You are on page 1of 421

United States Marine Corps

GCSS-MC/LCM INCREMENT 1



GCSS-MC Enterprise System Training

Plnr 301 Logistics Chain
Planning (ASCP)
Training Guide
Version 5.0 Patch Set 30+









Publisher Stamp 5/21/2013 3:17 PM (9200)
Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 1

COPYRIGHT & TRADEMARKS
Copyright 1998, 2009, Oracle and/or its affiliates. All rights reserved.
Oracle is a registered trademark of Oracle Corporation and/or its affiliates. Other names may be trademarks of their respective
owners.
This software and related documentation are provided under a license agreement containing restrictions on use and
disclosure and are protected by intellectual property laws. Except as expressly permitted in your license agreement or
allowed by law, you may not use, copy, reproduce, translate, broadcast, modify, license, transmit, distribute, exhibit,
perform, publish or display any part, in any form, or by any means. Reverse engineering, disassembly, or decompilation
of this software, unless required by law for interoperability, is prohibited.
The information contained herein is subject to change without notice and is not warranted to be error-free. If you find any errors,
please report them to us in writing.
If this software or related documentation is delivered to the U.S. Government or anyone licensing it on behalf of the U.S.
Government, the following notice is applicable:
U.S. GOVERNMENT RIGHTS
Programs, software, databases, and related documentation and technical data delivered to U.S. Government customers are
commercial computer software or commercial technical data pursuant to the applicable Federal Acquisition Regulation and
agency-specific supplemental regulations. As such, the use, duplication, disclosure, modification, and adaptation shall be subject to
the restrictions and license terms set forth in the applicable Government contract, and, to the extent applicable by the terms of the
Government contract, the additional rights set forth in FAR 52.227-19, Commercial Computer Software License (December 2007).
Oracle USA, Inc., 500 Oracle Parkway, Redwood City, CA 94065.
This software is developed for general use in a variety of information management applications. It is not developed or intended for
use in any inherently dangerous applications, including applications which may create a risk of personal injury. If you use this
software in dangerous applications, then you shall be responsible to take all appropriate fail-safe, backup, redundancy and other
measures to ensure the safe use of this software. Oracle Corporation and its affiliates disclaim any liability for any damages caused by
use of this software in dangerous applications.
This software and documentation may provide access to or information on content, products and services from third parties. Oracle
Corporation and its affiliates are not responsible for and expressly disclaim all warranties of any kind with respect to third party
content, products and services. Oracle Corporation and its affiliates will not be responsible for any loss, costs, or damages incurred
due to your access to or use of third party content, products or services.

Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 2


Table of Contents
Plnr 301 Logistics Chain Planning (ASCP) ...............................................................3
Plnr 301 Logistics Chain Planning (ASCP) ............................................................................. 4
301.01 - Course Introduction ................................................................................................................. 6
301.02 - Logistics Chain Planning (ASCP)/IO Overview.................................................................... 11
301.02.01 - Logistics Chain Planning (ASCP) Overview ................................................................................. 12
301.02.02 - Demonstrated Procedures .............................................................................................................. 75
301.02.02.01 - Reviewing IO Plan Output ................................................................................................... 76
301.02.02.02 - Viewing ASCP Plan and Exceptions ................................................................................. 137
301.02.02.03 - Releasing Planned Orders .................................................................................................. 174
301.02.02.04 - Creating Exception Sets ..................................................................................................... 246
301.02.02.05 - Setting Up ASCP Planners Workbench ............................................................................ 297
301.02.02.06 - Creating a Public / Private Query ...................................................................................... 348
301.02.02.07 - Maintaining a Public / Private Query ................................................................................. 387
301.03 - Course Summary ................................................................................................................. 411
301.04 - Knowledge Assessment ....................................................................................................... 413

Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 3

Plnr 301 Logistics Chain Planning (ASCP)



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 4

Plnr 301 Logistics Chain Planning (ASCP)

COURSE VERSION 5.0 PATCH SET 30


Preface


This course will introduce the capabilities of the Advance Supply Chain Planning (ASCP) application. ASCP
is a comprehensive planning solution, providing the tools required for optimizing the flow of material, cash,
and information across a supply chain; features a constraint based planning option; and user defined time
horizons.


Before beginning this course, the following are required
Thorough knowledge of the GCSS-MC security requirements
An active GCSS-MC user account
Basic navigation skills of the GCSS-MC applications

Prerequisites
Getting Started in GCSS-MC (CS 101)
Service Desk Support (CS 102)
Requestor (CS 103)
Reports User (Discoverer and Standard) (Rpts 101)
Using Unit Supply Procedures (Inv 101)
Intermediate Supply Procedures (Inv 201)
Oracle Demand Planning (ODP) (Plnr 201)

Course Terminal Learning Objective

Given instructions, system demonstrations, and reference materials, execute the duties of a Logistics Chain
Planner per the GCSS-MC Planning process. (Plnr 301.01)


Course Description

This course will introduce the capabilities of the Advance Supply Chain Planning (ASCP) application and
Inventory Optimization (IO). ASCP & IO are currently not planned to be used at the Organic battalion,
company level, or at the Intermediate Maintenance Activity (IMA).


Course Organization

Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 5

This is an instructor-led course featuring lecture and demonstrations.


Assessment Description

An examination will be administered to evaluate the students knowledge. A test score of 80% is required to
pass this examination.


Course Materials
Job Aids
Student Guide
Instructor Manual
UPK Player
Exception Explanations and Remedies
Supply Chain Plan Exception Messages
Understanding, Diagnosing and Resolving Exceptions

Target Audience

Inventory managers at the Enterprise & Intermediate supply level.


Recommended MOS

30xx


Viewing UPK in SeeIt! Mode

Attached or embedded content (i.e. Red Book, hyperlinks, or web page information) is not accessible when in
the SeeIt! mode.


Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 6

301.01 - Course Introduction


Terminal Learning Objective

Given instructions, system demonstrations, and reference materials, execute the duties of a Logistics Chain
Planner per the GCSS-MC Planning process. (Plnr 301.01)

Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 7



Step
1. Plnr 301 Logistics Chain Planning (ASCP)



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 8



Step
2. GCSS-MC


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 9



Step
3. Agenda



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 10



Step
4. Administrative Notes



Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 11

301.02 - Logistics Chain Planning (ASCP)/IO Overview

Terminal Learning Objective

Given instructions, system demonstrations, and reference materials, execute the actions and/or Exceptions
generated by the Advanced Supply Chain Plan (ASCP) per the GCSS-MC Planning process. (Plnr 301.02)

Enabling Learning Objectives

With references and per GCSS-MC APS processes:
Describe the high-level process for reviewing Inventory Optimization (IO) plans for Safety Stock
recommendations. (Plnr 301.02.01K)
Identify the basic process and steps for releasing Planned Orders from the (ASCP) Planners Work
Bench. (Plnr 301.02.02K)
Describe the navigation and steps to access, view and action Exception Messages from the Planners
Work Bench. (Plnr 301.02.03K)
Describe the basic process to create a new Exception Set. (Plnr 301.02.04K)
Identify valid adjustments or modifications to the Planners Work Bench Preferences. (Plnr
301.02.05K)
Identify the options to create, or maintain an existing Query. (Plnr 301.02.06K)


Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 12

301.02.01 - Logistics Chain Planning (ASCP) Overview


Topic Overview

This topic provides the course overview for Plnr 301 Logistics Chain Planning (ASCP).

