Mechanical installation work Status Monitoring Sheet
Last Update: 9/10/2014
Drawing Issue Material Delivery Marking Material Issue to Worker Anchor Bolt Install Equipment Installation Alignment Internal Inspection Progress No. Tag No. Equipment Name Q'ty Area 5 5 10 10 20 30 15 5 100.00 1 P-01 Sewage inlet pump 2 PS P F A 5% 2 Z-01 1 PS P F A 5% 4 P-102 Sand lift pump 2 Grit P Chamber F A 5% 5 P-103 2 Grit P Chamber F A 5% 6 Z-105 1 Grit P Chamber F A 08/12/14 08/16/14 08/17/14 95% 7 Z-107 1 Grit P Chamber F A 06/14/14 08/10/14 08/10/14 08/10/14 95% 8 Z-108 2 Grit P Chamber F A 5% 9 Z-109 1 Grit P Chamber F A 5% 10 Z-110 2 Grit P Chamber F A 5% 11 Z-111 4 Grit P Chamber F A 08/05/14 08/08/14 08/08/14 08/08/14 08/08/14 08/08/14 85% 12 Z-112 4 Grit P Chamber F A 08/05/14 08/09/14 08/09/14 08/09/14 08/09/14 08/09/14 85% 13 B-201 3 Blower P Room F A 06/24/14 08/25/14 08/25/14 08/25/14 08/25/14 08/25/14 95% Aeration blower Grit conveyor Scum skimmer Hydraulic Cyclone Screen gate Grit chamber gate Event Manual coarse screen cage Scum & Oil discharge pump Manual fine screen cage Auto fine bar screen 14 B-202 1 Blower P Room F A 08/24/14 08/25/14 08/25/14 08/25/14 08/25/14 08/25/14 95% 15 Z-203 1 Aeration P Tank F A 07/04/14 08/01/14 08/12/14 08/01/14 08/12/14 08/12/14 95% 1 Aeration P Tank F A 07/04/14 07/30/14 08/10/14 07/30/14 08/10/14 08/10/14 95% 1 Aeration P Tank F A 07/04/14 07/04/14 07/04/14 07/04/14 07/04/14 07/04/14 95% 1 Aeration P Tank F A 07/04/14 08/02/14 08/14/14 08/02/14 08/14/14 08/14/14 95% 1 Aeration P Tank F A 5% 1 Aeration P Tank F A 5% 1 Aeration P Tank F A 5% 1 Aeration P Tank F A 5% 16 Z-205 1 Secondary P Sedimentation F A 06/14/14 95% 1 Secondary P Sedimentation F A 06/14/14 90% 1 Secondary P Sedimentation F A 06/14/14 07/24/14 95% 1 Secondary P Sedimentation F A 06/14/14 95% 17 T-301 1 Sludge P Facility F A 08/23/14 NA 09/06/14 09/06/14 95% Air diffuser (Membrane) B2 Air diffuser (Header piping) A2 Air diffuser (Header piping) B1 Air diffuser (Header piping) B2 Air diffuser (Membrane) A1 Air diffuser (Membrane) A2 Air diffuser (Membrane) B1 Secondary Sludge Collector A (Lower) Secondary Sludge Collector B (Upper) Secondary Sludge Collector B (Lower) Polyelectrolyte Feeder Sludge lifting blower Air diffuser (Header piping) A1 Secondary Sludge Collector A (Upper) 18 P-302 2 Sludge P Facility F A 5% 19 P-303 2 Sludge P Facility F A 5% 20 T-305 Flocculant tank 1 Sludge P Flocculant agitator Facility F A 08/23/14 09/06/14 09/06/14 09/06/14 95% 21 Z-306 1 Sludge P Facility F A 5% 22 Z-307 Dehydrator 1 Sludge P Facility F A 06/14/14 95% 23 C-308 1 Sludge P Facility F A 09/12/14 10% 24 C-309 1 Sludge P Facility F A 09/12/14 10% 25 F-501 Deodorizer fan 2 Aeration P Tank F A 08/18/14 08/18/14 08/18/14 95% 26 Z-502 1 Aeration P Tank F A 08/14/14 08/15/14 08/14/14 08/15/14 08/15/14 08/15/14 95% 27 P-503 2 Aeration P Tank F A 09/12/14 09/12/14 09/12/14 09/12/14 09/12/14 09/12/14 95% 28 Z-504 1 Aeration P Tank F A 08/14/14 08/15/14 08/14/14 08/15/14 08/15/14 08/15/14 95% 29 P-601 2 Sludge P Facility F A 5% 30 Z-602 Sand filter 1 Sludge P Facility F A 08/14/14 08/15/14 08/14/14 08/16/14 08/16/14 08/16/14 95% 31 P-603 Reuse water pump 2 Sludge P Facility F A 5% Waste Sludge feed pump Activated Carbon deodorizer Recycled water pump Coagulant pump Deodorizer pump Scrubber deodorizer