PRO EK MEROBOH DAN MEMBINA SE ULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
Item Description Unit Qty Rate Amount
A Planning For Safety & Health
1) Preparation of 5 copies site safety and health plan (S-Plan) as Item
i)Safety and Health Policy
ii)Emergency Response Plan (ERP)
iii)Chemical Safety Data Sheet (CSDS)
(Shall submit within Three (3) months after the
2) Preparation of Hazard Identification Risk Assessment and Risk Item
3) Safety Report Item
Prepare and submit to the S.O/P.D of 5 copies monthly safety &
i)i. Schedule of safety & health committee meetings,
ii)Site safety & health toolbox meetings,
iii)Safety & health audit reports,
iv)Safety & health inspections reports.
B Resources For Site Safety
1) Employment of a Site Safety & Health Officer (SHO) Month
(For works exceeding RM20 millions contract value or high
2)Employment of a Site Safety & Health Supervisor (SSS) and to Item
A2/1
Item Description Unit Qty Rate Amount
A Protective Equipment
1) Provision and maintenance of Personal Protective Equipment LS
Safety boots Pairs 6
Safety helmets Pcs 6
Full Body Harness c/w Hook and Lankyard for workmen Pcs 6
Safety / life lines for workmen who work at heights more LS 6
Protective gloves Pairs 6
Safety goggles Pairs 6
Safety jackets of reflective type Pcs 6
Ear plugs and muffs Pairs 6
Gas masks Set 6
Dust masks Pcs 6
Head lamp Pcs 6
Life jacket Pcs 6
(any additional... etc.)
2) Provision and maintenance on the Site during the LS
Gas detectors
Breathing apparatus
Air ventilation pumps
Warning lights
Fire extinguishers
Hazard tape
Safety barriers
B Traffic Management & Signage
(Please delete this item if Traffic Management Plan is existed in
1)Provision and maintenance of adequate safety, traffic and Item
2)Provision and maintenance of traffic control and signage by Item
A2/2
PART A2 - OCCUPATIONAL SAFETY AND HEALTH
PART A2 - OCCUPATIONAL SAFETY AND HEALTH
PART A2 - OCCUPATIONAL SAFETY AND HEALTH
To Collection RM
To Collection RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
A2/3
Item Description Unit Qty Rate Amount
A Safe Working Area
1) Supply erection, maintenance and removal on completion of LS
2)Supply, erection and dismantling of scaffolding, working LS
3)Submission of scaffolding design and working platform for LS
4)Supply, erection, maintains and dismantling of catch platform LS
5)Supply erection, maintenance and removal of safety LS
6)Provision and maintenance of guardrails or board fences and LS
A2/3
Item Description Unit Qty Rate Amount
Safe Working Area (Cont'd)
7)Cordoning off working area and provision of public control LS
8)Measures to prevent the breeding of mosquitoes, houseflies, LS
A Special Work Condition
Allow for Statutory Obligation including payment of all fees and
1) Confined Spaces LS
The contractor shall ensure that closed tanks with restricted
(Proprietary meters are available).
The contractor shall establish a safe work system for workers
The contractor shall adopt an entry permit system, so as to
A2/4
Item Description Unit Qty Rate Amount
Summary
OCCUPATIONAL SAFETY AND HEALTH
From Page No. A2/1
From Page No. A2/2
From Page No. A2/3
From Page No. A2/4
A2/5
To Collection RM
To Grand Summary RM
PART A2 - OCCUPATIONAL SAFETY AND HEALTH
PART A2 - OCCUPATIONAL SAFETY AND HEALTH
To Collection RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
A2/3
Daywork rates will only be used as a basis for payment when normal rates
for supply and fix (as given above) are not applicable. No work shall be carried
out on Daywork basis except when ordered in writing by the Superintending
Officer.
When work is so ordered the Contractor shall be paid Daywork prices plus
15% which shall include for the use of all ordinary plant, tools and scaffolding,
supervision, establishment charges and profit. Daywork prices shall be taken to
mean the actual prime cost to the Contractor of his materials, transport and labour
for the work concerned.
The Contractor shall produce for verification to the S.O. vouchers specifying
the time and materials employed on the work. If required the Contractor shall also
produce his receipted bills and wages books in support of his accounts.
When special mechanical plant is required for use on Daywork, the S.O.'s
approval must be obtained and the cost to be paid to the Contractor must
be agreed before commencement of work: Only such plant that the S.O. has
accepted as special mechanical plant before commencement of work will be
considered for payment as special plant on Daywork basis.
The cost of any materials supplied by the Government for use on
Daywork shall not be taken into account when calculating the amount on which
the 15% addition is based.
Only time on work actually done will be allowed. A "Day" is considered to
be normal working day of 8 hours. Fractions of a day will be paid for "pro-rata".
Rates for power driven tools are not included in the labour rates but charges
for hand tools shall be deemed to be included.
1
DAYWORKS RATES
APPENDIX 'A'
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
A2/3
SCHEDULE OF BASIC PLANT CHARGES FOR USE
IN CONNECTION WITH DAYWORKS
The Contract Rates for pl9nt in the Schedule of Dayworks shall apply to all plant
whether belonging to the Contractor or hired by him and shall cover all the
contractors obligations whatsoever in providing and maintaining such plant at the
place of work including operators, all fuel and lubricants, all ancillary equipment
necessary for efficient operation and use of the plant grid overheads and profits.
The Contract Rates for plant shall apply both to plant which is already available at
site and to plant brought to site especially for dayworks but in the latter case the
Contractor shall be paid his additional cost in transporting such plant to and from
the site.
The daily rates in the Schedule are not intended to establish minimum charges.
The rates should be applied to the time during which the plant is actually engaged
in daywork. The inclusion of an item of plant in the Schedule does not necessarily
deem nor indicate that the items is chargeable.
Rates for other plant not included in the Schedule shall be settled at prices
reasonably related to the rates so included.
NO. DESCRIPTION UNIT RATE
Note: Against each item of the following items of
plant shall where applicable be entered the type,
A. Tipping Vehicle:
(i) 5 Tons and over Day
(ii) 3 Tons and under ,,
,,
B. Dumper 1 cu. yd. ,,
,,
C. Backhoe ,,
D. Air Compressor ,,
E. Pneumatic concrete breaker including tools and
hoses.
,,
APPENDIX 'A' (CONT'D)
3
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
A2/3
ITEM
NO.
MATERIALS UNIT CONTRACTO
R
UNIT COST
1. Cement Bag
2. Steel Ton
3. Aggregate MC
4. Sand MC
5. Brick Per 1000
6. Timber Ton
7. Roofing Materials MS
8. Ceiling Materials MS
9. Steel And Metal Sections Ton
10. Plumbing Materials
a) MR
b) MR
c) NO.
d) NO.
11. Floor And Wall Tiles MS
12. Sanitary Fittings
a) NO.
b) NO.
c) NO.
13. Ironmongery
a) NO.
b) NO.
c) NO.
14. Glass MS
15. Paint MS
I/We certify that this Schedule reflects the unit costing used in the submission of
the tender and it is based on current prevailing market price available.
Tenderer
5
APPENDIX 'B'
COST FOR THE PURPOSE OF TENDER EVALUATION
TOTAL
ESTIMATED
QUANTITY
LIST OF MATERIAL TOGETHER WITH QUANTITIES AND BASIC UNIT
SECTION A2 - PRELIMINARIES
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
A2/3
1. EQUIPMENT AND FACILITIES
The Contractor shall provide the following facilities listed hereunder for
the use of the Superintending Officer (S.0) and / or his staff. All
equipment(s) provided for the facilities shall be new, local products and
shall be delivered, tested and installed within a month of the issuance of
the Letter Of Acceptance. The place of delivery and installation shall be as
directed by the S.O. The facilities provided shall be maintained by the
Contractor or his appointed agent throughout the contract period until the
issuance of the Certificated of Practical Completion. Maintenance shall
include all necessary monthly servicing according to manufacturers
specification and supply of accessories and consumables.
The equipment(s) and facilities shall be in the custody of the Contractor at
all times. Upon the issuance of the Certificate Of Practical Completion,
the Contractor shall remove all equipment and facilities from its location.
If the Contractor fails to provide or maintain any equipment(s) for the
facilities as listed hereunder, the Government shall have the right to
procure the equipment(s) from other sources or maintain it and all
expenses arising shall be borne by the Contractor and an appropriate
adjustment shall be made to the Contract Sum.
7
APPENDIX 'C'
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
A2/3
Item Description Unit Qty Rate Amount
ELEMENT NO. 'I - DEMOLITION WORKS
General Notes
Generally the site clearance and demolition works in this Bills of
Unless otherwise stated all quantities are Fixed Quantities
In compliance with the Preliminaries, the Contractor shall be