The hyperlinks below provide additional information in the curriculum for students to access.

Exception Explanations and Remedies

Supply Chain Plan Exception Messages

Understanding, Diagnosing and Resolving Exceptions

Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 13



Step
1. Logistics Chain Planning (ASCP)Overview



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 14



Step
2. Objectives (1 of 2)


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 15



Step
3. Objectives (2 of 2)



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 16



Step
4. GCSS-MC Advanced Planning Suite (APS)


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 17



Step
5. What is the GCSS-MC Advanced Supply Chain Planning (ASCP) Business Solution?




The key capabilities of ASCP are:

Holistic Optimization, Planning, and Scheduling. ASCP can plan
for all supply chain facilities simultaneously. Short-term detailed
scheduling and long-term aggregate planning are supported within a
single plan.

Finite Capacity Planning and Scheduling. Finite Capacity Planning
and Scheduling. ASCP generates feasible supply chain plans that
consider both resource and material constraints.

Optimization. Users can easily configure ASCP to optimize specific
business criteria. No programming is necessary to access ASCP's
powerful mathematical optimization capabilities.

Backward Compatibility. ASCP's component architecture allows it
to be deployed against any version of GCSS-MC transaction systems.

Workflow-Driven Exception Messaging. ASCP's exception

Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 18

messages alert planners to critical issues across the extended supply
chain. Workflows that drive these exceptions route data to and provides
feedback from trading partners as required, thus effectively involving
them in the supply chain planning process.

Global Accessibility. ASCP's database-centric architecture stores a
plans data in a central planning server database. This data is accessible
from anywhere via a simple browser page. It is possible for multiple
planners to simultaneously access data for a single plan.

Integrated Planning and Execution. ASCP's Advanced Planner
Workbench user interface will not only display a plan's results, but will
also allow planners to execute planning recommendations. Planners do
not have to move to the transaction system to perform a plan's
execution.

Simulation Capability. ASCP allows many types of changes to
supply, demand, plan options, and resource profiles to simulate
changing business conditions. Planners can generate a plan considering
all the changes that have been entered via the Planner's Workbench.
Unlimited numbers of scenarios can be simulated and compared using
online planning, copy plans, and exceptions. Examples of the types of
changes are firming, changing sources, modifying quantities, dates,
priorities, resource availability, supplier capacity, and objective
weights.

Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 19



Step
6. The Key Capabilities of ASCP




The Demand-to-Buy Business Flow

The demand-to-make /demand-to-buy business flow begins with the
establishment of independent demands that will drive the activities of
the supply chain.

On the basis of sales history from GCSS-MC Order Management,
GCSS-MC Demand Planning generates statistical demand forecasts.

After adjustment by planners, these forecasts and their variability as
estimated by GCSS-MC Demand Planning are then input into GCSS-
MC Inventory Optimization.

Using user-supplied information about the variability of this forecast
demand and the variability of supplier lead-times, GCSS-MC Inventory
Optimization generates an optimal time-phased safety stock plan.

ASCP considers three streams of independent demand: the safety stock
planned demand from GCSS-MC Inventory Optimization, forecasts

Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 20

from GCSS-MC Demand Planning, and sales order demand from
GCSS-MC Order Management.

ASCP outputs a time-phased supply plan (planned orders) that can then
be released directly to the appropriate execution systems: GCSS-MC
Purchasing or GCSS-MC Work in Process WIP for Service/Repair.

Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 21



Step
7. Simplified Demand-to-Buy Business Flow



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 22



Step
8. Simplified 'Day-in-the-Life' flow for a GCSS-MC Logistics Chain Planner


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 23



Step
9. What is GCSS-MC Inventory optimization (IO)?




The following are the key capabilities of GCSS-MC Inventory
Optimization:

IO uses stochastic optimization technology that enables a planner to
factor in the multilevel supply chain network and interdependence of
demand variability and supply lead time variability when generating
time-phased safety stock recommendations.

IO enables planners to evaluate multiple inventory planning scenarios
and graphically compare the results. The planning scenarios for
example can include different sets of customer service levels, budget
constraints, and capacity constraints.

IO is integrated with GCSS-MC's E-Business Suite and Advanced
Planning products including ASCP and GCSS-MC Demand Planning.
This enables collaboration between these applications. For example, the
safety stock recommendations of IO can be automatically fed into
ASCP to drive tactical supply chain planning decisions.


Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 24



Step
10. Key Capabilities of IO


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 25



Step
11. What is Stochastic Optimization Technology?




IO uses Stochastic Optimization Technology to help manage the
uncertainty inherent to business decisions. Based on the requirements
and objectives, it is possible to determine the optimal inventory
stocking levels and other operational policies.

IO enables the decision maker to:

Determine the optimal inventory levels across the supply chain, which
improves customer service while lowering inventory investment.
Consider uncertainty in demand and supply.
Manage variability and risk.
Evaluate cost and risk trade-off.
See a graphical representation of the strategic inventory plan.
Plan telescoping time horizons.
Provide accurate inputs to tactical plans.
Manage key performance indicators (KPIs) and drive continuous
improvement.


Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 26



Step
12. IO (Safety Stock calculation) Business Process




The following steps summarize the business process flow depicted in
the diagram:

1. Determine the key objective of the inventory plan.
2. Collect existing data from other source instances.
3. Review the data collected by the inventory planning engine and
make changes as needed.
4. Specify additional inputs for the inventory plan. The following are
the data that planners can specify:

Service level policy
Inventory budget (optional)
Supplier lead time variability
Safety stock levels
Minimum and maximum inventory levels

5. The inventory planning engine processes the input and runs the
inventory plan.
6. The inventory planning engine reports the results after running the
Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 27

inventory plan.
7. Review the output generated by the inventory planning engine.
8. If the inventory plan is not optimal, make changes to the input. Steps
3 through 6 are repeated until the inventory plan is optimal.


Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 28



Step
13. Overview of Planner Workbench


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 29



Step
14. The Planners Workbench



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 30



Step
15. Implementing Planning Recommendations


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 31



Step
16. Planners can access a subset of planned orders for a specified time period or other user defined
sort criteria using the Supply/Demand window



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 32



Step
17. Planners can release all planned orders using a Release All feature or individually select
planned orders for release




Releasing Recommendations

When a planner release a planned order as buy from and do not change
the recommended dates, the release process sets Need-by Date to the
planned order Suggested Dock Date.

