PM7.01_E

METHOD STATEMENT

SYSTEM : SANITARY

PM7.01_E

Rev.1

Issued 12/1/53


METHOD STATEMENT FOR
SUBMERSIBLE PUMP INSTALLATION
FOR PLUMBING


1. GENERAL
This Method statement describes the installation of Submersible Pump, Detail of the procedure Contained
herein may be modified based on the actual site condition

2. SCOPE
The scope of this method statement is to carry out the submersible Pump.

3. MATERIAL
Submersible Pump and Accessories.


4. WORKING PROCEDURE
4.1 Installation
- Consider the relation of piping and wiring
Determine the right position of manhole
- Determine the size of manhole taking account of dimensions of discharge connection and pump
- Determine the lace where guide pipe can be placed, taking account of the dimensions of guide
support.
- Select the right position of anchor bolts and center line of guide rail pipe support.
- In this case, make sure that the bottom surface where discharge connection body is installed
should be just even in every respect. (if the bottom surface is not even the leakage between
connection parts of pump and discharge connection body can be occurred)
- Install discharge connection body and fix it, cut the guide pipe and then connect the pipe to
guide support thoroughly.





Page 2 of 4
PM7.01_E

METHOD STATEMENT

SYSTEM : SANITARY

PM7.01_E

Rev.1

Issued 12/1/53


- Connect the discharge pipe. Lay down the pump slowly along the guide pipe, making use of
fitting equipment such as hoister and chain block.
- Install discharge connection body and pump sc that they can be completely.
- Install the reinforcement of guide pipe.
Make sure that pump might be displaced when the length of guide pipe is too long.


5. QUALITY CONTROL
Preparing and installation work shall be performed in according with drawing and acceptance by inspection
and Check list as per attachment.
























Page 3 of 4
PM7.01_E

METHOD STATEMENT

SYSTEM : SANITARY

PM7.01_E

Rev.1

Issued 12/1/53

START
CHECK NAMEPLATE AND DIMENSION CF PUMP
DETERMINE THE RIGHT POSITION SIZE OF MANHOLE
DETEMINE THE PLACE WHERE GUIDE PIPE, TAKING DIMENSION OF GUIDE SUPPORT
SELECT RIGHT POSITION OF ANCHOR BOLTS AND CENTER LINE OF GUIDE RAIL PIPE SUPPORT
INSTALL DISCHARGE CONNECTION BODY AND FIXIT
CONNECT THE DISCHARGE PIPE
LAY DOWN THE PUMP SLOWLY ALONG THE GUIDE PIPE
END
INSTALL DISCHARGE CONNECTION BODY AND PUMP COMPLETELY
CHECK VISUAL APPEARANCE
OK.
CHECK CLEANLINESS
NOT OK.
SEPTIC TANK INSTALLATION



























Page 4 of 4
PM7.01_E

METHOD STATEMENT

SYSTEM : SANITARY

PM7.01_E

Rev.1

Issued 12/1/53

Inspected by : _______________________________
Signature : __________________________________
Name : _____________________________________
Date : ______________________________________
Approved by : _______________________________
Signature : __________________________________
Name : _____________________________________
Date : ______________________________________
CHECKLIST FOR SUBMERSIBLE PUMP
FOR PLU
MBING AND DRAINAGE SYSTEM

PROJECT NAME : __________________ Ref. No. : ___________
LOCATION : ________________________ DATE : ____/____/____
GRIDLINE : _________________________
REFER DRAWING NO. : ___________ REV NO. : _________

ITEM DESCRIPTION INSPECTION AND
TEST REQUIRED
STATUS REMARK
SATSFIED UNSATISFIED
1 Material
- F


- Unit No.


- Serial No.


- Type


- Capacity

2 Installation

- Guide rail pipe


- Discharge Connection Body


- Connection to Discharge Pipe


- Fixing Pump


Note : ___________________________________________________________________________________________________________________
__________________________________________________________________________________________________________________________
__________________________________________________________________________________________________________________________
___________________________________________________________________________________________________________