Activity ID Activity Name Original

Duration
Start Finish
Total Total
334 01-J un-13 30-Sep-14
Porto Arabi Porto Arabia New Project
334 01-J un-13 30-Sep-14
Milestones Milestones 334 01-J un-13 30-Sep-14
MLE1000 Start of Project 0 01-J un-13
MLE1010 Site office 0 15-J un-13
MLE1015 Mobilization of Manpower 0 29-J un-13
MLE1020 Temporary fire & wet riser 0 05-Aug-13
MLE1030 Issue of all Drawings 0 14-J ul-13
MLE1040 Structure repair completion 0 05-Aug-13
MLE1050 Foyer area completion 0 16-Nov-13
MLE1070 Amenity level completion 0 30-Nov-13
MLE1080 Facade work Completion 0 14-Dec-13
MLE1090 Mock up room completion 0 09-Dec-13
MLE1100 Podium 1 to 4 Completion 0 21-J an-14
MLE1105 Roof Level Completion 0 10-Feb-14
MLE1110 Level 1-6 Substantial Completion 0 13-Feb-14
MLE1120 Level 7-12 Substantial Completion 0 20-Apr-14
MLE1130 Level 13-18 Substatial Completion 0 24-J un-14
MLE1140 Level 19-20 Substatial Completion 0 16-J ul-14
MLE1145 Builders elevators operational 0 04-Mar-14
MLE1150 Removal of Builders Hoist 0 18-Mar-14
MLE1160 Removal of Tower Crane 0 02-Apr-14
MLE1170 Power ON 0 26-Aug-14
MLE1180 Chilled water connection 0 04-Aug-14
MLE1190 Wild air ON 0 04-Mar-14
MLE1200 Drainage Connection 0 04-Aug-14
MLE1210 Domestic Water Connection 0 04-Aug-14
MLE1220 UDC Completion Certificate (Substantial) 0 30-J ul-14
MLE1230 QCDD Inspection & Approval 0 27-Sep-14
M J J A S O N D J F M A M J J A S O N D
30-Sep-14, T
30-Sep-14, P
30-Sep-14, M
Start of Project
Site office
Mobilization of Manpower
Temporary fire & wet riser
Issue of all Drawings
Structure repair completion
Foyer area completion
Amenity level completion
Facade work Completion
Mock up room completion
Podium 1 to 4 Completion
Roof Level Completion
Level 1-6 Substantial Completion
Level 7-12 Substantial Completion
Level 13-18 Substatial Comp
Level 19-20 Substatial Co
Builders elevators operational
Removal of Builders Hoist
Removal of Tower Crane
Power ON
Chilled water connectio
Wild air ON
Drainage Connection
Domestic Water Conn
UDC Completion Certif
QCDD Inspec
PORTO ARABIA PARCEL TOWER
DETAILED SCHEDULE OF WORK

Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 1 of 44 TASK filter: All Activities
Primavera Systems, Inc.
Activity ID Activity Name Original
Duration
Start Finish
MLE1240 UDC Occupation Certificate 0 30-Sep-14
Preconstructi Preconstruction 225 01-J un-13 24-Apr-14
Engineering Engineering 115 14-J ul-13 29-Dec-13
Submit t als Submit t als 90 14-J ul-13 21-Nov-13
SU1000 All Civil & / Arch drawings 90 14-J ul-13 21-Nov-13
SU1010 Electrical drawings 90 14-J ul-13 21-Nov-13
SU1020 Plumbing & Drainage drawings 90 14-J ul-13 21-Nov-13
SU1030 Fire Fighting Drawings 90 14-J ul-13 21-Nov-13
SU1040 HVAC drawings 90 14-J ul-13 21-Nov-13
Approvals Approvals 100 05-Aug-13 29-Dec-13
AP1000 All Civil & / Arch drawings 100 05-Aug-13 29-Dec-13
AP1010 Electrical drwaings 100 05-Aug-13 29-Dec-13
AP1020 Plumbing & Drainage drawings 100 05-Aug-13 29-Dec-13
AP1030 Fire Fighting Drawings 100 05-Aug-13 29-Dec-13
AP1040 HVAC drawings 100 05-Aug-13 29-Dec-13
Procurement Procurement 225 01-J un-13 24-Apr-14
Civil/Arch Civil/Arch 130 01-J un-13 07-Dec-13
Mat erial Sub Mat erial Submit t al 60 01-J un-13 26-Aug-13
CMS1000 Marbles / Tiles 60 01-J un-13 26-Aug-13
CMS1010 Gypsum & other ceiling boards 60 01-J un-13 26-Aug-13
CMS1020 Wooden Doors & Accessories 60 01-J un-13 26-Aug-13
CMS1030 Aluminium windows & Doors 60 01-J un-13 26-Aug-13
