You are on page 1of 35

Estimate

Foundation

Height Width

Residence of

Bhavadasan

Location

India
123
1/123

H PCC

0.1

0.95

Plot No

H1
H2

0.3
0.3

0.75
0.55

Survey No

H3

0.45

0.35

H4

Brick Size

I:

Mortar

Area

Brick Masonry
RR Masonry Plinth

Wall Thickness =

I:

Mortar

Perimeter

GF

125.53

48.94

FF

64.30

34.88

0.2

Wall / Ceiling Height

Brick Masonry (Ground Floor)


No

No

1 Wall 01

Long Wall

11.2

1 Wall 01

Cross Wall

4.23

2 Wall 02

5.24

2 Wall 02

3.73

3 Wall 03

4.23

3 Wall 03

6.35

4 Wall 04

5.96

4 Wall 04

2.23

5 Wall 05

12.93

5 Wall 05

4.23

6 Wall 06

6 Wall 06

Concrete
Mix M

15

Brick Masonry (First Floor)


Long

Extra Brick if any

Partition Wall Masonry


Cross

No

No

11.07

4.22

No

Length

G.F

1.6

Roof GF

0.1

4.17

1.52

Roof FF

0.1

5.16

2.5

8.08

Steel

1.5

Beam

Wood Work

F.F

Slab Thickness

Slab

2.5
9

%
kg/sqm

GF

FF

D1

2.1

D2

2.1

0.9

No

Stair

D3

2.1

0.8

4.14

0.25

0.3

Rise

0.17

W1
W2

3
6

0
4

1
1.35

1
1.8

1
1

2.48
1.65

0.25
0.25

0.3
0.3

Tread
Width

0.25
1

W3

1.35

1.2

First Flight

W4
V1

1
2

0
2

1
0.9

1.5
0.6

0
0

0
0

0
0

0
0

First step starts at

V2

Beam
G.F

F.F

Lintel

0.15

No. of rise

0.25
12

Slab Thickness

0.12

Flooring
G.F
Kitchen

Column

s
c

Work area

2.8

Bed room

3.3

Bed room

3.5

Length

5.2

3.5

Nos

3.5

Dining Room
Drawing Room

Sun Shade

Extra length

Projection

0.6

G.F

F.F

Thickness

0.05

0.45
3.5

Loft [Berth Slab]

Thickness

Plastering

0.04

G.F

No

W/A

0.45

2.5

0.45

0.45

3.5

0.45

Verandah

4.25

Bath 1

2.6

1.6

Thickness mm

Bath 2

2.6

1.5

Ratio

Bath 3

Additional Room

2.5

0.45

Below Stair

BR

0.45

1
0

4
0

0.45
0

15
1:

F.F
Bed Room

3.5

F.F

Bed Room
Bath 1

4
2.6

3.3
1.6

BR

Bath 2
Additional Room

2.6
5

1.5
2

GF Area = 125.53 (1351.19 sqft)


FF Area = 64.30 ( 691.76 sqft)
Total
=163.12 (2042.95 sqft)

0.35
H1 0.45

H2 0.3

0.55

H3 0.3

0.75

H4 0
0.95

Not to scale

Cost of Basic structure


Basic Rates
Item
Rate Rs.
Cement
250
Steel
35000
Rubble
1000

Unit
Bag
/ tonne
/ cum

Metal 40 mm
Metal 20 mm
Sand
Brick
Wood

/ cum
/cum
/ cum
Nos
/cum

1500
1500
1500
3
40000

Material consumption

PCC Below Foundation


RR Masonry In Mud Mortar
RR Masonry In Cement Mortar
Brick Masonry Fdn
Brick Masonry
RCC
Plastering
PCC Flooring
Tile laying
Door Window Ventilator
Total

Rubble
Metal 40 mm
Metal 25mm
Sand
Cement
Brick
Steel
Wood

cum
cum
cum
cum
Bags
Nos
Tonne
cum

5
5
5
5
2
(Quick look)

