Analysis & Rates

The capacity of doing work by an artisan or skilled labour in the form of quantity of work per
day is known as the task work or out turn of the labour.
The out-turn of work per artisan varies to
some extent according to the nature, size,
height, situation, location, etc., In bigger
cities where specialized and experienced
labour is available the out-turn is greater than
small towns and country sides. In well
organized work less labour is required.
The following may be taken as the
approximate quantity of work or out turn or
task for an average artisan per day.
SNo.
Particulars of items
Quantity Perday
1. Bri ck work i n l i me or cement mort ar
i n foundat i on and pl i nt h
1. 25cum (45cuft )per mason
2. Bri ck work i n l i me or cement mort ar
i n superst ruct ure
1. 00cum (35cuft )per mason
3. Bri ck work i n mud mort ar i n
foundat i on and pl i nt h
1. 50cum (55cuft )per mason
4. Bri ck work i n mud mort ar i n
superst ruct ure
1. 25cum (45cuft )per mason
5. Bri ck i n cement or l i me mort ar i n
arches
0. 55 cum (20cuft )per mason
6. Bri ck i n cement or l i me mort ar i n
j ack arches
0. 55 cum (20cuft )per mason
7. Hal f bri ck wal l i n part i t i on 5. 00sqm (50sqft )per mason
8. Coursed rubbl e st one masonry i n
l i me cement mort ar i ncl udi ng
dressi ng
0. 80cum (30 cuft )per mason
9. Random rubbl e st one masonry i n
l i me or cement mort ar
1. 00cum (35cuft )per mason
10. Ashl ars masonry i n l i me or cement
mort ar
0. 40cum (15cuft )per mason
11. St one arch work 0. 40cum (15cuft )per mason
12. Li me concret e i n foundat i on or fl oor 8. 50cum (300cuft )per mason
13. Li me concret e i n roof t erraci ng 6. 00cum (200cuft )per mason
14. Li me concret e 1: 2; 4 5. 00cum (175cuft )per mason
15. RB work 1. 00cum (35cuft )per mason
16. RCC work 3. 00cum (125cuft )per mason
17. 12mm (1/ 2) pl ast eri ng wi t h cement or
l i me mort ar
8. 00sqm (80sqft )per mason
18. Poi nt i ng wi t h cement or l i me mort ar 10. 00sqm (100sqft )per mason
19. Whi t e washi ng or col our washi ng
coat s
70. 00sqm (700sqft )per whi t e
washer
20. Whi t e washi ng or col our washi ng
coat s
200. 00sqm (2000sqft )per whi t e
washer
21. Pai nt i ng or varni shi ng doors or
wi ndows one coat
25sqm (250sqft )per pai nt er
22. Coal t arri ng or sol i gum pai nt i ng one
coat
35. 00sqm (350sqft )per pai nt er
23. Pai nt i ng l arge surface one coat 35. 00sqm (350sqft )per pai nt er
24. Di st emperi ng one coat 35. 00sqm (350sqft )per pai nt er
25. 2. 5cm(1 ) CC fl oor 7. 50sqm (75sqft )per pai nt er
26. Fl ag st ore fl oor l ayi ng wi t h l i me or
cement mort ar excl udi ng LC
10. 00sqm (100sqft )per pai nt er
27. Bri ck on edge i n fl oor l i me or cement
mort ar excl udi ng LC
7. 00sqm (70sqft )per pai nt er
28. Bri ck bat fl oor as i n above 8. 00sqm (80sqft )per pai nt er
29. Ti mber frami ng sal or t eak wood 0. 07cum (2. 5cuft )percarpent er
30. Ti mber frami ng sal or count ry wood 0. 15cum (5cuft )per carpent er
31. Door and wi ndow shut t ers panel ed or
gl azed
0. 15sqm (7sqft ) per carpent er