The Contractor is referred to the items of Preliminaries and the
Prior to any demolition works, the contractor is responsible in
The Contractor shall be held responsible for terminating,
Prior to demolition works, the contractor shall carry out utilities
Demolition works shall be held to include for breaking up all
Prior to any demolition works the contractor is to submit the
B/1/1
Item Description Unit Qty Rate Amount
ELEMENT NO. 1 - DEMOLITION WORK (CONT'D)
General Notes
The pulling down, dismantling etc. for the following items are
When shorings, buttress, supports and temporary safety
The contractor shall allow in the demolition costs provision at
All demolition works shall be held to include the handling and
The contractor is to include in the rates and prices for site
B/1/2
PART B - DEMOLITION WORKS
TO COLLECTION RM
PART B - DEMOLITION WORKS
TO COLLECTION RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
A2/3
Item Description Unit Qty Rate Amount
General Notes
Removal for Re-Use
The tenderers shall not include the following item/materials in
All the said items/materials itemised below will be disposed by
However, prior to commencement of the work, the contractor is
A Provide all machines, labours, scaffolding, temporary works
Air Conditioning Units
a 1HP - 2.5 HP (at Pejabat Pengurusan) Nos 7
b 1HP - 2.5 HP (Surau As-Siddiq) Nos 3
c 1HP - 2.5 HP (Pejabat Operasi) Nos 1
d 5HP -7HP (Menara Pekan Rabu) Nos 6
e 3HP-5HP (Menara Pekan Rabu) Nos 5
f Pam Kumbahan (Block A) Nos 4
g D.B Board (Blaock A& B) Nos 358
h Pam Air Bersih (Block A) Nos 2
j Panel LV Board (low voltage) (Block A) Nos 2
k ACV 800A (pemutus liter Udara) (Block A) Nos 1
l Tiang lampu (Dataran Che Det) Nos 28
Pam Hose Reel
m Block A Nos 2
n Block B Nos 2
p Tangki Air Bomba (Block B) Nos 1
Generator Block( A & B)
q Block A Nos 1
r Block B Nos 1
B/1/3
Item Description Unit Qty Rate Amount
General Notes
Removal for Re-Use (Cont'd)
The tenderers shall not include the following item/materials in
All the said items/materials itemised below will be disposed by
However, prior to commencement of the work, the contractor is
A Provide all machines, labours, scaffolding, temporary works
Roller Shutter
Kedai makan
a 6x8 Nos 50
Kedai Pekasam dan kuih
b 4x8 Nos 83
6x8 Nos 73
8x8 Nos 1
Bangunan Fasa 2:
c 6x8 Nos 25
d 8x8 Nos 53
e 5x8 Nos 10
f 8x10 Nos 40
GI Besi
Block A
g (2x4, 1x1) Nos 40
GI Steel (Block A)
h 3 inch Nos 10
B/1/4
TO COLLECTION RM
PART B - DEMOLITION WORKS
PART B - DEMOLITION WORKS
TO COLLECTION RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
A2/3
Item Description Unit Qty Rate Amount
General Notes
Removal for Re-Use (Cont'd)
The tenderers shall not include the following item/materials in
All the said items/materials itemised below will be disposed by
However, prior to commencement of the work, the contractor is
A Provide all machines, labours, scaffolding, temporary works
Set Railing Tangga
(2x4, 1x1, 1/2x1/2)
Block A
a 12ft Nos 24
b 6ft Nos 7
Block B
c 12ft Nos 20
d 8ft Nos 2
Railing Walkway (2x4)
Block A
e 48ft Nos 12
f 20ft Nos 2
g 16ft Nos 1
h 8ft Nos 1
j 4ft Nos 1
k Block B
l 12ft Nos 20
m 8ft Nos 2
n Pintu Kayu (2.5x7) at Menara Pekan Rabu Nos 18
p Tangki Air (12x6 / 4x4) at Menara Pekan Rabu Nos 2
q Meja at Menara Pekan Rabu Nos 8
r Peti Besi (2.5x3) at Menara Pekan Rabu Nos 2
s Sistem lif menara at Menara Pekan Rabu Nos 1
B/1/5
PART B - DEMOLITION WORKS
TO COLLECTION RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
A2/3
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
A2/3
Item Description Unit Qty Rate Amount
General Notes
Removal for Re-Use (Cont'd)
The tenderers shall not include the following item/materials in
All the said items/materials itemised below will be disposed by
However, prior to commencement of the work, the contractor is
A Provide all machines, labours, scaffolding, temporary works
a Bumbung Zink ( 2.5 x 40ft) at Block A Nos 200
Alat Pemadam Api
b (ABC & CO2-9kg) at Block A & Block B Nos #######
c Kipas Siling at Block A & Block B Nos #######
d CCTV at at Block A & Block B Nos 8
e PA sistem at Block A & Block B Nos 5
Set Meja Makan
Kedai makan
f 1 meja, 6 kerusi (2x5) Set #######
g 1 meja, 4 kerusi (2x3) Set #######
h Tong Sampah (660L/240L) at Block A & Block B Nos #######
Spotlight
i Block A Nos 5
j Block B Nos #######
Glass(kaca) \
k 4x4 at Menara Pekan Rabu Nos #######
l Bumbung Atap Genting at Block B LS
B/1/6
Item Description Unit Qty Rate Amount
ELEMENT NO. 1 - DEMOLITION WORK (Cont'd)
UTILITY MAPPING
A Provide manpower and equipment to carry out the LS
TERMINATING AND REINSTATEMENT OF EXISTING UTILITY
B Locate on Site, carefully shut down, turn-off, terminate, LS
SHORING
C Design a system, provide and erect shoring where LS
DEMOLITION OF EXISTING BUILDINGS/STRUCTURES
Demolition of the following existing buildings and or structures
B/1/7
PART B - DEMOLITION WORKS
TO COLLECTION RM
PART B - DEMOLITION WORKS
TO COLLECTION RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
A2/3
Item Description Unit Qty Rate Amount
ELEMENT NO. 1 - DEMOLITION WORK (Cont'd)
A Existing One block of Block Aked (Block Aj. Including TNB
a Demolition and removal of all structures and fittings, finishes LS
b Ditto of all existing structures between ground beams and LS
c Ditto Column Stumps including excavation to expose structures LS
d Ditto Pile Caps and Footings including excavation to expose LS
e Extract out existing piles in full length including excavation Nos 105
f Cutting up of existing piles at the required depth including Nos 105
B/1/8
Item Description Unit Qty Rate Amount
ELEMENT NO. 1 - DEMOLITION WORK (Cont'd)
A Existing One block of Block Aked (Block B, of approximate
a Demolition and removal of all structures and fittings, finishes LS
b Ditto of all existing structures between ground beams and LS
c Ditto Column Stumps including excavation to expose structures LS
d Ditto Pile Caps and Footings including excavation to expose LS
e Extract out existing piles in full length including excavation Nos 28
f Cutting up of existing piles at the required depth including Nos 28
B/1/9
Item Description Unit Qty Rate Amount
ELEMENT NO. 1 - DEMOLITION WORK (Cont'd)
A Existing One Nos Single Storey Surau
a Demolition and removal of all structures and fittings, finishes LS
b Ditto of all existing structures between ground beams and LS
c Ditto Column Stumps including excavation to expose structures LS
d Ditto Pile Caps and Footings including excavation to expose LS
e Extract out existing piles in full length including excavation Nos 9
f Cutting up of existing piles at the required depth including Nos 9
B Dismantle and remove off site complete existing external ITEM
C Dismantle and remove off site complete existing external water ITEM
D Dismantle and remove existing of site external surface water ITEM
E Provide necessary temporary closure for pedestrian bridge ITEM
F Dismantle and remove complete from site all structures, steps, ITEM
B/1/10
TO COLLECTION RM
PART B - DEMOLITION WORKS
TO COLLECTION RM
TO COLLECTION RM
PART B - DEMOLITION WORKS
PART B - DEMOLITION WORKS
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
A2/3
Item Description Unit Qty Rate Amount
COLLECTION
B/1/1
B/1/2
B/1/3
B/1/4
B/1/5
B/1/6
B/1/7
B/1/8
B/1/9
B/1/10
B/1/11
Item Description Unit Qty Rate Amount
SUMMARY Page No.
1 ELEMENT NO.1 - DEMOLITION WORK B/1/11
B/S
PART B - DEMOLITION WORKS
TO SUMMARY RM
PART B - DEMOLITION WORKS
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
A2/3
ITEM DESCRIPTION UNIT QTY RATE AMOUNT (RM)
A Protective Equipment
1) Provision and maintenance of Personal Protective LS
Equipment to S.O/P.D staffs at site of adequate
quantity and of approved quality. The equipment
shall include but not be limited to the following:
Safety boots Pairs
Safety helmets Pcs
Full Body Harness c/w Hook and Lankyard
for workmen who work at heights more than
2m above ground level
Pcs
Safety / life lines for workmen who work at
heights more than 2m above ground level
LS
Protective gloves Pairs
Safety goggles Pairs
Safety jackets of reflective type Pcs
Ear plugs and muffs Pairs
Gas masks Set
Dust masks Pcs
Head lamp Pcs
Life jacket Pcs
(any additional... etc.)
2) Provision and maintenance on the Site during the
duration of the Works, of the adequate safety
equipment to be approved by the S.O/P.D as
LS
Gas detectors
Breathing apparatus
Air ventilation pumps
Warning lights
Fire extinguishers
Hazard tape
Safety barriers
B Traffic Management & Sic:nage
(Please delete this item if Traffic Management Plan is
existed in the contract already.)
1)Provision and maintenance of adequate safety,
traffic and warning signs and warning lights as
stipulated in JKR Specification For Occupational
Item
Safety And Health For Engineering Construction
Works.
2)Provision and maintenance of traffic control
and signage by competent persons where site is
in close proximity of public road including
provision of
Item
Occupational Safety And Health For Engineering
Construction Works.
C
D

