Pro CHEMICAL STORAGE TANK FARM & INTERCONNECTED PIPING AT ANSOL PROJECT, JAFZA.ect
Credentials Page 1
Kavya llc scope
Preparation of Process Flow Diagram, P&ID, PLOT plan.
Preparation of Tank Datasheets in accordance with API 650 & Pig Receiver &
pig Launcher datasheets, Valve datasheets & piping material specifications.
Design Calculations of Storage Tanks
Venting Calculations
General Arrangement drawing of storage tank & Detailed Drawings
Design Calculations of the Pig Receiver & Pig Launcher as per ASME Sec VIII
Div. I
General Arrangement & detail drawings for Pig Receiver & Launcher.
Hydraulic Calculation of Piping with respect to Pump Specifications.
Stress Analysis & flexibility analysis of the pipe line.
Complete 3-D Plant Model with clash detection, walk- through & animation
Piping Line List & Piping support schedule.
Project Equipment:
This project includes: 6 Chemical tanks as per API-
650
Pig Receiver & pig launcher
Interconnected piping
Pumps, Valves
Drum Plant & Tanker Filling Station


INCREASED WATER HANDLING (IWH) FACILITY AT OURHOUD OIL & GAS PRODUCTION FACILITY, ALGERIA
Kavya LLC Scope

Design Calculations of CPI Tank, Hydrocyclones, Walnut Shell Filter
& Degasser.
General Arrangement & Detailed Drawings of each of the
Equipment.
Foundation Layout
Skid & Piping General Arrangement Drawing (Plan & Isometric
view)
Structural GA & Detailed drawings.
3-D Modelling of each Equipment
Project Equipment:
2 Three Phase Separators
3 Walnut Shell Filters
1 Degasser
2 Desandling Cyclones
2 Hydrocyclones
1 Corrugated Plate Interceptor (CPI Tank)
3 Skids
Pumps Skid
Various Interconnected Piping


AMINE FILTRATION PACKAGE, GASCO, PALL CORPORATION- GERMANY
Kavya LLC Scope
Mechanical:
Package vendor Doc Review.
Review of Design Calculation for the vessels as per the Data sheet.
Review of GA & Detailed Fabrication Drawing.
Review of Lifting Lug Calculations.
Vendor Submission
Piping:
Equipment Layout
Piping Bill of Materials
Piping General Arrangement drawings
Piping isometrics with support
Support Definition
3-D Model in PDMS (Plant Design Management System)
Stress analysis of Piping
Structural Skid:
Perform Design Analysis by using STAAD pro.
Including STAAD pro model of the structural skid.
Providing design calculation of each skid under various loads such
as Equipment load, piping load, variable load, Live Load Thermal
Load, Wind Load {x and Y axis} & seismic load as may be
applicable.
Design & connections & weld details.
Lifting Lug calculation and plan
Foundation Loadings
Electrical:
Electrical Loading Calculations
Cable Schedule & PCC
Junction Boxes
Terminal Diagram
Cable trays & Support layout
Instrumentation:
Review of package vendor document/ specification.
Specification for local instruments like PI, TI, LG and safety
devices.
Sizing of Instruments and Data sheets preparation for control
valves, safety devices.
Instrument support drawing, as applicable.
Wiring and interconnection (drawing)


BLACK POWDER: PEL MIDDLEAST (ARAMCO KSA)
Kavya LLC Scope
P&I D mark up
PFD
Plot plan layout
Mechanical design & Detail Engineering drawing- of Cyclone.
Mechanical design & Detail Engineering drawing of filter vessels
3D modelling of the plant
Piping ISO metric drawings
Piping Stress Analysis
Piping support schedule
Tie in point schedule
STAAD Analysis of all structural platform.

Project Equipment:
Filter Vessels
Cyclones
Automatic launching Trolleys
Hoist
Piping
Structural Access platforms




CONDENSATE LIFTING PACKAGE ( Man Diessel Germany/ Reliance Energy / Thermax)
Kavya LLC Scope:

Design of condensate Tank
Structural Analysis of Skid Base
Piping Stress Analysis
3D modelling
Piping iso metric drawings
Piping Support Schedule & Drawing
Tie In point Schedule
Detail Engineering drawings for the package


Project Equipment:

Condensate Vessel
Rifox Pumps ( Operating on differential pressure)
Piping
Skid Base
Valves & Instruments


OILY WATER PUMP TRANSFER SKID ( PEERLESS EUROPE /TECHNIP-SHELL- LNG VESSEL )
Kavya LLC Scope

Design of Pump Skid
Foundation Details
Structural Analysis of Skid Base
Piping Stress Analysis ( 100Y & 1000Y cycles)
Offshore Towing Analysis
3D modelling
Piping iso metric drawings
Piping Support Schedule & Drawing
Tie In point Schedule
Instrumentation/Cable Tray /Junction Box layout
Detail Engineering drawings for the package
Lifting Scheme and COG calculations
Project Equipment:

Clyde Uninion Pumps 2 nos
Pulsation Dampers
Skid Base
Piping & Valves
Instruments


3 PHASE SEPRATOR PEERLESS BURGESS MANNING - GERMANY
Kavya LLC Scope:

Design of condensate Tank
Structural Analysis of Skid Base
Piping Stress Analysis
3D modelling
Piping iso metric drawings
Piping Support Schedule & Drawing
Tie In point Schedule
Detail Engineering drawings for the package
Lifting Scheme & COG calculation


Project Equipment:

3 Phase separator
Flow control Valves
Skid Base
Piping & Valves
Instruments


GLYCHOL DEHYDRATION PACKAGE (GASTECH USA PUNJ LLYOD ADCO ( Spiking Project)
Kavya LLC Scope:
Project Management Consultancy.
Review of Quotation from various Fabricator in UAE
Review of GA drawing for structural skid
Review of P & ID and Piping ISO metric and verify BOQ
Monitor material procurement in UAE
Monitor Fabrication activities.
Compile QA/QC dossier
Coordinate with Punj Lloyd & ADCO Project Team
Anticipate slippage and bottleneck and provide remedial
engineering clarification surfaced during the construction
Assembly of the Skid including Electrical &
Instrumentation installation.
Load out


Project Equipment:
17 number of Pressure Vessels
Flow control Valves
Skid Base 4-5 level
Piping & Valves
Electrical & Instrumentation