CMS1040 Paints & other finishes 60 01-J un-13 26-Aug-13
Mat erial App Mat erial Approval 60 15-J un-13 10-Sep-13
CMA1050 Marbles / Tiles 60 15-J un-13 10-Sep-13
CMA1060 Gypsum & other ceiling boards 60 15-J un-13 10-Sep-13
CMA1070 Wooden Doors & Accessories 60 15-J un-13 10-Sep-13
CMA1080 Aluminium windows & Doors 60 15-J un-13 10-Sep-13
CMA1090 Paints & other finishes 60 15-J un-13 10-Sep-13
Fabricat ion Fabricat ion / Delivery on sit e 90 29-J ul-13 07-Dec-13
CMD1100 Marbles / Tiles 90 29-J ul-13 07-Dec-13
CMD1110 Gypsum & other ceiling boards 90 29-J ul-13 07-Dec-13
CMD1120 Wooden Doors & Accessories 90 29-J ul-13 07-Dec-13
CMD1130 Aluminium windows & Doors 90 29-J ul-13 07-Dec-13
M J J A S O N D J F M A M J J A S O N D
UDC Occupa
24-Apr-14, Preconstruction
29-Dec-13, Engineering
21-Nov-13, Submittals
All Civil & / Arch drawings
Electrical drawings
Plumbing & Drainage drawings
Fire Fighting Drawings
HVAC drawings
29-Dec-13, Approvals
All Civil & / Arch drawings
Electrical drwaings
Plumbing & Drainage drawings
Fire Fighting Drawings
HVAC drawings
24-Apr-14, Procurement
07-Dec-13, Civil/Arch
26-Aug-13, Material Submittal
Marbles / Tiles
Gypsum & other ceiling boards
Wooden Doors & Accessories
Aluminium windows & Doors
Paints & other finishes
10-Sep-13, Material Approval
Marbles / Tiles
Gypsum & other ceiling boards
Wooden Doors & Accessories
Aluminium windows & Doors
Paints & other finishes
07-Dec-13, Fabrication / Delivery on site
Marbles / Tiles
Gypsum & other ceiling boards
Wooden Doors & Accessories
Aluminium windows & Doors
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 2 of 44 TASK filter: All Activities
Primavera Systems, Inc.
Activity ID Activity Name Original
Duration
Start Finish
CMD1140 Paints & other finishes 90 29-J ul-13 07-Dec-13
Mechanical & Mechanical & Plumbing 225 01-J un-13 24-Apr-14
Mat erial Sub Mat erial Submit t al 60 01-J un-13 26-Aug-13
MMS1000 Ducts & Accessories 60 01-J un-13 26-Aug-13
MMS1010 Pipes & fittings 60 01-J un-13 26-Aug-13
MMS1020 Sanitary fixtures 60 01-J un-13 26-Aug-13
MMS1030 Chilled water pipes 60 01-J un-13 26-Aug-13
MMS1040 Chilled water pump 60 01-J un-13 26-Aug-13
MMS1050 Fire fighting pumps 60 01-J un-13 26-Aug-13
MMS1060 HVAC machineries 60 01-J un-13 26-Aug-13
MMS1070 Final Fix items 60 01-J un-13 26-Aug-13
Mat erial App Mat erial Approval 120 22-J un-13 14-Dec-13
MMA1080 Ducts & Accessories 60 22-J un-13 17-Sep-13
MMA1090 Pipes & fittings 60 22-J un-13 17-Sep-13
MMA1100 Sanitary fixtures 60 22-J un-13 17-Sep-13
MMA1110 Chilled water pipes 60 22-J un-13 17-Sep-13
MMA1120 Chilled water pump 45 27-Aug-13 31-Oct-13
MMA1130 Fire fighting pumps 60 27-Aug-13 21-Nov-13
MMA1140 HVAC machineries 60 22-J un-13 17-Sep-13
MMA1150 Final Fix items 60 17-Sep-13 14-Dec-13
Fabricat ion Fabricat ion / Delivery on sit e 180 05-Aug-13 24-Apr-14
MMD1160 Ducts & Accessories 90 05-Aug-13 14-Dec-13
MMD1170 Pipes & fittings 90 05-Aug-13 14-Dec-13
MMD1180 Sanitary fixtures 90 05-Aug-13 14-Dec-13
MMD1190 Chilled water pipes 90 05-Aug-13 14-Dec-13
MMD1200 Chilled water pump 120 31-Oct-13 24-Apr-14
MMD1210 Fire fighting pumps 100 23-Nov-13 16-Apr-14
MMD1220 HVAC machineries 90 05-Aug-13 14-Dec-13
MMD1230 Final Fix items 90 14-Nov-13 26-Mar-14
Elect rical Elect rical 210 01-J un-13 02-Apr-14
Mat erial Sub Mat erial Submit t als 60 01-J un-13 26-Aug-13
EMS1000 Cables & Wiring accessories 60 01-J un-13 26-Aug-13