32. Door and wi ndow shut t ers panel ed or
bat t ened
0. 80sqm (0. 80sqft )percarpent er
33. Sawi ng hard wood 4. 00sqm (40sqft ) per pai r of
sawers
34. Sawi ng soft wood 6. 00sqm (60sqft ) per pai r of
Related Articles
Tips to keep your home germ free
Making your home germ free and clean is
not a major project. Just follow some tips
described here and you are done for..
Building Architect vs. Structure
Engineer
It is very important to know the difference
between architect and structure engineer
if you are planning to construct ..
More Articles
Top 10 Mistakes to avoid when Hiring a Contractor
Building New Home V/S Buying Builder Flat
How to hire a carpenter?
10 things to check before the rain hit your home!
Daylighting
View all
Hot Articles
Ceiling Design- New Ceiling Design
for 2012
Ceiling design ideas can change the
overall look of the room. Look at the new
collection of ceiling design that gives ..
Read more
Kids room ceiling designs
Are your kids room is well decorated,
themed room but ceiling is flat? Now you
can decorate kids room ceiling, we will..
Read more
Living Room Ceiling
Living room ceiling can change the
interior of your room. Beautiful ceiling
designs and colorful ceiling can be the
fe..
Read more
Top 10 mistakes in stairs design
Most people do not realize the many
choices they have for staircases. May be
they do not know about the some
mistake i..
Read more
How to Grow Bamboo Indoor
Growing eco friendly plant like bamboo
helps in keeping environment clean.
Bamboo is considered as sign of good
health..
Read more
How to Design Stairs?
Going up and down the stairs needs
much energy if the steps are not
designed smoothly. For easy access to
upper floors..
Read more
Ready Made Doors
Are you looking for appealing ready made
doors for your home? Here is a variety of
ready made doors to provide safety ..
Read more
Study Room Designs
Study Room Design Ideas and Pictures
can help you to design study room. Here
Valme concrete
pipes
valme.it
Design, production and direct sale
of high quality concrete pipes
343
Find Architects/Interior Designers/Civil Engineers in your city
--Select City-- Show
Upload your designs to feature on GharExpert & to connect to our reader!
Featured Architect today

pankaj Mhatre
Archi tect
Mumbai

Home Shop Construction Decorating Vastu House Plans Estimator Discussions Picture Gallery More Sign in Sign up
18/8/2014 Analysis & Rates, Analysis and rates for construction work, labour for construction work, Material required for construction
http://www.gharexpert.com/articles/Start-Construction-1703/Analysis--Rates_0.aspx 2/8
sawers
35. Si ngl e al l ahabad t i l i ng or mangal ore
t i l i ng
6. 00sqm (60sqft ) per t i l e l ayer
36. Doubl e al l ahabad t i l i ng 4. 00sqm (40sqft ) per t i l e l ayer
37. Breaki ng of bri ck bal l est 40mm
(11/ 2) gauge
0. 75cum (35cuft )per l abourer or
breaker
38. Breaki ng of bri ck bal l est 25mm (1)
gauge
0. 55cum (20cuft )per l abourer or
breaker
39. Breaki ng of st one bal l est 40mm
(11/ 2) gauge
0. 40cum (10cuft )per l abourer or
breaker
40. Breaki ng of st one bal l est 25mm (1)
gauge
0. 25cum (10cuft )per l abourer or
breaker
41. Ashl ar st one dressi ng 0. 70cum (25cuft )perst onecut t er
42. Fl ag st one dressi ng 1. 50sqm (25sqft )perst onecut t er
43. Eart hwork i n excavat i on i n ordi nary
soi l
3. 00cum (100cuft )per bel der
mazdoor
44. Eart hwork i n excavat i on i n hard soi l 2. 00cum (75cuft )per bel der
mazdoor
45. Excavat i on i n soi l 1. 00cum (35cuft )per bel der
mazdoor
46. Number of bri cks l ai d by a mason i n
bri ck work upt o a hei ght of 3m(10)
600 bri cks per mason
47. Amount of work done by a mazdoor
hel per per day

Mi x 3. 00cum (100cuft )mort ar per
mazdoor
Del i ver bri ck 4000 nos t o a di st ance of 15m (50)
per mazdoor
Del i ver mort ar 5. 5cum (200cuft ) per mazdoor
48. Scaffol di ng cost for si ngl e st orey
bui l di ng
Re. 0. 50per
cum
(Rest . 1. 5%cuft ) of bri ck
work.
Items 46,47 and 48 are based on the committee report on rates and cost government of
India.
LABOUR (MAZDOOR) REQUIRED FOR DIFFERENT
WORKS