When a planner release a planned order as buy from and change the
recommended dates, the release process calculates Need-by Date as
follows:

If Implement Date is a non-workday in the manufacturing calendar,
moves Implement Date to the previous working day.
Calculates Dock Date = Implement Date - Post processing lead time
If Dock Date is a non-workday in the manufacturing calendar, moves
Dock Date to the previous working day.
If the organization has a receiving calendar and Dock Date is a non-
workday in the receiving calendar, moves Dock Date to the previous
working day on this calendar.
Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 33

Sets Need-by Date to Dock Date

To release recommendations do:
1. In the View By Actions mode, drill down to the Recommendations
node.
2. Drill down to items in Purchase Requisitions or Discrete Jobs.
3. Right-click an item, select Supply/Demand > Supply/Demand.
4. To change the supply Suggested Due Date or Qty/Rate, navigate to
the Release Properties tabbed region:

To change the supply Suggested Due, select a new date in the
Implement Date. Select a non-workday. If a date in the past is selected,
the scheduled receipt will have today's date.
To change the supply Qty/Rate, enter a new quantity or rate in Imp
Qty/Rate.

5. To mark a supply for conversion into a purchase requisition or a
discrete job, select For Release. If For Release on the Orders tabbed
region is selected before the Implement Date or Imp Qty/Rate on the
Release Properties tabbed region is changed, clear the For Release,
make the changes and then select the For Release again.
6. Right-click in any field in the Orders tabbed region or the Release
Properties tabbed region and select Release.

Releasing All Recommendation

To release all recommendations do:
1. From the Recommendations node, drill down to Purchase
Requisitions or Discrete Jobs.
2. Navigate to Supply/Demand from items in Purchase Requisitions or
Discrete Jobs.
3. Select Edit > Select All
4. Press [right-click] > Release to release all.
Make necessary changes and save.


Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 34



Step
18. Viewing, Managing and Resolving Exception Messages (1 of 2)


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 35



Step
19. Viewing, Managing and Resolving Exception Messages (2 of 2)






Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 36



Step
20. To view exceptions




Exception Summary Window

The Exception Summary window displays summary exception message
information:

Generated by the current planning run
Saved from previous simulation runs

It displays the following information:

Action Type: The exception group
Version
Count: The exception message count by exception group

The window displays the exception groups by their typical importance
to troubleshooting; for example, late orders are more important than
recommendations.

The Find window, can sort, group, or subtotal exceptions according to
Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 37

various criteria, for example, item, supplier, and buyer. If grouped by
organization, item, planner code, resource, category, department,
customer, or supplier, the results window displays their column
headings. For other group by criteria, the results window displays a
generic column heading, for example, Group By 1

Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 38



Step
21. To view exception details




Exception Details Window

The Exception Details window displays information about each
exception. If one exception type is selected, the window displays
information in a folder for that exception type. If multiple exception
types are selected, the window displays the generic default folder.

Days Late applies to the Late replenishment for forecast and Late
replenishment for sales order exception messages.

Quantity Satisfied By Due Date is the portion of a demand that can be
satisfied by the due date.

Buttons

On the Exception Details window, it is possible to obtain additional
information about certain exceptions by clicking buttons on the bottom.
The buttons that appear are unique to the exception.

Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 39

Right Mouse Options

From the Exception Details window, additional information can be
obtained by right-clicking on the exception. The choices in the pop-up
menu are unique to the exception. Some choices are:

Supply
Demand
Resource Availability
Resource Requirements
Sources
Destinations
Related Exceptions
Gantt Chart
Horizontal Plan
Vertical Plan
End Item Supplies
End Pegged Supplies
Critical Activities

Related Exceptions

If working in a constrained or optimized plan, use the right mouse
option Related Exceptions to obtain further cause and effect
information, for example:

Is an order late because of a resource, material, or transportation
resource constraint?
Does a material, resource, or transportation resource issue cause late
orders?

From a resource, material, or transportation resource constraint
exception message, drill down to Late replenishment for sales order
and Late replenishment for forecast exception messages that the
constraint affects.

Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 40



Step
22. Resolving Exception Messages (1 of 2)


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 41



Step
23. Resolving Exception Messages (2 of 2)



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 42



Step
24. "Exception Explanations and Remedies.doc"


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 43



Step
25. "Understanding, Diagnosing and Resolving Exceptions.pdf"



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 44



Step
26. "Supply Chain Exception Messages.doc"


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 45



Step
27. Exception Sets (1 of 2)



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 46



Step
28. Exception Sets (2 of 2)


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 47



Step
29. Creating and Updating Exception Sets



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 48



Step
30. Defining Planners Workbench Display Preferences (1 of 3)




To define display preferences

1. Navigate to the Planner Workbench.
2. Choose Tools > Preferences.
3. Type the name for the Preference Set.

A Preference Set is applicable to all types of horizontal plans. Up to
three personal preference sets can be created and save for viewing a
horizontal plan based on the requirements. Multiple preference sets can
be created to view different levels of information for a horizontal plan.
For example, a planner may want to view summary-level information
with rows displaying gross requirements, total supply, safety stock, and
on-hand quantity to validate whether or not supply matches demand at
a period level. The planner may also want to view detailed information
for each supply type on a daily-level.

Preference Sets are unique to the individuals creating it. If specific
preference sets are created and applied, it is available only to the
planner that created them.
Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 49


4. Enter Display Buckets, Display Factor, Decimal Places, Show Graph
and check each type of plan to display the information in the material
plan.
5. Choose the Capacity Plan tab.
6. Check each type of plan information to be displayed in the resource
capacity plan.
7. Choose the Supplier Plan tab.
8. Check each type of plan information to be displayed in the supplier
capacity plan.
9. Choose the Transportation tab.
10. Check each type of plan information to be displayed in the capacity
plan.
11. Choose the Allocated ATP tab.
12. Check each type of information to be displayed in the allocated
ATP.
13. Choose the Other tab.

Supply/Demand details appear. The planner can select the following
based on requirements:

Release Phantoms: Enables the release of planned orders for the
phantoms.
Release Configurations: Enables the release of planned orders for
ATO items.
Firm Jobs: Enables the release of the Firm status when the planner
releases the work in process jobs.
Include Sales Orders: Enables the release of sales orders (loopback)
from the Planner Workbench.
Release VMI Items: Enables the release of those items from the
Planner Workbench that has the item attribute set to VMI items. This
check box is selected by default.
Job Status: When Planner Workbench creates discrete jobs from
planned orders, it assigns this status to the discrete jobs.

14. Enter a Job Status.
When the Planner Workbench creates discrete jobs from implemented
planned orders, it assigns the job status the planner entered in the
Preferences window.

15. Select a Job Class.
When the Planner Workbench creates discrete jobs from implemented
planned orders, it assigns the job class entered in the Preferences
window.

16. Select a Req Group.
When the Planner Workbench creates purchase requisitions from
implemented planned orders, it assigns the requisition load group

Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 50

entered in the Preferences window.

17. Under General, select either Plans or Queries in the Default Tab.
The planner may consider having the Queries tabbed pane as default if
they want a query to be executed automatically each time they open the
Planner Workbench. Planners can specify the query name in the Auto
Execute Query field. In addition, planners can specify a default plan
that needs to open when accessing the Planner Workbench.
Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 51



Step
31. Defining Planners Workbench Display Preferences (2 of 3)




View Recommendations for (Days from Today):

Specifies how many days of recommendations are viewable. Planner
Workbench calculates Days from Today using the supply Suggested
Order Date.

