1 Permits
&4nsert (e%ow the act)a% permits re/)ired +or this pro3ect. e7t descri(ing wh! some permits
ma! or ma! not (e re/)ired sho)%d (e added i+ necessar! &e.g., a <P1"# permit is not re/)ired
(eca)se ***$$$$***, or a shore%ine management permit is re/)ired (eca)se ***$$$$***'.
Permits and iss)ing agencies re/)ired +or this pro3ect areC
Permit :genc!
#ection 404 $%ean *ater :ct :rm! $orps o+ "ngineers
<P1"# Permit <* ;egiona% 1epartment o+ "co%og!
$%earing Permit
***$$$$*** $o)nt! G $it! o+ ***$$$$***
=!dra)%ic Pro3ect :pprova% *ashington #tate 1epartment o+
.isheries/*i%d%i+e
2ther :pp%ica(%e Permits 0oca%, $o)nt!, #tate, .edera%
1.).2 Ass/ciated Re2/rts
&,e%ow is an e7amp%e %ist o+ reports. ;evise to match act)a% reports and st)dies re%ated to this
pro3ect.'
2ther reports and st)dies cond)cted and prepared in con3)nction with this pro3ect inc%)desC
;eport :)thor
=!dra)%ic ;eport
***$$$$***
,io%ogica% :ssessment
***$$$$***
*et%and :na%!sis
***$$$$***
***$$$$*** P%an
***$$$$***
/var/www/apps/conversion/tmp/scratch_4/247056140.doc, 10/10/2014,
10/10/2014
TESC PLAN March 24, 2003
SR xx
3
#pi%% Prevention, $ontro%, and
$o)ntermeas)res P%an
o (e prepared (! $ontractor
$o%%ection, $ontainment, and 1isposa% P%an o (e prepared (! $ontractor
/var/www/apps/conversion/tmp/scratch_4/247056140.doc, 10/10/2014,
10/10/2014
TESC PLAN March 24, 2003
SR xx
4
2.0 TE*PORAR, EROSION AND SEDI*ENT CONTROL PLAN
2.1 P3RPOSE OF PLAN
he emporar! "rosion and #ediment $ontro% &"#$' P%an descri(es the temporar! ,-Ps
se%ected +or stormwater detention and water /)a%it! treatment d)ring constr)ction o+ this
pro3ect. : ,-P is a ph!sica%, str)ct)ra%, and/or manageria% practice that prevents or red)ces the
po%%)tion o+ water. he goa% o+ the "#$ P%an is to prevent t)r(id discharges and sediments
+rom %eaving the site and to meet *ater @)a%it! #tandards as de+ined in *:$ 17D6201:.
#ho)%d +ie%d conditions d)ring constr)ction re/)ire additiona% temporar! ,-Ps or i+ a change in
p%acement o+ temporar! ,-Ps is needed, this p%an sha%% (e modi+ied (! the $ontractor "#$
0ead and *#12 Pro3ect 2++ice 4nspectors, and approved (! the "ngineer. he o(3ectives o+
this "#$ P%an are toC
4mp%ement ,-Ps to minimi9e erosion and sedimentation +rom rain+a%% at constr)ction sites,
and to identi+!, red)ce, e%iminate, or prevent the po%%)tion o+ stormwater.
Prevent vio%ations o+ s)r+ace water /)a%it!, gro)nd water /)a%it!, or sediment management
standards.
Prevent, d)ring the constr)ction phase, adverse water /)a%it! impacts inc%)ding impacts on
(ene+icia% )ses o+ the receiving water (! contro%%ing pea8 rates and vo%)mes o+ stormwater
r)no++ at *#12Es o)t+a%%s and downstream o+ the o)t+a%%s.
1)ring active wor8, the $ontractor sha%% 8eep the "#$ P%an and ,-P inspection reports on
site. *hen constr)ction activit! is comp%ete, the *#12 Pro3ect 2++ice sha%% retain the "#$
P%an, inspection reports, and a%% other reports re/)ired (! the contract.
4t is re/)ired that the "#$ P%an (e prepared (! a pro3ect 1esigner that has attended the
*#12 $onstr)ction Site Erosion and Sediment Control Certification Course &$#"#$
$erti+ication $o)rse'. ;e6certi+ication is re/)ired ever! D !ears.
1esignerEs <ameC
$#"#$ $erti+ication $o)rse "7piration 1ateC ___________________________
2.2 CONSTR3CTION POLL3TION PREVENTION TEA* 8APPLIES
TO WSDOT CONSTR3CTED PROJECT ONL,:
he po%%)tion prevention team is responsi(%e +or imp%ementing, en+orcing, maintaining, and
revising the #P$$ and "#$ P%ans. he $onstr)ction Po%%)tion Prevention eam +orm,
presented in a(%e 261, sho)%d (e comp%eted (! *#12 at the pre6constr)ction meeting.
he $ontractor is responsi(%e +or insta%%ing and maintaining a%% temporar! ,-Ps thro)gh the
d)ration o+ the contract and removing the ,-Ps when the! are no %onger needed per the
re/)irements in this p%an.