Rubble
cum

Unit

add for
waste/void %
5
2
18

Metal 40 mm Metal 20 mm Sand Cement Brick


cum
cum
cum
bag
Nos
6.761
3.381 25.456

31.112
12.813

3.675
0

18.450
0

18.104
27.234 13.617

90.884
205.077

17.548
3.459

132.140
26.050

7.821

6.726

6.919

43.924

13.680

add for
Qty
waste/void %
43.924
18
13.680
5
27.234
5
67.606
5
504.784
5
39174.307
5
3.185
2
1.359
2

27.234 67.606 504.784

Qty
Rate
51.83 1000
14.36 1500
28.60 1500
70.99 1500
530.02
250
41133.02
3
3.25 35000
1.39 40000

Add for labour


Add for supervision charges

Steel
Tonne

0
39174

3.185

39174 3.185

Amount
51830.47
21546.01
42893.87
106479.12
132505.76
123399.07
113713.61
55466.38
647834.28

30 %

842184.57

7%

901137.49

Other components door, electrification, plumbing, floor finish etc to be added in Measurement Sheet.

Wood
cum

1.359
1.359

Measurements
Item

1 Site Cleaning leveling


Foundation
2 Excavation for Foundation

Unit

Quantity

LS

LS

Rate

Amt

2,000.00

107

cum

52.103

5,574.99

1500
1500
250
3250

3570

cum

7.4

26,572.40

31.1 1000
300 1000

1300

cum
cum

12.813

1900.000

24,343.99

cum

43.924

cun

0.000 cum

0.000

2000

0.00

cum

36.5616

350

12796.56

6 Ground Floor

cum

First Floor
Total

cum

44.096
34.252

2400
2500

105,831.56
85,630.33

sqmt

40.860

40.86

22.338
10.531

4300
4500

96,051.54
47,390.85

3 Plain Cement Concrete


Metal 40 mm
Sand
Cement
Labour
4 RR Masonry in Mud Mortar
Rubble
Labour
Plinth
5 RR Masonry in Cement Mortar
Total Rubble
OR
Brick Masonry in Cement Mortar

6.76
3.38
25.5
320

Plinth re-filling

31.112 done

40,444.95

Brick Masonry

cum

78.349

7 Partition wall (qty added above)


RCC

8 Ground Floor
9 First Floor
Total
Steel bending hooking
Plastering
10 GF
11 FF
Total

cum

32.869

3.185255

3.1852551

35000 111483.93

sqmt
sqmt

753.432
366.401

100
105

75,343.23
38,472.11

12 Floor

cum

7.617

7.62

13 Lean Mortar & cement slury for Tiles

sqm

sqmt
sqmt
sqmt
sqmt
sqmt
sqmt
sqmt
sqmt
sqmt
sqmt
sqmt

12.00
5.60
27.20
0.00
18.20
14.00
8.50
8.06
0.00
8.00

500
500
500
500

500
500
500
300
1
500
80

6,000.00
2,800.00
13,600.00
0.00
9,100.00
7,000.00
4,250.00
2,418.00
0.00
4,000.00
768.00

sqmt
sqmt
sqmt
sqmt

14.00
8.06
10.00

500
300
500
500

7,000.00
2,418.00
5,000.00
6,600.00

sqmt

1119.833

PCC

Floor / tiles
G.F
Kitchen
Work area
Bed room
Bed room
Dining Room
Drawing Room
Verandah
Bath rooms
Additional Room
Below Stair

13
14
15
16
17
18
19
20
21
22
23 Stair stepps
24
25
26
27

F.F
Bed Room
Bath rooms
Additional Room
Bed Room

9.6

13.20

28 W/C wall tile (Dado)


TOTAL

sqmt

56.19

200

11,238.00
754,176.91

Item

Unit

Qty

Rate

C/F
Wood Work
Door / Window
Wood for Door / window Frame
Door Panel
Window Pane
Ventilator
12 mm round bar
07mm x 30 mm flat

