BP-PP-Master Data Routing &

Rate Routing

BP - PP Master Data Routing & Rate


Routing

Revision History
Page 1
of 9

244107293.doc

BP-PP-Master Data Routing &


Rate Routing
Created
By:
1st Review
By:

Created
Date:
1st Review
Date:

El Araby Process Owner Sign-off


Name:
Position:
Sign-off
Date:
Signature:

El Araby Team Leader Sign-off


Name:
Sign-off
Date:
Signature:

SAP Team Leader Sign-off


Name:
Sign-off
Date:
Signature:

Page 2
of 9

244107293.doc

BP-PP-Master Data Routing &


Rate Routing

Table of Contents
1.

OVERVIEW OF MASTER DATA (ROUTING & RATE ROUTING).................4

2.

REQUIREMENTS / EXPECTATIONS.............................................................4

3.

NAMING/NUMBERING CONVENTIONS........................................................5

4.

DATA STRUCTURE OF MASTER DATA (ROUTING & RATE ROUTING). . .5

5.

SAP ORGANISATION STRUCTURE..............................................................6

6.

BUSINESS PROCESS....................................................................................6
6.1
6.2

BUSINESS PROCESS FLOW CHART.............................................................6


BUSINESS PROCESS DESCRIPTION.............................................................6

7.

CHANGES TO EXISTING ORGANISATION..................................................6

8.

KEY BUSINESS IMPROVEMENT..................................................................6

9.

DESCRIPTION OF FUNCTIONAL DEFICITS................................................7

10.

NOTES ON FURTHER IMPROVEMENTS..................................................7

11.

SYSTEM CONFIGURATION CONSIDERATIONS......................................7

12.

DEVELOPMENTS CONSIDERATIONS......................................................8

12.1
12.2
12.3
12.4
12.5
13.

DATA CONVERSION CONSIDERATIONS.........................................................8


INTERFACE CONSIDERATIONS.....................................................................8
REPORTING CONSIDERATIONS....................................................................8
FORM CONSIDERATIONS............................................................................ 9
ENHANCEMENT CONSIDERATIONS...............................................................9
AUTHORISATION CONSIDERATIONS......................................................9

Page 3
of 9

244107293.doc

BP-PP-Master Data Routing &


Rate Routing

1. Overview of Master Data


Routing
Routings enables to plan the production of materials (products). Therefore,
routings are used as a template for production orders, capacity planning,
scheduling the production orders, quality checks as well as a basis for product
costing. Routings are used in discrete manufacturing environment.
Rate Routing
A routing for whose operations the production quantity and a fixed duration
has been defined. Thus the production rate is also defined. Rate routings are
used when you plan on a quantity basis, for example in repetitive
manufacturing.
Reference Operation Set/Reference Rate Routing
In case of common assemblies and Final assembly, Reference operation set/
Reference Rate routing can be used:

Discrete Mfg Environment


Routing will be used as task list in production

Repetitive Mfg Environment


Rate Routing will be used as task list in production
El Araby manufacturing plants run on both, discrete as well as repetitive
manufacturing environment as listed below with routing procedures being
followed:
Glass Manufacturing Plant
Repetitive
Lamp Manufacturing Plant
Repetitive & Discrete (less percentage)
A/C Manufacturing Plant
Discrete

Plastic Manufacturing plant (Under A/C)


Discrete
Page 4
of 9

244107293.doc

BP-PP-Master Data Routing &


Rate Routing
Water Heater manufacturing plant
Discrete
Plastic Manufacturing Plant (under Water Heater)
Discrete
Mould & Die manufacturing plant
XYZ

Matrix of work centers/Production lines and operations within the


above mfg plants

2. Requirements / Expectations
Routing/Rate Routing

Should be able to assign work center/s or production line/s

Should able to define list of operations in the routing as long text

Should be able to define planned values for machine hours, set up


time, and other activity types for calculating capacity, scheduling and
cost

Should able to maintain Quality related data per operation

Should be able to define parallel and alternate sequence of operations

Should be able to assign components to the operations where ever


required

Should be able to maintain per operation quantity and ratios

Should be able to define alternate UoMs for each of the operations

Should be able to maintain PRT related data per operations

Should have the option to include/exclude an operation/work


center/production line from scheduling, capacity, costing or
confirmation

Should be able to define an operation as intend for internal or external


operation

Should have option of assigning any additional user defined fields for
any operation