*henever a se%+6inspection revea%s that the description o+ po%%)tant so)rces or the ,-Ps
speci+ied in the "#$ P%an are inade/)ate, d)e to the act)a% or potentia% discharge o+ a
signi+icant amo)nt o+ an! po%%)tant, the $ontractor and *#12 sha%% modi+! the "#$ P%an as
appropriate, with the "ngineerEs approva%.
/var/www/apps/conversion/tmp/scratch_4/247056140.doc, 10/10/2014,
10/10/2014
TESC PLAN March 24, 2003
SR xx
5
T#0.e 2.1 Co+st-ctio+ Po..-tio+ Pe/e+tio+ Te#$
Affi.i#tio+ Tit.e N#$e N-$0e Respo+si0i.ities
*#12 :rea :dministrator ransportation program de%iver! in the ***$$$*** :rea.
*#12 "ngineering -anager :ssists the :rea :dministrator.
*#12 $onstr)ction Pro3ect "ngineer $ontract administrationH <P1"# point o+ contact.
*#12 $hie+ 4nspector 2versees administration o+ the contract inc%)ding maintenance, revision, and
imp%ementation o+ the "#$ P%an. "ns)res that "#$ monitoring ta8es p%ace, certi+ies
comp%iance with the "#$ P%an and <P1"# permit, and 8eeps a%% records.
*#12 "nvironmenta% Permit
$omp%iance 0iaison
:ssists the Pro3ect 2++ice to ens)re comp%iance with a%% environmenta% permits and
provides pro3ect assistance as needed.
*#12 *ater @)a%it! "ngineer :ssists the Pro3ect 2++ice to ens)re comp%iance with the <P1"# -)nicipa% permitH
provides pro3ect assistance as neededH eva%)ates the per+ormance o+ ,-PsH and
provides direction +or +ie%d water /)a%it! monitoring as re/)ested.
$ontractor Pro3ect "ngineer $ontract administration.
$ontractor $hie+ 4nspector 2versees administration o+ the contract.
$ontractor "rosion and #ediment $ontro%
&"#$' 0ead*
"ns)res that ,-Ps are in p%ace and +)nctioning as designedH responds to "#$
directives +rom *#12H inspects ,-Ps wee8%! and +o%%owing stormsH identi+ies
necessar! changes to ,-PsH and disc)sses changes o+ the "#$ p%an with *#12
$hie+ 4nspector.
$ontractor #pi%% Prevention, $ontro% and
$o)ntermeas)res &#P$$' 0ead*
1eve%ops and imp%ements the #P$$ P%an. 4n the event o+ a ha9ardo)s materia% spi%%,
the #P$$ 0ead is the designated person to respond and a%ert the appropriate
a)thorities.
"co%og! *ater @)a%it! 4nspector 4nvestigates pro3ect practices and discharges to determine whether or not comp%iance
with water /)a%it! standards and the "#$ P%an is achieved. $ontacts *#12 Pro3ect
"ngineer and "nvironmenta% sta++ regarding comp%iance.
:pp%ica(%e
$o)nt!, $it!
or
-)nicipa%it!
#ite 1eve%opment #pecia%ist 4nvestigates pro3ect practices and discharges to determine whether or not comp%iance
with water /)a%it! standards, "#$ P%an and permits are achieved. $ontacts *#12
Pro3ect "ngineer and "nvironmenta% sta++ regarding comp%iance.
* he $ontractor designates the "#$ and #P$$ 0eads. hese 0eads m)st (e certi+ied thro)gh *#12Es $onstr)ction #ite "rosion and #ediment $ontro% $o)rse.
/var/www/apps/conversion/tmp/scratch_4/247056140.doc, 10/10/2014, 10/10/2014
TESC PLAN March 24, 2003
SR xx
6
he $ontractor sha%% designate and ma8e 8nown the +irmEs "#$ 0ead and #pi%% Prevention,
$ontro%, and $o)ntermeas)res &#P$$' 0ead to the Pro3ect "ngineer d)ring the pre6constr)ction
meeting. ,oth the "#$ and the #P$$ 0eads wi%% have the training to administer active and
e++ective constr)ction site erosion and spi%% contro% program. 4+ /)a%i+ied, one person ma! (e
designated as (oth the "#$ 0ead and #P$$ 0ead. $erti+ication as the "#$ 0ead is achieved (!
attending a *#126approved co)rse in Construction Site Erosion and Sediment Control. ;e6
certi+ication is re/)ired ever! D !ears. &he method o+ pa!ment +or the "#$ and #P$$ 0eads
m)st (e esta(%ished within the "#$ P%an and disc)ssed with the *#12 Pro3ect 2++ice. hree
pa!ment options are avai%a(%eC +orce acco)nt, (! the da!, or (! the ho)r &see >#P +or "#$
0ead'.'