EMS1010 Mv panel & Accessories 60 01-J un-13 26-Aug-13
EMS1020 MCC, EMDB & VFD 60 01-J un-13 26-Aug-13
M J J A S O N D J F M A M J J A S O N D
Paints & other finishes
24-Apr-14, Mechanical & Plumbing
26-Aug-13, Material Submittal
Ducts & Accessories
Pipes & fittings
Sanitary fixtures
Chilled water pipes
Chilled water pump
Fire fighting pumps
HVAC machineries
Final Fix items
14-Dec-13, Material Approval
Ducts & Accessories
Pipes & fittings
Sanitary fixtures
Chilled water pipes
Chilled water pump
Fire fighting pumps
HVAC machineries
Final Fix items
24-Apr-14, Fabrication / Delivery on site
Ducts & Accessories
Pipes & fittings
Sanitary fixtures
Chilled water pipes
Chilled water pump
Fire fighting pumps
HVAC machineries
Final Fix items
02-Apr-14, Electrical
26-Aug-13, Material Submittals
Cables & Wiring accessories
Mv panel & Accessories
MCC, EMDB & VFD
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 3 of 44 TASK filter: All Activities
Primavera Systems, Inc.
Activity ID Activity Name Original
Duration
Start Finish
EMS1030 BMS system 60 01-J un-13 26-Aug-13
EMS1040 CCTV 60 01-J un-13 26-Aug-13
EMS1050 Diesel Generator 60 01-J un-13 26-Aug-13
EMS1060 Light Fittings 60 01-J un-13 26-Aug-13
Mat erial App Mat erial Approvals 60 14-J ul-13 09-Oct-13
EMA1070 Cables & Wiring accessories 60 14-J ul-13 09-Oct-13
EMA1080 Mv panel & Accessories 60 14-J ul-13 09-Oct-13
EMA1090 MCC, EMDB & VFD 60 14-J ul-13 09-Oct-13
EMA1100 BMS system 60 14-J ul-13 09-Oct-13
EMA1110 CCTV 60 14-J ul-13 09-Oct-13
EMA1120 Diesel Generator 60 14-J ul-13 09-Oct-13
EMA1130 Light Fittings 60 14-J ul-13 09-Oct-13
Fabricat ion Fabricat ion / Delivery on sit e 150 27-Aug-13 02-Apr-14
EMD1140 Cables & Wiring accessories 60 27-Aug-13 21-Nov-13
EMD1150 Mv panel & Accessories 120 09-Oct-13 02-Apr-14
EMD1160 MCC, EMDB & VFD 60 27-Aug-13 21-Nov-13
EMD1170 BMS system 120 09-Oct-13 02-Apr-14
EMD1180 CCTV 120 09-Oct-13 02-Apr-14
EMD1190 Diesel Generator 120 09-Oct-13 02-Apr-14
EMD1200 Light Fittings 100 09-Oct-13 04-Mar-14
Construction Construction 285 30-J un-13 19-Aug-14
Facade Facade 115 30-J un-13 14-Dec-13
Ent ry elevat io Ent ry elevat ion 55 25-Sep-13 14-Dec-13
FA1300 Rendering works 20 25-Sep-13 23-Oct-13
FA1310 GRC works 30 09-Oct-13 21-Nov-13
FA1320 Aluminium windows 20 24-Oct-13 21-Nov-13
FA1330 Light fittings 15 07-Nov-13 30-Nov-13
FA1340 Protective Coating 10 30-Nov-13 14-Dec-13
Rear elevat ion Rear elevat ion 55 27-Aug-13 14-Nov-13
FA1250 Rendering works 20 27-Aug-13 24-Sep-13
FA1260 GRC works 30 10-Sep-13 23-Oct-13
FA1270 Aluminium windows 20 25-Sep-13 23-Oct-13
FA1280 Light fittings 15 09-Oct-13 31-Oct-13
FA1290 Protective Coating 10 31-Oct-13 14-Nov-13
M J J A S O N D J F M A M J J A S O N D
BMS system
CCTV
Diesel Generator
Light Fittings
09-Oct-13, Material Approvals
Cables & Wiring accessories
Mv panel & Accessories
MCC, EMDB & VFD
BMS system
CCTV
Diesel Generator
Light Fittings
02-Apr-14, Fabrication / Delivery on site
Cables & Wiring accessories
Mv panel & Accessories
MCC, EMDB & VFD
BMS system
CCTV
Diesel Generator
Light Fittings
19-Aug-14, Constru
14-Dec-13, Facade
14-Dec-13, Entry elevation
Rendering works
GRC works
Aluminium windows
Light fittings
Protective Coating
14-Nov-13, Rear elevation
Rendering works
GRC works
Aluminium windows
Light fittings
Protective Coating
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 4 of 44 TASK filter: All Activities
Primavera Systems, Inc.