Note: Often defaults to a value of 1 usual cause for Planners
Workbench to either have very few planned orders visible, or be
entirely empty!

Category Set:

Specifies which Items are visible in the Planners Workbench based on
the assignment from the Source instance also a powerful method to
filter a workbench to only specific items a planner may want to review
for a particular plan run.

Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 52



Step
32. Defining Planners Workbench Display Preferences (3 of 3)




Retain Find criteria:

This is an option designed to ease or speed the use of the Planners
Workbench by retaining or remembering the select or exclude
criteria entered the first time a Planner enters a Find function.

While this is seemingly beneficial, practical experience has shown that
Planners seldom use only one set of Find criteria, for all the various
views they will typically invoke on the Planners Workbench.

A much more realistic daily planning routine would be for a Planner to
create multiple Queries, and to invoke those Queries for all desired
Select, Filter and Exclude criteria he or she may want.

It is strongly recommended that Logistics Chain Planners ensure that
this option is NOT enabled on their individual Workbench Preferences,
to preclude the possibility of inadvertently limiting their Workbench
views to a static, outdated set of Find criteria.
Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 53



Step
33. Customizing the Presentation of Data (Folder Views)




Defining Query Criteria for a Folder

To define query criteria for a folder:

1. Run a query, either by using the Find command or Query By
Example.
2. Save the query criteria by choosing Save As from the Folder menu.
3. Enter a name for the folder.
4. Select Always, Never, or Ask Each Time from the Autoquery option
group to define how frequently to perform the saved query.
5. Select the Open as Default check box to set this folder definition as
the default every time the planner navigates to this form.
6. Select the Public check box to allow other users to access the folder
definition. Selecting Public does not enable other users to modify the
folder.
7. Select the Include Query check box to include the query in the folder
definition. If the check box is not selected, only the folder layout is
saved.

Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 54



Step
34. Training Note regarding Folder functions in APS


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 55



Step
35. Navigate to Folder Tools using the Tools menu toolbar



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 56



Step
36. Launching the Folder Tools Sub-menu


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 57



Step
37. Navigate to Folder Tools with 'Right Click'



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 58



Step
38. Folder Tools Sub-Menu - Function Icons




Customizing the Layout of a Folder

Use the Folder menu or the Folder Tools window to customize the
folder layout. Some layout changes can be made using the mouse. For
example:

Change the width of a column by dragging the columns border.
Change the sequence of a column by dragging the columns heading
to a new position.
Change the name of a column by using the right mouse button on the
columns heading. A window prompt will display for a new name.

To access the Folder Tools window:

Select the Folder Tools toolbar icon, or choose Folder Tools from the
Folder menu.
Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 59



Step
39. Queries Tabbed Pane (Create of Maintain a Query)



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 60



Step
40. Navigate the Queries Tabbed Pane Icons


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 61



Step
41. Right-click Menu Options



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 62



Step
42. Navigate Nodes in the Queries Tabbed Pane




The Queries tabbed pane consists of the following nodes:

Query Result: Planners can expand the Query Result node to view the
results of the unsaved queries.

Personal Queries: Planners can save query either as a Personal query
or a Public query. The query can be shared with others planners by
saving the query as a Public query. Planners can create and save
various types of queries such as items, resources, exception messages,
and suppliers within the Personal Queries node. For example, if a
planner wanted to create a personal query to filter items in a plan,
navigate to the Item type in the Personal Queries node, right-click and
select Create Query.

Public Queries: If a planner wanted to have exclusive ownership
rights to view, execute, and modify a query, then it is saved as a
Personal query. The Public Queries node comprises of Item, Resource,
Exception, and Supplier. Planners can create and save various types of
queries such as items, resources, exception messages, and suppliers
Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 63

within the Public Queries node. For example, if a planner wanted to
create a public query to filter exception messages associated with a
plan, navigate to the Exception type in the Public Queries node, right-
click and select Create Query.

Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 64



Step
43. Create a Query


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 65



Step
44. Create Query window; Query Types



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 66



Step
45. Query Type: Item Criteria


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 67



Step
46. Query Type: Resource Criteria



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 68



Step
47. Query Type: Exceptions Criteria




For detailed information about how to filter exception messages when
building queries, see the embedded (hyper-linked) document titled
Supply Chain Plan Exception Messages.doc and/or Understanding,
Diagnosing and Resolving Exceptions.pdf from the Course Concept
pane at the beginning of this training course.

Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 69



Step
48. Query Type: Suppliers Criteria



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 70



Step
49. Query Type: Orders Criteria




To create a query

Planners can create queries for filtering items, resources, suppliers, and
exception messages associated with a plan in the Planner Workbench.

1. Click the Queries tab in the Planner Workbench. The Queries tabbed
pane appears.
2. Specify the name of the plan on which to run the query.
3. Right-click in the Queries tabbed pane to display the pop-up menu.
4. In the pop-up menu, select Create Query. Alternatively, planners can
click the Create Query icon at the bottom of the Queries tabbed pane to
create queries.
5. Specify a name for the query in the Query Name field.
6. Select a type of query from the Query Type drop-down menu to
specify the information to filter.

The various types of queries are Item, Resources, Exceptions, and
Suppliers. Planners can select Item to create queries that filter
information related to items. Similarly, Resources and Suppliers can be
Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 71

selected to create queries that filter information related to resources and
suppliers, respectively. For information about how to filter exception
messages.

7. Click Yes in the Public drop-down menu in case the planner wants
the query to be visible to other planners as a public query.
8. Specify the criteria in the Criteria box. For example, planners may
want to filter those items that need to be purchased. In this case, specify
Make or Buy, Equals, and Buy in the Criteria, Condition, and From
fields, respectively.
9. To retrieve all the records that meet any one of the criteria that a
planner specifies, select Match Any. However, if the planner wants to
retrieve only those records that meet all criteria, select Match All.
10. Select the check box preceding the criteria specifications for those
criteria specifications that planner wants to include as active. When
executing a query, the planning engine considers only the active criteria
as the basis for the search.
11. Click Save to save the query. Based on the selection, the planning
engine saves the query either as a Personal Query or a Public Query.
12. Click Execute to run the query. The planning engine filters and
displays the result based on the criteria the specified in the query.

If the planner wants to view the details of a specific filtered row, click
the row. When right-clicking the selected row, the available options
appear. The planner can select the required option from the drop-down
menu to navigate to context windows such as Exceptions window and
Horizontal Plan window.

If the planner wants to the view the Results window without the
Navigator, click the Collapse window sliding bar, which is the vertical
slider between the Navigator and the Results window.

Note: To execute a query for a particular plan, specify the name of the
plan in the Plan field.

Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 72



Step
50. View Results of a Query


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 73



Step
51. View Query Details




To the view the Results window without the Navigator, click the
Collapse window sliding bar, which is the vertical slider between the
Navigator and the Results window.

Note: To execute a query for a particular plan, specify the name of the
plan in the Plan field.

Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 74



Step
52. Multi-select Items in Query Results Window



Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 75

301.02.02 - Demonstrated Procedures

IMPORTANT

The topics contained within this lesson are for demonstration purposes only and do not contain
practical applications or data sheets.

Scenario

Use GCSS-MC to look at items by NIIN, and order type. Review Actions and Work Exception messages in
the Planner Workbench, release planned orders, create a new Exception Set, set up Planner's Workbench,
create a Public Query, and add additional filter criteria in GCSS-MC.

Note: Due to the unique architecture of the Advanced Planning Suite (APS) in GCSS-MC, the application
cannot be installed in the deployed Mobile Training Suite environment. Consequently, all practical
application topics in this course are presented as Demonstrations, to be viewed only - they cannot be
exercised in the Mobile Training Suite


Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 76

301.02.02.01 - Reviewing IO Plan Output


Mission

You are the Logistics Chain Planner reviewing the IO Plan output in. Use the following criteria for your
review:

Look at the following items by NIIN: Bracket, mounting and Bag, Tools and Spares.
Look at the items by the following Order Type: Safety Stock Demands, Planned Orders and Forecast
orders.


Execution

Using the GCSS-MC Logistics Chain Planner responsibility, navigate to Inventory Optimization > Inventory
Plan > Workbench

1. Open the IO Plan.

2. Review & confirm the Workbench and Plan output.

3. Close the Workbench.



Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 77



Step
1. Double-click to select the Inventory Optimization list item to expand.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 78



Step
2. Double-click to select the Inventory Plan list item to expand.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 79



Step
3. Double-click to select the Workbench list item to select.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 80



Step
4. Click the plus (+) sign button beside the Plans tree item to expand.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 81



Step
5. Click the MR1_A (MR1_Group Class A) tree item to select.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 82



Step
6. Right-click the MR1_A (MR1_Group Class A) tree item to display a sub menu.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 83



Step
7. Point to the Supply and Demand menu to display the submenu.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 84



Step
8. Click the Supply and Demand command.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 85



Step
9. Click the Criteria LOV button.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 86



Step
10. Click on Item to select.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 87



Step
11. Click the OK button.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 88



Step
12. Click the Condition drop down.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 89



Step
13. Select the Among list item.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 90



Step
14. Click the From box.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 91



Step
15. Click the Values box.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 92



Step
16. Type the desired NIIN information into the Values box. Type a valid value; e.g., "014140701".


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 93



Step
17. Press TAB.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 94



Step
18. Type the desired NIIN information into the Values box. Type a valid value; e.g., "014804004".


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 95



Step
19. Press TAB.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 96



Step
20. Click the OK button.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 97



Step
21. Click the Criteria box.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 98



Step
22. Click the Criteria LOV button.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 99



Step
23. Click the Vertical Scrollbar to scroll down.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 100



Step
24. Click on Order Type to select.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 101



Step
25. Click the OK button.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 102



Step
26. Click the Condition drop down button.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 103



Step
27. Select the Among list item.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 104



Step
28. Click the From box.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 105



Step
29. Click the Values LOV button.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 106



Step
30. Type the desired information into the Find box. Type a valid value; e.g., "Safety%".


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 107



Step
31. Click the Find button.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 108



Step
32. Click the OK button.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 109



Step
33. Click the Values LOV button.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 110



Step
34. Type the desired information into the Find box. Type a valid value; e.g., "Plan%".


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 111



Step
35. Click the Find button.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 112



Step
36. Click on Planned Order to select.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 113



Step
37. Click the OK button.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 114



Step
38. Click the Values LOV button.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 115



Step
39. Type the desired information into the Find box. Type a valid value; e.g., "Fore%".



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 116



Step
40. Click the Find button.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 117



Step
41. Click the OK button to select Forecast.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 118



Step
42. Click the OK button.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 119



Step
43. Click the Find button.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 120



Step
44. Click the Sugg Due Date box to place the cursor into the field.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 121



Step
45. Click the Folder menu.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 122



Step
46. Click the Sort Data... command.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 123



Step
47. Click the First field to sort LOV button.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 124



Step
48. Type the desired information into the Find box. Type a valid value; e.g., "s".


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 125



Step
49. Click on Suggested Due Date to select.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 126



Step
50. Click the OK button.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 127



Step
51. Click the Order By drop down button.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 128



Step
52. Select the Ascending list item.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 129



Step
53. Click the OK button.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 130



Step
54. Drag the pointer to the desired location to expand the form to view more fields.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 131



Step
55. Release the mouse button.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 132



Step
56. To view more data, click the Horizontal or Vertical Scrollbars.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 133



Step
57. Click the Close (X) button.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 134



Step
58. Click the Clear button.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 135



Step
59. Click the Close (X) button.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 136



Step
60. Click the Close (X) button and exit the application.



Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 137

301.02.02.02 - Viewing ASCP Plan and Exceptions


Mission

You are the Logistics Chain Planner opening and reviewing the Actions and Exception Messages in the
Planners Workbench for Past Due Sales Orders.


Execution

Using the GCSS-MC Logistics Chain Planner responsibility, navigate to Supply Chain Plan > Workbench

1. Navigate to the Planners Workbench.

2. View recommendations and Exception Messages.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 138



Step
1. Click the GCSS-MC Logistics Chain Planning Administrator - APS link.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 139



Step
2. Click the Workbench link.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 140



Step
3. Click the ETB:MR1 cell to select the organization to view.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 141



Step
4. Click the OK button.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 142



Step
5. Click the plus (+) sign button beside the Plans tree item to expand.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 143



Step
6. Click the View By drop down button. By default the view by is Action and needs to be
changed to Organizations.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 144



Step
7. Select the Organizations list item.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 145



Step
8. Click the plus (+) sign button beside the Plans tree item to expand.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 146



Step
9. Click the plus (+) sign button beside the FUE_1 tree item to expand.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 147



Step
10. Click the plus (+) sign button beside the A12 account tree item to expand.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 148



Step
11. Click the Vertical Scrollbar to scroll down.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 149



Step
12. Right-click item number 001425369. This will display the sub menu for selecting the
Horizontal Plan.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 150



Step
13. Point to the Horizontal Plan menu.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 151



Step
14. Click the Default command.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 152



Step
15. Double-click the Horizontal Plan Title Bar to expand the window to see more information.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 153



Step
16. After viewing the data for the item selected, click the Close (X) button.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 154



Step
17. Click the View By drop down button to change the view to actions.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 155



Step
18. Select the Actions list item.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 156



Step
19. Click the plus (+) sign button before the Plans tree item.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 157



Step
20. Click the FUE_1 (Sandbox Plan #1: Unconstrained) tree item.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 158



Step
21. Click the plus (+) sign button beside the FUE_1 tree item to expand.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 159



Step
22. Click the plus (+) sign button beside the Current tree item to expand.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 160



Step
23. Click the Late Sales Orders and Forecasts tree item.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 161



Step
24. Click the plus (+) sign button beside the Shortages and Excess tree item to expand the list and
view the options.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 162



Step
25. Click the plus (+) sign button beside the Reschedules tree item to expand the list to view the
options.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 163



Step
26. Click the Vertical Scrollbar to scroll down.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 164



Step
27. Click the plus (+) sign button beside the Item Exceptions tree item to expand the list to view
the options.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 165



Step
28. Click the Vertical Scrollbar to scroll down.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 166



Step
29. Click the plus (+) sign button beside the Recommendations tree item to expand the list to
view.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 167



Step
30. Click the plus (+) sign button beside the Past due sales orders tree item to expand the list to
view the options.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 168



Step
31. Right-click the ETB:MR1 tree item to display the sub menu.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 169



Step
32. Point to the Exceptions to display the sub menu.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 170



Step
33. Click the Detail command.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 171



Step
34. View the data displayed for the detail exceptions for ETB:MR1. Click the Close (X) button to
close the form.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 172



Step
35. Click the Close (X) button.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 173



Step
36. Click the OK button.




Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 174

301.02.02.03 - Releasing Planned Orders

Mission

You are the Logistics Chain Planner tasked with releasing Planned Orders for item 010331523.


Execution

The workbench is currently open.

1. Set the Planners Workbench Preferences.

2. Close the work bench.

3. Select the plan.

4. Save and release the plan.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 175



Step
1. INFORMATION


GCSS-MC has been configured to NOT allow a Planner to release orders if the Planner's
Workbench Preferences have not been set and saved.

If the planner attempts to release without having completed the workbench preferences setup,
the planner will receive an error message. The following steps/frames will guide the planner
through a quick, basic Workbench Preference setup.

There is a full lesson on setting and saving Planners Workbench Preferences later in the course
as well.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 176



Step
2. Click the OK button.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 177



Step
3. Click the Tools menu.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 178



Step
4. Click the Preferences menu item.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 179



Step
5. Enter the desired information into the Preference Set name field. Enter a valid
value e.g. "TRNG_1".



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 180



Step
6. Enter the desired information into the Preference Set Description field. Enter a valid
value e.g. "Default Training Pref Set".


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 181



Step
7. Enter the desired information into the Days field. Enter a valid value e.g. "30".



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 182



Step
8. Press Tab.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 183



Step
9. Enter the desired information into the Weeks field. Enter a valid value e.g. "4".



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 184



Step
10. Press Tab.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 185



Step
11. Enter the desired information into the Periods field. Enter a valid value e.g. "4".



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 186



Step
12. Click the Show Graph drop down button.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 187



Step
13. Click the No list item.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 188



Step
14. INFORMATION


Assuming that all preference settings which have defaulted in the Supplies fields are correct -
no changes are required.

The next step/frame demonstrates how to navigate to the Demands preferences in the Material
Plan tab.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 189



Step
15. Click the Supplies drop down button.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 190



Step
16. Click the Demands list item.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 191



Step
17. Click the Payback Demand checkbox option to deselect the option.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 192



Step
18. Click the Other tab.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 193



Step
19. Click the Release VMI Items checkbox option to deselect the option.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 194



Step
20. Click the Show Operations and Resources checkbox option to deselect the option.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 195



Step
21. Click in the Category Set field.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 196



Step
22. Click the Category Set LOV button.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 197



Step
23. Click the Vertical Scrollbar to scroll down.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 198



Step
24. Click the XXMC_PLANNING list item.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 199



Step
25. Click the OK button.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 200



Step
26. Click in the View Recommendations for (Days from Today): field.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 201



Step
27. Enter the desired information into the View Recommendations for (Days from Today): field.
Enter a valid value e.g. "30".



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 202



Step
28. Click the Retain find criteria checkbox option to deselect the option.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 203



Step
29. Click the Save button.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 204



Step
30. Click the Close (X) button.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 205



Step
31. INFORMATION


Now that the preferences are set, the next steps demonstrate the Planner returning to the
workbench, and attempting the release process again - without having exited and re-entered the
Workbench.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 206



Step
32. Click the Tools menu.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 207



Step
33. Click the Plan menu.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 208



Step
34. Click the Release menu item.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 209



Step
35. INFORMATION


As shown in this step/frame - the release process fails.

GCSS-MC cannot recognize the new Planners Workbench Preferences without the Planner
exiting the Workbench completely, and then re-launching the workbench.

GCSS-MC uses the 'Start Workbench' process to look up and loads the Planners preferences -
so this start must be done after making and saving any changes to the Workbench Preferences.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 210



Step
36. Click the OK button.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 211



Step
37. Click the Close (X) button.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 212



Step
38. Click the Clear button.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 213



Step
39. Click the Close (X) button to close the Find Supply/Demand window.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 214



Step
40. Click the Close (X) button to close the Navigator.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 215



Step
41. Click the OK button.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 216



Step
42. Double-click the Workbench list item to open the workbench.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 217



Step
43. Click the plus sign (+) button before the Plans tree item.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 218



Step
44. Click the FUE_1 (Sandbox Plan #1: Unconstrained) tree item.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 219



Step
45. Right-click the FUE_1 (Sandbox Plan #1: Unconstrained) tree item to display the sub menu.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 220



Step
46. Point to the Supply and Demand to display a sub menu.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 221



Step
47. Click the Supply and Demand menu item.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 222



Step
48. Enter the desired information into the Criteria field. Enter "order type".


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 223



Step
49. Press Tab.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 224



Step
50. Enter the desired information into the Condition field. Enter a valid value e.g. "e".


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 225



Step
51. Press Tab.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 226



Step
52. Enter the desired information into the From field. Enter a valid value e.g. "planned".


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 227



Step
53. Press Tab.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 228



Step
54. Click the Planned order list item.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 229



Step
55. Click the OK button.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 230



Step
56. Enter the desired information into the Criteria field. Enter a valid value e.g. "cat".


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 231



Step
57. Press Tab.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 232



Step
58. Enter the desired information into the Condition field. Enter a valid value e.g. "e".


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 233



Step
59. Press Tab.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 234



Step
60. INFORMATION


Remember, in the previous steps/frames in this topic, Workbench Preferences were updated
and saved.

A key update made when setting the workbench preferences was the Category Set. Originally,
the workbench displayed using the 'RIC' Category Set - but was changed that to now display
using the 'XXMC_PLANNING' Category Set.

When entering the criteria in the Find now, remember to use the 'XXMC_CATEGORY'
needed. In this demonstration, Find all Planned Orders in the 'Y.Consumable' Category will be
displayed.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 235



Step
61. Enter the desired information into the Category field. Enter a valid value e.g. "Y%".



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 236



Step
62. Press Enter.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 237



Step
63. Click the OK button to select Y.CONSUMABLE.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 238



Step
64. Press Enter.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 239



Step
65. Click the Plan menu.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 240



Step
66. Click the Release list item.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 241



Step
67. Click the Close (X) button.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 242



Step
68. Click the Clear button.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 243



Step
69. Click the Close (X) button to close the Find Supply/Demand window.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 244



Step
70. Click the Close (X) button to close the Navigator.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 245



Step
71. Click the OK button.




Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 246

301.02.02.04 - Creating Exception Sets

Mission

You are the Logistics Chain Planner tasked with creating a new Exception Set called GCSS-MC_TR.


Execution

Using the Supply Chain Planner responsibility, navigate to Setup > Exception Set

1. Navigate to the Exception Set.

2. Create a new Exception Set in the Source instance.



Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 247



Step
1. Click the Supply Chain Planner link.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 248



Step
2. Click the Exception Set link.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 249



Step
3. Click the MR1 MMR100 cell for the organization to be used.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 250



Step
4. Click the OK button.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 251



Step
5. Click in the Name field.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 252



Step
6. Click the Find button on the toolbar. This will display a list of values to select from to select
for account MR1.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 253



Step
7. Click the Vertical Scrollbar to scroll down.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 254



Step
8. INFORMATION


In this particular EBS environment, the MR1 Organization already has all required Exception
Sets defined.

For training purposes, the following steps/frames will demonstrate creating a new Exception
Set, using the options and parameters that would normally apply to the standard, pre-defined
Exception Set "GCSS-MC_A1".


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 255



Step
9. Click the Cancel button.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 256



Step
10. Click in the Name field to enter a new Exception name for MR1.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 257



Step
11. Enter the desired information into the Name field. Enter a valid value e.g. "GCSS-MC_TR".



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 258



Step
12. Press Tab to move to the next field. The following steps will show how to create a new
exception.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 259



Step
13. Enter the desired information into the Excess Quantity field. Enter a valid value e.g. "100".
This will limit reporting of excess to situations in which supply exceeds demand by 100.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 260



Step
14. Press Tab.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 261



Step
15. Enter the desired information into the Repetitive Variance field. Enter a valid value e.g. "5".



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 262



Step
16. Press Tab.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 263



Step
17. Enter the desired information into the Under-utilization field. Enter a valid value e.g. "5".



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 264



Step
18. Press Tab.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 265



Step
19. Enter the desired information into the Over-utilization field. Enter a valid value e.g. "5".



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 266



Step
20. Press Tab.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 267



Step
21. Enter the desired information into the User-Defined Time Fence (Days) field. Enter a valid
value e.g. "180". This will limit reporting of shortages to those situations in which the shortage
is within 180 days.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 268



Step
22. Press Tab.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 269



Step
23. Enter the desired information into the Setup Time field. Enter a valid value e.g. "5".



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 270



Step
24. Press Tab.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 271



Step
25. Enter the desired information into the Utilization Change field. Enter a valid value e.g. "5".



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 272



Step
26. Press Tab.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 273



Step
27. Click the Shortage Exceptions LOV button.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 274



Step
28. Click on User-defined time fence to select. This will allow the planner to set shortage
exceptions as needed.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 275



Step
29. Click the OK button.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 276



Step
30. Click the Excess Exceptions LOV button.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 277



Step
31. Click on User-defined time fence to select. This will allow the planner to set the excess
exceptions as needed.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 278



Step
32. Click the OK button.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 279



Step
33. Click the Resource Under-utilized Exceptions LOV button.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 280



Step
34. Click on Do not report to select. This will keep the Resource Under-utilized from being
displayed.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 281



Step
35. Click the OK button.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 282



Step
36. Click the Resource Over-utilized Exceptions LOV button.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 283



Step
37. Click on Do not report to select. This will prevent the Resource Over-utilized from being
displayed.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 284



Step
38. Click the OK button.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 285



Step
39. Click the Overpromised Exceptions LOV button.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 286



Step
40. Click on User-defined time fence to select. This will allow the planner to set the exception as
needed.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 287



Step
41. Click the OK button.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 288



Step
42. Click the Repetitive Variance Exceptions LOV button.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 289



Step
43. Click on Do not report to select This will prevent the Repetitive Variance from displaying.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 290



Step
44. Click the OK button.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 291



Step
45. Note: In this step we demonstrate use of GCSS-MC's 'Auto Fill' capability, to speed data entry.

In this list of values, there is only one list item which begins with the letter 'D'. By typing only
the letter 'D' into the field, and pressing the Tab key, we use Auto Fill to find all values that
begin with 'D'. As there is only one value beginning with 'D', that value is automatically filled
into the field.

Enter the desired information into the Setup Time Exceptions field. Enter a valid
value e.g. "D".



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 292



Step
46. Press Tab.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 293



Step
47. Enter the desired information into the Utilization Change Exceptions field. Enter a valid
value e.g. "D".



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 294



Step
48. Press Tab.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 295



Step
49. Click the Save button.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 296



Step
50. Click the Close (X) button.



Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 297

301.02.02.05 - Setting Up ASCP Planners Workbench


Mission

You are the Logistics Chain Planner tasked with setting the Planner's Workbench Preferences called TRNG_1
with the description of Preference Set for Training.


Execution

The workbench is currently displayed.

Set the options and Preferences.




Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 298



Step
1. Click the plus sign (+) button beside the Plans tree item to expand.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 299



Step
2. Click the PSS_FUE_1 (PSS:Final User Eval_III MEF_1) tree item.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 300



Step
3. Click the Tools menu.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 301



Step
4. Click the Preferences menu.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 302



Step
5. Click in the Preference Set field.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 303



Step
6. Press Backspace to clear the field.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 304



Step
7. Enter the desired information into the Preference Set field. Enter a valid
value e.g. "TRNG_1".


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 305



Step
8. Press Tab.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 306



Step
9. Press Delete to clear the field.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 307



Step
10. Enter the desired information into the Preference Set Description field. Enter a valid
value e.g. "Preference Set for Training".



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 308



Step
11. Click in the Days field.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 309



Step
12. Enter the desired information into the Days field. Enter a valid value e.g. "30".



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 310



Step
13. Press Tab.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 311



Step
14. Enter the desired information into the Weeks field. Enter a valid value e.g. "4".



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 312



Step
15. Press Tab.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 313



Step
16. Enter the desired information into the Periods field. Enter a valid value e.g. "4".



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 314



Step
17. Click in the Display Factor field.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 315



Step
18. Enter the desired information into the Display Factor field. Enter a valid value e.g. "1".



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 316



Step
19. Press Tab.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 317



Step
20. Enter the desired information into the Decimal Places field. Enter a valid value e.g. "1".



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 318



Step
21. Press Tab.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 319



Step
22. Click the Show Graph drop down button.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 320



Step
23. Click the No list item.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 321



Step
24. Click the Display Product Family Details checkbox option to deselect the option.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 322



Step
25. Click the Work Orders checkbox option to select.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 323



Step
26. Click the Purchase Orders checkbox option to select.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 324



Step
27. Click the Requisitions checkbox option to select.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 325



Step
28. Click the In transit checkbox option to select.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 326



Step
29. Click the In receiving checkbox option to select.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 327



Step
30. Click the Planned Orders checkbox option to select.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 328



Step
31. Click the Beginning On Hand checkbox option to select.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 329



Step
32. Click the Supplies dropdown button.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 330



Step
33. Click the Demands list item.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 331



Step
34. Click the Sales Orders checkbox option to select.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 332



Step
35. Click the Forecast checkbox option to select.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 333



Step
36. Click the Dependent Demand checkbox option to select.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 334



Step
37. Click the Gross Requirements checkbox option to select.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 335



Step
38. Click the Safety Stock checkbox option to select.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 336



Step
39. Click the Other tab.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 337



Step
40. Click the Show Dependant Demands checkbox option to select.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 338



Step
41. Click in the Category Set field.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 339



Step
42. Click the Category Set LOV button.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 340



Step
43. Click the Vertical Scrollbar to scroll down.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 341



Step
44. Click on XXMC_PLANNING to select.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 342



Step
45. Click the OK button.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 343



Step
46. Click in the View Recommendations for (Days from Today): field.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 344



Step
47. Enter the desired information into the View Recommendations for (Days from Today): field.
Enter a valid value e.g. "30".


