METHOD STATEMENT FOR INSTALLATION OF PPR PIPES & FITTINGS

FOR HOT & COLD WATER SYSTEM


1. SCOPE OF WORK
Installation as per manufacturers instruction. All the PPR pipes & fittings to DIN8079 & DIN8080 then test and
commission to the satisfaction of the Engineers.
2. RESPONSIBILITY
uper!ision" Inspection and implementation of the tandard installation of all a#o!eground PPR pipes & fittings for
$ot & cold %ater s&stem. 'efore commencement of installation" the follo%ing %or(s are re)uired to #e completed
'& the *ain +ontractor,
-.. /here re)uired" cutouts to #e pro!ided on the #loc( %or( in positions as sho%n in the #uilders %or(
dra%ings.
-.- +hec( pipe %or( to #e installed is indicated on appro!ed construction dra%ings.
-.- +hec( materials to #e used ha!e an appro!ed material su#mittal.
-.0 +hec( %or( area clean and safe.
3. DESCRIPTION OF WORK
Instal l at !n !" #!$ %!ntal & &' s(&&!$ts
0.. $ori1ontal pipe supports %ill #e spaced as per specification and the supports %ill #e installed not o!er
000mm from the pipefitting 2oint at each change in direction of the piping. Pipe supports %ill #e spaced
not o!er ..3m apart at !al!es.
0.- *ar( the locations of the clamps on the soffit %ith chal( or mar(er pen as per the pipe routing in the shop
dra%ing.
0.0 *a(e holes in the mar(ed positions %ith a hammering drilling machine.
0.4 +lean the hole and insert the Anchor 5astener.
0.3 +ut the 6hreaded rod in the correct length and put the nut.
0.7 6ight the threaded rod %ith the inserted Anchor 5astener and tight the nut %ith a spanner.
0.7 6ight the $anging clamp to the threaded rod.
Instal l at !n !" )'$t *al & &' s(&&!$t .
0.8 8ertical pipe %ill #e supported at each floor le!el and at inter!als as specified in the specification.
0.9 *ar( the locations of the supports on the %all %ith chal( or mar(er pen as per the pipe routing in the
shop dra%ing.
0..0 *a(e holes in the mar(ed locations %ith a hammering drilling machine.
0... +lean the holes and insert the Anchor 5astener. Anchorage to %alls %ill #e #& toggle #olting.
0..- Place the support in position9 insert #olt %ith %asher and it %ill #e tightened %ith spanner.
Instal l at !n !" & &'s & " tt n+s
0..0*easure the length of pipe re)uired and cut to suit ensuring a s)uare cut. De:#urr inside and chamfer
outside edges of the pipes
0..4 *a(e 2oints of all fittings and #&,
0..4.. *easure the depth of soc(et and mar( %ith pencil on spigot end of pipe.
0..4.- 6he outside of the pipe and the inside of the soc(et of the fitting %ill #e cleaned.
0..4.0 6he pipe end and fitting %ill #e 2oined %ith fusion %eld 2oints to DIN .797- standards.
0..4.4 Push spigot end of pipe into the soc(et to full depth.
0..4.3 Repeat procedure along length of pipe and all #ranch pipes.
0..4.7 6he cold %ater pipe #ranch ta(en from the shaft %ith isolating !al!e and routed to the indi!idual
toilets. ;ne #ranch %ill #e fed to the heater and after the heater" hot & cold %ater pipes %ill run
parallel and distri#uted to all fi<tures. 6he !ertical hot & cold %ater distri#uted through PE= pipes.
,. LABO-R. PLANT & MATERIAL RE/-IREMENTS
4.. >a#our %ill #e as per the program and as re)uired for the a#o!e said acti!it& to finish the 2o# on time.
0. S-PER)ISION ARRANGEMENTS
3.. ?ualified super!isors" foremen & charge hands %ill conduct super!ision9 to achie!e a good )ualit& of
%or( as per the appro!ed standard and appro!al to the satisfaction of the Engineers.
1. TEMPORARY WORKS TO BE DESIGNATED AND INSTALLED
N@A
2. HEALTH AND SAFETY RE/-IREMENTS
7.. 5usion 2oints are made %ith the help of hot plate. /or(ers are to #e instructed to protect their hands from
#urn.
7.- Ensure %or( area is clean and tid&.
7.0 afet& e)uipment Ae<ample $ard $ats" afet& hoes" safet& harness" Blo!es" Boggles %hen necessar& etc.C
%ill #e %orn at all times.
7.4 ''AE & *ain +ontractor afet& ;fficers %ill conduct a %ee(l& afet& a%areness orientation to
uper!isors" 5oremen and +harge hands.
3. EN)IRONMENTAL RE/-IREMENT
8.. Ensure %or( place is clean and tid&
8.- Ensure %or( place is ha1ard free.
4. SEC-RITY ARRANGEMENTS
N@A
15. SPECIFIC CONTRACT-AL OBLIGATIONS
N@A
11. REFERENCE DOC-MENTS
.... Rele!ant dra%ing issued for +onstruction
...- 6echnical pecification Di!ision .34..
...0 6est heet
12. RECORDS TO BE PROD-CED
.-.. Appro!al #& the Engineers for the installation for the a#o!e said acti!it&.
.-.- /ater lea( testing appro!al #& Engineers.
P$'&a$'6 789 K. Ln+anna R':';'6 789 Can'$ T!na< A&&$!:'6 789 Can'$ T!na<
S+nat($'9 S+nat($'9 S+nat($'9