Activity ID Activity Name Original
Duration
Start Finish
Wat er f ront e Wat er f ront elevat ion 55 29-J ul-13 16-Oct-13
FA1200 Rendering works 20 29-J ul-13 26-Aug-13
FA1210 GRC works 30 12-Aug-13 24-Sep-13
FA1220 Aluminium windows 20 27-Aug-13 24-Sep-13
FA1230 Light fittings 15 10-Sep-13 02-Oct-13
FA1240 Protective Coating 10 02-Oct-13 16-Oct-13
Radial elevat Radial elevat ion 55 30-J un-13 17-Sep-13
FA1150 Rendering works 20 30-J un-13 28-J ul-13
FA1160 GRC works 30 14-J ul-13 26-Aug-13
FA1170 Aluminium windows 20 29-J ul-13 26-Aug-13
FA1180 Light fittings 15 12-Aug-13 03-Sep-13
FA1190 Protective Coating 10 03-Sep-13 17-Sep-13
Foyer Area Foyer Area 96 30-J un-13 16-Nov-13
Ent rance Lob Ent rance Lobby 96 30-J un-13 16-Nov-13
Civil / Arch Civil / Arch 96 30-J un-13 16-Nov-13
FY1000 Masonry works 7 30-J un-13 09-J ul-13
FY1010 Plastering 5 09-J ul-13 16-J ul-13
FY1020 1st coat paint on walls 5 17-J ul-13 24-J ul-13
FY1030 Floor screeding 5 24-J ul-13 31-J ul-13
FY1040 Marble flooring 7 31-J ul-13 11-Aug-13
FY1050 Marble cladding works 7 11-Aug-13 20-Aug-13
FY1060 Ceiling gypsum works 10 31-Aug-13 15-Sep-13
FY1070 Ceiling painting 1st coat 7 15-Sep-13 24-Sep-13
FY1080 Aluminum doors & windows 5 25-Sep-13 02-Oct-13
FY1090 Automatic revolving door 5 02-Oct-13 09-Oct-13
FY1100 Wooden doors & accessories 5 09-Oct-13 16-Oct-13
FY1110 Reception counter 7 16-Oct-13 27-Oct-13
FY1120 Final coat on celing 7 27-Oct-13 06-Nov-13
FY1130 Final coat on walls 7 06-Nov-13 16-Nov-13
MEP MEP 36 11-Aug-13 02-Oct-13
FYM1000 Light & small power 1st & 2nd fix 5 11-Aug-13 18-Aug-13
FYM1010 Fire Fighting Pipe installation 7 11-Aug-13 20-Aug-13
FYM1020 Fire Alarm 1st & 2nd fix 5 11-Aug-13 18-Aug-13
FYM1030 BMS & data 1st & 2nd fix 5 11-Aug-13 18-Aug-13
M J J A S O N D J F M A M J J A S O N D
16-Oct-13, Water front elevation
Rendering works
GRC works
Aluminium windows
Light fittings
Protective Coating
17-Sep-13, Radial elevation
Rendering works
GRC works
Aluminium windows
Light fittings
Protective Coating
16-Nov-13, Foyer Area
16-Nov-13, Entrance Lobby
16-Nov-13, Civil / Arch
Masonry works
Plastering
1st coat paint on walls
Floor screeding
Marble flooring
Marble cladding works
Ceiling gypsum works
Ceiling painting 1st coat
Aluminum doors & windows
Automatic revolving door
Wooden doors & accessories
Reception counter
Final coat on celing
Final coat on walls
02-Oct-13, MEP
Light & small power 1st & 2nd fix
Fire Fighting Pipe installation
Fire Alarm 1st & 2nd fix
BMS & data 1st & 2nd fix
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 5 of 44 TASK filter: All Activities
Primavera Systems, Inc.