1.359 40000
22.017 2000
24.547 1600
1.498 1600

Cum
sqmt
sqmt
sqmt
kg
kg

311.322
227.088

35
35

sqmt
sqmt
sqmt
sqmt

249.9023
136.581
484.27
219.905

70
75
60
60

Painting / white washing Wall

GF Outside
FF Outside
GF Inside
FF inside
Painting Door / Window
Multiplying factor
Door Frame
Door pannel
Window Frame
Window Pannel
Ventilator

Metal 40 mm
Sand
Cement

6.761091
3.380546
25.45592

1
1
1
1
1

1500
1500
250
320

10141.63654
5070.818268
6363.97875
21576.43355
3191.26506

3511.26506
23739.98268

sqmt
sqmt
sqmt
sqmt
sqmt

tile

82,192.00
671,984.91

Amount
754176.9114

Plumbing

Unit Qty

Rate

10 Cold Water
54378.8
44034
39275.84
2396.16
10896.27
7948.08

17493.161
10243.575
29056.2
13194.3

Supplying and fixing 40 mm PVC /GI Pipe including all pipe


specials and fixtures etc

Rmt

20

Supplying and fixing 25 mm PVC /GI pipe including all pipe


specials and fixtures etc

Rmt

45

Kitchen Sink

4000

WC, Seat, Flushing cistern, Seat cover

4200

Wash Basin

Hot Water
Supplying and fixing 25 mm CPVC pipe including all pipe
specials and fixtures etc

800

Rmt

Sewerage
Supplying and fixing 110 mm PVC pipe including all pipe specials Rmt
and fixtures etc
Supplying and fixing 40 mm PVC pipe including all pipe specials Rmt
and fixtures etc

983093.2974

45

Amount
983093.2974

Unit

Qty

Rate

Electrical

Conduit wiring for light, fan, plug


using 2 runs of 1 sqmm PVC coated
wire of approved quality along with
Long Point
No
Short Point
No

6
24

600
500

Conduit wiring for Power, Power plug


using 2 runs of 2.5 sqmm PVC
coated wire of approved quality along No

850

Conduit wiring for AC Power, Power


plug using 2 runs of 4 sqmm PVC
coated wire of approved quality along No

3000

Conduit wiring for Telephone along


with one 4 pair and one 2 pair cable

No

Cinduit wiring for TV cable with


socket 75 ohms shielded cable

No

Distribution Board for single phase


power supply for 8 mcb and one

No

Distribution Board for single phase


power supply for 12 mcb and one

No

Distribution Board for three phase


power supply for 12 mcb and one

No

2000

No
No
No
No
No

3000
1400
750
650
1500

4 Pole ELCB (3 Phase)


ELCB Single phase
MCB 12A
MCB 6A
Power Plug for AC

650
750

Amount

Amount
Kitchen

Work
Bath 1
GF
Bath 2
GF
Bath 3
FF
Bath 4
FF

Sink Aqua Washing Mixing


Guard
1
1
1
1

Long
Body

Helth Pt Flush

1
3

1
8

1
4

1
4

Wash
Basin

Heater

1
1
2

1
2

Shower

1
1

1
1
4

Masonary Eatimate
Foundation
Masonry
Wall Thickness =
Wall / Ceiling Height
H1
H2
H3
H4

0.45
0.3
0.3
0
0.10
Foundation Depth
Excavation
No
1
1
1
1
1
0

>>>>>>>PCC

G.F
Kitchen
Work area
Bed room
Bed room
Dining Room
Drawing Room
Verandah
Bath 1
Bath 2
Bath 3
Additional Room
Below Stair
F.F
Bed Room
Bath 1
Bath 2
Additional Room
Bed Room