2." EROSION AND SEDIMENT CONTROL MINIMUM
REQUIREMENTS
&"dit the +o%%owing to inc%)de the ,-Ps proposed on !o)r speci+ic pro3ect.'
-inim)m re/)irements o+ the *#12 =ighwa! ;)no++ -an)a% +or erosion and sediment
contro% wi%% (e imp%emented d)ring the design and constr)ction o+ this pro3ect. hese
re/)irements inc%)de the +o%%owingC
&:dd #ection 2.D to the "#$ <otes drawing sheet.'
2.3.1 STA&!I'ATION AND SEDI,ENT TRAPPIN#
:%% e7posed and )nwor8ed soi%s sha%% (e sta(i%i9ed according to the +o%%owing criteriaC
.rom 2cto(er 1 to :pri% D0, no e7posed and )nwor8ed soi%s sha%% remain )nsta(i%i9ed
&e7posed' +or more than two da!s. <on6erodi(%e, c%ean, gran)%ar (ase materia%s sha%% (e
app%ied to sta(i%i9e a%% tra++ic8ed areas.
.rom -a! 1 to #eptem(er D0, no e7posed and )nwor8ed soi%s on s%opes sha%% remain
)nsta(i%i9ed &e7posed' +or more than seven da!s.
#tormwater r)no++ sha%% pass thro)gh I______J prior to %eaving the site.
&#peci+! the ,-P to (e )sed s)ch as a sediment pond or s)ita(%e sediment trap that
inc%)de geote7ti%e6encased chec8 dams, +i%ter +ences, and/or grave% +i%ters'.
2.3.2 DE!INEATE C!EARIN# AND EASE,ENT !I,ITS
:%% e7isting vegetation &trees, ()shes, shr)(s, grasses' sha%% (e preserved when not re/)ired
+or the constr)ction o+ the pro3ect. he $ontractor is re/)ired to s)rve!, sta8e, and +%ag the
c%earing %imits shown in the P%ans and/or areas not to (e dist)r(ed inc%)ding easements,
set(ac8s, sensitive and critica% areas and associated ()++ers, and ()++ers +or drainage co)rses
(e+ore an! c%earing or gr)((ing can (egin. he "ngineer sha%% (e noti+ied 24 ho)rs in
advance o+ the c%earing %imits (eing sta8ed. 0aths sha%% (e s)rve!ed in and p%aced at ang%e
points and in 50 +eet interva%s on tangents and c)rves. 0aths sha%% have A$%earing 0imitsB
written on them and s)rve! +%agging app%ied. $%earing %imits sho)%d (e chec8ed periodica%%!,
sta8es sho)%d (e rep%aced immediate%! i+ dist)r(ed.
2.3.3 PROTECTION OF ADJACENT PROPERTIES
Properties ad3acent to the pro3ect site sha%% (e +)%%! protected +rom sediment deposition.
#)ita(%e sediment traps sha%% (e insta%%ed on the pro3ect site to prevent sediment r)no++. he
/var/www/apps/conversion/tmp/scratch_4/247056140.doc, 10/10/2014,
10/10/2014
TESC PLAN March 24, 2003
SR xx
7
sediment contro% ,-Ps are descri(ed in section 2.4.2 and %ocated on the "#$ p%an sheets
in :ppendi7 I ___ J.
2.".& TI*IN( OF SEDI*ENT TRAPPIN( *EAS3RES
#ediment ponds and traps, perimeter di8es, sediment (arriers, and other ,-Ps intended to
trap sediment on site sha%% (e constr)cted as a +irst step prior to an! %and dist)r(ing
activities. hese ,-Ps sha%% (e +)nctiona% (e+ore %and dist)r(ing activities ta8e p%ace.
"arthen str)ct)res s)ch as dams, di8es, and diversions sha%% (e seeded and m)%ched, or
otherwise sta(i%i9ed, according to the timing and dates indicated in -inim)m ;e/)irement 1.
he sched)%e +or constr)ction o+ ,-Ps designed to trap sediments is presented in #ection
2.4.2
2.3.5 CT AND FI!! S!OPES
$)t and +i%% s%opes sha%% (e constr)cted in a manner that wi%% minimi9e erosion. $)t and +i%%
s%opes sha%% have erosion contro% ,-Ps insta%%ed +or s%ope protection as needed. 1)ring
constr)ction, e7posed s%opes sha%% have seed, +erti%i9er, and m)%ch app%ied. *hen seeding
and m)%ching are not possi(%e, p%astic covering or other s)ita(%e cover sha%% (e app%ied.