Activity ID Activity Name Original
Duration
Start Finish
FYM1040 CCTV 1st & 2nd fix 5 11-Aug-13 18-Aug-13
FYM1045 HVAC 1st & 2nd fix 7 11-Aug-13 20-Aug-13
FYM1050 MEP testing 7 21-Aug-13 31-Aug-13
FYM1060 MEP final fix 5 25-Sep-13 02-Oct-13
Concierge ro Concierge room 42 11-Aug-13 10-Oct-13
Civil / Arch Civil / Arch 42 11-Aug-13 10-Oct-13
FCR1050 Wet area water proofing 7 11-Aug-13 20-Aug-13
FCR1060 Wet area flooring 5 25-Aug-13 01-Sep-13
FCR1070 1st coat on walls 5 02-Sep-13 09-Sep-13
FCR1080 Wet area ceiling works 5 09-Sep-13 16-Sep-13
FCR1090 Dry area ceiling works 5 16-Sep-13 23-Sep-13
FCR1100 1st coat on ceiling 3 23-Sep-13 28-Sep-13
FCR1110 Wooden doors & accessories 3 28-Sep-13 02-Oct-13
FCR1120 Final coat on ceiling 3 02-Oct-13 06-Oct-13
FCR1130 Final coat on walls 3 07-Oct-13 10-Oct-13
MEP MEP 33 18-Aug-13 05-Oct-13
FCR1000 Light & small power 1st & 2nd fix 5 18-Aug-13 25-Aug-13
FCR1010 HVAC 1st & 2nd fix 5 18-Aug-13 25-Aug-13
FCR1020 Fire fighting pipe installation 5 18-Aug-13 25-Aug-13
FCR1030 MEP testing 5 25-Aug-13 01-Sep-13
FCR1040 MEP final fix 5 28-Sep-13 05-Oct-13
Canopy Canopy 65 17-J ul-13 20-Oct-13
Civil / Arch Civil / Arch 65 17-J ul-13 20-Oct-13
FC1000 Plastering works 7 17-J ul-13 27-J ul-13
FC1010 GRC works 7 27-J ul-13 06-Aug-13
FC1020 Paint 1st coat on walls 5 06-Aug-13 13-Aug-13
FC1030 Celing gypsum works 7 08-Sep-13 17-Sep-13
FC1040 1st coat paint on ceiling 5 17-Sep-13 24-Sep-13
FC1050 Flooring works 7 25-Sep-13 05-Oct-13
FC1060 Ceiling final coat painting 5 05-Oct-13 12-Oct-13
FC1070 Final coat on walls 5 13-Oct-13 20-Oct-13
MEP MEP 33 18-Aug-13 05-Oct-13
FCM1000 Light & small power 1st & 2nd fix 7 18-Aug-13 28-Aug-13
FCM1010 Fire fighting pipe installation 7 18-Aug-13 28-Aug-13
M J J A S O N D J F M A M J J A S O N D
CCTV 1st & 2nd fix
HVAC 1st & 2nd fix
MEP testing
MEP final fix
10-Oct-13, Concierge room
10-Oct-13, Civil / Arch
Wet area water proofing
Wet area flooring
1st coat on walls
Wet area ceiling works
Dry area ceiling works
1st coat on ceiling
Wooden doors & accessories
Final coat on ceiling
Final coat on walls
05-Oct-13, MEP
Light & small power 1st & 2nd fix
HVAC 1st & 2nd fix
Fire fighting pipe installation
MEP testing
MEP final fix
20-Oct-13, Canopy
20-Oct-13, Civil / Arch
Plastering works
GRC works
Paint 1st coat on walls
Celing gypsum works
1st coat paint on ceiling
Flooring works
Ceiling final coat painting
Final coat on walls
05-Oct-13, MEP
Light & small power 1st & 2nd fix
Fire fighting pipe installation
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 6 of 44 TASK filter: All Activities
Primavera Systems, Inc.