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 345



Step
48. Click the Block Zero Res. Requirements checkbox option to select.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 346



Step
49. Click the Save button.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 347



Step
50. Click the Close (X) button and exit the application.




Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 348

301.02.02.06 - Creating a Public / Private Query

Mission

You are the Logistics Chain Planner tasked with creating a Public Query with the name of Cat=Y.
Consumable and a description of Category Y. Consumable Items TRAINING.

As the Logistics Chain Planner run an existing query against an existing plan and view the results.


Execution

From the Navigator using the GCSS-MC Logistics Chain Planner responsibility to navigate to Supply Chain
Plan > Workbench

1. Navigate to the Planners Workbench.

2. Create a new Query.

3. Save it as 'Public' to be accessible by other Logistics Planners.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 349



Step
1. Double-click the Advanced Supply Chain Planning list item to expand.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 350



Step
2. Double-click the Supply Chain list item to expand.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 351



Step
3. Click the Workbench list item to select.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 352



Step
4. Click the Open button to open the workbench.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 353



Step
5. Click the Queries tab.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 354



Step
6. Click the Public Queries tree item.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 355



Step
7. Click the Item tree item.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 356



Step
8. Click the Create Query button.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 357



Step
9. Enter the desired information into the Query Name field. Enter a valid
value e.g. "Cat=Y.Consumable".



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 358



Step
10. Press Tab.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 359



Step
11. Enter the desired information into the Desc field. Enter a valid value e.g. "Category
Y.Consumable Items TRAINING".



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 360



Step
12. Click the Query Type drop down button.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 361



Step
13. Click the Item list item.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 362



Step
14. Click the Public drop down button.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 363



Step
15. Click the Yes list item.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 364



Step
16. Click in the Criteria field.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 365



Step
17. Click the Criteria LOV button.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 366



Step
18. Click on Category to select.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 367



Step
19. Click the OK button.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 368



Step
20. Click the Condition drop down button.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 369



Step
21. Click the Equals list item.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 370



Step
22. Click in the From field.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 371



Step
23. Click the From LOV button.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 372



Step
24. Click the OK button.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 373



Step
25. Click on Y.CONSUMABLE to select.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 374



Step
26. Click the OK button.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 375



Step
27. Click the Save As button.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 376



Step
28. Click the Ok button to accept the name and description displayed.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 377



Step
29. Click the Close (X) button.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 378



Step
30. Click the minus sign (-) button beside the Public Queries tree item to collapse the tree and
refresh the list.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 379



Step
31. Click the plus sign (+) button beside Public Queries tree item to expand.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 380



Step
32. Click the plus sign (+) button before the Item tree item to expand.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 381



Step
33. The new query item that was created is now displayed

Double-click the Cat_Y_Special (Category Y Special Trng Review Query) tree item to
open.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 382



Step
34. Click the Execute button.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 383



Step
35. Click the Plan Name LOV button.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 384



Step
36. Click the OK button to run the query against the PSS_FUE_1 plan.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 385



Step
37. INFORMATION


Note the results of the query are now displayed in a table.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 386



Step
38. Click the Close (X) button and exit the application.



Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 387

301.02.02.07 - Maintaining a Public / Private Query

Mission

You are the Logistics Chain Planner tasked with adding additional filter criteria of Make or Buy = Buy to an
existing Query, save the changes and then run the query.


Execution

Using the GCSS-MC Logistics Chain Planner responsibility, navigate to Supply Chain Plan > Workbench

1. Navigate to the Planners Workbench.

2. Open an existing Public Query.

3. Change the Find/Filter criteria, save, execute and close.





Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 388



Step
1. Click the GCSS-MC Logistics Chain Planner APS link.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 389



Step
2. Click the Workbench link.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 390



Step
3. Click on ENA:MR1 to select.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 391



Step
4. Click the OK button.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 392



Step
5. Click the Queries tab.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 393



Step
6. Click the View By LOV button.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 394



Step
7. Click the plus sign (+) button beside the Publish Queries: Item tree item to expand.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 395



Step
8. Double-click on Cat=Y.Consumable (Category Y.Consumable Items TRAINING) tree
item to open the query.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 396



Step
9. Click in the second row, Criteria field.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 397



Step
10. Click the Criteria LOV button to add additional Criteria to the query.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 398



Step
11. Click the Vertical Scrollbar to scroll down to the Make or Buy.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 399



Step
12. Click on Make or Buy to select.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 400



Step
13. Click the OK button.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 401



Step
14. Click the Condition drop down button.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 402



Step
15. Click the Equals list item to select.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 403



Step
16. Click in the From field.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 404



Step
17. Click the From LOV button.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 405



Step
18. Click on Buy to select.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 406



Step
19. Click the OK button.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 407



Step
20. Click the Save button.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 408



Step
21. Click the Execute button to run the query created against the PSS_FUE_1 plan.


Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 409



Step
22. INFORMATION


Note the query results are displayed in a table.



Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 410



Step
23. Click the Close (X) button and exit the application.



Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 411

301.03 - Course Summary


Topic Overview

This topic covers the summary of the course.


Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 412



Step
1. Course Summary



Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 413

301.04 - Knowledge Assessment

Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 414

Question 1

Question

Stochastic Optimization consider factors to minimize and maximize (i.e.,
minimize plan cost while maximizing plan service level)

Response

A. True
B. False

Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 415

Question 2

Question

A Planner can release Planned orders from the Workbench without having
set the Workbench Preferences first

Response

A. True
B. False


Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 416

Question 3

Question

Exception messages can be displayed in
____________________________ table form.

Response

A. Gunny's preferred view
B. Details
C. OIC Action Sequence view
D. Summary
E. Detail or Summary view

Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 417

Question 4

Question

Exception sets are created and maintained in the
________________________ instance.

Response

A. Planning
B. APS
C. EBS
D. Discoverer


Training Guide
GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 418

Question 5

Question

The most commonly missed or incorrectly set value in the Planners
Workbench that would lock or freeze the search/find/filter ability
is______________.

Response

A. Show Item Description in Pegging
B. Expand All Actions
C. Retain find criteria
D. Default Plan

Training Guide

GCSS-MC Enterprise System Training
Version 5.0 PS30+
Page 419

Question 6

Question

Query may have only one Find or Filter criteria set and saved.

Response

A. True
B. False

You might also like