.inished s%opes sha%% have permanent seeding app%ied (etween -arch 1 and -a! 15 or
:)g)st 15 and 2cto(er 1. 2)tside these speci+ied app%ication periods, temporar! cover sha%%
(e app%ied.
2.3." CONTRO!!IN# OFF$SITE EROSION
Properties and waterwa!s downstream +rom the pro3ect sha%% (e protected +rom erosion d)e
to increase in vo%)me, ve%ocit! and pea8 +%ow rate o+ stormwater r)no++ +rom the pro3ect site.
(If applicable state t!e measures t!at will be ta"en to control off#site $olume $elocity and
pea" flow rates of stormwater or reference %&''() *i+!way Runoff ,anual Section -...).
2.3.% STA&I!I'ATION OF CON(E)ANCE C*ANNE!S AND OT!ETS
he P)get #o)nd condition re/)ires that a%% temporar! on6site conve!ance channe%s sha%% (e
designed, constr)cted and sta(i%i9ed to prevent erosion +rom the e7pected ve%ocit! o+ +%ow
+rom a 26!ear 246ho)r +re/)enc! storm +or deve%oped conditions. #ta(i%i9ation ade/)ate to
prevent erosion at o)t%ets, ad3acent stream (an8s, s%opes, and downstream reaches sha%% (e
provided at a%% conve!ance s!stems.
$onve!ance channe%s wi%% (e sta(i%i9ed with I______J &speci+! the ,-Ps to (e )sed s)ch as
geote7ti%e6encased chec8 dams and roc8 chec8 dams' to minimi9e (oth the transport o+
sediment and erosion o+ the channe%. $onve!ance s!stem o)t%ets wi%% (e sta(i%i9ed with
I______J &speci+! the methodH i.e., /)arr! spa%%s' to prevent erosion at the discharge point.
2.3.+ STOR, DRAIN IN!ET PROTECTION
:%% storm drain in%ets )sed to discharge r)no++ +rom the constr)ction site sha%% (e protected
so that stormwater r)no++ sha%% not enter the conve!ance s!stem witho)t +irst (eing +i%tered
or otherwise treated to remove sediment.
/var/www/apps/conversion/tmp/scratch_4/247056140.doc, 10/10/2014,
10/10/2014
TESC PLAN March 24, 2003
SR xx
8
he I______J* (State t!e number of drains.) storm drain in%ets on the pro3ect site wi%% (e
protected )sing I______J (specify t!e /,Ps.) #i%t6%aden r)no++ sha%% (e prevented +rom
entering c)%vert ends (! insta%%ing I______J &speci+! the ,-Ps, i.e., geote7ti%e6encased
chec8 dams and grave% +i%ter (erms' in the ditches or swa%es +%owing to the c)%vert.
2.3.- NDER#ROND TI!IT) CONSTRCTION
<o more than 500 +eet o+ storm drain or )ti%it! trench sha%% (e opened at one time. *here
consistent with sa+et! and space considerations, e7cavated materia% sha%% (e p%aced on the
)phi%% side o+ the trench. :%% de6watering devices sha%% discharge into a sediment trap or
sediment pond.
&4+ an! o+ these items app%!, descri(e the meas)res to (e ta8enH i.e., appro7imate%! 500
+eet o+ trenching wi%% (e opened I______J. no trenching is proposed +or this pro3ect,
etc.'
2.3.1. CONSTRCTION ACCESS ROTES
*herever constr)ction vehic%e access ro)tes intersect paved roads, provisions m)st (e made
to minimi9e the transport o+ sediment and m)d onto the paved roads. 4+ sediment is
transported onto a road s)r+ace, the road sha%% (e c%eaned thoro)gh%! at the end o+ each da!.
#ediment sha%% (e removed +rom roads (! shove%ing or sweeping and (e transported to a
contro%%ed sediment disposa% area. #treet washing wi%% (e a%%owed on%! a+ter sediment is
removed in this manner.
&#tate how sediment transport o++6site wi%% (e red)cedH i.e., d)ring constr)ction activities
roads wi%% (e c%eaned as speci+ied a(ove. 4n addition, sta(i%i9ed constr)ction entrance&s'
and tire wash areas wi%% (e constr)cted as descri(ed in #tandard #peci+ication #ection K6
01.D&6'and shown on the "#$ p%an sheets in the :ppendi7.'