Activity ID Activity Name Original
Duration
Start Finish
FCM1020 BMS 1st & 2nd fix 7 18-Aug-13 28-Aug-13
FCM1030 Fire Alarm 1st & 2nd fix 7 18-Aug-13 28-Aug-13
FCM1040 MEP testing 7 28-Aug-13 07-Sep-13
FCM1050 MEP final fix 7 25-Sep-13 05-Oct-13
Podium Podium 255 12-Aug-13 19-Aug-14
Parking 1 Parking 1 195 27-Aug-13 07-J un-14
Civil / Arch Civil / Arch 104 25-Sep-13 23-Feb-14
PA1540 Masonry Works 10 25-Sep-13 09-Oct-13
PA1550 Plastering Works 10 09-Oct-13 23-Oct-13
PA1560 Ceiling splatter painting 10 24-Oct-13 07-Nov-13
PA1570 Wall 1st coat painting 10 07-Nov-13 21-Nov-13
PA1575 Wheel stopper fixing 10 23-Nov-13 07-Dec-13
PA1580 Floor screeding 7 22-Dec-13 31-Dec-13
PA1590 Epoxy preparation on floor 10 31-Dec-13 15-J an-14
PA1600 Floor epoxy coating on floor 10 15-J an-14 29-J an-14
PA1610 Final Coat on wall 7 29-J an-14 09-Feb-14
PA1615 Column Guard fixing 7 29-J an-14 09-Feb-14
PA1620 Paking line & number marking 10 09-Feb-14 23-Feb-14
PA1625 Steel Door Fixing 7 09-Feb-14 19-Feb-14
MEP MEP 40 07-Nov-13 05-J an-14
PME1000 Light & Small power 1st & 2nd fix 20 07-Nov-13 07-Dec-13
PME1010 CCTV 1st & 2nd fix 10 07-Nov-13 21-Nov-13
PME1020 Fire Alarm 1st & 2nd fix 10 07-Nov-13 21-Nov-13
PME1030 BMS 1st & 2nd fix 10 07-Nov-13 21-Nov-13
PME1040 Fire fighting pipe installation 30 07-Nov-13 21-Dec-13
PME1050 CO system 1st & 2nd fix 10 07-Nov-13 21-Nov-13
PME1060 Plumbing 1st & 2nd fix 10 07-Nov-13 21-Nov-13
PME1070 Ducting & Insulation works 30 07-Nov-13 21-Dec-13
PME1080 MEP final fix 10 22-Dec-13 05-J an-14
Ut ilit y rooms Ut ilit y rooms 195 27-Aug-13 07-J un-14
Subst at ion Subst at ion 75 27-Aug-13 14-Dec-13
SB1000 Civil works 15 27-Aug-13 17-Sep-13
SB1010 Electrical Equipment Installation 20 17-Sep-13 16-Oct-13
SB1020 Cable termination 15 16-Oct-13 07-Nov-13
M J J A S O N D J F M A M J J A S O N D
BMS 1st & 2nd fix
Fire Alarm 1st & 2nd fix
MEP testing
MEP final fix
19-Aug-14, Podium
07-J un-14, Parking 1
23-Feb-14, Civil / Arch
Masonry Works
Plastering Works
Ceiling splatter painting
Wall 1st coat painting
Wheel stopper fixing
Floor screeding
Epoxy preparation on floor
Floor epoxy coating on floor
Final Coat on wall
Column Guard fixing
Paking line & number marking
Steel Door Fixing
05-J an-14, MEP
Light & Small power 1st & 2nd fix
CCTV 1st & 2nd fix
Fire Alarm 1st & 2nd fix
BMS 1st & 2nd fix
Fire fighting pipe installation
CO system 1st & 2nd fix
Plumbing 1st & 2nd fix
Ducting & Insulation works
MEP final fix
07-J un-14, Utility rooms
14-Dec-13, Substation
Civil works
Electrical Equipment Installation
Cable termination
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 7 of 44 TASK filter: All Activities
Primavera Systems, Inc.
Activity ID Activity Name Original
Duration
Start Finish
SB1030 FM 200 Installation 20 07-Nov-13 07-Dec-13
SB1040 Light fittings 5 07-Dec-13 14-Dec-13
ETS room ETS room 115 17-Sep-13 04-Mar-14
ET1000 Civil works 10 17-Sep-13 02-Oct-13
ET1010 Chilled Water pump installation 15 02-Oct-13 23-Oct-13
ET1020 Mechanical Equipments Installation 30 24-Oct-13 07-Dec-13
ET1030 Piping & Insulation works 30 07-Dec-13 19-J an-14
ET1040 Control panel Installation 10 20-J an-14 03-Feb-14
ET1050 Cabling & termination 15 03-Feb-14 25-Feb-14
ET1060 Light fittings 5 25-Feb-14 04-Mar-14
Pump room Pump room 74 02-Oct-13 18-J an-14
PR1000 Civil works 10 02-Oct-13 16-Oct-13
PR1010 Fire fighting pump installation 7 16-Oct-13 27-Oct-13
PR1020 Domestic water pump installation 7 23-Nov-13 02-Dec-13
PR1030 Control panel Installation 7 02-Dec-13 12-Dec-13
PR1040 Piping works 10 12-Dec-13 26-Dec-13
PR1050 Cabling & termination 10 28-Dec-13 11-J an-14
PR1060 Light fittings 5 11-J an-14 18-J an-14
Generat or Generat or room 45 02-Apr-14 07-J un-14
GE1000 Generator Installation 10 02-Apr-14 16-Apr-14
GE1010 Control panel installation 10 17-Apr-14 01-May-14
GE1020 Ducting 15 17-Apr-14 08-May-14
GE1030 Cabling & termination 10 01-May-14 15-May-14
GE1040 Civil finishing works 10 17-May-14 31-May-14
GE1050 Light fittings 5 31-May-14 07-J un-14
Parking 2 Parking 2 235 10-Sep-13 19-Aug-14
Civil / Arch Civil / Arch 104 10-Sep-13 09-Feb-14
PA1450 Masonry Works 10 10-Sep-13 24-Sep-13
PA1460 Plastering Works 10 25-Sep-13 09-Oct-13
PA1470 Ceiling splatter painting 10 09-Oct-13 23-Oct-13
PA1480 Wall 1st coat painting 10 24-Oct-13 07-Nov-13
PA1485 Wheel stopper fixing 10 07-Nov-13 21-Nov-13
PA1490 Floor screeding 7 07-Dec-13 17-Dec-13
PA1500 Epoxy preparation on floor 10 17-Dec-13 31-Dec-13
M J J A S O N D J F M A M J J A S O N D
FM 200 Installation
Light fittings
04-Mar-14, ETS room
Civil works
Chilled Water pump installation
Mechanical Equipments Installation
Piping & Insulation works
Control panel Installation
Cabling & termination
Light fittings
18-J an-14, Pump room
Civil works
Fire fighting pump installation
Domestic water pump installation
Control panel Installation
Piping works
Cabling & termination
Light fittings
07-J un-14, Generator room
Generator Installation
Control panel installation
Ducting
Cabling & termination
Civil finishing works
Light fittings
19-Aug-14, Parking
09-Feb-14, Civil / Arch
Masonry Works
Plastering Works
Ceiling splatter painting
Wall 1st coat painting
Wheel stopper fixing
Floor screeding
Epoxy preparation on floor
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 8 of 44 TASK filter: All Activities
Primavera Systems, Inc.
