Item
Descripcin
Unidad
Metrado
Precio
GLB
GLB
1.00
1.00
600.00
200.00
M2
M2
798.00
38.00
1.57
18.86
M3
504.00
5.36
307.10
477.75
784.85
0.92
11.42
4.73
140.07
95.55
54.72
46.11
01.00.00
01.01.00
01.02.00
OBRAS PROVISIONALES
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M
MOVILIZACION Y DESMOVILIZACION DE EQUIPO -HERRAMIENTA
02.00.00
02.01.01
02.01.02
02.02.00
02.02.01
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO
REFORZAMIENTO EN TALUD MANUAL
CORTE DE TERRENO
CORTE TERRENO MANUAL
03.00.00
03.01.01
03.01.02
03.01.03
03.02.00
03.02.01
03.02.02
MOVIMIENTO DE TIERRAS
REFINE Y NIVELACION EN LOSA DEPORTIVA
M3
EXCAVACION SUPERFICIAL DE TERRENO NORMAL MANUAL E= 25.00 CM
M3
ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 M )
M3
RELLENO CON MATERIAL DE PRESTAMO
RELLENO CON MATERIAL DE PRESTAMO COMPACTADO
M3
RELLENO COMPACTADO COM MATERIAL DE HORMIGON EN LOSA DEPORTIVAM2
e=15cm
04.00.00
04.01.00
04.01.01
04.01.02
04.01.03
04.01.04
04.01.05
M2
M3
KG
M
M3
55.40
65.90
929.30
399.00
22.05
39.82
417.10
5.62
5.06
2.19
05.00.00
05.07.00
PINTURA
PINTURA EN LOSA DEPORTIVA
312.42
2.88
06.00.00
06.01.00
06.02.00
06.03.00
06.04.00
06.05.00
06.06.00
06.06.01
06.07.00
VARIOS
ESTRUCTURA DE ACERO GALVANIZADO PARA FULBITO Y BASQUET
ESTRUCTURA DE ACERO GALVANIZADO PARA VOLEY
EQUIPAMIENTO PARA ESTRUTURA DE FULBITO PROFESIONAL
EQUIPAMIENTO PARA ESTRUTURA DE VOLEY PROFESIONAL
EQUIPAMIENTO PARA ESTRUTURA DE VASQUET PROFESIONAL
CANALIZACION
EXCAVACION SUPERFICIAL DE TERRENO NORMAL MANUAL E= 0.70 CM
PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION)
UND
UND
GLB
GLB
GLB
2.00
1.00
1.00
1.00
1.00
1,700.00
150.00
150.00
160.00
28.00
ML
UND
110.00
6.00
8.36
30.00
07.00.00
07.01.00
FLETE TERRESTRE
FLETE TERRESTRE
GLB
1.00
1,500.00
Costo Directo 1
TRIBUNAS
Item
01.00.00
01.01
01.02.00
02.00.00
02.01.00
02.01.01
02.02.00
02.02.01
02.02.02
02.02.03
02.03.00
02.03.01
02.04.00
02.04.01
02.05.00
02.05.01
03.00.00
03.01.00
03.02.00
03.03.00
03.04.00
04.00.00
04.01.00
04.01.01
04.01.02
04.02.00
Descripcin
CONSTRUCCION DE TRIBUNAS
TRABAJOS PRELIMINARES
Trazo y Replanteo Preliminar
MOVIMIENTO DE TIERRAS
Excavacion de Zanjas Para Cimiento
Excavacion de Zanjas Para Columnas
Eliminacion de Material Excedente
Relleno Con Afirmado
OBRAS DE CONCRETO SIMPLE
Cimiento Corido Concreto 1:10 + 30%P.G
Sobrecimiento 1:8 + 25%P.M.