Extracts from the report on productivity
projects in building industries issued by
National Building Organisation are given
below:-

a) Earthwork per 28. 30 cum (12000cuft)
1) Excavat i on i n foundat i ons, t renches et c. ,
i n ordi nary soi l i ncl udi ng di sposal up t o
30m (100 ) and l i ft of 1. 5m(5ft ) 5 bel dars
and 4 mazdoors can do 28. 30 cum
(1000cuft ) per day.
2) Refi l l i ng excavat ed eart h i n foundat i ons, poi nt h et c, i ncl udi ng consol i dat i on
i n 15cm(6) l ayers-3 bel dars, 2 mazdoors and bhi st i can do 28. 30 cum
(1000cuft ) per day.
3) Di sposal of surpl us eart h wi t hi n a l ead of 30m (100 )-1 mazdoor can do
2. 83cum (100 cuft ) per day.

b) Cement concrete work per 2. 83 cum (100cuft)
l ayi ng cement concret e 2 bel dars, 3 mazdoors, bhi st i and mason, can do
2. 83 cum (100 cuft ) per day.

c) R C C work:-

1) Layi ng rei nforced concret e 3 bel dars, 3 mazdoors, 1 Bhi st i and mason
can do 2. 83 cum (100cuft ) per day.
2) Cent eri ng and shut t eri ng for fl at surfaces 4 bel dars and 4 carpent ers (II
cl ass) can do 9. 6sqm(96sqft ) per day.
3)Rei nforcement work for R C C 1 bl acksmi t h or fi t t er and 1 bel dar can bend
and pl ace i n posi t i on 1 qui nt al (2 cwt ) of st eel per day.

d) Stone work per 2. 83 cum (100cuft)-

Random rubbl e masonry wi t h bl ue st one i n foundat i ons-3 masons, 3 bel dars, 2
mazdoors and 1/ 4bhi st i can do 2. 83 cum (100cuft 0 per day

e) Bri ck work per 2. 83 cum (100cuft)-

Fi rst cl ass bri ck work i n 1: 4 cement mort ar i n superst ruct ure part i t i on wal l s,
j unct i ons of roof, parapet wal l s and st ri ng course 2masons, 4 mazdoors
and 1/ 2 bhi st i can do 2. 83 cum (100cuft ) per day.

F) Wood work :-

1) For t he frames of doors and wi ndows 2 carpent ers and 1 bel dar can work
0. 18 cum (6. 40cuft ) of wood equi val ent t o door frames 7. 5cm x 10m of 1. 2m x
2. 1m (3 x4 of 3 x11 x7 )si ze per day.
are given some pictures of study rooms:
Read more
More featured articles
Window Styles for Your Bedroom
French style
Room Dividers
Teenage Bedroom
Cork Flooring
Various Waste Water Pipes (Sewer Construction)
Kitchen Ventilation
Vastu Guidelines for Basement
Types of Roofing
Vastu for Water Tank
Master Bedroom
Vastu Tips for Doors and Windows
Related tips
If excavation is made deeper than the adjacent building
then proper support should be planned for the old
building before starting the work.
In case of shuttering for even small bridges & culvert
work the shuttering cribs or iron girders should be used.
Tags
Aggregate Bathroom Board Brick Building
Ceiling Cement Color Concrete
Construction Dampness Dining Door Finishing
Flooring Furniture Glass Home Interior
Interior decoration Kitchen Kota Light Marble
Paint Plastic Plumbing Pop Sand Security
Steel Study Termite Tile Vastu Window
View all tags>>
1 2 3 >>
18/8/2014 Analysis & Rates, Analysis and rates for construction work, labour for construction work, Material required for construction
http://www.gharexpert.com/articles/Start-Construction-1703/Analysis--Rates_0.aspx 3/8
2) For panel ed, gl azed, et c, shut t ers-15 carpent ers and 4 bel dars can make
and fi x 4 shut t ers 40 mm t hi ck of si ze 2. 00m x 1. 15m (1 t hi ck of si ze of
6 -9x 3 -9 ) per day. Quant i t y of wood per shut t er 0. 075 cum, i e2. 66 cuft .
g) I ron work :-

1) Fi xi ng 40mm x 3mm=38cm(1 x x 150 fl at i ron hol dfast s-1 bl acksmi t h
(II cl ass), I mason and I bel dar can fi x 36 hol dfast s per day.
2) Fi xi ng 16mm di a. 5/ 3 di a) M S rods 1 bl acksmi t h (II cl ass), 2 carpent ers (II
cl ass) and 3 mazdoors can fi x 16. 5m (54rft ) per day.

h) Fl oori ng: -
4cm t hi ck (1 1/ 2 )t hi ck cement concret e fl oori ng of 40sqm (400sqft ) requi re 5
masons, 4 bel dars, 3 mazdoors and 1 bhi st i per day for mi xi ng l ayi ng and
fi ni shi ng.