2.3.11 RE,O(A! OF TE,PORAR) &,PS
:%% temporar! erosion and sediment contro% ,-Ps sha%% (e removed within D0 da!s a+ter
+ina% site sta(i%i9ation is achieved or when the "ngineer determines that the temporar! ,-P
is no %onger needed. he $ontractor sha%% remove the item, then c%ean, restore and
permanent%! sta(i%i9e a%% dist)r(ed areas to the "ngineerEs satis+action. rapped sediment
sha%% (e removed or sta(i%i9ed on site.
2.3.12 DE9ATERIN# CONSTRCTION SITES
1ewatering devices sha%% discharge into a sediment trap or sediment pond. he rate o+
dewatering discharge sha%% not e7ceed the design capacit! o+ the sediment trap or pond. 4+
re/)ired in the pro3ectEs specia% provisions a dewatering p%an sha%% (e s)(mitted +or approva%
(e+ore imp%ementation.
/var/www/apps/conversion/tmp/scratch_4/247056140.doc, 10/10/2014,
10/10/2014
TESC PLAN March 24, 2003
SR xx
9
&#tate whether dewatering wi%% (e cond)cted as part o+ this pro3ect, and i+ so what
meas)res are (eing ta8en to contro% sediment transport o++6site. 4+ this pro3ect is %ocated
within Ling $o)nt! right6o+6wa!, inc%)de the +o%%owing te7tC'
Specific @i+2 Co-+t4 ReA-ie$e+ts. 4n the areas shown in the P%ans as re/)iring specia%
dewatering p%ans, the $ontractor sha%% prepare a dewatering p%an that inc%)de detai%s and
constr)ction se/)ences that address the hand%ing and disposa% o+ t)r(id water in these
sensitive areas. he $ontractor sha%% s)(mit the dewatering p%an to the Ling $o)nt!
1epartment o+ 1eve%opment and "nvironmenta% #ervices &11"#' with a cop! to the
"ngineer at %east one wee8 prior to commencement o+ an! constr)ction activit!, inc%)ding
erosion contro%. <o wor8 sha%% commence in these sensitive areas or their ()++ers witho)t
approva% o+ the dewatering p%an (! 11"#.
4n the event that the contractor sha%% enco)nter areas that re/)ire dewatering regard%ess o+
whether these areas have (een indicated on the approved p%ans or not, no wor8, e7cept the
erosion contro% meas)res as needed to remed! )n+oreseen water /)a%it! pro(%ems, sha%%
commence or contin)e )nti% a dewatering p%an approved (! Ling $o)nt! 11"#, is o(tained.
he $ontractor sha%% (e responsi(%e +or preparing, s)(mitting, and o(taining approva% +or
dewatering p%ans in s)ch sit)ations.
<o gro)ndwater withdrawa%s are to (e a%%owed, )n%ess the $ontractor o(tains the
appropriate permits'.
2.3.13 ,AINTENANCE
:%% temporar! and permanent erosion contro% ,-Ps sha%% (e maintained and repaired as
needed to ass)re contin)ed per+ormance o+ their intended +)nction per #tandard
#peci+ication K601.D&11'.
2.& TE*PORAR, EROSION AND SEDI*ENT CONTROL BMPS
his section presents the temporar! ,-Ps that were se%ected to contro% erosion and
sediment d)ring constr)ction o+ this pro3ect. he ,-Ps se%ected inc%)de #o)rce $ontro%
,-Ps, #ediment $ontro% ,-Ps, #tr)ct)ra% "rosion $ontro% ,-Ps, and "7perimenta%
and 2ther ,-Ps.
he ,-Ps were se%ected (ased on the potentia% +or erosion at the site and the potentia%
+or impacts to s)rro)nding sensitive areas &i.e., wet%ands and water (odies'. he erosion
potentia% +or this pro3ect was determined to (e &%ow, moderate, high'. 1escri(e what
+actors %ed to the se%ection o+ the erosion potentia%. &#%ope, s%ope %ength, amo)nt o+
dist)r(ed soi%, pro7imit! to receiving water (odies, o)t+a%%s, etc.' he designer sho)%d
disc)ss how the pro3ect wi%% (e AstagedB to the e7tent possi(%e to dist)r( as %itt%e o+ the
site +or the shortest amo)nt o+ time d)ring constr)ction.
he t!pe and %ocation o+ "#$ ,-Ps )sed d)ring constr)ction ma! var! +rom those
presented (e%ow. his p%an ma! (e modi+ied (! the $ontractor in the +ie%d as necessar!
to contro% erosion and the migration o+ sediments at the pro3ect site.
he proposed %ocations o+ the se%ected "#$ ,-Ps are presented on the "#$ P%an
#heets presented in &speci+! where in this doc)ment the p%ans are %ocated &i.e., :ppendi7
I______J*, P%an #heets I______J* and I______J*'.