Add stepps =

12
5.6
27.2
18.2
14
8.5
8.06

0
8
14
8.06
10
13.2
146.82
156.42

L
4
2.8
4
4
5.2
4
4.25
2.6
2.6
0
0
4

B
3
2
3.3
3.5
3.5
3.5
2
1.6
1.5
0
0
2

4
2.6
2.6
5
4

3.5
1.6
1.5
2
3.3

1
2
3
4
5
6

Stone Masonry
Along
Wall 01
Wall 02
Wall 03
Wall 04
Wall 05
Wall 06

1
2
3
4
5
6

Across
Wall 01
Wall 02
Wall 03
Wall 04
Wall 05
Wall 06

0.2
3

2
2
2
1
3
0

Area

1
1
0

1
1

Ceiling Area

12
5.6
13.2
14
18.2
14
8.5
4.16
3.9
0
0
8
101.56
14
4.16
3.9
10
13.2
45.26
146.82

17.94
Perimetre
14
9.6
14.6
15
17.4
15
12.5
8.4
8.2
0
0
12
126.7
15
8.4
8.2
14
14.6
60.2

Total Perimeter
Lean Mortar for tile
Area
cum
cement kg
cement bag
total bags

156.42
7.821
43
0.86 /cum
6.72606

186.9

Outside GF
Outside FF
Parapet

48.9386
34.88
GF Floor area =>>>

Concrete MIX
cement
1
M15
M20
M15
M20

sand
metal
1
2
4
1
1.5
3
0.207143 0.41428571 0.828571
0.263636 0.39545455 0.790909

205.0768 13.6171022 27.2342


261.0069 12.998143 25.99629
15 205.0768 13.6171022 27.2342

Brick Work
6
58

Brick Work 1:
Cement required
Sand

No of Bricks / Size

78.349
58 Kg/cum

B
0.19
0.229
0.22

0.09
0.112
0.1

0.09
0.07
0.065

1
1
1

0.2
0.239
0.23

0.1
0.122
0.11

0.1
0.08
0.075

Septic Tank
D1
D2
Q=

B
S
O
hc

500
429
527
100
H
1

1.72
1.5
0.556376
Total

Unit Weight

1
1
1

1.72
1.28
1.866106
2.422482

Metal
Brick
Cement
Sand

1700 Kg/cum
1750
1500
1500

0.2
Width

H4
Foundation Depth
Excavation

L1
L2
L3
L4

0.35
0.55
0.75
0
0.95
0.7
52.10275

11.2
5.24
4.23
5.96
12.93
0

1
1
1
1
1
1

0.35
0.55
0.75
0
0.95

0.44
0.59
0.59
0
0.59 ok

Hcc

Wall
11.2
11.2
11.2
11.2
11.2
11.2

5.24
5.24
5.24
5.24
5.24
5.24

1
1
1
1
1
1

4.23
4.23
4.23
4.23
4.23
4.23

1
1
1
1
1
1

5.96
5.96
5.96
5.96
5.96
5.96

1
1
1
1
1
1

0
4.23
3.73
6.35
2.23
4.23
0

Tile

c
c
c
c
c
c

Doors =
12 Wall Height
5.6

1
1
1
1
1
1
1
1
4.23
4.23
4.23
4.23
4.23

4
3
0.1

bath

L1
L2
L3
L4
Hcc
Wall
2
2
2
2
2

3.73
3.73
3.73
3.73
3.73

2
2
2
2
2

6.35
6.35
6.35
6.35
6.35

2
2
2
2
2

16.12
Stair

Plaster

dado =

56.19

9.6
GFOutside
181.073
FFOutside
104.64
113.1 Parapet
29.3632
156.42
Plaster loft sunshade
Outside inside
Sunshade
GF
210.436
481.66
58.72632
FF
104.64
225.86
41.856

Plastering 1:. 4
Cement
Sand

15
59 Kg/cum

Paint
loft
Deduct
Out side
21.87 19.26 753.43
249.9023
3.96 9.915 366.4
136.581
1119.8
1090.6583
1119.83
0.03918 cum/10sqm 132.14
0.1567 cum/10sqm 17.548

1:

Plinth refilling

GF Floor area =>>>


PCC

36.5616

101.56
7.617 cum

One cubic metre needs >


7
5.5
One bag =

Cemrnt / Sand ratio


1: 5
1: 6
1: 8
.