Encofrado y Desencofrado Sobrecimiento
OBRAS DE CONCRETO ARMADO
Concreto Losa de Tribuna Fc = 175 kg/cm2
Encofrado y Desencofrado Losa Tribuna
Acero de Refuerzo F`y=4,200 kg/cm2
Concreto Fc = 175 kg/cm2 Columna
Encofrado y Desencofrado Columna
Acero de Refuerzo F`y=4,200 kg/cm2
MUROS
Muro Ladrillo Arcilla Cabeza (7 x 12 x 22)
Muro Ladrillo Arcilla KK Soga
COBERTURAS
Cobertura Con Calamina Galvanizada
Tijeral de Tubo Cuadrado de 1"X1"
Viguetas de FF 3/8"
REVOQUES Y ENLUCIDOS
Tarrajeo en Sobrecimiento y Muros
Tarrajeo En Columna
PINTURAS
Pintura en Muros
Pintura en Columnas
INSTALACIONES ELECTRICAS
Excavacion de Zanjas Para Dado de Concreto de Postes
Concreto F`c=175 kg/cm2 Colocacion de Poste
Suministro e Instalacion de Poste de Concreto Centrifugado de 8.7 mt.
Suministro e Instalacion Reflectores
Unidad
Metrado
Precio
M2
60.00
1.57
M3
M3
M3
M3
9.84
5.54
17.91
58.80
7.67
7.67
8.25
12.66
M3
M3
M2
10.80
3.33
33.24
206.43
226.18
21.31
M3
M2
KG
M3
M2
KG
6.84
32.40
716.04
4.68
29.70
756.72
352.86
20.61
4.31
345.19
22.75
4.31
M2
M2
74.40
8.40
37.33
30.22
M2
ML
ML
59.22
23.00
100.80
25.90
93.68
11.08
M2
M2
98.40
8.40
20.74
21.73
M2
M2
106.80
33.00
15.37
15.37
M3
M3
UD
UD
2.93
2.25
4.00
4.00
7.67
326.27
751.42
677.38
04.02.01
04.02.02
04.02.03
07.00.00
07.01.00
ML
UD
UD
ML
GLB
400.00
1.00
1.00
400.00
9.35
821.59
2,808.73
3.04
1.00
2,500.00
Costo Directo 2
MALLA OLIMPICA
Item
01.00.00
01.01
01.02.00
02.01.00
02.02.00
02.02.01
02.02.02
02.03.00
02.03.01
03.00.00
07.00.00
07.01.00
Descripcin
CONSTRUCCION DE TRIBUNAS
TRABAJOS PRELIMINARES
Trazo y Replanteo Preliminar
MOVIMIENTO DE TIERRAS
Excavacion de Zanjas Para Cimiento
Eliminacion de Material Excedente
OBRAS DE CONCRETO SIMPLE
Cimiento Corido Concreto 1:10 + 30%P.G
Sobrecimiento 1:8 + 25%P.M.
Encofrado y Desencofrado Sobrecimiento
Dados de Concreto
Encofrado y Desencofrado de Sobrecimiento
Encofrado y Desencofrado de Dados
MALLA METALICA
Tubos de FF de 3"
Malla Metalica Alambre N 10Rombo de 2"x2"
PINTURAS
Pintura en Malla
VEREDA ACCESO
TRABAJOS PRELIMINARES
Trazo y Replanteo Preliminar
MOVIMIENTO DE TIERRAS
Excavacion de Zanjas Para Cimiento
Eliminacion de Material Excedente
Conformacion y Corte de Talud
OBRAS DE CONCRETO SIMPLE
Sardinel
Concreto en Gradas y Veredas
Encofrado y Desencofrado de gradas y veredas
FLETE TERRESTRE
FLETE TERRESTRE
Unidad
Metrado
Precio
M2
39.40
1.57
M3
M3
12.06
15.62
7.67
8.25
M3
M3
M2
M3
M2
M2
2.15
1.89
33.24
1.76
23.70
4.56
206.43
226.18
21.31
352.86
20.61
20.43
ML
M2
19.00
98.30
99.90
135.68
M2
98.30
15.37
M2
27.00
1.57
M3
M3
M2
4.32
4.32
29.74
7.67
8.25
8.23
Ml
M3
M2
27.00
3.88
15.42
98.43
326.18
21.34
GLB
1.00
1,800.00
Costo Directo 3
Costo Directo 1
Costo Directo 2
Costo Directo 3
COSTO DIRECTO TOTAL
GASTOS GENERALES (10)%
SUB TOTAL
SUPERVISION 5%
EXPEDIENTE TECNICO(4%)
PRESUPUESTO TOTAL
Parcial
Subtotal
800.00
600.00
200.00
4,670.98
1,252.86
716.68
2,701.44
21,521.22
282.53
5,455.91
3,712.34
7,664.63
4,405.81