Activity ID Activity Name Original
Duration
Start Finish
PA1510 Floor epoxy coating on floor 10 31-Dec-13 15-J an-14
PA1520 Final Coat on wall 7 15-J an-14 25-J an-14
PA1525 Column Guard fixing 7 15-J an-14 25-J an-14
PA1530 Paking line & number marking 10 26-J an-14 09-Feb-14
PA1535 Steel Door Fixing 7 26-J an-14 04-Feb-14
MEP MEP 50 24-Oct-13 05-J an-14
PME1090 Light & Small power 1st & 2nd fix 20 24-Oct-13 21-Nov-13
PME1100 CCTV 1st & 2nd fix 10 24-Oct-13 07-Nov-13
PME1110 Fire Alarm 1st & 2nd fix 10 24-Oct-13 07-Nov-13
PME1120 BMS 1st & 2nd fix 10 24-Oct-13 07-Nov-13
PME1130 Fire fighting pipe installation 30 24-Oct-13 07-Dec-13
PME1140 CO system 1st & 2nd fix 10 24-Oct-13 07-Nov-13
PME1150 Plumbing 1st & 2nd fix 10 24-Oct-13 07-Nov-13
PME1160 Ducting & Insulation works 30 24-Oct-13 07-Dec-13
PME1170 MEP final fix 20 07-Dec-13 05-J an-14
MV Panel ro MV Panel room 95 02-Apr-14 19-Aug-14
MV1000 MV panel Installation 30 02-Apr-14 15-May-14
MV1010 Cabling & termination 30 17-May-14 29-J un-14
MV1020 Foam system 20 29-J un-14 28-J ul-14
MV1030 Civil finishing works 10 28-J ul-14 11-Aug-14
MV1040 Light fittings 5 12-Aug-14 19-Aug-14
Parking 3 Parking 3 104 27-Aug-13 25-J an-14
Civil / Arch Civil / Arch 104 27-Aug-13 25-J an-14
PA1360 Masonry Works 10 27-Aug-13 10-Sep-13
PA1370 Plastering Works 10 10-Sep-13 24-Sep-13
PA1380 Ceiling splatter painting 10 25-Sep-13 09-Oct-13
PA1390 Wall 1st coat painting 10 09-Oct-13 23-Oct-13
PA1395 Wheel stopper fixing 10 24-Oct-13 07-Nov-13
PA1400 Floor screeding 7 23-Nov-13 02-Dec-13
PA1410 Epoxy preparation on floor 10 02-Dec-13 17-Dec-13
PA1420 Floor epoxy coating on floor 10 17-Dec-13 31-Dec-13
PA1430 Final Coat on wall 7 31-Dec-13 11-J an-14
PA1435 Column Guard fixing 7 31-Dec-13 11-J an-14
PA1440 Paking line & number marking 10 11-J an-14 25-J an-14
M J J A S O N D J F M A M J J A S O N D
Floor epoxy coating on floor
Final Coat on wall
Column Guard fixing
Paking line & number marking
Steel Door Fixing
05-J an-14, MEP
Light & Small power 1st & 2nd fix
CCTV 1st & 2nd fix
Fire Alarm 1st & 2nd fix
BMS 1st & 2nd fix
Fire fighting pipe installation
CO system 1st & 2nd fix
Plumbing 1st & 2nd fix
Ducting & Insulation works
MEP final fix
19-Aug-14, MV Pan
MV panel Installation
Cabling & termination
Foam system
Civil finishing works
Light fittings
25-J an-14, Parking 3
25-J an-14, Civil / Arch
Masonry Works
Plastering Works
Ceiling splatter painting
Wall 1st coat painting
Wheel stopper fixing
Floor screeding
Epoxy preparation on floor
Floor epoxy coating on floor
Final Coat on wall
Column Guard fixing
Paking line & number marking
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 9 of 44 TASK filter: All Activities
Primavera Systems, Inc.
