Comparative Chart Plinth AreaRate of CPWD as on 01-10-2007 & UPPWD 01-11-2011

added 43% for October 2007 for CPWD)


Sl.
No
.

Discription

2
R.C.C. Frame structure Building ht.
1 3.35mtr.

Type of
Building

Extra Ht. Beyond 2.9mtr.

Extra Ht. for every 0.3mtr.


Extra plinth for every 0.3mtr.
Every 0.3mtr. Differ foundation
Making Stronger foundation to take
2 load of one floor addl. Ht.
3 Reisting earthquake
4 Raft Foundation

Non Residential
A Class Building

Pli8nth
Plinth area
Area Rate rate CPWD
CPWD
added 43%
01-10-2007
on
01-10-2010

Plinth area
UPPWD
01-11-2011

Diff. of
CPWD
20007 &
UPPWD
2011

Diff. of
CPWD Oct.
2010 &
UPPWD
NOV 2011
on Column
5
8

13200.00

18876.00

9490.00

13200.00

18876.00

615.00
10105.00

-3095.00

-8771.00

150.00

214.50

410.00

260.00

195.50

150.00
150.00

214.50
214.50

410.00
410.00

260.00
260.00

195.50
195.50
0.00

1250.00

1787.50

1200.00

-50.00

-587.50

200.00
-2100.00

0.00
-70.90
-3630.80

630.00
3560.00

900.90
5090.80

830.00
1460.00

(And

Sl.
No
.

Discription

Type of
Building

Diff. of
CPWD Oct.
2010 &
UPPWD
NOV 2011
on Column
5
8

5 Pile foundation upto depth

6470.00

9252.10

2030.00

-4440.00

-7222.10

6 Larger module over 35 Sq.M

990.00

1415.70

710.00

-280.00

-705.70

7 Strip Foundation

286.00

408.98

410.00

124.00

1.02

850.00

1215.50

630.00

-220.00

-585.50

Basement Floor ht. 335mtr. With


9 normal water proofing.

18035.00

25790.05

13280.00

-4755.00

-12510.05

10 Extra for Mastric Asphalt W.P.T.

1144.00

1635.92

14720.00

13576.00

13084.08

11 Extra ht. every 0.3mtr.

1274.00

1821.82

1620.00

346.00

-201.82

-728.00

-1041.04

-950.00

-222.00

91.04

Not Quot.

240.00

1235.00

1766.05

1620.00

385.00

-146.05

Stronger Structural meber to take


8 heavy load

Deduction of every 0.5 mtr. Ht.


12 Anti Termite Treatment
13 Extra Provision for O.P.D.

Non Residential
A Class Building

Pli8nth
Plinth area
Area Rate rate CPWD
CPWD
added 43%
01-10-2007
on
01-10-2010

Plinth area
UPPWD
01-11-2011

Diff. of
CPWD
20007 &
UPPWD
2011

Note : - Extra Provision for Telephone conduting 0.5% Computer Conduting 0.5% & quality Insurance 1% Approved in CPWD.

Comparative Chart Plinth AreaRate of CPWD as on 01-10-2007 & UPPWD 01-11-2011


added 43% for October 2007 for CPWD)
Sl.
No
.

Discription

2
Load Bearing Structure
1 Floor ht. 3.3mtr. Single Storey
Extra for floor ht. beyond 2.9mtr.

Double Storey
Extra for floor ht. beyond 2.9mtr.
Three Storey
Extra for floor ht. beyond 2.9mtr.

Four Storey
Extra for floor ht. beyond 2.9mtr.

Type of
Building

Non Residential
A Class Building

Pli8nth
Plinth area
Area Rate rate CPWD
CPWD
added 43%
01-10-2007
on
01-10-2010

Plinth area
UPPWD
01-11-2011

Diff. of
CPWD
20007 &
UPPWD
2011

Diff. of
CPWD Oct.
2010 &
UPPWD
NOV 2011
on Column
5
8

8250.00
8250.00

11797.50
11797.50

8440.00
360.00
8800.00

550.00

-2997.50

7900.00

11297.00

8070.00

7900.00
8250.00

11297.00
11797.50

-130.00

-3527.00

8250.00

11797.50

-140.00

-3687.50

8715.00

12462.45

8715.00

12462.45

325.00

-3207.45

360.00
8430.00
8440.00
360.00
8800.00
8910.00
360.00
9270.00

(And

11

(And
Remark

Remark

Approved in CPWD.

11

(And
Remark

High NonResidentioal
Building

Cost Index per Year

1/11/2011

1/4/2010

1/1/2009 1/10/2007

1/7/2005 1/1/1997

8440.00

7780.00

7482.00

6802.00

5332.00

3760.00

3.98%

9.99%

27.56%

15.95%

3.98%

500%

5.53%

Comparative Chart Plinth AreaRate of UPPWD &CPWD


Sl. No.