(
9

(
.
0

C
D

C
D

D

(
0

C
D

C
D

C
D

C
D
To Collection RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
A2/3
FAK I AZ - UDL;UF'A I IUNAL SArt I Y AND I
-
ItAL 111
ITEM DESCRIPTION UNIT QTY RATE AMOUNT (RM)
A
Safe Working
Area
:1) Supply erection, maintenance and removal on
completion of the works, protective and security
hoarding as stipulated in JKR Specification For
LS
Occupational Safety And Health For Engineering
Construction Works.
2)Supply, erection and dismantling of scaffolding,
working platform with safety nettings (please
delete where not applicable) by competent
person(s) under the direct supervision of a
designated person as stipulated in JKR
LS
Safety And Health For Engineering Construction
Works.
3)Submission of scaffolding design and working
platform for works above 15m height certified by
LS
Professional Engineer for the approval of the
S.O/P.D as stipulated in JKR Specification For
Occupational Safety And Health For Engineering
Construction Works.
4)Supply, erection, maintains and dismantling of
catch
platform during demolition of structure or other
LS
Such platform shall be designed by a Professional
Engineer and certified for safety prior to erection as
stipulated in JKR Specification For Occupational
Safety And Health For Engineering Construction
Works.
5)Supply erection, maintenance and removal of safety
barricades / fencing / railing / screen / wire netting /
toe board for maintaining safe working environment
LS
(please delete where not applicable) during the
6)Provision and maintenance of guardrails or
board fences and temporary foot walks with
adequate temporary overhead protection for
public walkways and thoroughfares. (Please
delete where not
applicable).
LS
To Collection RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
A2/3
PART A2 - OCCUPATIONAL SAFETY AND HEALTH
ITEM DESCRIPTION UNIT QTY RATE AMOUNT (RM)
Safe Working Area (Cont'd)
7)Cordoning off working area and provision of
public
control and safety measures where lifting
operations, moving, shifting, transferring works are
carried out outside the hoarded up area of the
LS
Occupational Safety And Health For Engineering
Construction Works.
8)Measures to prevent the breeding of mosquitoes,
houseflies, rats, insects and other dangerous
animals on the Site throughout contract period.
LS
A Special Work Condition
Allow for Statutory Obligation including payment of
all fees and charges compliance with Occupational
Safety and Health requirements stated in laws,
regulations and by-laws which are not included
elsewhere in this Bill of Quantities as stipulated
under the Conditions of Contract and JKR
Specification For Occupational Safety And
Health For Engineering Construction Works , details
of which are to be particularized below:-
1) Confined Spaces LS
The contractor shall ensure that closed tanks with
restricted means of entry and exit, open manholes,
trenches, pipes, flues, ducts, ceiling voids, enclosed
rooms such as basements and other places where
there is inadequate ventilation and/or the air is either
contaminated or oxygen deficient, be tested before
entry to determine that there are adequate levels of
oxygen present, and that dangerous amounts of
(Proprietary meters are available).
The contractor shall establish a safe work system for
workers who will be carrying out their work in
confined spaces.
The contractor shall adopt an entry permit system, so
as to ensure that employees and others are aware of
the location of anyone required to enter confined
spaces.
To Collection RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
A2/5
PART A2 - OCCUPATIONAL SAFETY AND HEALTH
ITEM
DESCRIPTION
UNIT
QTY
RATE
AMOUNT (RM)
Summary
OCCUPATIONAL SAFETY AND HEALTH
From Page No. A2/1
From Page No. A212
From Page No. A2/3
From Page No. A2/4
To Grand Summary RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
A2/5
APPENDIX 'B'
APPENDICES TO PRELIMINARIES
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
APPENDIX 'B'
DAYWORKS RATES
Daywork rates will only be used as a basis for payment when normal rates
for supply and fix (as given above) are not applicable. No work shall be carried
out on Daywork basis except when ordered in writing by the Superintending
Officer.
When work is so ordered the Contractor shall be paid Daywork prices plus
15% which shall include for the use of all ordinary plant, tools and scaffolding,
supervision, establishment charges and profit. Daywork prices shall be taken to
mean the actual prime cost to the Contractor of his materials, transport and labour
for the work concerned.
The Contractor shall produce for verification to the S.O. vouchers specifying
the time and materials employed on the work. If required the Contractor shall also
produce his receipted bills and wages books in support of his accounts.
When special mechanical plant is required for use on Daywork, the S.O.'s
approval must be obtained and the cost to be paid to the Contractor must
be agreed before commencement of work: Only such plant that the S.O. has
accepted as special mechanical plant before commencement of work will be
considered for payment as special plant on Daywork basis.
The cost of any materials supplied by the Government for use on
Daywork shall not be taken into account when calculating the amount on which
the 15% addition is based.
Only time on work actually done will be allowed. A "Day" is considered to
be normal working day of 8 hours. Fractions of a day will be paid for "pro-rata".
Rates for power driven tools are not included in the labour rates but charges
for hand tools shall be deemed to be included.
5
APPENDIX 'B'
APPENDIX 'A' (CONT'D)
SCHEDULE OF BASIC PLANT CHARGES FOR USE
IN CONNECTION WITH DAYWORKS
The Contract Rates for pl9nt in the Schedule of Dayworks shall apply to all plant
whether belonging to the Contractor or hired by him and shall cover all the
contractors obligations whatsoever in providing and maintaining such plant at the
place of work including operators, all fuel and lubricants, all ancillary equipment
necessary for efficient operation and use of the plant grid overheads and profits.
The Contract Rates for plant shall apply both to plant which is already available at
site and to plant brought to site especially for dayworks but in the latter case the
Contractor shall be paid his additional cost in transporting such plant to and from
the site.
The daily rates in the Schedule are not intended to establish minimum charges.
The rates should be applied to the time during which the plant is actually engaged
in daywork. The inclusion of an item of plant in the Schedule does not necessarily
deem nor indicate that the items is chargeable.
Rates for other plant not included in the Schedule shall be settled at prices
reasonably related to the rates so included.
NO. DESCRIPTION UNIT RATE
Note: Against each item of the following items
of plant shall where applicable be entered the type,
class, capacity or rating of the plant which the
Contractor proposes to use.
A. Tipping Vehicle:
(i) 5 Tons and over Day
B.
(ii) 3 Tons and under
Dumper 1 cu. yd.
,,
,,
C. Backhoe
,,
D. Air Compressor
,,
E. Pneumatic concrete breaker including tools and
hoses.
,,
5
APPENDIX 'B'
SECTION A2 - PRELIMINARIES
LIST OF MATERIAL TOGETHER WITH QUANTITIES AND BASIC UNIT
COST FOR THE PURPOSE OF TENDER EVALUATION
ITEM
NO.
MATERIALS UNIT
TOTAL
ESTIMATED
QUANTITY
CONTRACTOR
UNIT COST
1. Cement Bag
2. Steel Ton
3. Aggregate MC
4. Sand MC
5. Brick Per 1000
6. Timber Ton
7. Roofing Materials MS
8. Ceiling Materials MS
9. Steel And Metal Sections Ton
10. Plumbing Materials
a) MR
b) MR
c) NO.
d) NO.
11. Floor And Wall Tiles MS
12. Sanitary Fittings
a) NO.
b) NO.
c) NO.
13. Ironmongery
a) NO.
b) NO.
c) NO.
14. Glass MS
15. Paint MS
I/We certify that this Schedule reflects the unit costing used in the submission of
the tender and it is based on current prevailing market price available.
Tenderer
5
APPENDIX 'C'
1. EQUIPMENT AND FACILITIES
The Contractor shall provide the following facilities listed hereunder for
the use of the Superintending Officer (S.0) and / or his staff. All
equipment(s) provided for the facilities shall be new, local products and
shall be delivered, tested and installed within a month of the issuance of
the Letter Of Acceptance. The place of delivery and installation shall be as
directed by the S.O. The facilities provided shall be maintained by the
Contractor or his appointed agent throughout the contract period until the
issuance of the Certificated of Practical Completion. Maintenance shall
include all necessary monthly servicing according to manufacturers
specification and supply of accessories and consumables.
The equipment(s) and facilities shall be in the custody of the Contractor at
all times. Upon the issuance of the Certificate Of Practical Completion,
the Contractor shall remove all equipment and facilities from its location.
If the Contractor fails to provide or maintain any equipment(s) for the
facilities as listed hereunder, the Government shall have the right to
procure the equipment(s) from other sources or maintain it and all
expenses arising shall be borne by the Contractor and an appropriate
adjustment shall be made to the Contract Sum.
BAHAGIAN
B DEMOLITION WORKS
PROJEK MEROBOH DAN MEMB NA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
PART B - DEMOLITION WORKS
Item Description Unit Qty Rate Amount
ELEMENT NO. 'I - DEMOLITION WORKS
General Notes
Generally the site clearance and demolition works in this Bills
of Quantities have not been measured in accordance to the
Building SMM and or MyCESSMM
Unless otherwise stated all quantities are Fixed Quantities
In compliance with the Preliminaries, the Contractor shall be
deemed to have visited and examined the Site and to have
ascertained the nature, character and extent of the Works,
local conditions, accessibility of the Site & locations and
extent of the required dump sites.
The Contractor is referred to the items of Preliminaries and
the Specifications regarding protection, watching and
lighting, temporary scaffolding and hoardings and he will be
held to have included for these provisions and for taking all
necessary safety.
Prior to any demolition works, the contractor is responsible
in obtaining all necessary approvals, permits from respective
regulating agencies, statutority bodies etc, and including
making payments, charges and or fees imposed by the
respective related agencies.
The Contractor shall be held responsible for terminating,
TO COLLECTION RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
B/1/1
PART B - DEMOLITION WORKS
Item Description Unit Qty Rate Amount
ELEMENT NO. 1 - DEMOLITION WORK (CONT'D)
General Notes
The pulling down, dismantling etc. for the following items are
generally to be executed manually except where the
demolition of the major works requiring the use of
mechanical equipment which will cause excessive vibration
for which the prior approval of S.O/Authorities is required
When shorings, buttress, supports and temporary safety
measures including protection are necessary in connection
with the demolition of any particular section, portion or
items of the Works, the Contractor is to allow for such
contigencies in his demolition costs.
The contractor shall allow in the demolition costs provision
at all time through the demolition works his own consultants,
maintain the stability and integrity of the adjoining, adjacent
and or nearby buildings, and or structures. The contractor
shall provide/do whatever necessary to comply with such
requirement including temporary supports, strutting and/or
underpinning etc if it is required and so advice by his own
consultants. In the event that the shop lots, structures and or
buildings are damaged, the contractor shall repair and
restored them to its original condition at his own costs.
All demolition works shall be held to include the handling
TO COLLECTION RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
B/1/2
PART B - DEMOLITION WORKS
Item Description Unit Qty Rate Amount
General Notes
Removal for Re-Use
The tenderers shall not include the following item/materials
in the calculation of credit value arises from demolition
works.
All the said items/materials itemised below will be disposed
by the Koperasi Pekan Rabu.
However, prior to commencement of the work, the
contractor is to carry out a joint survey with the SO for the
following inventories on the assets to be dismantled and
delivered and stored at a storage designated by Koperasi
Pekan Rabu. The said inventory shall be recorded in the
presence of the Koperasi Pekan Rabu's representative .
Provide all machines, labours, scaffolding, temporary works
where necessary and carefully remove manually and or la
machine of the following items from the existing
building/structures including setting aside, multiple
handling, transporting, stacking, storing at SO's designated
storage site not exceeding 20km radius from site including
dispatching from site and returning to site as required and
such materials shall become the property of the Employer
and be excluded from the credit/salvage value
Air Conditioning Units
1HP - 2.5 HP (at Pejabat Pengurusan) Nos 7
1HP - 2.5 HP (Surau As-Siddiq) Nos 3
1HP - 2.5 HP (Pejabat Operasi) Nos 1
5HP -7HP (Menara Pekan Rabu) Nos 6
3HP-5HP (Menara Pekan Rabu) Nos 5
Pam Kumbahan (Block A) Nos 4
D.B Board (Blaock A& B) Nos 358
Pam Air Bersih (Block A) Nos 2
Panel LV Board (low voltage) (Block A) Nos 2
ACV 800A (pemutus liter Udara) (Block A) Nos 1
Tiang lampu (Dataran Che Det) Nos 28
Pam Hose Reel
Block A Nos 2
Block B Nos 2
Tangki Air Bomba (Block B) Nos
Generator Block( A & B)
Block A Nos 1
Block B Nos 1
C
O

S
D

C
.
)

"
0

(
1
)

_
C

E

c

0
.
TO COLLECTION RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
B/1/3
PART B - DEMOLITION WORKS
Item Description Unit Qty Rate Amount
General Notes
Removal for Re-Use (Cont'd)
The tenderers shall not include the following item/materials
in the calculation of credit value arises from demolition
works.
All the said items/materials itemised below will be disposed
by the Koperasi Pekan Rabu.
However, prior to commencement of the work, the
contractor is to carry out a joint survey with the SO for the
following inventories on the assets to be dismantled and
delivered and stored at a storage designated by Koperasi
Pekan Rabu. The said inventory shall be recorded in the
presence of the Koperasi Pekan Rabu's representative .
Provide all machines, labours, scaffolding, temporary works
where necessary and carefully remove manually and or 12y
machine of the following items from the existing
building/structures including setting aside, multiple
handling, transporting, stacking, storing at SO's designated
storage site not exceeding 20km radius from site including
dispatching from site and returning to site as required and
such materials shall become the property of the Employer
and be excluded from the credit/salvage value
Roller Shutter Kedai makan 6x8
Kedai Pekasam dan kuih
4x8
6x8
8x8
Bangunan Fasa 2:
6x8 8x8 5x8 8x10
GI Besi
Block A
(2x4, 1x1)
GI Steel (Block A) 3 inch
U