Horizontal sludge conveyor Compressor Air dryer 32 T-604 1 Sludge P Facility F A 09/06/14 09/07/14 09/08/14 30% 33 P-605 2 Sludge P Facility F A 5% 38 T-701 Chlorine tank 2 Sludge P Facility F A 09/07/14 09/07/14 95% 39 P-702 Chlorine pump 2 Sludge P Facility F A 5% 40 Z-901 Generator set 1 Genset P Room F A 6/1414 95% 41 P-902 Fuel pump 1 Disinfection P F A 5% 42 T-903 Fuel day tank 1 Genset P Room F A 08/14/14 95% 43 T-904 Fuel storage tank 1 Disinfection P F A 09/02/14 09/02/14 09/02/14 95% 44 ALP-1 4 Primary P Sedimentation F A 08/26/14 80% 45 ALP-2 4 Aeration P Tank F A 08/26/14 50% 46 ALP-3 2 Aeration P Tank F A 08/26/14 50% 47 ALP-4 1 Grit P Chamber F A 5% Scum and Oil Collection Pump Pressure tank for reuse water Drain discharge pump Primary sludge pump Return sludge pump Excess sludge pump 61 Instruments P (SS) F A 62 Instruments P (DO) F A 63 Instruments P (RC) F A 64 Instruments P (Odour) F A 81 Hand rail P F A 88% 82 Man hole cover P F A 80% 83 P F A 90% 84 Main Piping Rack P F A 95% 85 P F A ##### P: Plan F: Forecast A: Actual Percent Completion Monorail & lifting frame Piping Work Status Monitoring Sheet Last Update: Line Name or Work Volume Drawing Issue Material Delivery Material Issue to Worker Fab Start (incl. piping support) Marking Installation Start 50% Installation Completion Installation Complete Line Check Leak Test Progress No. Line No. Material Size BM 5 5 5 10 10 20 15 15 5 10 100 1 Air Line P AIR-B201-SS304-001 F A P AIR-B201-SS304-002 F A P AIR-B201-SS304-003 F A P AIR-B201-SS304-004 F A P AIR-B202-SS304-001 F A P AIR-B202-SS304-002 F A P AIR-B202-SS304-003 F A P AIR-B202-SS304-004 F A P AIR-B202-ABS-005 F A P AIR-B202-SS304-006 F A P AIR-B202-SS304-007 F A P AIR-B202-ABS-008 F A P AIR-B202-SS304-009 F A P AIR-B202-SS304-010 F A Event P AIR-B202-ABS-011 F A P AIR-B202-ABS-012 F A 2 Gas Line P GAS-F501-ABS-001 F A P GAS-F501-ABS-002 F A 3 WW Line P WW-Z602-ABS-001 F A P WW-Z801-ABS-001 F A P WW-V301-ABS-001 F A P WW-V801-ABS-001 F A P WW-P605-ABS-001 F A P WW-P103-ABS-001 F A P WW-P103-ABS-001 F A P WW-V103-ABS-001 F A P WW-V103-ABS-002 F A P WW-Z109-SS304-001 F A P WW-Z109-ABS-001 F A P WW-PS01-ABS-001 F A P WW-PS01-ABS-002 F A P WW-V101-ABS-001 F A 4 Sludge Line P SG-ALP1-ABS-001 F A P SG-ALP1-ABS-002 F A P SG-ALP2-ABS-001 F A P SG-ALP2-ABS-002 F A 5 Chemical Line P CH-P702-ABS-001 F A P CH-P702-ABS-002 F A P CH-P302-ABS-001 F A P CH-P302-ABS-002 F A 6 Reuse Water Line P TW-P601-ABS-001 F A P TW-Z602-ABS-001 F A P TW-Z602-ABS-002 F A P TW-P603-ABS-001 F A P TW-P603-ABS-002 F A P TW-P603-ABS-003 F A P TW-P603-ABS-004 F A P F A P F A P F A P F A P F A P F A P F A P F A P F A P F A P F A P F A P F A P F A P F A P F A P: Plan F: Forecast A: Actual Electrical Work Status Monitoring Sheet Last Update: Work Volume Drawing Issue Material Delivery Material Issue Support Fab Start Cable Tray Installation Start Cable Pulling Start Termination Start All Cabling Completion Installation Test Progress No. Cable No. Size M % 5 5 5 10 10 10 10 30 15 100 1 P F A Date or Date Date Date Date Date Date Date Date 2 P F A 3 P F A 4 P F A 5 P F A 6 P F A 7 P F A 8 P F A 9 P F A 10 P F A 11 P F A 12 P F A 13 P F A 14 P F A 15 P F Event A 16 P F A 17 P F A 18 P F A 19 P F A 20 P F A 21 P F A 22 P F A 23 P F A 24 P F A 25 P F A 26 P F A 27 P F A 28 P F A P: Plan F: Forecast A: Actual