0.038512 cum
0.231072 cum

cement
cum
Cement =

26.05014

sand

Metal

3.4595 6.9189

1.45 cum
1.45
RCC

32.869

0.0332
.+
Plinth
12.812625
Plinth RR masonry
12.812625 kg/cum
cement
72
sand

Cement. Kg

fdn
31.112

.=

total
43.924
6

cum
0.0478 18.45
0.2868 3.6753

72
58
43
RCC
GF
FF

90.8844
18.1042

Slab
12.313
6.43
18.743

Vol
No/m3
0.001539 649.77258
0.001795 556.991355
0.00143 699.300699

Bricks
39174.307
500
S
500
429
527
No/m3 including Plaster
0.002
500
500
0.002333 428.698813
429
0.001898 527.009223
527

Lintel
Loft
2.5923 0.6318
1.7643 0.1144
4.3566 0.7462

S.Shade
1.712544
1.0464
2.758944

RR Masonry =
PCC =
Brick Masonry
GF
FF
Partition Wall
GF
FF
RCC
GF
FF

527

Coping GF
FF

1.8

Stair Rise
Tread
Width
Slab Thickness
Total No. of rise
First Flight

.=
.=

0.17Adjusted 0.1722
0.25
1
0.12
18.24Adjusted 18

First step starts at


No. of rise
Head room
No.of stepps
D1 =
Second Flight
No. of rise
No. of steps
D2

.=
.=
.=
.=
.=
H1

0.25
13

.=
.=
.=

5
4
1
1.78

H2

Slant Height

1
2

12
3
2.14

3.16 Concrete0.886973319
1.00

11.55
11.75
11.95
11.2

5.59
5.79
5.99
5.24

4.58
4.78
4.98
4.23

6.31
6.51
6.71
5.96

13.28
13.48
13.68
12.93

0
0
0
0
RR

12.15

6.19

5.18

6.91

13.88

HCC

11.4

5.44

4.43

6.16

13.13

WALL

12.93
12.93
12.93
12.93
12.93
12.93

1
1
1
1
1
1

0
0
0
0
0
0

0
0
0
0
0
0

PCC 1:3:6

0.6568

7.76
7.36
6.96
8.46

6.76
6.36
5.96
7.46

12
11.6
11.2
12.7

1.88
1.68
1.48
2.23

11.64
11.04
10.44
12.69

0
0
0
0

0
0
0
0

0
0
0
0

6.56
8.06

5.56
7.06

10.8
12.3

1.28
2.03

9.84
12.09

0
0

0
0

0
0

0
0
0
0
0

17.94
17.94
17.94
17.94
17.94

2.23
2.23
2.23
2.23
2.23

1
1
1
1
1

4.23
4.23
4.23
4.23
4.23
L

3
3
3
3
3

B
H
3.5 0.45
0.3 0.55
0.3 0.65

0
0
0
0
0
0.45
0.55
0.65

fdn thickness
0.15

0
0
0
0
0

0
0
0
0
0

Q
0.7088
0.0908
0.1268
1.8525
0.5567
0.0239
1.161

inside
484.27
219.91
Cement comsumption kg/10m2
4
15
12
15
3
66
15
4
54
15
5
43

0
0
0
0
0

Column
B
Length
Nos
LINTEL

lintel
L

GF
FF
15
72
59
48

15
72
59 G.F
48 W/A

Thickness
No
L
2
3

0.15
0.15
0.04
W
0.45
0.04

0.2

15

36

40

40
59 K

1
1
1
1
1
0

2.5
3
3.5
2.5
4
0

0.45
0.45
0.45
0.45
0.45
0

0.04
0.04
0.04
0.04
0.04
0.04

0.2
0.2
0.2
0.2
0.2
0.2

1
0

4
0

0.45
0

0.04
0.04

0.2
0.2

0
Extra Brick if any
L
0
0
0
0
0

D
BR
B
0
0
0
0
0
Total>>>

1: 5
1: 6
1: 8

86
72
54

H
0
0
0
0
0

0
0
0
0
0
0

F.F
BR

Area For plaster

Steel
Beam quantity
Lintel
stair

0.620250
4.3566
0.886973319
5.863823319
0.146595583
1.158105106

2.5 %
Stair
0.887

Column
1.8525

0.887

1.8525

Sqm
Sqm
cum
cum
cum

Foundation PCC
pcc
cement sand metal
7.617
26.05 3.46 6.9189
7.443 25.456 3.38 6.7611
Brick Nos