"
C
S

C
D

4
-

-
C
Nos
Nos
50
83
TO COLLECTION RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
B/1/4
PART B - DEMOLITION WORKS
Item Description Unit Qty Rate Amount
General Notes
Removal for Re-Use (Cont'd)
The tenderers shall not include the following item/materials
in the calculation of credit value arises from demolition
works.
All the said items/materials itemised below will be disposed
by the Koperasi Pekan Rabu.
However, prior to commencement of the work, the
contractor is to carry out a joint survey with the SO for the
following inventories on the assets to be dismantled and
delivered and stored at a storage designated by Koperasi
Pekan Rabu. The said inventory shall be recorded in the
presence of the Koperasi Pekan Rabu's representative .
Provide all machines, labours, scaffolding, temporary works
where necessary and carefully remove manually and or by
machine of the following items from the existing
building/structures including setting aside, multiple
handling, transporting, stacking, storing at SO's designated
storage site not exceeding 20km radius from site including
dispatching from site and returning to site as required and
such materials shall become the property of the Employer
and be excluded from the credit/salvage value
Set Railing Tangga
(2x4, 1x1, 1/2x1/2)
Block A
12ft Nos 24
6ft Nos 7
Block B
12ft Nos 20
8ft Nos 2
Railing Walkway (2x4)
Block A
48ft Nos 12
20ft Nos 2
16ft Nos 1
8ft Nos 1
4ft Nos 1
Block B
12ft Nos 20
8ft Nos 2
Pintu Kayu (2.5x7) at Menara Pekan Rabu Nos 18
Tangki Air (12x6 / 4x4) at Menara Pekan Rabu Nos 2
Meja at Menara Pekan Rabu Nos 8
Peti Besi (2.5x3) at Menara Pekan Rabu Nos 2
Sistem lif menara at Menara Pekan Rabu Nos 1
TO COLLECTION RM
<

C
O

.
.
0

C
.
)

"
0
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
B/1/5
PART B - DEMOLITION WORKS
Item Description Unit Qty Rate Amount
General Notes
Removal for Re-Use (Cont'd)
The tenderers shall not include the following item/materials
in the calculation of credit value arises from demolition
works.
All the said items/materials itemised below will be disposed
by the Koperasi Pekan Rabu.
However, prior to commencement of the work, the
contractor is to carry out a joint survey with the SO for the
following inventories on the assets to be dismantled and
delivered and stored at a storage designated by Koperasi
Pekan Rabu. The said inventory shall be recorded in the
presence of the Koperasi Pekan Rabu's representative .
Provide all machines, labours, scaffolding, temporary works
where necessary and carefully remove manually and or y
machine of the following items from the existing
building/structures including setting aside, multiple
handling, transporting, stacking, storing at SO's designated
storage site not exceeding 20km radius from site including
dispatching from site and returning to site as required and
such materials shall become the property of the Employer
and be excluded from the credit/salvage value
Bumbung Zink ( 2.5 x 40ft) at Block A Nos 200
Alat Pemadam Api
(ABC & CO2-9kg) at Block A & Block B Nos 41
Kipas Siling at Block A & Block B Nos 44
CCTV at at Block A & Block B Nos 8
PA sistem at Block A & Block B Nos 5
Set Meja Makan
Kedai makan
1 meja, 6 kerusi (2x5) Set 18
1 meja, 4 kerusi (2x3) Set 44
Tong Sampah (660L/240L) at Block A & Block B Nos 17
Spotlight
Block A Nos 5
Block B Nos 24
Glass(kaca) \
4x4 at Menara Pekan Rabu Nos 31
Bumbung Atap Genting at Block B LS
Q

c
4

0

4
-

0
)