Discription

Plinth area
UPPWD
01-10-2010

Plinth
area
UPPWD
01-112011

9490.00

13200.00

18876.00

615.00
10105.00

13200.00

18876.00

410.00

150.00

214.50

3
4

Non Residential A Class Building


R.C.C. Frame structure Building ht.
3.35mtr.

8740

Plinth Area Plinth area


Rate
rate CPWD
CPWD
added 43%
01-10-2007
on
01-10-2010

Extra Ht. Beyond 2.9mtr.

570
9310.00

Extra Ht. for every 0.3mtr.

380

Extra plinth for every 0.3mtr.

380

410.00

150.00

214.50

Every 0.3mtr. Differ foundation

380

410.00

150.00

214.50

Making Stronger foundation to take


load of one floor addl. Ht.

1110

1200.00

1250.00

1787.50

Reisting earthquake
Raft Foundation

760
1350

830.00

630.00

900.90

1460.00

3560.00

5090.80

NOTE SPECIFICATION OF CPWD w.e.f.JULY 2007 & UPPWD NOV.2008

Sl. No.

Discription

Plinth
area
UPPWD
01-112011

Pli8nth
Plinth area
Area Rate rate CPWD
CPWD
added 43%
01-10-2007
on
01-10-2010

2030.00

6470.00

9252.10

710.00

990.00

1415.70

7 Strip Foundation

410.00

286.00

408.98

Stronger Structural meber to take


8 heavy load

630.00

850.00

1215.50

Basement Floor ht. 335mtr. With


9 normal water proofing.

13280.00

18035.00

25790.05

14720.00

1144.00

1635.92

1620.00

1274.00

1821.82

-950.00

-728.00

-1041.04

240.00

Not Quot.

1620.00

1235.00

1766.05

5 Pile foundation upto depth


6 Larger module over 35 Sq.M

10 Extra for Mastric Asphalt W.P.T.


11 Extra ht. every 0.3mtr.
Deduction of every 0.5 mtr. Ht.
12 Anti Termite Treatment
13 Extra Provision for O.P.D.

Note : - Extra Provision for Telephone conduting 0.5% Computer Conduting 0.5% & quality Insurance 1% A

Comparative Chart Plinth AreaRate of CPWD as on 01-10-2007 & UPPWD 01


Sl. No.

Discription

2
Load Bearing Structure

Floor ht. 3.3mtr. Single Storey


Extra for floor ht. beyond 2.9mtr.

Plinth
area
UPPWD
01-112011

Pli8nth
Plinth area
Area Rate rate CPWD
CPWD
added 43%
01-10-2007
on
01-10-2010

8440.00

8250.00

11797.50

360.00

8800.00

8250.00

11797.50

7900.00

11297.00

8430.00
8440.00
360.00
8800.00

7900.00
8250.00

11297.00
11797.50

8250.00

11797.50

Four Storey

8910.00

8715.00

12462.45

Extra for floor ht. beyond 2.9mtr.

360.00
8715.00

12462.45

Double Storey
Extra for floor ht. beyond 2.9mtr.
Three Storey
Extra for floor ht. beyond 2.9mtr.

8070.00
360.00

9270.00

PWD &CPWD
Plinth
area
CPWD
01-012012
added
64%

Diff. of
Diff. of
CPWD CPWD Jan.
2010 &
2012 &
UPPWD
UPPWD
2010
NOV 2011
on Column
5

7(3 - 5 )

8(4 - 6)

21648.00

-9566.00

-11543.00

246.00

165.50

164.00

246.00

165.50

164.00

246.00
0.00

165.50
0.00

164.00
0.00

2050.00

-677.50

-850.00

0.00

0.00

0.00

1033.20

-140.90

-203.20

5838.40

-3740.80

-4378.40

Plinth
area
CPWD
01-012012
added
64%

Diff. of
CPWD
20007 &
UPPWD
2011

21648.00

7
10610.80

#REF!

1623.60

#REF!

469.04

#REF!

1394.00

#REF!

29577.40

#REF!

1876.16

#REF!

2089.36

#REF!

-1193.92

#REF!

2025.40

#REF!

0.00
& quality Insurance 1% Approved in CPWD.

-2007 & UPPWD 01-11-2011


Plinth
area
CPWD
01-012012
added
64%

Diff. of
CPWD
20007 &
UPPWD
2011

13530.00

13530.00

#REF!

