22kV / 6.6kV INTERTRIPPING SYSTEM 28 / 7 / 2014 BSR Electrical Team intertripping shall beprovided between associated equipment to correctly isolatefaulted items. Operation of any transformer buchholz or overpressure / gas evolution protection shall trip the transformer feeder circuit breaker. Opening of any feeder circuitbreaker, by protection operation or manual opening, shall intertriptheassociateddownstreamcircuitbreaker.
22kV / 6.6kV INTERTRIPPING SYSTEM 28 / 7 / 2014 BSR Electrical Team intertripping shall beprovided between associated equipment to correctly isolatefaulted items. Operation of any transformer buchholz or overpressure / gas evolution protection shall trip the transformer feeder circuit breaker. Opening of any feeder circuitbreaker, by protection operation or manual opening, shall intertriptheassociateddownstreamcircuitbreaker.
22kV / 6.6kV INTERTRIPPING SYSTEM 28 / 7 / 2014 BSR Electrical Team intertripping shall beprovided between associated equipment to correctly isolatefaulted items. Operation of any transformer buchholz or overpressure / gas evolution protection shall trip the transformer feeder circuit breaker. Opening of any feeder circuitbreaker, by protection operation or manual opening, shall intertriptheassociateddownstreamcircuitbreaker.
28/ 7/ 2014 BSR Electrical Team Intertrippingsystem 22kV/ 6.6kV Intertripping shall beprovided between associated equipment to correctly isolatefaulted itemsandtoleavethesysteminapredictableorderly stateafter operationof protection. Operation of any transformer buchholz or overpressure/gas evolution protection shall trip the transformer feeder circuit breaker and shall intertrip the associated downstreamcircuitbreaker Opening of any feeder circuit breaker, by protection operation or manual opening, shall intertriptheassociateddownstreamcircuitbreaker General information Intertrippingsystem 22kV/ 6.6kV General information Intertrippingsystem 22kV/ 6.6kV History of issue Fromcommissioning phase, many malfunctioned trips at 6.6kV incomers/bus-tie which maketheelectrical systemaswell astheRefineryunstable. TPC/Schneider/ABB did sitesurvey, checked thesystemmany times but they could not findtheroot causeaswell astheproper countermeasures Intertrippingsystem 22kV/ 6.6kV Finding Blackout PPplantdated30-Mar-2012duetoFiber OpticConverter failure Outagebusbar B of Subtation4dated02-Mar-2013duetopower supplyfailure Blackout substation7dated03-Mar-2013duetopower supplyfailure Blackout substation7dated05-May-2013duetoFiber OpticConverter failure Incomer B of 8C-UPS-3-1trippedon26-Aug-2013duetoFiber OpticConverter failure Blackout substation8B dated19-April 2014duetothefiber opticconverter failure Intertrippingsystem 22kV/ 6.6kV 1.1. Current status of intertripping system : Feeder A Substation 01 22kV 6.6kV MDB08RFR/SM Tx Rx Rx Tx MDB08RFR/SM FO Cable Feeder B Incomer A Incomer B REF 542plu s REF 542plu s REF 542plu s Transformer A Transformer B Power Supply Unit DC-DC Converter (110VDC/48VDC) ABL7 RP4803 Power Supply Unit DC-DC Converter (110VDC/24VDC) ABL7 CEM24 Other substations 1. Upgrade PSU and change manufacturer of FOC II. Intertripping system 22kV/ 6.6kV o There is only one power supply unit Malfunction of this power unit could lead to unwantedtripincomers/bustie. A part or wholeloadsof substationcouldbeblackout (risk). o CurrentFiber OpticConvertershaveexperiencedmalfunctionbyitself: +Type : MDB08RFR/SM +Manufacturer : Equiptrans Weak point: II. Intertripping system 22kV/ 6.6kV 1.2. Proposal for improvement the intertrippingsystem : Thenewtypeof Fiber Optic Converters, whichareequippedwithEmergencySwitchboards, haveno experiencedmalfunctionsofar. Feeder A Substation 01 Substation 07 22kV 6.6kV 2S36 Transmitter 2P02 Input Module (Weed Instrument) Tx Rx 2H09 Receiver 2K02 Output Module (Weed Instrument) Feeder B Incomer A Incomer B REF 542plu s REF 542plu s Transformer A Transformer B Power Supply Unit DC-DC Converter Power Supply Unit DC-DC Converter TVS diode TVS diode Power Supply Unit DC-DC Converter Power Supply Unit DC-DC Converter TVS diode TVS diode Next page Next page II. Intertripping system 22kV/ 6.6kV Feeder A Substation 01 Substation 07 22kV 6.6kV 2H09 Receiver 2K02 Output Module (Weed Instrument) Rx Tx 2S36 Transmitter 2P02 Input Module (Weed Instrument) Feeder B Incomer A Incomer B REF 542plus REF 542plus Transformer A Transformer B Previous page Previous page 1.2. Proposal for improvement the intertrippingsystem : II. Intertripping system 22kV/ 6.6kV o Redundancypower supplyunit Whenever oneof thepower supplyunit fails, theother will continuously supply power to converter, not effect to operation of Fiber Optic Converter/Intertripping system. The failure unit will be replaced by a new one without interruptingthesystem. o Newtypeof Fiber Optic Converter, whichinstalledinEmergency Switchboard, has not experiencedmaltrippingsofar: +Type : 2H09 Receiver and2K02 OutputModule +Manufacturer : WeedInstrument o History: Nomalfunctionof fiber opticconverter hasbeenrecordedsofar Advantage point: II. Intertripping system 22kV/ 6.6kV 2. Modify wiring and logic inside protection relay REF542plus of two incomers for all 6.6kV switchboards as per approved MOC-SS-13-115 BEFORE MODIFICATION II. Intertripping system 22kV/ 6.6kV BEFORE MODIFICATION II. Intertripping system 22kV/ 6.6kV AFTER MODIFICATION II. Intertripping system 22kV/ 6.6kV AFTER MODIFICATION II. Intertripping system 22kV/ 6.6kV Benefits: In case of one incomer is opened by fault or maintenance, the remain incomer will not be opened by intertripping signal to prevent blackout one substation; This modification still satisfy the intertrip-interlock philosophy of this project document no 8474L 000 J SD 1600 001 II. Intertripping system 22kV/ 6.6kV No Description Schedule 1 - Upgrade to redundancy power supply unit - Change manufacturer of converter - Substation 7: November 2013 (Substation 7 already proceeded at first, no issue has been recorded since November 2013 so far - Others substation: al ready done at 2 nd TA 2 Modify logic and hardwire for REF542plus as per approved MOC-SS-13-11 5 2 nd TA (Apply for all substations) 3. Tentative schedule of modification: Follow 775/TTr-BDSC dated 23 rd May 2013 Plan for upgrading of intertripping system between22kV and6.6/0,4kV, thescheduleof modificationshall beasfollows: THANK YOU FOR YOUR ATTENTION E.O.D