.
0
TO COLLECTION RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
B/1/6
PART B - DEMOLITION WORKS
Item Description Unit Qty Rate Amount
ELEMENT NO. 1 - DEMOLITION WORK (Cont'd)
UTILITY MAPPING
Provide manpower and equipment to carry out the
necessary utility mapping to locate all the underground
services and identify all affected sevices and upon
completion of the services the contractor is to provide the SO
with the utility plan to show all existing services at site
TERMINATING AND REINSTATEMENT OF EXISTING
UTILITY SERVICES
Locate on Site, carefully shut down, turn-off, terminate,
disconnect and seal up all existing live and/or dead surface
and underground electric, water and any other utilities
services supply lines prior to starting other works on Site,
including pull down, grub up, remove from site and or divert,
reinstate it if any
SHORING
Design a system, provide and erect shoring where
necessary including obtaining approvals, permits,
maintaining the shoring and clearing away the shoring and
making good all work disturbed by the said shoring
DEMOLITION OF EXISTING BUILDINGS/STRUCTURES
Demolition of the following existing buildings and or
structures including supply of all expertise, skills and
general labours, special machineries, and tools for
breaking up, cutting up, and hacking of buildings, structures
into safe and transportable sizes complete where found
necessary including all necessary excavation, multiple
handling and disposal of excavated material, demolished
materials to Contractor's own dump site off site and
including all necessary costs for completion of works not
measured separately elsewhere
A
B
C
LS
LS
LS
TO COLLECTION RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
B/1/7
PART B - DEMOLITION WORKS
Item Description Unit Qty Rate Amount
ELEMENT NO. 1 - DEMOLITION WORK (Cont'd)
Existing One block of Block Aked (Block Aj. including
TNB substation inside/attached to the building of
approximate overall size of width 45 metres x length
110 metres x height 20 metres including all structures
within the boundary
Demolition and removal of all structures and fittings, finishes
and services all complete from ground beams including all
necessary excavation to expose structures and removal off
site all excavated materials and demolished materials off
Ditto of all existing structures between ground beams and
column stumps ditto
Ditto Column Stumps including excavation to expose
structures cutting off reinforcement and removal off site all
excavated materials and demolished materials off site
Ditto Pile Caps and Footings including excavation to
expose structures, cutting of reinforcement and removal off
site all excavated materials and demolished materials off site
Extract out existing piles in full length including excavation
multiple handling and removing from site to contractor's own
dumping ground (Provisional Quantities)
Cutting up of existing piles at the required depth including
excavate to expose, cutting and stripping of reinforcement,
multiple handling and disposal of cut piles to the contractor's
own dumr shall be held responsible for
A
a
b
c
d
e
LS
LS
LS
LS
Nos
Nos
TO COLLECTION RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
B/1/8
PART B - DEMOLITION WORKS
Item Description Unit Qty Rate Amount
ELEMENT NO. 1 - DEMOLITION WORK (Cont'd)
Existing One block of Block Aked (Block pi, of
approximate overall width 10 metres x length 110
metres x height 12 metres including all structures
within the boundary
Demolition and removal of all structures and fittings, finishes
and services all complete from ground beams including all
necessary excavation to expose structures and removal off
site all excavated materials and demolished materials off site
Ditto of all existing structures between ground beams and
column stumps ditto
Ditto Column Stumps including excavation to expose
structures cutting off reinforcement and removal off site all
excavated materials and demolished materials off site
Ditto Pile Caps and Footings including excavation to
expose structures, cutting and of reinforcement and removal
off site all excavated materials and demolished materials off
site
Extract out existing piles in full length including excavation
multiple handling and removing from site to contractor's own
dumping ground (Provisional Quantities)
Cutting up of existing piles at the required depth including
A
a
b
c
d
LS
LS
LS
LS
LS
Nos
Nos
28
28
TO COLLECTION RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
B/1/9
PART B - DEMOLITION WORKS
Item Description Unit Qty Rate Amount
ELEMENT NO. 1 - DEMOLITION WORK (Cont'd)
Existing One Nos Single Storey Surau
Demolition and removal of all structures and fittings, finishes
and services all complete from ground beams including all
necessary excavation to expose structures and removal off
site all excavated materials and demolished materials off site
Ditto of all existing structures between ground beams and
column stumps ditto
Ditto Column Stumps including excavation to expose
structures cutting off reinforcement and removal off site all
excavated materials and demolished materials off site
Ditto Pile Caps and Footings including excavation to
expose structures, cutting of reinforcement and removal off
site all excavated materials and demolished materials off site
Extract out existing piles in full length including excavation
multiple handling and removing from site to contractor's own
dumping ground (Provisional Quantities)
Cutting up of existing piles at the required depth including
excavate to expose, cutting and stripping of reinforcement,
multiple handling and disposal of cut piles to the contractor's
own dump situres and or buildings are damaged, the
contractor shall repair and restored them to its original
condition at his own costs.
All demolition works shall be held to include the handling
and disposal of toxic and or or other dangerous materials if
any
A
a
b
c
d
LS
LS
LS
LS Nos
Nos
ITEM
ITEM
ITEM
ITEM
ITEM
TO COLLECTION RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
B/1/10
PART B - DEMOLITION WORKS
Item Description Unit Qty Rate Amount
COLLECTION
B/1/1
B/1/2
B/1/3
B/1/4
B/1/5
B/1/6
B/1/7
B/1/8
B/1/9
B/1/10
TO SUMMARY RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
B/1/11
PART B - DEMOLITION WORK
Item Description Qty Amount
SUMMARY Page No.
1 ELEMENT NO. 1 - DEMOLITION WORK B/1/11
TOTAL CARRIED TO GRAND SUMMARY RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS RABU, ALOR SETAR, KEDAH
B/S
GIAN C
C PI ING WORKS AND DIAPHRAGM WAL
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR , KEDAH
PART C - PILING WORKS AND DIAPHRAGM WALL
Ite
m
Description Unit Qty Rate Amount
ELEMENT NO. 'I - BORE PILE
(ALL PROVISIONAL)
PILING WORKS (750MM DIAMETER)
A Mobilisation and Demobilisation of piling equipment
and plant to site
Item
B Allow for movement within site Item
Information
Payable pile length shall be measured from pile cut off
level to pile toe level
Boring shall commenced from exising ground level
until pile toe level
Empty bore shall be backfilled with approved surplus
material, say 5m
Permissible verticality for bored pile is 1:75
The work in this section comprises
Installation of 750mm Diameter Bore Piles as per
Engineer's drawings
Prices for testing of piles shall be deemed to include
the provision of all pile testing equipment on site and
dismantling and removing the same on completion of
piling works and extension of pile section for testing if
required
C
Boring through soil strata for 750mm diameter
vertical bored pile including provision of temporary
steel casing and drilling fluid where required [40 No]
M 1,480
D Steel bar reinforeement in bored piles KG 39,125
E Provision and placement of Grade 40 (Tremie 2)
concrete in 750mm diameter bored piles as specified
M3 566
F
Dispose of surplus material boring operation away
from site
M
1,480
G Cut off surplus 750mm diameter bored piles No. 40
TO COLLECTION RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
C/1/1
PART C - PILING WORKS AND DIAPHRAGM WALL
Item Description Unit Qty Rate Amount
ELEMENT NO. 1 - BORE PILE (CONT'D)
(ALL PROVISIONAL)
PILING WORKS (1050MM DIAMETER)
Information
Payable pile length shall be measured from pile cut off
level to pile toe level
Boring shall commenced from exising ground level
until pile toe level
Empty bore shall be backfilled with approved surplus
material, say 5m
Permissible verticality for bored pile is 1:75
The work in this section comprises
Installation of 1050mm Diameter Bore Piles as per
Engineer's drawings
Prices for testing of piles shall be deemed to include
the provision of all pile testing equipment on site and
dismantling and removing the same on completion of
piling works and extension of pile section for testing if
required
A
Boring through soil strata for 1050mm diameter
vertical bored pile including provision of temporary
steel casing and drilling fluid where required [50 No]
M 2,225
B Steel bar reinforeement in bored piles KG 112,378
C
Provision and placement of Grade 40 (Tremie 2)
concrete in 1050mm diameter bored piles as specified
M3 1,710
D Dispose of surplus material boring operation away
from site
M 2,225
E Cut off surplus 1050mm diameter bored piles No. 50
Setting Out
F Allow for setting out work to be executed by a ITEM
Licensed Surveyor including submission four (4) sets
of records and submission to the Engineer four (4)
sets of as-built piling survey drawings
TO COLLECTION RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
C/1/2
PART C - PILING WORKS AND DIAPHRAGM WALL
Item Description Unit Qty Rate Amount
ELEMENT NO. 1 - BORE PILE (CONT'D) (ALL PROVISIONAL)
PILING WORKS
Pile Testing
Maintained Load Test (MLT) on test pile including
provision of all kentledge, hydrauic jack, load cells,
dia gauges, temporary staging and equipment
required and all necessary attendance and
supervision during test period and removal upon
completion. This is to include strengthening of
Kentledge base to support blocks.
Instrumented Load Test on 750mm diameter
preliminary bored pile to 2.0 times the pile working load (2.0 x
WL =7720KN)
Ditto but for 1050mm diameter diameter BP (2.0 x WL =
15600 KN)
Non-instrumented load test on 750mm diameter
Subsequent working pile to 2.0 times the pile working load (2.0
x WL = 7720 KN)
Ditto but for 1050mm diameter Bored Pile (2.0 x WL = 15600
KN)
To carry out PDA test on the following piles ,
750mm diameter bored pile
1050mm diameter bored pile
To carry out PIT test on the following piles ;
750mm diameter bored pile 1050mm diameter bored pile
Piling Record
Allow for preparation and submission of record of all piles (in 4
copies) duly signed by Contractor and Engineer's
representative as the work proceeds
A
B
C
D
E
F
G
H
J
NO NO
NO NO
NO
NO
NO
NO
ITEM
1
1
1
1
2
2
9
5
TO COLLECTION RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
C/1/3
PART C - PILING WORKS AND DIAPHRAGM WALL
Item
Description
Unit
Qty
Rate
Amount
COLLECTION
C/1/1
C/1/2
C/1/3
BORE PILE
TO SUMMARY RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
C/1/4
PART C- PILING WORKS AND DIAPHRAGM WALL
Item Description Unit Qty Rate Amount
ELEMENT NO. 2 - DIAPHRAGM WALL
(ALL PROVISIONAL)
GENERAL
Shop construction drawings by specialist contractor (if any)
Allow for mobilisation of all necessary equipment, plant and tools for
their transportation to site, handling, assembling and erection and
dismantling and removal off site on completion
Allow for setting out of Bentonite pool / silo
Allow for movement of plant and equipment about the site.
EXCAVATION WORKS
Excavate commencing from formation levels and pet out
part return, fill in and ram deposit and spread in making up
levels where directed within the site and remainder load and
cart away from site :-
Trench excavation for 600mm thick Diaphragm Wall
maximum depth not exceeding 30m deep
Trench excavation for 600mm wide x 1000mm depth Capping Beam
CONCRETE WORKS
Vibrated reinforced concrete Grade 35 as specified in :-
Capping Beam
Vibrated reinforced concrete Grade 35-T2 as specified in :-