39174

R
Bricks for Fdn
21962.1

Cement for brick fdn


Sand for fdn
Total brick=

9.6

9 kg/sqm
8 kg/sqm
total steel=

Beam coping
0.62025 1.73 22.3376 correct
0
1.18 10.5313 correct
0.62025 2.9 32.8689 correct

43.924 cum
7.443 cum
78.349 cum
44.09648
34.25213
25.86
15
32.869
22.33757
10.5313

Slab Area
GF slab
FF slab
loft
Sun shade

RR masonry
43.924125
31.1115
12.812625
0
0
0
0
39174.30705

Nos
cum
bag
cum

Q
6.506325
6.98115
9.74475
0
23.232225
4.20945
24.336
GF

0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1

6.3063
6.2766
8.109
0
20.6919
3.2338
24.924

Brick Masonry (First Floor)


Long
No
11.1
2
4.22
1
5.16
1
8.08
1
0
0
Long Total

0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2

3
3
3
3
3
3
3
3 Cross
3
6
1
3
4.17
3
3
0
0
3
0
0
3
0
0
3
Cross Total
3
Parapet Length
48.9386
Q=
5.872632
FF

59.886

Q
13.044
2.412
2.976
4.728
0
23.16

3.48
7.146
0
0
0
10.626
33.786
FF

Concrete
Roof GF
Area Slab Thickness Q
125.5
0.1
12.553
64.3
0.1
6.43
Stair
18.983
Deduct
0.24
Add Stair
0.887
Total
19.63