36,982.81
2,206.03
27,486.89
5,222.67
2,018.94
48.29
899.77
899.77
3,888.00
3,400.00
150.00
150.00
160.00
28.00
1,099.60
919.60
180.00
1,500.00
1,500.00
71,362.38
GENERALES (10)%
7136.24
78,498.62
3924.93
3139.94
85,563.50
ENTE TECNICO(4%)
UESTO TOTAL
Parcial
Subtotal
94.20
94.20
1,010.13
75.47
42.49
147.76
744.41
3,690.97
2,229.44
753.18
708.34
11,720.09
2,413.56
667.76
3,086.13
1,615.49
675.68
3,261.46
3,031.20
2,777.35
253.85
4,805.30
1,533.80
2,154.64
1,116.86
2,223.35
2,040.82
182.53
2,148.73
1,641.52
507.21
15,058.10
22.47
734.11
3,005.68
2,709.52
3,740.00
821.59
2,808.73
1,216.00
2,500.00
2,500.00
46,282.06
GENERALES (10)%
4628.21
50,910.27
2545.51
2036.41
55,492.19
ENTE TECNICO(4%)
UESTO TOTAL
Parcial
Subtotal
61.86
61.86
221.37
92.50
128.87
1,579.65
443.82
427.48
708.34
621.03
488.46
93.16
15,235.44
1,898.10
13,337.34
1,510.87
1,510.87
42.39
42.39
313.53
33.13
35.64
244.76
4,252.25
2,657.61
1,265.58
329.06
1,800.00
1,800.00
25,017.36
GENERALES (10)%
ENTE TECNICO(4%)
UESTO TOTAL
2501.74
27,519.10
1375.95
1100.76
29,995.82
71,362.38
46,282.06
25017.36
DIRECTO TOTAL
GENERALES (10)%
ENTE TECNICO(4%)
UESTO TOTAL
142661.81
14266.18
156,927.99
7846.40
6277.12
171,051.50
Principales Rubros
1.- Expediente Tecnico
2.- Costo Directo
Resultado 01:
Resultado 02:
Resultado 03:
3.-GASTOS GENERALES(10%)
4.- SUPERVISIN(5%)
TOTAL DE PRESUPUESTO
Unidad de
Medida
Cantidad
Costo
Unitario
Expediente
1.0
6277.12
GLOBAL
GLOBAL
GLOBAL
GLOBAL
GLOBAL
1.0
1.0
1.0
1.0
1.0
71362.38
46282.06
25017.36
14266.18
7846.40
Costo Total a
precios de
mercado
6277.12
142661.81
71362.38
46282.06
25017.36
14266.18
7846.40
171051.50
277.23
Principales Rubros
1.- Expediente Tecnico
TRIM I
100
TRIM II
0
TRIM III
0
100
90
90
90
90
0
10
10
10
10
0
0
0
0
0
3.-GASTOS GENERALES(10%)
4.- SUPERVISIN(5%)
TRIM IV
0
0
0
0
0
0
Principales Rubros
1.- Expediente Tecnico
2.- Costo Directo
Resultado 01: Construccion de Losa Concreto Armado(e=0.10cm)
Resultado 02:Construccion de Tribunas de Concreto Armado
Resultado 03: Construccion de Malla Olimpica
3.-GASTOS GENERALES(10%)
4.- SUPERVISIN(5%)
TRIM I
100
TRIM II
0
TRIM III
0
100
90
90
90
90
0
10
10
10
10
0
0
0
0
0
TRIM IV
0
0
0
0
0
0
Descripcion
Pintura
Mano de Obra para Pintado
Reparacion de Losa
Reparacion de arcos y tableros
Reparacion de Malla
Reparacion de Tribunas
Total
Items de Gastos
Pintura
Mano de Obra para Pintado
Reparacion de Losa
Reparacion de arcos y tableros
Reparacion de Malla
Reparacion de Tribunas
Total a Precios de Mercado
Total a Precios Sociales
Mensual
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Anual
12.0
12.0
12.0
12.0
12.0
12.0
Ao 1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Ao 2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Precios
de
Mercado
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Ao 3
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Precios
Sociales
Factor
0.84
0.60
0.84
0.84
0.84
0.84
Ao 4