600mm Thick for Diaphragm Wall FORMWORK
Sawn formwork as described :-
J
150mm Thick for Guide Wall
(Temporary Wall)
600mm Thick for Diaphragm
Wall
Capping Beam
A
B
C
D
E
F
G
H
K
L
LS
LS
LS
LS
M3 M3
M3 M3
M2
M2
M2
3,802
252
252
3,799
672
14,778
662
TO COLLECTION RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
C/2/1
PART C - PILING WORKS AND DIAPHRAGM WALL
Item Description Unit Qty Rate Amount
ELEMENT NO.2 - DIAPHRAGM WALL (CONT'D)
(ALL PROVISIONAL)
REINFORCEMENT
Supply and install High Yield Type 2 Deformed Bar to BS
4449 (Grade 460MPa)
A Capping Beam (T12) KG 5,970
B Capping Beam (T16) KG 9,552
C 600mm Thick for Diaphragm Wall (T12) KG 46,293
D 600mm Thick for Diaphragm Wall (T16) KG 128,196
E 600mm Thick for Diaphragm Wall (T20) KG 195,855
GUIDE WALL
F
Design and construct reinforced concrete temporary guide
walls including all necessary excavation, concrete,
formworks and rebar and subsequent break out and remove
M 331
(1 side only) upon completion of works
G Supply and install 150mm wide rubber waterstop to M 784
Diaphragm Wall
H To allow temporary stop end to Diaphragm Wall M 1,176
CUT OFF
J Cutt of top 600mm thick diaphragm wall to required level M 331
TRIMMING
K Trimming or cleaning of exposed diaphragm wall internally M2 2,016
RECORDS
L Submission of records. LS
DISMANTLE
M 10 T10-150 Dowel bar for connection between diphragm wall and Rate
100,000.00 basement slabs with Hilti RE-500
LS
TO COLLECTION RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
C/2/2
PART C - PILING WORKS AND DIAPHRAGM WALL
Item Description Unit Qty Rate Amount
COLLECTION
C/2/1
C/2/2
TO SUMMARY RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
C/2/3
PART C- PILING WORKS AND DIAPHRAGM WALL
Item Description Unit Qty Rate Amount
ELEMENT NO.3 -TEMPORARY STRUTTING
TEMPORARY STRUTTING
A Transport to site and demob off site
Supply of:
B Strut UC 356 x 368 x 134 kg/m (ST1) KG 150,750
C Strut UC 254 x 254 x 73 kg/m (ST2) KG 1,752
D Waler UC 356 x 368 x 134 kg/m (CW) KG 45,024
E Tie UC 254 x 254 x 73 kg/m (TB) KG 6,497
F King Post UC 305 x 305 x 97 kg/m (KP) KG 50,537
G Laced UC 100 x 100 x 15 kg/m KG 11,235
Total Weight = 265.795 tons @ 266 MT
H Installation Cost MT 266
J
Supply of 10% of ms plate, splice plate and other accessory
MT
26.6
K Dismantling Cost MT 266
L Installation of 12m long dummy pile for king post (40 nos)
a. Bore 750mm diameter vertical hole (18m long point) M 720
b.High tensile road reinforcement in 750mm diameter DP KG 6,942
c.10mm diameter mild steel rod reinforcement in 750mm DP KG 1,911
d.Concrete for 750mm diameter DP (Dummy Pile) M 468
M
Supply, install, dismantle & salvage of angle bracket to
support waler beam & strut @ 2m c/c over 336m
No 168
N
Supply, install, preload, dismantle, removal & salvage of hydraulic
jack
No 15
P Supply and install shear key between wall and waler M 336
Q Installation of concrete packing between waler and wall M 336
R Removal of concrete packing and shear key M 336
S To cut off H300 king post No 130 39.0 5,070.00 No 39
T Allow for submission of shop drawing by specialist
contractor
LS
TO COLLECTION RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
C/3/1
D - BUILDING WORKS
PROJEK MEROBOH DAN ME BINA SEMULA KOMPLEKS PEKAN RABU, A OR SETAR, KEDAH
GIAN Dl
NA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
PART D.1 - BASEMENT
Item Description Unit Qty Rate Amount
ELEMENT NO.1 - WORK BELOW LOWEST FLOOR FINISH
(WBLFF)
Generally
NOTE: All excavation are measured from formation level unless
otherwise stated
Specification and General Labour Clause
For description of materials and Workmanship and General Labour
applicable to this Bill refer to Specification and Preambles
Excavation Works
Excavate commencing from formation levels and get out part return,
fit in and ram deposit and spread in making up, levels where directed
within the site and remainder load and cart away from site :-
Basement
Maximum depth not exceeding 6.00m deep Lift pit base
Maximum depth not exceeding 8.00m deep Ditto; 10.00m deep
Pile Cap
Maximum depth not exceeding 1.00m deep Ditto; not xeceeding 2.00m
deep
Retaining Wall
Maximum depth not exceeding 2.00m deep Sump Wall
Maximum depth not exceeding 2.00m deep Ramp beam
Maximum depth not exceeding 1.00m deep Basement Slab
Maximum depth not exceeding 1.00m deep Filling
Hardcore as described spread, levelled, well rammed and
consolidated, watered and blinded on top with sand to receive
concrete including trimming base of excavation
150mm Thick under basement slab
One layer of 0.25mm thick polythene sheet or other equal and
approved damp proof membrane as described and well lapped at
joints (measured nett and no allowance made for laps)
Under basement slab
B
C
D
E
F
G
H
J
K
L
M3
M3
M3
M3
M3
M3
M3
M3
M3
M2
M2
19,433
147
156
27
114
66
5
5
1,912
3,824
3,824
TO COLLECTION RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
D.1/1/5
PART D.1 - BASEMENT
Item Description Unit Qty Rate Amount
ELEMENT NO.1 - WORK BELOW LOWEST FLOOR FINISH
(WBLFF) (Cont'd)
Concrete Works
Lean concrete Grade 15 blinding with surfaces finished level to
receive concrete including where necessary trimming base of
excavation
A 50mm Thick under pile cap M3 6
B 50mm Thick under lift pit base M3 4
C 50mm Thick under retaining wall M3 2
D 50mm Thick under sump wall M3
E 50mm Thick under ramp beam M3 1
F 50mm Thick under basement slab M3 191
Vibrated reinforced concrete Grade 35 as described in
Pile cap M3 135
G Column stumps (Provisional) M3 19
H Lift pit base M3 120
J Retaining wall M3 65
K Sump wall M3 5
L Ramp beam M3 5
M Basment slab; exceeding 300mm thick M3 1,721
N Extra Over for forming 300mm wide x 150mm deep scrupper drain M 527
Reinforcement bars M.S 146 hot rolled plain round mild steel as
described :-
Ramp beam
P 10mm Diameter as stirrups
KG 227
Basement slab
Q 6mm Diameter as stirrups KG
318
Reinforcement bars, M,S 146 hot rolled deformed high tensile steel as
described :-
Pile cap
R 10mm Diameter as binder KG 1,083
S 16mm Diameter as main bars KG 10,495
Column stumps (Provisional)
T
10mm Diameter as ties
KG 897
U 16mm Diameter as main bars KG 916
V 20mm Diameter as main bars KG 466
TO COLLECTION RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
D.1/1/5
PART D.1 - BASEMENT
Item Description Unit Qty Rate Amount
ELEMENT NO.1 - WORK BELOW LOWEST FLOOR FINISH
(WBLFF) (Cont'd)
Concrete Works (Cont'd)
Column stumps (Provisional) (Cont'd)
A
25mm Diameter as main bars
KG
2,110
B 32mm Diameter as main bars KG 27,014
Lift pit base
C
16mm Diameter as binder
KG 1,203
D 25mm Diameter as main bars KG 4,486
E 32mm Diameter as main bars KG 6,193
Retaining wall
F 12mm Diameter as main bars KG 2,254
G 16mm Diameter as main bars KG 6,164
Sump wall
H 12mm Diameter as main bars KG 235
J 16mm Diameter as main bars KG 286
Ramp beam
K 25mm Diameter as main bars KG
681
Basement slab
L 16mm Diameter as main bars KG 197,551
Sawn formwork as described :-
M Sides of pile cap M2 422
N Sides of lift pit base M2 99
P Sides of Column stumps (Provisional) M2 150
Q Sides of Ramp beam M2 47
To edges of basement slab; not exceeding 250mm high M 26
S To edges of basement slab; exceeding 250mm but not exceeding
500mm high M 567
Waterproofing
Prepare and apply of two coat approved flexible cemetitious
waterproofing system including fiberglass mat reinforcement at
junction between slab and wall all applied in strict accordance with the
manufacturer's instructions and recommendations
T To lift pit base; laid to fall M2 70
TO COLLECTION RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
D.1/1/5
PART D.1 - BASEMENT
Item Description Unit Qty Rate Amount
ELEMENT NO.1 - WORK BELOW LOWEST FLOOR FINISH
(WBLFF) (Cont'd)
Construction joints
Approved construction joint including waterstop as described and
including all necessary formwork, grouting tubes and etc.
Horizontal joint in 450mm thick basement slab with approved
waterstop
Horizontal joint in 300mm thick retaining wall with approved waterstop
Horizontal joint in 300mm thick sump wall with approved waterstop
Polysterene board
Approved polysterene board fix into position including all necessary
fixing accessories
Sides of retaining wall Sides of sump wall
Anti Termite Treatment
Ground treatment against subterranean termites using termiticides
chemical soil treatment approved py Pesticide Board of Malaysia.
including providing not less than twenty (20) years written guarantee :-
Prepare and apply '4 stage' anti - termite treatment to a concentration of
4 gallons per ten square feet to base and sides of pile cap, sides of
beams, sides of column stump, apron, on hardcore and borders and to
be carried out by an approved soil treatment specialist to progressively
accommodate the construction works or in sections all to the approval
by the S.0
Sundries
Allow for forming all necessary services pipe openings in concrete as per
the approved M&E Engineers drawings, make good any defects all to the
entire satisfaction by the S.O's
A
B
C
D
F
G
M
M
M
M2
M2
M2
Item
113
12
115
15
3,824
TO COLLECTION RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
D.1/1/5
PART D.1 - BASEMENT
Item Description Unit Qty Rate Amount
COLLECTION
D.1/1/1
D.1/1/2
D.1/1/3
D.1/1/4
WORK BELOW LOWEST FLOOR FINISH (WBLFF)
TO SUMMARY RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
D.1/1/5
PART D.1 - BASEMENT
Item Description Unit Qty Rate Amount
ELEMENT NO. 2 - APRON, RAMP & PERIMIETER DRAIN
Generally
NOTE: All excavation are measured from formation level unless otherwise
stated
Specification and General Labour Clause
For description of materials and Workmanship and General Labour
applicable to this Bill refer to Specification and Preambles
Excavation Works
Excavate commencing from formation levels and get out part return,
fill in and ram deposit and spread in making up levels where directed
within the site and remainder load and cart away from site :-
Non suspended ramp slab
Maximum depth not exceeding 1.00m deep Filling
Hardcore as described, spread, levelled, well rammed and
consolidated, watered and blinded on top with sand to receive
concrete including trimming base of excavation
200mm Thick under non suspended ramp slab
Handpacking hardcore to form the battering faces in 350mm high under
non suspended ramp slab
One layer of 0.25mm thick polythene sheet or other equal and
approved damp proof membrane as described and well lapped at
joints (measured nett and no allowance made for laps)
Under non suspended ramp slab Concrete Works
Lean concrete Grade 15 blinding with surfaces finished level to
receive concrete including where necessary trimming base of
excavation
50mm Thick under non suspended ramp slab
Vibrated reinforced concrete Grade 35 as described in
Non suspended ramp slab
Suspended ramp slab
Extra Over for forming 25mm wide x 25mm deep groove line
Extra Over for forming 150mm wide x 50mm deep scrupper drain on
non suspended ramp slab
Extra Over for forming 75mm wide x 25mm deep scrupper drain on
suspended ramp slab
A
B
C
D
E
F
G
H
J
K
M3
M2
M
M2
M3
M3
M3
M2
M
M
34 78 39
78 5
29
14
157
39
39
TO COLLECTION RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
D.1/2/1
PART D.1 - BASEMENT
Item Description Unit Qty Rate Amount
ELEMENT NO. 2 - APRON, RAMP & PERIMIETER DRAIN
(CONT'D)
Concrete Works (Cont'd)
Reinforcement bars M.S 146 hot rolled deformed high tensile steel as
described :-
Non suspended ramp slab
10mm Diameter as main bars 12mm Diameter as main bars Suspended
ramp slab
10mm Diameter as main bars 12mm Diameter as main bars Sawn
formwork as described :-
Soffit of suspended ramp slab
To edges of suspended ramp slab; not exceeding 250mm high
To edges of non suspended ramp slab; exceeding 250mm but not
exceeding 500mm high
Anti Termite Treatment
Ground treatment against subterranean termites using termiticides
chemical soil treatment approved
k
Pesticide Board of Malaysia.
including providing not less than twenty (20) years written guarantee :-
Prepare and apply '4 stage' anti - termite treatment to a concentration of
4 gallons per ten square feet to base and sides of apron slab, on hardcore