GF

s
c

Brick SQ
RCC SQ
RCC CIR

0.45
3.5
2

Sun Shade

Q
2.5923
1.7643
4.3566
L1
3.4

Coping

51.846
35.286
Loft
W1
0.65

GF
FF

12.313
RCC

Q
0.1768

Lintel length =

1.7282
1.1762

Projection
0.6 RCC Q
0.05
sunshade area=

2.5923
1.7643
4.3566
Area
4.42

Total

0
1.8525 1.85
0

Total
Q
4.3566

D1
D2
D3
W1
W2
W3
W4
V1
V2

GF
FF
3.06

L
18.9
8.4

L1
24.5
10.8

B
0.6
0.6

1.059
21.18

H
0.05
0.05

2.9
3.4
3.9
2.9
4.4
0.4

0.65
0.65
0.65
0.65
0.65
0.2

4.4
0.4

0.65
0.2

1.885
2.21
2.535
1.885
2.86
0

0.0754
0.0884
0.1014
0.0754
0.1144
0

1.31
1.53
1.76
1.31
1.98
0
10.94

Area
Qty

2.86
0.1144
1.98
0
0
0
GF
FF
Total
1.98
15.795
2.86 18.655
0.6318 0.1144 0.7462

125.53
64.3
18.655
21.18
189.83 39.835
1.7085 0.31868
total steel=

3.1853

Tonne

Beam
G.F
0
0
0
F.F

No
1
1
1

L
4.14
2.48
1.65

B
0.25
0.25
0.25

0
0
0

0
0
0

0
0
0

Partition Wall Masonry


No
1 G.F
1
2
1
3
1
4
1
5 F.F
1
6
2
7
0

GF
2
4
2
3
6
2
1
2
0
22
14

Length
3
1.6
1.52
2.5
2
1.5
0

Wood Work
FF
No
0
2
3
7
2
4
0
3
4
10
0
2
0
1
2
4
0
0
11
6

Qty
Area
0.9
9
0.48
4.8
0.456
4.56
0.75
7.5
0.6
6
0.9
9
0
0
4.086
40.86
GF+FF

H
2.1
2.1
2.1
1
1.35
1.35
1
0.9
0

B
1
0.9
0.8
1
1.8
1.2
1.5
0.6
0

33

8.8

GF
FF

Qty
2.586
1.5

Area
25.86
15

For Lintel cal


GF
FF
Total
GF
No X B No X B
No X B
Area
2
0
2
4.2
3.6
2.7
6.3
7.56
1.6
1.6
3.2
3.36
3
0
3
3
10.8
7.2
18 14.58
2.4
0
2.4
3.24
1.5
0
1.5
1.5
1.2
1.2
2.4
1.08
0
0
0
0
26.1
18.9

12.7
8.4

38.8

FF
Area

Area
0
4.2
5.67 13.23
3.36
6.72
0
3
9.72 24.30
0
3.24
0
1.5
1.08
2.16
0
0

38.52

19.83 58.35

7.704

3.966

Round bar
GF
FF

26.439 Brick
6.43 Masonry

GF Total
FF Total

Perimeter Extra L
f
GF
48.94 24.44
f
FF
34.88 24.08
35.3
GF
Extra length
24.439
Extra width
0.8
Extra qty
0.9775
Total qty
2.7589
plaster area
14.663
Extra length
Q Area
Q
Area
0.735
14.7 0.977544 14.663
0.324
6.48
0.7224 14.448
1.059
21.18 1.699944 29.111

38.690
39.659

f
f
FF

24.439
24.08

24.08
0.6
0.7224

W1
W2
W3
W4
V1
V2

3
10
2
1
4
0
20

H
1
1.35
1.35
1
0.9
0

B
1
1.8
1.2
1.5
0.6
0

Flat
HxN

14.448
Qty
1.71254
1.0464
2.75894

No

Area
29.363 GF
20.928 FF
50.291

W1
W2
W3
W4
V1
V2

1.66
1.66
1.66
1.66
1.66
1.66

3
13.5
2.7
1
3.6
0

length
12
97.2
12.96
6
8.64
0

H
0.3
0.3
0.3

Q
0.3105
0.186
0.1238

0
0
0

0
0
0

0.62025

cum
Door
0.46907
Window 0.82124
Ventilator 0.06916
1.35947

L
0.1

B
0.07

0.007
0.007
0.007
0.007
0.007
0.007
0.007
0.007
0.007

0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07

LXB
0.007
No. of verticals
2
2
2
3
5
4
4
2
1

Total Q
Door Only
Masonry Deduction

CUM
0.07378
0.25333
0.14196
0.08547
0.6034
0.09338
0.03899
0.06916
0
1.35947
0.46907
11.67

B1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1

H1
0.95
0.84
0.74
0.83
1.53
0.98
1.28
0.48
0

Door =
Window =
Ventilator =

Area
2.05
2.05
2.05
0.88
1.23
1.23
0.88
0.78
0

3.895
12.054
6.068
2.1912
18.819
2.4108
1.1264
1.4976
0

kalli

2
4
3
3
1
0

22.017
24.5474
1.4976
48.062

NoxB clear H No. group Round


3
0.86
5.375
5
18
1.21
7.5625
7
2.4
1.21
7.5625
7
1.5
0.86
5.375
5
2.4
0.76
4.75
4
0
0
0
0
27.3

19.92
161.4
21.51
9.96
14.34
0
227.1

No of bar
10
14
14
10
8
0

length weight/m weight.kg


30
0.89
26.7 4
252
0.89
224.28 7.2
33.6
0.89
29.904 4.8
15
0.89
13.35 6
19.2
0.89
17.088 2.4
0
0.89
00
311.322

W.pane width

No. Pane
0

0.42
0.38
0.33
0.43
0.48
0.00

2.325581
4.186047
2.790698
3.488372
1.395349
0

2
4
3
3
1
0

Room Height
Slab Thickness

.=
.=

3
0.1

You might also like