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Ao 5
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Ao 6
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Ao 7
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Ao 8
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Ao 9
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Ao 10
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Ao 7
720.0
900.0
1176.0
1260.0
1356.0
1380.0
6792.0
5423.0
Ao 8
720.0
900.0
1176.0
1260.0
1356.0
1380.0
6792.0
5423.0
Ao 9
720.0
900.0
1176.0
1260.0
1356.0
1380.0
6792.0
5423.0
Ao 10
720.0
900.0
1176.0
1260.0
1356.0
1380.0
6792.0
5423.0
Descripcion
Pintura
Mano de Obra para Pintado
Reparacion de Losa
Reparacion de arcos y tableros
Reparacion de Malla
Reparacion de Tribunas
Total
Items de Gastos
Pintura
Mano de Obra para Pintado
Reparacion de Losa
Reparacion de arcos y tableros
Reparacion de Malla
Reparacion de Tribunas
Total a Precios de Mercado
Total a Precios Sociales
Mensual
60.0
75.0
98.0
105.0
113.0
115.0
566.0
Anual
12.0
12.0
12.0
12.0
12.0
12.0
Ao 1
720.0
900.0
1176.0
1260.0
1356.0
1380.0
6792.0
5423.0
Ao 2
720.0
900.0
1176.0
1260.0
1356.0
1380.0
6792.0
5423.0
Precios
de
Mercado
720.0
900.0
1176.0
1260.0
1356.0
1380.0
6792.0
Ao 3
720.0
900.0
1176.0
1260.0
1356.0
1380.0
6792.0
5423.0
Factor
0.84
0.84
0.60
0.84
0.84
0.84
Ao 4
720.0
900.0
1176.0
1260.0
1356.0
1380.0
6792.0
5423.0
Precios
Sociales
604.8
756.0
705.6
1058.4
1139.0
1159.2
5423.0
Ao 5
720.0
900.0
1176.0
1260.0
1356.0
1380.0
6792.0
5423.0
Ao 6
720.0
900.0
1176.0
1260.0
1356.0
1380.0
6792.0
5423.0
Proyeccion de la Poblacion
Ao
Poblacion
2011
569
2012
581
1013
592
2014
604
2015
617
2011 *
2012
2013
2014
2015
Ciudad de Sallique
100.00
617
668
724
785
850
Total
100.00
617
668
724
785
850
(f - p)
Pf : Poblacin en el ao 2008
La poblacion demandante efectiva del proyecto esta conformada por el 35% de la poblacion de referencia, la cual alcanza un to
De acuerdo con las encuestas realizadas en la zona de estudio, este grupo de personas muestra mayor inters en el deporte y
Es necesario remarcar que los nios realizan las prcticas deportivas los das lunes a viernes por las tardes y los adultos entre
2010 *
2011
2012
2013
2014
100.00
178
185
193
201
209
Total
100.00
178
185
193
201
209
(f - p)
Pf : Poblacin en el ao 2008
Hombres
Mujeres
Total
85
81
166
32.68%
64
52
116
22.83%
158
68
226
44.49%
307
201
508
100.00%
Dias
Sabados
Domingos
Lunes a
Viernes
Total de
Partidos
Semanales
Total de
Partidos
Mensuales
Total de
Partidos al
Ao
10
10
33
15
16
132
60
64
1584
720
768
Dias
Sabados
Domingos
Lunes a
Viernes
Total de
Partidos
Semanales
Total de
Partidos
Mensuales
Total de
Partidos al
Ao
Total
General
162
164
280
120
140
540
462
180
224
866
1848
720
896
3464
22176
8640
10752
41568
POBLACIN
2016
2017
2018
2019
922
999
1,082
1,173
922
999
1,082
1,173
81-1993)
008
TC: 0.0203
nte Efectiva
POBLACIN
2015
2016
2017
2018
218
227
236
246
218
227
236
246
81-1993)
008
TC: 0.0203