and borders and to be carried out by an approved soil treatment
specialist to progressively accommodate the construction works or in
sections all to the approval by the S.0
A
B
C
D
E
G
H
KG
KG
KG
KG
M2
M
M
M2
534
1,176
534
1,408
78
55
94
78
TO COLLECTION RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
D.112/2
PART - BASEMENT
Item Description Unit Qty Rate Amount
COLLECTION
D.1 /2/1
D.1/2/2
APRON, RAMP & PERIMIETER DRAIN
TO SUMMARY RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
D.1/2/3
PART DA - BASEMENT
Item Description Unit Qty Rate Amount
ELEMENT NO.3 - FRAME
Concrete Works
Vibrated reinforced concrete Grade 35 as described in
A Stiffener M3 7
B Isolated column M3 240
C Staircase column M3 1
D Suspended floor beam M3 136
E Lift wall M3 230
F Parapet wall M3 16
Ramp wall M3 10
Reinforcement bars, M.S 146 hot rolled plain round mild steel
as described :-
Stiffener
H 6mm Diameter as ties KG 312
Isolated Column
J 6mm Diameter as ties KG 91
K 10mm Diameter as ties KG 13,908
Staircase Column
L 10mm Diameter as links
KG 141
Suspended floor beam
M 10mm Diameter as stirrups KG 9,005
Lift Wall
A 8mm Diameter as stirrups KG
1,198
Reinforcement bars M.S 146 hot rolled deformed high tensile
steel
Stiffener
P 12mm Diameter as main bars
KG
941
Isolated column
Q 16mm Diameter as main bars KG
7,068
R 20mm Diameter as main bars KG 3,318
S 25mm Diameter as main bars KG 2,718
T 32mm Diameter as main bars KG 73,117
TO COLLECTION RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
D.1/3 / 2
PART DA - BASEMENT
Item Description Unit Qty Rate Amount
ELEMENT NO. 3 - FRAME (CONT'D)
Concrete Works (Cont'd)
Staircase Column
A
12mm Diameter as main bars KG 36
B 16mm Diameter as main bars KG 268
Suspended floor beam
C 12mm Diameter as main bars KG
150
D 16mm Diameter as main bars KG 86
E 20mm Diameter as main bars KG 2,057
F 25mm Diameter as main bars KG 8,710
32mm Diameter as main bars KG 11,638
Lift wall
H 12mm Diameter as main bars KG 20,406
J 16mm Diameter as main bars KG 18,058
K 20mm Diameter as main bars KG 613
Parapet wall
M 10mm Diameter as main bars KG
391
N 12mm Diameter as ties KG 3,062
Ramp wall
0 10mm Diameter as main bars
KG 375
P 12mm Diameter as ties KG 799
TO COLLECTION RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
D.1/3 / 2
PART D.1 - BASEMENT
Item Description Unit Qty Rate Amount
ELEMENT NO. 3 - FRAME (CONT'D)
Concrete Works (Cont'd)
Sawn formwork as described :-
A Sides of stiffener M2 172
B Sides of isolated column M2 1,924
C Sides of Staircase Column M2 20
D Sides and soffit of suspended floor beam M2 584
E Sides of lift wall M2 2,087
F Open boxing size 2050mm x 1100mm for door lift NO 22
G Sides of parapet wall M2 211
H Sides of ramp wall M2 96
Waterproofing
Prepare and apply of two coat approved flexible cemetitious
waterproofing system including fiberglass mat reinforcement at
junction between slab and wall all applied in strict accordance
with the manufacturer's instructions and recommendations
J To basement M2 2,071
K To lift pit wall M2 50
Construction joints
Approved construction joint including waterstop as described
and including all necessary formwork, grouting tubes and etc.
Horizontal joint in 300mm thick basement wall with approved
waterstop
M 331
Sundries
M Allow for opening in floors, beam, wall, etc. including additional
trimmer bars, pipe sleeves, sealing opening on completion
around services pipe etc. with approved fire stop sealing
compound or approved non shrink grout all carried out to the
S.O's approval Item 1
N Allow for sealing opening in ducts around pipes, etc. with
cement grout all carried out to the S.O's approval and
satisfaction Item 1
TO COLLECTION RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
D.1/3/4
PART D.1 - BASEMENT
Item Description Unit Qty Rate Amount
COLLECTION
D.1/3/1
D.1/3/2
D.1/3/3
FRAME
TO SUMMARY RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
D.1/3/4
PART D.1- BASEMENT
Item Description Unit Qty Rate Amount
ELEMENT NO. 4 - UPPER FLOOR
Concrete Works
Vibrated reinforced concrete Grade 35 as described in
A Suspended floor slab M3 429
B Extra Over for forming 300mm wide x 150mm deep scrupper
drain
M 223
Reinforcement bars, M.S 146 hot rolled plain round mild steel
as described :-
Suspended floor slab
C 6mm Diameter as stirrups KG 283
Reinforcement bars, M.S 146 hot rolled deformed high tensile
steel as described :-
Suspended floor slab
D 16mm Diameter as main bars KG 93,812
Sawn formwork as described
E Soffit of suspended floor slab M2 1,343
F
To edges of suspended floor slab; not exceeding 250mm high
M 12
Sundries
G Allow for opening in floors, beam, wall, etc. including additional
trimmer bars, pipe sleeves, sealing opening on completion
around services pipe etc. with approved fire stop sealing
compound or approved non shrink grout all carried out to the
S.O's approval Item 1
H Allow for sealing opening in ducts around pipes, etc. with
cement grout all carried out to the S.O's approval and
satisfaction Item 1
TO COLLECTION RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
D.1/4/2
PART D.1- BASEMENT
Item Description Unit Qty Rate Amount
COLLECTION
D.1/4/1
UPPER FLOOR CONSTRUCTION
TO SUMMARY RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
D.1/4/2
PART D.1 - BASEMENT
m Description Unit Qty Rate Amount
ELEMENT NO. 5 - STAIRCASE CONSTRUCTION
Concrete Works
Vibrated reinforced concrete Grade 35 as described:-
Landing Beam M3 1
Landing Slab M3 7
Staircase M3 13
Reinforcement bars, M.S 146 hot rolled plain round mild steel
Landing Beam
) 10mm Diameter as stirrups KG 29
Reinforcement bars, M.S 146 hot rolled deformed high tensile
steel:-
Landing Beam
10mm Diameter as main bars KG 5
F 12mm Diameter as main bars KG 17
i 20mm Diameter as main bars KG 26
Landing Slab
H 10mm Diameter as main bars KG 359
12mm Diameter as main bars KG 1,025
Staircase
10mm Diameter as main bars KG 388
12mm Diameter as main bars KG 1,076
J
L
TO COLLECTION RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
D.1/5/5
PART D.1 - BASEMENT
Item Description Unit Qty Rate Amount
ELEMENT NO 5 - STAIRCASE CONSTRUCTION (CONT'D)
Concrete Works (Cont`c1)
Sawn formwork as described:-
A Sides and soffit of landing beam M2 9
B Soffit of landing slab M2 51
C Soffit of staircase flight M2 60
D To undercut riser; 150mm High M 149
E To undercut riser; 164mm High M 50
F To sides of staircase stringer 125mm (minimum) and 200mm M 80
(maximum) wide including cutting to profile to tread and riser
Staircase Finishes
Paving Works
Cement and sand (1:3) finished with a steel trowel
G 19mm Thick to landing slab M2 51
H To tread; 225mm Wide M 127
J Ditto; to tread; 260mm Wide M 72
K To riser; 150mm High M 149
L Ditto;to riser; 164mm High M 50
M Extra Over for nosing tile; 20mm Wide M 199
TO COLLECTION RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
D.1/5/5
PART D.1 - BASEMENT
Item Description Unit Qty Rate Amount
ELEMENT NO. 5 - STAIRCASE CONSTRUCTION (CONT'D)
Staircase Finishes (Cont'd)
Plastering Works
Approved cement based skim coat plaster system to concrete
surfaces consisting of one base coat and finishing coat
including preparing, gridding, and patching joints and undulating
surfaces, trowelled smooth all in accordance with the
manufacturer's instructions and recommendations internally
To sides and soffit of landing beam To soffit of landing slab
To soffit of staircase flight
To sides of open stringer 125mm (minimum) and 200mm
(maximum) wide
Painting Works
Prepare and apply one sealer coat of alkali-resisting primer and
two coats of supermatt standard colour or equivalent internally
on surfaces of:-
To sides and soffit of landing beam To soffit of landing slab
To soffit of staircase flight
To sides of open stringer 125mm (minimum) and 200mm
(maximum) wide
Painting Works
Prepare and apply one sealer coat of alkali-resisting primer and
two coats of supermatt standard colour or equivalent internally
on surfaces of:-
To sides and soffit of landing beam To soffit of landing slab
To soffit of staircase flight
To sides of open stringer 125mm (minimum) and 200mm
(maximum) wide
A
B
C
E
F
G
H
J
K
L
M
M2
M2
M2
M
M2
M2
M2
M
M2 M2
M2 M
9
51
60
80
9
51
60
80
9
51
60
80
TO COLLECTION RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
D.1/5/5
PART D.1 - BASEMENT
Item Description Unit Qty Rate Amount
ELEMENT NO. 5 - STAIRCASE CONSTRUCTION (CONT'D1
Meta!works
Handrail constructed stainless steel oval extruded hollow
section as per manufacturer details and instructions and all as
per Drawing No.No.AA/K12/KPLKS(PR)/371/DD-ST1-ST10
1200mm high Handrail (Overall)
1200mm high Handrail; on rake (Overall)
Mild steel railing and balustradinq constructed stainless steel
oval handrailing, 38m x 6mm thick mild steel plate baluster
welded to mild steel railing post at every 1625mm centres,
complete with mild steel post constructed of 75mm x 12mm
thick mild steel plate with angle shape twin railing post
alternately welded together to 75mm x 12mm mild steel
bracing, intermediate mils steel post constructed of 75mm x
12mm thick mild steel plate, horizontal railing in 7 nos in size of
38mm x 6mm thick mild steel plate in 109mm to 135mm
centers all welded together and bolted to concrete floor
structure with 12mm thick mild steel plate and including all
necessary painting to surface of metalworks and all as per
manufacturer accordance with the manufacturer's instructions
and recommendations and all as per Drawing No.
AA/K12/KPKLS(PR)/371/DD-RL-01-04
1200mm high Handrail and balustrade (Overall) 1200mm high Handrail
and balustrade; on rake (Overall)
A
B
C
D
M
M
M
M
46
59
3
35
TO COLLECTION RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
D.1/5/5
PART D.1 - BASEMENT
Item Description Unit Qty Rate Amount
COLLECTION
D.1/5/1
D.1/5/2
D.1/5/3
D.1/5/4
STAIRCASE CONSTRUCTION
TO SUMMARY RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
D.1/5/5
PART D.1- BASEMENT
Item Description Unit Qty Rate Amount
ELEMENT NO. 6 - ROOF CONSTRUCTION AND FINISHES
RC FLAT ROOF
Concrete Works
Vibrated reinforced concrete Grade 35 as described:-
Roof Slab
150mm Thick 165mm Thick Reinforcement bars M.S 146 hot rolled
deformed high tensile
steel:-
Roof Slab
10mm Diameter as main bars Sawn formwork as described:-
To soffit of roof slab Sundries
Allow for opening in floors, beam, wall, etc. including additional
trimmer bars, pipe sleeves, sealing opening on completion
around services pipe etc. with approved fire stop sealing compound
or approved non shrink grout all carried out to the S.O's approval
Allow for sealing opening in ducts around pipes, etc. with
cement grout all carried out to the S.O's approval and
satisfaction
Paving Works
Approved waterproofing membrane laid in strict accordance
with the manufcaturer's instructions and recommendations
(measured nett and no allowance made for laps)
To roof slab; laid to fall
Cement and sand (1:3) protective screed finished with a steel
trowel to a smooth and level surface laid in bays including
expansion joints and filled with approved sealants
To roof slab; laid to fall
A
B
C
D
E
F
G
M3
M3
KG M2
Item
Item
M2 M2
60
25
7,134
551
1
551
551
TO COLLECTION RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
D.1/6/2
PART D.1- BASEMENT
Item Description Unit Qty Rate Amount
COLLECTION
D.1/6/1
ROOF CONSTRUCTION AND FINISHES
TO SUMMARY RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
D.1/6/2
PART D.1 - BASEMENT
Item Description Unit Qty Rate Amount
ELEMENT NO. 7 - INTERNAL WALL & PARTITON
Brickworks & Blockworks
Cement and sand bricks bedded and jointed in cement mortar
(1:3) with plasticiser as described :-
Half brick wall (115mm thick) reinforced with and including a
layer of "Exmet" 65mm wide at every fourth course
Sundries
Bituminous damp proof course as specified (measured nett-no
allowance for laps)
On 115mm thick brickwall
6mm diameter mild steel rod 350mm long as bonding tie, one
end cast into concrete other end built into joint of brickwall
A
B
C
M2
M
No
495
121
1,028
TO COLLECTION RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
D.1/7/2
PART D.1 - BASEMENT
Item
Description