12956.00
0.00
12956.00
13530.00
0.00
13530.00
0.00
14292.60

-130.00

14292.60

325.00

-140.00

High
NonReside
ntioal
Buildin
g

1/11/2011

8440.00
Cost Index per Year

1/4/2010

1/1/2009

1/10/2007

1/7/2005

1/7/2000

7780.00
7482.00
3.98%
3.98%

6802.00
9.99%
500%

5332.00
27.56%
5.53%

4360.00
22.22%
7.43%

1/1/1997

3760.00
15.95%

Comparative Chart Plinth AreaRate of UPPWD &CPWD


Sl. No.

Discription

Plinth area
UPPWD
01-10-2010

Plinth
area
UPPWD
01-112011

9490.00

13200.00

18443.04

20380.80

615.00
10105.00

13200.00

18443.04

20380.80

-9133.04

410.00

150.00

209.58

231.60

170.42

Non Residential A Class Building


R.C.C. Frame structure Building ht.
3.35mtr.
Extra Ht. Beyond 2.9mtr.

3
4

8740
570
9310.00

Plinth Area Plinth area Plinth area CPWD


Rate
rate CPWD
(28+11.72+164CPWD
added
=( 143/143)%=54.40%
01-10-2007
28+14301-01-2012 added
128/128)%=
39.72% on
01-10-2010

Diff. of
CPWD
2010 &
UPPWD
2010

7(3 - 5 )

Extra Ht. for every 0.3mtr.

380

Extra plinth for every 0.3mtr.

380

410.00

150.00

209.58

231.60

170.42

Every 0.3mtr. Differ foundation

380

410.00

150.00

209.58

231.60

170.42

Making Stronger foundation to take


load of one floor addl. Ht.

1110

1200.00

1250.00

1746.50

1930.00

-636.50

Reisting earthquake
Raft Foundation

760
1350

830.00

630.00

880.24

972.72

-120.24

1460.00

3560.00

4974.03

5496.64

-3624.03

NOTE SPECIFICATION OF CPWD w.e.f.JULY 2007 & UPPWD NOV.2008

Sl. No.

Discription

Plinth
area
UPPWD
01-112011

2030.00

6470.00

9252.10

10610.80

#REF!

710.00

990.00

1415.70

1623.60

#REF!

7 Strip Foundation

410.00

286.00

408.98

469.04

#REF!

Stronger Structural meber to take


8 heavy load

630.00

850.00

1215.50

1394.00

#REF!

Basement Floor ht. 335mtr. With


9 normal water proofing.

13280.00

18035.00

25790.05

29577.40

#REF!

14720.00

1144.00

1635.92

1876.16

#REF!

1620.00

1274.00

1821.82

2089.36

#REF!

-950.00

-728.00

-1041.04

-1193.92

#REF!

240.00

Not Quot.

1620.00

1235.00

1766.05

2025.40

#REF!

5 Pile foundation upto depth


6 Larger module over 35 Sq.M

10 Extra for Mastric Asphalt W.P.T.


11 Extra ht. every 0.3mtr.
Deduction of every 0.5 mtr. Ht.
12 Anti Termite Treatment
13 Extra Provision for O.P.D.

Pli8nth
Plinth area
Area Rate rate CPWD
CPWD
added 43%
01-10-2007
on
01-10-2010

Plinth area CPWD


01-01-2012 added
64%

Diff. of
CPWD
20007 &
UPPWD
2011

0.00
Note : - Extra Provision for Telephone conduting 0.5% Computer Conduting 0.5% & quality Insurance 1% Approved in CPWD.

Comparative Chart Plinth AreaRate of CPWD as on 01-10-2007 & UPPWD 01-11-2011


Sl. No.

Discription

2
Load Bearing Structure

Floor ht. 3.3mtr. Single Storey


Extra for floor ht. beyond 2.9mtr.

Double Storey
Extra for floor ht. beyond 2.9mtr.

Plinth
area
UPPWD
01-112011

Pli8nth
Plinth area
Area Rate rate CPWD
CPWD
added 43%
01-10-2007
on
01-10-2010

8440.00

8250.00

11797.50

360.00

8800.00

8250.00

11797.50

13530.00

8070.00

7900.00

11297.00

12956.00

360.00
7900.00
8250.00

11297.00
11797.50

8250.00

11797.50

Four Storey

8910.00

8715.00

Extra for floor ht. beyond 2.9mtr.

360.00
8715.00

Extra for floor ht. beyond 2.9mtr.

9270.00

Diff. of
CPWD
20007 &
UPPWD
2011

13530.00

#REF!

0.00

8430.00
8440.00
360.00
8800.00

Three Storey

Plinth area CPWD


01-01-2012 added
64%

(And

-130.00

12462.45

12956.00
13530.00
0.00
13530.00
0.00
14292.60

12462.45

14292.60

325.00

-140.00

Diff. of
CPWD Jan.
2012 &
UPPWD
NOV 2011
on Column
5
8(4 - 6)

-10275.80
178.40
178.40
178.40

-730.00

-142.72
-4036.64

CPWD.