/var/www/apps/conversion/tmp/scratch_4/247056140.doc, 10/10/2014,
10/10/2014
TESC PLAN March 24, 2003
SR xx
10
2.7.1 SORCE CONTRO! &,PS
#o)rce contro% ,-Ps se%ected +or this pro3ect inc%)de ________________________
___________________________________________________________________ .
&0ist cover practices to (e )sed, s)ch as seeding, m)%ching, matting, P:-, p%astic cover,
etc. 1escri(e se%ected ,-Ps and speci+! t!pe o+ seed, m)%ch, or matting to (e )sed, i.e.,
straw m)%ch, wood +i(er m)%ch, (onded wood +i(er matting, etc. 1escri(e where each
,-P wi%% (e constr)cted and re+erence the speci+ic "#$ P%an #heet showing the
proposed %ocation.'
-inimi9e nat)ra% vegetation remova%. 5egetation restoration is disc)ssed in the
5egetation -anagement P%an #ection D.D. #treet sweeping proper storage and hand%e o+
potentia% po%%)tions wi%% (e covered in the #pi%% Prevention, $ontro% and $o)ntermeas)res
P%an.
2.7.2 SEDI,ENT CONTRO! &,PS
he ,-Ps se%ected +or the contro% o+ sediment inc%)de0
&0ist the ,-Ps se%ected +or contro%%ing sediment, s)ch as +i%ter +ence, geote7ti%e6encased
chec8 dams, (r)sh (arrier, grave% +i%ter (erm, storm drain in%et protection, straw watt%e,
compost soc8 or (erm, sediment trap, and sediment ponds or (asins.'
2.7.3 STRCTRA! EROSION CONTRO! &,PS
#tr)ct)ra% "rosion $ontro% ,-Ps se%ected inc%)de __________________________ .

&0ist ,-Ps s)ch as sta(i%i9ed constr)ction entrance, tire wash, constr)ction road
sta(i%i9ation, d)st contro%, pipe s%ope drains, %eve% spreader, interceptor di8e and swa%e,
etc.'
2.7.7 E8PERI,ENTA! AND OT*ER &,PS
&4+ app%ica(%e inc%)de this section descri(ing an! proposed e7perimenta% i.e. $hitosan
Press)ri9e Porta(%e #and +i%ter or other ,-Ps. 2therwise sa! A<o e7perimenta% ,-Ps
are proposed +or this wor8.'
".0 CONSTR3CTION INSTALLATION5 INSPECTION AND
*AINTENANCE SC6ED3LE
his pro3ect wi%% (e constr)cted in accordance with the #tandard #peci+ications contained within
#ection K601, and the specia% provisions inc%)ded in :ppendi7 ___ .
he pro3ect wi%% (e inspected and maintained in accordance with #ection K601.D&1',.
".1 WATER 73ALIT, *ONITORIN(
he $ontractor "#$ 0ead, "nvironmenta% $onstr)ction 0iaison, or *ater @)a%it! "ngineer ma!
determine that water /)a%it! monitoring is warranted. 4+ needed, the I*#12J or
I$ontractorJ or I1eve%operJ sha%% meas)re t)r(idit!, p= and temperat)re at a%% o+ the identi+ied
site discharge points a+ter each 246ho)r rain+a%% events o+ 0.5 inches or greater. 4+ t)r(idit! at
/var/www/apps/conversion/tmp/scratch_4/247056140.doc, 10/10/2014,
10/10/2014
TESC PLAN March 24, 2003
SR xx
11
an! o+ the site discharge points e7ceeds the water /)a%it! standards &*:$ 17D6201:', then the
$ontractor sha%% ma8e appropriate ad3)stments to the "#$ p%an. )r(idit! wi%% (e meas)red
with a =:$= 2100P porta(%e t)r(idit! meter or e/)iva%ent and reported in <ephe%ometric
)r(idit! Fnits &<Fs'. &4+ it is 8nown that monitoring wi%% (e re/)ired, revise this te7t to
descri(e re/)ired monitoring.' #ee 40 404?.00 +or +)rther g)idance &i+ pro3ect wi%% (e
constr)cted (! *#12'.
4+ warranted d)ring the site wor8, the responsi(%e part! sha%% +o%%ow #ection K601.D&1', in the
#tandard #peci+ications, s)pp%emented (! the +o%%owing:
&. he "#$ 0ead sha%% vis)a%%! monitor o++6site water discharge +or sedimentation and
t)r(idit!. 4+ t)r(id discharges are o(served the t)r(idit! sha%% (e determined (! )se o+ a
t)r(idit! meter. )r(idit! sha%% not e7ceed 5 <F over (ac8gro)nd t)r(idit! when the
(ac8gro)nd t)r(idit! is 50 <F or %ess, or have more than a 10 percent increase in
t)r(idit! when the (ac8gro)nd t)r(idit! is more than 50 <F. 4+ t)r(idit! e7ceeds
these re/)irements, a +orma% *ater @)a%it! -onitoring P%an sho)%d (e imp%emented.