Unit
Qty
Rate
Amount
COLLECTION
0.1/7/1
INTERNAL WALL & PARTITON
TO SUMMARY RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
D.1/7/2
PART D.1- BASEMENT
Item Description Unit Qty Rate Amount
ELEMENT NO. 8 - DOOR & IRONMONGERIES
INTERNALLY
Concrete Works
In-situ Concrete Lintol
Precast reinforced concrete Grade 25 as described lintol
reinforced with 4 No 10mm Diameter high tensile bars
hooked at ends and 6mm Diameter mild steel bars as
stirrups and bedded in cement and sand (1:3) mortar
125mm wide x 125mm high to door Metalworks
Metal Door Frame
1.2mm Thick approved zincalume metal door frame bent to
shape and profile and infilled with cement mortar including
all wire-ties and all necessary, bedding, pointing both sides,
complete with sealant on backing rod and fixing accessories
all in accordance with the manufacturer's instructions and
recommendations
Overall size 1600mm x 2100mm high (Type D6) Door
Fire Rate Door
Approved one hours fire rated door complete with metal
door frame, intumescent strip, fire seal, all necessary
ironmongery and fixing accessories and hung in position on
butt hinges all in accordance with the manufacturer's
instructions and recommendations and in compliance with
Fire Authority's requirements all as per Drawing No.
AA/K12/KPLKS(PR)/371/DD-DRS-01&02
1100mm x 2100mm high (Type FD1) Semi Glazed Door
Approved semi glazed timber door complete with all
necessary accessories and hung in position all in
accordance with the manufacturer's instruction and
recommendations all as per Drawing No.
ANK12/KPLKS(PR)/371/DD-DRS-01&02
1600mm x 2100mm high double leaf door (Type D6)
A
B
C
D
M
No
No
No
35
8
8
8
PROJEK MEROBOH DAN MEMBINA SEMULA PEKAN RABU, ALOR SETAR, KEDAH
D.1/8/1
TO COLLECTION RM
PART D.1 - BASEMENT
Item Description Unit Qty Rate Amount
ELEMENT NO. 8 - DOOR & IRONMONGERIES
ELEMENT NO. 8 - DOOR & IRONMONGERIES (CONT'D)
Door (Cont'd)
Aluminium Louvres Door
Supply and install approved aluminium louvres door
including all heads, jambs, transomes, mullions, cills, etc.
and all necessary sub-frames, fixing lugs, brackets, straps,
supports, bolts, screws and all necessary approved
ironmongery, approved weather striping, packing piece and
grounds, cutting and waste, notching, mitres, labour, drilling,
plugging, screwing and fixing in position, mastic pointing
and cleaning down on completion all to S.O.'s approval all
as per Drawing No.AA/K12/KPLKS(PR)/371/DD-DRS-
01&02
1800mm x 2400mm high double leaf door (Type D7) Mild Steel
Roller Shutter
Supply and install the following approved mild steel roller
shutter complete with frames, fixing screws, ironmongery,
painting and all other fitting accessories all in accordance to
manufacturer's instructions and recommendations and all
as per Drawing No. No.AA/K12/KPLKS(PR)/371/DD-DRS-
10&11
4400mm x 2700mm high (Type RS16) Metaiworks
Supply and fix the following or other equal and approved
ironmongery including providing requisite matching screws
and required finishes fixed to hardwood or metal or set in
concrete floor
Locksets
E-Z-Set 200B-US32D-60mm Dead Bold (L10) Hinges
Lokrite 102mm x 76mm x 2.0mm SS Higes (H1) Accessories
Lockrite 150mm & 300mm SS Flush Bolt (A3)
TO COLLECTION RM
A
B
C
D
E
No
No
No
No
No
1
2
9
54
9
PROJEK MEROBOH DAN MEMBINA SEMULA PEKAN RABU, ALOR SETAR, KEDAH
D.1/8/2
PART D.1 - BASEMENT
Item Description Unit Qty Rate Amount
ELEMENT NO. 8 - DOOR & IRONMONGERIES
ELEMENT NO. 8 - DOOR & IRONMONGERIES (CONTD1
Painting Works
Prepare, knot, prime, stop and apply approved paint system
comprising one primer coat and two finishing coats of
approved colour; internally on timber surfaces
General surface of fire door
General surface of door
Prepare and apply approved paint system comprising one
coat of metallic primer, one undercoat and two finishing
coats of enamel paint internally on metal surfaces
General surfaces of frame exceeding 200mm but not exceeding
300mm girth
A
B
C
M2
M2
M
51
54
46
PROJEK MEROBOH DAN MEMBINA SEMULA PEKAN RABU, ALOR SETAR, KEDAH
D.1/8/3
TO COLLECTION RM
PART D.1 - BASEMENT
Item Description Unit Qty Rate Amount
ELEMENT NO. 8 - DOOR & IRONMONGERIES
COLLECTION
D.1 /8/1
D.1/8/2
D.1/8/3
DOOR & IRONMONGERIES
TO SUMMARY RM
PROJEK MEROBOH DAN MEMBINA SEMULA PEKAN RABU, ALOR SETAR, KEDAH
D.1/8/4
PART D.1 - BASEMENT
Item Description Unit Qty Rate Amount
ELEMENT NO. 9 - INTERNAL WALL FINISHES
Plastering Works
Internal plastering consisting of two coats of cement and
sand (1:3) finished with a steel float and including raking
out joints of brickwall or hacking concrete surfaces for key
on
19mm Thick to concrete or bricks surfaces
A To Basement wall M2 2,792
B To parapet wall M2 210
C To ramp wall M2 159
D To isolated column M2 696
E To wall and associated column M2 868
Painting Works
Prepare and apply approved paint system comprising one
coat sealer and two coats of emulsion paint of approved
colour internally on surfaces of
F To surface of Basement wall M2 2,792
G To surface of parapet wall M2 210
H To surface of ramp wall M2 159
J To surface of isolated column M2 696
K To surface of wall and associated column M2 868
TO COLLECTION RM
PROJEK MEROBOH DAN MEMBINA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
D.1/9/2
PART D.1 - BASEMENT
Item Description Unit Qty Rate Amount
COLLECTION
D.1/9/1
INTERNAL WALL FINISHES
TO SUMMARY RM
PROJEK MEROBOH DAN MEMBINA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
D.1/9/2
PART D.1- BASEMENT
Item Description Unit Qty Rate Amount
ELEMENT NO. 10 - INTERNAL FLOOR FINISHES
Paving Works
Prepare and apply of two coat approved flexible cemetitious
waterproofing system including fiberglass mat reinforcement at
junction between slab and wall all applied in strict accordance
with the manufacturer's instructions and recommendations
To floor; laid to fall
Extra Over for working around pipe protrusion areas
Cement and sand (1:3) protective screed finished with a steel
trowel to a smooth and level surface laid in bays including
expansion joints and filled with approved sealants
To floor; laid to fall
Cement and sand (1:3) finished with a steel trowel
19mm thick paving to floor finished to fall
Cement and sand (1:3) paving with approved floor hardener at
the prescribed rate with power float and cured with approved
curing compound; all in accordance with the manufacturer's
instructions and recommendations
19mm thick to floor; finished to fall
Extra Over for finishing to300mm x 150mm deep scrupper drain
19mm thick to ramp; finished to fall
Extra Over for finishing to 25mm x 25mm deep groove line
Screedinq Works
Cement and sand (1:3) backing screed as described :-
To receive ceramic tiles
19mm Thick to floor slab; levels, laid to fall and to slope not exceeding 15
degrees from horizontal
To skirting; 100mm high To drop; 100mm high
A
B
C
D
E
F
G
H
J
K
L
M2
Item
M2
M2
M2
M
M2
M2
M2
M
M
5,338
1
5,338
74
4,933
750
215
215
66
39
28
TO COLLECTION RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
D. 1/ 10/4
PART D.1- BASEMENT
Item Description Unit Qty Rate Amount
ELELEMENT NO. 9 - INTERNAL FLOOR FINISHES
(CONT'D)
Tiling Works
Non Slip Homogeneous Tiles
300mm x 300mm non-slip homogeneous floor tiles,work to
floors on concrete base; approved colour, bedded in approved
pattern, jointed and pointed in cement mortar (1:3), on
and sand (1:3) screed (measured separately) as specified laid
to pattern approved by the S.O.:
To floor on concrete base;levels, falls and crossfalls and to
slope not exceeding 15 degree from horizontal
To skirting; 100mm high To drop; 100mm high Painting Works
Prepare and apply approved paint system comprising one
undercoat and hot melt primer and one finishing coat of melt
thermoplastic traffic system applied in strict accordance to
manufacturer's instructions and recommendations
Parking Lot
100mm Wide straight line marking to form parking lot
Directional Arrow
150mm Wide Direction arrow; straight arrow 150mm Wide
direction arrow; double headed arrow 150mm Wide direction
arrow; turn left arrow 150mm Wide direction arrow; turn
right arrow Logo/Symbol
OKU Logo
Prepare and apply approved non-slip epoxy paint comprising
of
one undercoat and one finishing coat applied in strict
accordance to manufacturer's instruction and
recommendations
To floor
A
B
C
D
E
F
G
H
J
K
M2
M
M
M
No No
No No
No
M2
66
39
28
1,412
50
TO COLLECTION RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
D. 1/ 10/4
PART D.1- BASEMENT
Item Description Unit Qty Rate Amount
ELELEMENT NO. 9 - INTERNAL FLOOR FINISHES
(CONT'D)
Meta!works
Supply and install approved mild steel pratting overall size
150mm x 600mm long fix into position all as per manufacturer's
instruction and recommendations, all as per Drawing No.
AA/K12/KPKLS(PR)/371/DD-BR1&2101 -03
To floor Sundries
Ponding Test
Allow for ponding test including preparation and provision of water,
plugging all opening, cleaning and making good including all
associated works
A
B
M
Item
750
1
TO COLLECTION RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
D. 1/ 10/4
PART D.1- BASEMENT
Item
Description
Unit
Qty
Rate
Amount
COLLECTION
D.1/10/1
D.1/10/2
D.1/10/3
INTERNAL FLOOR FINISHES
TO SUMMARY RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
D. 1/ 10/4
PART D.1- BASEMENT
Item Description Unit Qty Rate Amount
ELEMENT NO. 11 - INTERNAL CEILING FINISHES
Plastering Works
Approved cement based skim coat ceiling consisting of one base
coat and one finishing coat including preparing, grinding and
patching formwork joints, undulating surfaces, trowelled smooth
all in accordance with the manufacturer's instructions; internally
3mm thick plastered to ceiling and associated beam
3mm thick plastered to soffit of ramp slab and associated beam
Painting Works
Prepare and apply approved paint system comprising one coat
sealer 'and two coats of emulsion paint of approved colour
internally on surfaces of
Surface of skim coat plastered ceiling and associated beam
Surface of skim coat plastered ramp slab and associated beam
A
B
C
D
M2
M2
M2
M2
5,982
220
5,982
220
TO COLLECTION RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
D.1/11/2
PART D.1- BASEMENT
Item Description Unit Qty Rate Amount
COLLECTION
0.1/11/1
INTERNAL CEILING FINISHES
TO SUMMARY RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
D.1/11/2
PART D.1- BASEMENT
Item Description Unit Qty Rate
ELEMENT NO. 12 - SUNDRIES
Construct and complete of RC Plinth as described complete
with all concrete, reinforcement, formworks, waterproofing
and cement rendering on exposed surface of plinth
Overall size 6400mm long x 300mm wide x 600mm high (Sprinkler Tank
Plinth)
Overall size 1000mm x 1000mm x 150mm thick (Sprinkler Tank Plinth)
Overall size 600mm x 600mm x 150mm high (Jockey pump plinth)
A
B
C
NO
NO
NO
10
2
1
TO COLLECTION RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
D.1/12/2
PART D.1- BASEMENT
Item Description Unit Qty Rate
COLLECTION
D.1/12/1
SUNDRIES
TO SUMMARY RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS PEKAN RABU, ALOR SETAR, KEDAH
D.1/12/2
PART D.1 - BASEMENT
Item Description Qty
SUMMARY Page No.
1 ELEMENT NO.1 - WORK BELOW LOWEST FLOOR D.1/1/5
FINISH (WBLFF)
2 ELEMENT NO. 2 - APRON, RAMP & PERIMIETER D.1/2/3
DRAIN
3 ELEMENT NO.3 - FRAME 0.1/3/4
4 ELEMENT NO. 4 - UPPER FLOOR D.1/4/2
5 ELEMENT NO. 5 - STAIRCASE CONSTRUCTION D.1/5/5
6 ELEMENT NO. 6 - ROOF CONSTRUCTION AND D.1/6/2
FINISHES
7 ELEMENT NO. 7 - INTERNAL WALL & PARTITON D.1/7/2
8 ELEMENT NO. 8 - DOOR & IRONMONGERIES 0.1/8/4
9 ELEMENT NO. 9 - INTERNAL WALL FINISHES D.1/9/2
10 ELEMENT NO. 10 - INTERNAL FLOOR FINISHES D.1/10/4
11 ELEMENT NO. 11 - INTERNAL CEILING FINISHES D.1/11/2
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS RABU, ALOR SETAR, KEDAH
D.1/S
PART D.1 - BASEMENT
12 ELEMENT NO. 12 - SUNDRIES D.1/12/2
TOTAL CARRIED TO GRAND SUMMARY
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS RABU, ALOR SETAR, KEDAH
D.1/S
PART D.1 - BASEMENT
Amount
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS RABU, ALOR SETAR, KEDAH
D.1/S
PART D.1 - BASEMENT
RM
PROJEK MEROBOH DAN MEMBINA SEMULA KOMPLEKS RABU, ALOR SETAR, KEDAH
D.1/S