I) Fi ni shi ng :-

1) Pl ast eri ng wi t h any mort ar 12mm (5) t hi ck 3 masons, 3 mazdoors and 1
bhi st i can pl ast er 40sqm (400a ft ) per day.
2)Whi t e washi ng or col our washi ng (3 coat s) 1 whi t e washer and 1 mazdoor
can do 60sqm (600sqft ) per day.
3) Pai nt i ng t wo coat s such as chocol at e, red, grey, et c on wood are st eel 3
Pai nt ers and 2 mazdoors can pai nt 10sqm (100sqft ) per day.

LOAD FOR A TWO BULLOCKS CART

Quantity or Number
Sl # Parti cul ars of materi al s On Kachcha Road On Pucca Road
1. Bri ck 19 cm x 9cm x 9cm 275nos 400nos
2. Bri ck bal l ast 0. 85 cum (30cuft ) 1. 10 cum (40cuft )
3. St one bal l ast 0. 70 cum (25 cuft ) 1. 00 cum (35cuft )
4. Kankar 0. 85 cum (30cuft ) 1. 10 cum (40cuft )
5. Sand surkhi 0. 85 cum (30cuft ) 1. 10 cum (40cuft )
6. Li me 1. 10 cum (40cuft ) 1. 40 cum (50cuft )
7. Ti l es Al l ahabad or Mangal ore 275nos 400nos
8. Cement 15bags 20 bags
9. St eel 0. 75 t onne 1 t onne

Not e; A bul l ock . . carry about one t onne l oad. The average speed for a bul l ock cart
may be t aken as 3. 20km (2 uni t s) per hour and hour may be al l owed for l oadi ng and
unl oadi ng. Taki ng 8 hours worki ng per day, t he number of t ri ps per day, can be
cal cul at ed.

LOAD FOR TRUCKS

ON PUCCA METALLED ROAD

Trucks3 t onners 5 t onners8 t onners di esel t ruck

Bri ck or Al l ahbad t i l es or
Mangal ore t i l es1000nos 1500nos2000nos

Cement , st eel and ot her
Heavy mat eri al s 3 t onne 5 t onne8 t onne

Ot her mat eri al s
Bal l ast , Kankar, gri t
Sand coal , et c. , 2. 8cum 4. 20cum5. 6cum
(100cuft ) (150cuft )(200cuft )

On kachcha eart hen road t he l oad wi l l be l ess by 33 per cent .

MATERIALS FOR DIFFERENT ITEMS OF WORKS

The requi rement of mat eri al s for di fferent i t ems of works i s as gi ven bel ow: -

Sl # Parti cul ars Quanti ty
1. Bri cks (9 x 4 x3 or 20 cm x
10cm x 10cm nomi nal si ze) for
bri ck work
1350 nos for
100cuft
50000 nos per %
cum (500nos. per
cum)
2. Dry mort ar for bri ck work 30% 30cuft for 100 cuft 30cum for 100 cum
3. St one for rubbl e st one masonry
125%
125cuft for 100
cuft
125cum for 100 cum
4. Dry mort ar for rubbl e st one
masonry 42%
42cuft for 100 cuft 42cum for 100 cum
5. Bri cks for bri ck bal l ast for l i me
concret e
1050cuft for 100
cuft
37000cum for 100
cum
18/8/2014 Analysis & Rates, Analysis and rates for construction work, labour for construction work, Material required for construction
http://www.gharexpert.com/articles/Start-Construction-1703/Analysis--Rates_0.aspx 4/8

6. Bri ck bat s or bri ck bal l ast for
l i me concret e
150cuft for 100
cuft
150cum for 100 cum
7. Bri ck bal l ast for l i me concret e 100cuft for 100
cuft
100cum for 100 cum

Sl # Parti cul ars Quanti ty
8. Dry mort ar for l i me concret e I
foundat i on and fl oor 35%
35cuft for 100cuft 35cum for 100 cum
9. Dry mort ar for l i me concret e i n
roof t erraci ng 45%
45cuft for 100cuft 45cum for 100 cum
10. Mat eri al s for cement concret e
1: 2: 4