<oti+! the *#12 chie+ inspector &i+ app%ica(%e' i+ an! t)r(id discharges are o(served
and when meas)rements are ta8en with a t)r(idit! meter.
-. 5is)a%%! monitor +or t)r(id water or o++6site sedimentation. $hec8 +or potentia% ,-P
improvements i+ sediment is acc)m)%ating o++6site, or i+ the discharge appears t)r(id. he
"#$ 0ead sha%% (e responsi(%e +or con+irming that no t)r(id water or sediment %eaves the
site.
he responsi(%e part! sha%% )pdate the "#$ p%an sheets &app%! to *#12 constr)cted pro3ects
on%!' to re+%ect changing +ie%d conditions.
".2 PER*ANENT STABILIBATION 8APPLICABLE TO WSDOT
CONSTR3CTED PROJECTS ONL,:
he permanent sta(i%i9ation ,-Ps +or this pro3ect consist o+C 1' reesta(%ishing vegetationH 2'
o)t%et protection and D' p%anting trees and shr)(s. 1ist)r(ed areas wi%% (e p%anted with a
seed/m)%ch mi7t)re to prevent soi% erosion. :%% new storm sewer o)t%ets wi%% (e %ined with
/)arr! spa%%s to prevent sco)ring. 4n addition wet%and vegetation, detention area and riparian
()++er p%antings wi%% (e provided to sta(i%i9e and prevent erosion.
#eeding and p%anting sha%% (e done according to the dates in the #pecia% Provisions or the
#tandard #peci+ication )n%ess otherwise approved (! the "ngineer.
"." VE(ETATION *ANA(E*ENT PLAN 8APPLICABLE TO WSDOT
CONSTR3CTED PROJECTS ONL,:
(Re$ise t!e followin+ text to describe t!e actual $e+etation plan)
Permanent erosion and sediment contro% on this pro3ect wi%% consist o+ seeding, +erti%i9ing, and
m)%ching. 1ist)r(ed areas wi%% (e re6seeded with permanent cover as soon as possi(%e. 4+
e7posed areas wi%% remain )ndist)r(ed +or more than seven da!s in the s)mmer months, or more
than two da!s in the winter months, temporar! cover practices wi%% (e provided.
*here possi(%e, e7isting areas with vegetation wi%% remain )ndist)r(ed )n%ess no a%ternative
e7ists. Fndist)r(ed areas provide a positive ()++er +or stormwater +%ows (etween the
improvements associated with the pro3ect and sensitive areas near these improvements.
/var/www/apps/conversion/tmp/scratch_4/247056140.doc, 10/10/2014,
10/10/2014
TESC PLAN March 24, 2003
SR xx
12
/var/www/apps/conversion/tmp/scratch_4/247056140.doc, 10/10/2014,
10/10/2014
TESC PLAN March 24, 2003
SR xx
13
&.0 Spi.. Pe/e+tio+ Co+to. #+% Co-+te$e#s-es 8SPCC: ReA-ie$e+ts
he $ontractor sha%% deve%op a #pi%% Prevention, $ontro% and $o)ntermeas)res &#P$$' P%an per
the amendment to the #tandard #peci+ications M1607.15&1' and according to the +ormat and
content in the Aoo%s and emp%ateB doc)ment, avai%a(%e on the internet at
httpC//www.wsdot.wa.gov/eesc/environmenta%/programs/ha9w/ec/ha9_docp)(s.htm.
his p%an is +or contro% o+ po%%)tants on constr)ction sites that have the potentia% to harm h)man
hea%th or the environment, &;$* 70.105, =a9ard *aste $%ean)p6-ode% o7ics $ontro% :ct'.
he p%an sha%% address so)rces o+ po%%)tants, critica% receptors, spi%% prevention and containment,
spi%% response, and reporting re/)irements. his p%an is e7pected to address comprehensive
contro% o+ po%%)tants that inc%)de, ()t are not %imited to, management o+ +)e%s, oi%s, so%vents, and
chemica%s )sed in operations and maintenance, so%id waste decomposition prod)cts determined
(! 1epartment o+ "co%og! to present a ha9ard, and maintenance and management o+
contaminated soi%s and water enco)ntered or generated on the constr)ction site.
