You are on page 1of 2

1

SHANKEY BAFNA, PMP, CMIT, LEED AP BD+C, EIT Phone: 9820586580


Shatrunjay Darshan,Byculla,LoveLane,Mumbai-27, Email:shankeybafna@gmail.com
EDUCATION
Syracuse University: L.C.Smith College Of Engineering GPA-3.2/4.0 (Grad-Dec 2011)
Masters in Civil Engineering
University of Mumbai: M.G.M. College of Engineering
Bachelors in Civil Engineering First Class (Grad-May 2009)

SKILL SET
Project Management : Budget & Finances / Personnel Acquisition & Training /Team Management / Design & Development /
Customer Relations /Multi-Site Management / New Business Development /MS Office Tools
Construction Management: AIA Documentation/ Certified Payroll/ OSHA Safety Guidelines/MS Project/ TIMBERLINE
Drawing , Design and Estimating Tools: AutoCAD , Microstation and PlanSwift 9, Sap 2000, ETABs, MathCAD, STAAD Pro

PROFESSIONAL WORK EXPERIENCE
Gallo Construction Corp, Watervliet , NY July 2013-August2014

Estimator/Project Manager, Glens Falls Waste Water Treatment Plant- $ 3.8 M
Reviewed Drawings, created estimate for Bid Opening
Reviewed Contract, Letter of Intent and Logistics of the Project
Created Project Schedule, Shutdown Plans for tie-in .
Created Confined Space Safety Plan
Created Hazardous Material handling Plan
Buyout of Major Equipment

Project Manager, Schenectady Airport Building Addition
Expediting the project to meet the project deadline
Creating and Updating Project Schedule using MS Project
Completed the project in six weeks and reduced the cost of the project by 40 %
Submitting Pay Apps ,Preparing Close Out Documents

Project Manager/Safety Engineer, Mohawk View Waste Water Treatment Plant- $ 2M
Reviewing Contract, Project Submittals, Specifications
Creating Project Schedule using MS Project
Carrying Out Cost Analysis and Reviewing Project Cost To Complete
Submitting Payment Applications Using AIA formant
Scoping and Creating Subcontracts , Purchase Orders for various trade using TIMBERLINE
Submitting Pay Apps ,Preparing Close Out Documents

Project Manager/Safety Engineer, OGS Corning Tower Rig Enclosures-$1.3
Created a LEED Waste Management Plan
Providing Construction Schedule and Sequence to the Owner
Attending Bi weekly Meeting and discussing open issues
Updating Submittals using Submittal Exchange
Project Buyouts and Negotiating with Subcontractors
Processing Field Orders and Information Bulletins using TIMBERLINE
Submitting Pay Apps ,Preparing Close Out Documents

Project Manager, Shenendowa School Panel Abatement and Replacement of Insulation System-$1M
Expediting the project to meet the project deadline
Creating and Updating Project Schedule using MS Project
Completed the project in six weeks and reduced the cost of the project by 10 %
Submitting Pay Apps ,Preparing Close Out Documents

LIW Iron Work, Washington, D.C. April2013- May 2013
Asst. Project Manager
Reviewing Plans for project.
Perform takeoffs from architectural drawings/blueprints
Correspond with vendors to determine costs related to raw materials and purchased services



2
Fine Wall Corporation, Iselin , New Jersey Feb 2012- March2013
Asst. Estimator
Reviewing Plans for project , Bid requirements and preparing bid documents
Perform takeoffs from architectural drawings/blueprints
Correspond with vendors to determine costs related to raw materials and purchased services

Project Engineer, Cliffside Park Housing Authority Senior Center, Cliffside Park, NJ-$2.4M June 2012- March2013
Supervising ongoing construction work and managing the site security
Filing the required permits and scheduling the Inspections
Keeping a track of the supplies and ensuring the work goes on acc to schedule and the requirements

Field Engineer, Renovation at Fire House Engine No. 17, Newark, NJ-$.75M Feb 2012- June2012
Coordinating construction and reporting to the City Engineer , Architect.
Supervising ongoing construction work and managing the site security
Ensuring the timely completion of the job

Field Engineer, Renovation at Rivervale Schools, Rivervale, NJ- $180K
Coordinating construction and reporting to the City Engineer , Architect.
Supervising ongoing construction work and managing the site security
Ensuring the timely completion of the job

Ernie Davis Dining Center, Syracuse University Food Service, Syracuse, NY April2011-Dec2011
Hiring Manager
Supervising Operations & Managing a workforce of 200
Liaising between the management and employees.
Motivating and Training employees through team building

Intertek Architect, Navi Mumbai May 2010-August 2010
Summer Intern
Prepared and modified AutoCAD drawings of plan and elevation of the structure to initiated the site work.
Revised site plans, building plans and cost estimation of an ongoing project and tracked the pace of the project.
Strategized the material procurement and labor requirement on the site to increase the efficiency of the project.
Obtained hands on experience in site management and legal procedures involved in construction and revised the flow of site work.

McAfferie International, Navi Mumbai July 2008- June2009
Jr. Structural Engineer
Determined the effect of wind load, seismic load, live load and dead load and proposed a safe and economical design.
Carried out a detailed analysis of the pedestrians cable bridge and simplified the effect of loads.
Monitored different combination of loads on bridge deck and bridge cable to solve worst-case scenario.
Designed the H-shaped pylon and communicated with the fabricator for the feasibility of the design.
Designed a Cable Stayed walkway with most N-type efficient hollow girders.

ACADEMIC PROJECTS
Design of a Two Span I-Girder Bridge: August 2009-Dec 2009
Carried out detailed analysis of diverse loads on abutment and founded live loads and dead loads from super and sub-structure.
Monitored the effects of braking, temperature, earthquake and live surcharge on abutment and expedited the design of abutment.
Designed the minimum requirements of rebar and spacing between the rebars and simplified the process of construction of abutment.
Pioneered for using wind turbine to generate electricity on the bridge to emphasize on green technology.

Comparison of Glass Fiber-Reinforced Polymers Rebar and Steel Rebar in a Concrete Beam: Jan 2010- May 2010
Analyzed and designed concrete beam in ANSYS software with steel rebar and glass fiber-reinforced polymer rebar
Evaluated the formation of cracks, bond strength and stress intensity in the concrete beam.
Determined the formation of cracks in concrete beam diminishes the serviceability life of the concrete beam.
Examined the Bond strength between concrete-steel rebar and concrete-glass fiber-reinforced rebar.

CERTIFICATION and AWARDS
Project Management Professional (PMP) Certification Date-12/6/2013
Construction Manager In Training (CMIT) Certification Date-06/15/2013
LEED AP BD+C Certification Date-01/02/2013
OSHAs 30 Hr Training Certification Date-Dec 2012
Engineer In Training ( Virginia State) October 2013

You might also like