Bal l ast or gri t 88% 88cuft for 100cuft 88cum for 100 cum
Sand 44% 44cuft for 100cuft 44cum for 100 cum
Cement 22% 22cuft for 100cuft 22cum (60 bags)for
100 cum
11. Mat eri al s for 2. 5cm (1)cc 1: 2: 4
fl oor

St one gri t 8cuft for 100sqft 2. 40cum for 100
cum
Sand 4cuft for 100sqft 1. 20cum for 100
cum
Cement 2 cuft (2 bags)
for 100cuft
0. 08cum (24
bags)for 100 cum
12. Bri cks for R B work 1200 nos for
100cuft
42000nos/ %
cum(420 mps. [ er
ci , )
13. Dry mort ar for R B work 45% 45cuft for 100cuft 45cum for 100 cum
14. Dry mort ar for 12mm (1/ 2)
pl ast eri ng
6cuft for 100sqft 2. 00cum for 100
sqm
15. Dry mort ar for poi nt i ng i n
bri ckwork
2cuft for 100sqft 0. 60cum for 100
sqm
16. Li me for whi t e washi ng one coat 1kg for 100sqft 10kg for 100 sqm
17. Dry di st emper for i st coat 0. 65 kg for 100sqft 6 kg for 100 sqm
18.
Dry di st emper for 2
nd
coat
0. 50 kg for 100sqft 5kg for 100 sqm
19. Snow-Cem for Ist coat 3kg for 100sqft 30kg for 100 sqm
20.
Snow-Cem for 2
nd
coat
2kg for 100sqft 20kg for 100 sqm
21. Pai nt ready mi xed for pai nt i ng
one coat
1/ 3gl . for 100sqft 10l t r for 100 sqm
22. Pai nt (st i ff) for pai nt i ng one coat 1kg for 100sqft 10kg for 100 sqm
23. Bri cks (20 x 10 x 10cm) for bri ck
fl oor or hal f bri ck wal l
500 nos for 100sqft 5000nos. for 100sqm
24. Dry mort ar for bri ck fl oor or hal f
bri ck wal l
12cuft for 100sqft 3. 20 cum for 100
sqm
25. Bri cks (9 x 4 x3) for bri ck
fl at work
350 nos for 100sqft 3500nos. for 100sqm
26. Dry mort ar for bri ck fl at fl oor 8cuft for 100sqft 2. 25cum for 100
cum
27. Bri cks (9 x 4 x3) requi red
for honey comb wal l
325 nos for 100sqft 3250 nos. for
100sqm
28. Dry mort ar for honey comb wal l 8cuft for 100sqft 2. 5cum for 100 cum
29. Mat eri al s for 2cm (3/ 4)t hi ck
damp proof course of 1: 2 cement
mort ar

Cement 3cuft (2. 5bags) for
100sqft
0. 90cum (27
bags)for 100 cum
Sand 6cuft for 100sqft 1. 80cum for 100
cum
Compound or i mpermo @ 1kg per
bag of cement
2. 5kg for 100sqft 27kg for 100 sqm
30. Mat eri al s for 2. 5cm (1)cc 1: 1
: 3 damp proof course

St one gri t 8cuft for 100sqft 2. 25cum for 100
cum
Sand coarse 4cuft for 100sqft 1. 13cum for 100
cum
Cement 2 cuft (2
bags) for 100sqft
0. 75cum for
(221/ 2bags)for100
cum
Compound or i mpermo @ 1kg per
bag of cement
21/ 2 kg for 100sqft 22 kg for 100
sqm
31. Bi t umen or asphal t for pai nt i ng
on D P C or on roof 1
s t
coat
15 kg for 100sqft 150 kg for 100 sqm

2
nd
coat
10 kg for 100sqft 100 kg for 100 sqm
32. G G I sheet for roof 128sqft for 100sqft 128 sqmfor 100sqm
33. A G corrugat ed sheet for roof 115sqft for 100sqft 115 sqmfor 100sqm
34. Ti mber for panel ed door shut t er
4cm (1 ) t hi ck
15cuft for 100sqft 4. 5 cum for 100
cum
35. Ti mber for bat t end door shut t er
4cm (1 ) t hi ck
13cuft for 100sqft 4. 0 cum for 100
cum
36. Ti mber for panel ed & gl azed
shut t er 4cm (1 ) t hi ck
11cuft for 100sqft 3. 0 cum for 100
cum
Ti mber for ful l y gl azed shut t er
4cm (1 ) t hi ck
8cuft for 100sqft 2. 0 cum for 100
cum