Should be able to print the routing


Page 5
of 9

244107293.doc

BP-PP-Master Data Routing &


Rate Routing

Should be able to define routing for rework/reprocessing on


products/sub assemblies

3. Naming/numbering conventions

Routing/Rate Routing Internal number range or XXXXXXXX


(alphanumeric) for some group of products or similar set of work
centers/production lines is possible

4. Data structure of Master Data


Routing/Rate Routing

Header Data

Operation Data

Component Data

Quality Management Data

PRT Data

5. SAP Organisation Structure

Routing/Rate Routing will be maintained at material/plant level

6. Business Process
7. Business Process Flow Chart (Optional)
8. Business process Description
Step Department
#
1

2
3

User Role

Manufacturing/Planning Planner
group/
mfg
department
Manufacturing/Planning Planner
group/ mfg
department
Manufacturing/Planning Planner
group/ mfg
Page 6
of 9

Process Description

SAP
Module

Create/Change/Display
Routing

SAP PP

Create/Change/Display
Rate Routing

SAP PP

Create/Change/Display

SAP PP

244107293.doc

BP-PP-Master Data Routing &


Rate Routing
Step Department
#

User Role

Process Description

department

reference Operation Set

Manufacturing/Planning Planner
group/ mfg
department
Manufacturing/Planning Planner
group/ mfg
department
Manufacturing/Planning Planner
group/ mfg
department
Manufacturing/Planning Production

4
5
6
7

SAP
Module

Create/Change/Display
reference rate Routing

SAP PP

Replace work centers

SAP PP

Schedule Material Master

SAP PP

Update Material Master

SAP PP

Where used work center

SAP PP

Scheduler
Manufacturing/Planning Production
Scheduler

9. Changes to Existing Organisation

10.

Centralize master data creation to avoid duplication and uniform


among the plants.

Key Business Improvement

Centralize master data creation to avoid duplication and uniform


among the plants

Data is stored in a well organized fashion. There are different data


views pertinent to different areas of business like header level and item
level information etc.

Accesses to different departments to the master data can be controlled.

11.

Description of Functional Deficits

Page 7
of 9

244107293.doc

BP-PP-Master Data Routing &


Rate Routing
Ref.
#
1.

Description of Functional Deficits

Recommendation to
Fulfil Functional Deficits

None

12.

Notes on Further Improvements

None

13.

System Configuration Considerations

Define Standard value parameters

Define Formulae

Define Standard Value Keys

Define Control Key

Assign Material Types to task list type

14.

Developments Considerations

15.

Data Conversion Considerations

Ref.
#
1.

Description of Objects / Data to


be Converted
Initial uploading of present
routing/rate routing from Legacy
to SAP.

16.
Ref.
#
1.

Reference
Development
Specification Number

LSMW/ABAP

Interface Considerations
Description of System / Process to be
Interfaced

Reference Interface
Specification Document
Number

None

17.
Ref.
#
1.

Data Conversion
Method (CATT,
LSMW,
Development)

Reporting Considerations
Description of Report Requirements

Work Center Report


Page 8
of 9

Reference Report
Development
Specification
Standard Report

244107293.doc

BP-PP-Master Data Routing &


Rate Routing
Ref.
#

Description of Report Requirements

2.

Where used list

3.

List of Routing

4.

List of Production Version

5.

Where used list

18.

Form Considerations

Ref.
#
1.
2.

Description of Forms

Reference
Enhancement
Specification Number

None

19.
Ref.
#
1.
2.

Reference Report
Development
Specification
available
Standard Report
available
Standard Report
available
Standard Report
available
Standard Report
available

Enhancement Considerations
Description of Enhancement Requirements

Reference
Enhancement
Specification Number

None

20.

Authorisation Considerations

Authorisation can be restrict to users based on the Plant


Authorization can be restrict based on the authorization group
Create/Change/Display Routing/Rate Routing
CA01/CA02/CA03/CA11/CA12/CA13