he $ontractor sha%% ma8e avai%a(%e at the constr)ction site an individ)a% designated as the
#P$$ 0ead that is 8now%edgea(%e in ha9ardo)s waste recognition, and spi%% contro% and
response. he #P$$ 0ead is the person responsi(%e +or deve%oping and imp%ementing the #P$$
P%an. 4n the event o+ a ha9ardo)s materia% spi%%, the #P$$ 0ead is the designated person to
respond and a%ert the appropriate a)thorities. :t a minim)m this individ)a% wi%% have training or
e7perience in the +o%%owingC
1. Lnow%edge o+ (asic ha9ard and ris8 assessment techni/)es
2. Lnow%edge o+ the proper se%ection and )se o+ persona% protective e/)ipment
D. :n )nderstanding o+ (asic ha9ardo)s materia%s terms.
4. :(i%it! to per+orm (asic contro%, containment, and/or con+inement operations within
the capa(i%ities o+ the reso)rces and personne% protective e/)ipment avai%a(%e.
5. Lnow%edge o+ how to imp%ement decontamination proced)res.
6. :n )nderstanding o+ re%evant standard operating proced)res and termination
proced)res contained in the #P$$.
he $ontractor sha%% ta8e meas)res to prevent so%id wastes +rom (ecoming a so)rce o+
po%%)tants to stormwater or decomposition prod)cts +rom entering waters o+ the state. he
$ontractor sho)%d )se (est avai%a(%e practices to contain, segregate, store, and dispose o+ so%id
wastes consistent with state and %oca% stat)tes and ordinances contro%%ing so%id waste disposa%.
,-Ps $61.10 thro)gh $61.20 in the =ighwa! ;)no++ -an)a% &=;-' sho)%d (e considered +or
incorporation into the #P$$ where app%ica(%e. ,-Ps )sed on this pro3ect are not %imited to
those mentioned a(ove.
APPENDICES
/var/www/apps/conversion/tmp/scratch_4/247056140.doc, 10/10/2014,
10/10/2014
TESC PLAN March 24, 2003
SR xx
14
N/te< Add t=e 1/ll/5ing a22endices t=at are a22lica4le. Al5a3s incl6de A22endices A and C
>attac=ed?
APPENDI' A< TESC *ONITORIN( AND *AINTENANCE
C6EC@S6EETS
APPENDI' B< TESC PLAN S6EETS AND DETAILS
APPENDI' C< TESC B*P CONSTR3CTION C6AN(E TRAC@IN( FOR*
APPENDI' D< SPECIAL PROVISIONS
Permit ;e/)irements, "rosion and #ediment $ontro%, and 1rainage
;e/)irements specia% provisions.
APPENDI' E< WAC 1>"?201A
P!oto+rap!s may be included to !elp describe t!e site.
/var/www/apps/conversion/tmp/scratch_4/247056140.doc, 10/10/2014,
10/10/2014
TESC PLAN March 24, 2003
SR xx
15
APPENDI' A< TESC *ONITORIN( AND *AINTENANCE
C6EC@S6EETS
.i%% o)t the appropriate portions o+ this +orm as wor8 progresses. -a8e additiona% copies o+ this
+orm as needed. Leep a%% comp%eted copies o+ this +orm with the on6site "#$ P%an. ;e+%ect a%%
"#$ changes on the "#$ p%an sheets.
Pro3ect <ameC _________________________________________
Pio to E#t= Wo!
,-Ps are in p%ace prior to constr)ction &signat)re'________________________________
1ateC _____________
D-i+2 E#t= Wo!
D#te N#$e B*P C Loc#tio+ Rep#isD*o%ific#tio+s
Nee%e%
Co$$e+tsDS#$p.i+2
Res-.ts
/var/www/apps/conversion/tmp/scratch_4/247056140.doc, 10/10/2014,
10/10/2014
TESC PLAN March 24, 2003
SR xx
16
APPENDI' C< TESC B*P CONSTR3CTION C6AN(E TRAC@IN(
FOR*
.i%% o)t the appropriate portions o+ this +orm as wor8 progresses. -a8e additiona% copies o+ this
+orm as needed. Leep a%% comp%eted copies o+ this +orm with the on6site "#$ P%an. ;e+%ect a%%
"#$ ,-P changes on the "#$ p%an sheets.
Pro3ect <ameC _________________________________________
C=#+2e
N-$0e
C=#+2e
D#te
N#$e of Peso+
*#!i+2 B*P
C=#+2e
CSESC
Cetific#tio+
E;pi#tio+ D#te
Desciptio+ of TESC P.#+ S=eet
C=#+2e Wit= D#wi+2 N-$0e
/var/www/apps/conversion/tmp/scratch_4/247056140.doc, 10/10/2014,
10/10/2014
TESC PLAN March 24, 2003
SR xx
17