Activity ID Activity Name Original
Duration
Start Finish
PA1445 Steel Door Fixing 7 11-J an-14 21-J an-14
MEP MEP 50 09-Oct-13 21-Dec-13
PME1180 Light & Small power 1st & 2nd fix 20 09-Oct-13 07-Nov-13
PME1190 CCTV 1st & 2nd fix 10 09-Oct-13 23-Oct-13
PME1200 Fire Alarm 1st & 2nd fix 10 09-Oct-13 23-Oct-13
PME1210 BMS 1st & 2nd fix 10 09-Oct-13 23-Oct-13
PME1220 Fire fighting pipe installation 30 09-Oct-13 21-Nov-13
PME1230 CO system 1st & 2nd fix 10 09-Oct-13 23-Oct-13
PME1240 Plumbing 1st & 2nd fix 10 09-Oct-13 23-Oct-13
PME1250 Ducting & Insulation works 30 09-Oct-13 21-Nov-13
PME1260 MEP final fix 20 23-Nov-13 21-Dec-13
Parking 4 Parking 4 104 12-Aug-13 11-J an-14
Civil / Arch Civil / Arch 104 12-Aug-13 11-J an-14
PA1270 Masonry Works 10 12-Aug-13 26-Aug-13
PA1280 Plastering Works 10 27-Aug-13 10-Sep-13
PA1290 Ceiling splatter painting 10 10-Sep-13 24-Sep-13
PA1300 Wall 1st coat painting 10 25-Sep-13 09-Oct-13
PA1305 Wheel stopper fixing 10 09-Oct-13 23-Oct-13
PA1310 Floor screeding 7 07-Nov-13 18-Nov-13
PA1320 Epoxy preparation on floor 10 18-Nov-13 02-Dec-13
PA1330 Floor epoxy coating on floor 10 02-Dec-13 17-Dec-13
PA1340 Final Coat on wall 7 17-Dec-13 26-Dec-13
PA1345 Column Guard fixing 7 17-Dec-13 26-Dec-13
PA1350 Paking line & number marking 10 28-Dec-13 11-J an-14
PA1355 Steel Door Fixing 7 28-Dec-13 06-J an-14
MEP MEP 50 25-Sep-13 07-Dec-13
PME1270 Light & Small power 1st & 2nd fix 20 25-Sep-13 23-Oct-13
PME1280 CCTV 1st & 2nd fix 10 25-Sep-13 09-Oct-13
PME1290 Fire Alarm 1st & 2nd fix 10 25-Sep-13 09-Oct-13
PME1300 BMS 1st & 2nd fix 10 25-Sep-13 09-Oct-13
PME1310 Fire fighting pipe installation 30 25-Sep-13 07-Nov-13
PME1320 CO system 1st & 2nd fix 10 25-Sep-13 09-Oct-13
PME1330 Plumbing 1st & 2nd fix 10 25-Sep-13 09-Oct-13
PME1340 Ducting & Insulation works 30 25-Sep-13 07-Nov-13
M J J A S O N D J F M A M J J A S O N D
Steel Door Fixing
21-Dec-13, MEP
Light & Small power 1st & 2nd fix
CCTV 1st & 2nd fix
Fire Alarm 1st & 2nd fix
BMS 1st & 2nd fix
Fire fighting pipe installation
CO system 1st & 2nd fix
Plumbing 1st & 2nd fix
Ducting & Insulation works
MEP final fix
11-J an-14, Parking 4
11-J an-14, Civil / Arch
Masonry Works
Plastering Works
Ceiling splatter painting
Wall 1st coat painting
Wheel stopper fixing
Floor screeding
Epoxy preparation on floor
Floor epoxy coating on floor
Final Coat on wall
Column Guard fixing
Paking line & number marking
Steel Door Fixing
07-Dec-13, MEP
Light & Small power 1st & 2nd fix
CCTV 1st & 2nd fix
Fire Alarm 1st & 2nd fix
BMS 1st & 2nd fix
Fire fighting pipe installation
CO system 1st & 2nd fix
Plumbing 1st & 2nd fix
Ducting & Insulation works
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 10 of 44 TASK filter: All Activities
Primavera Systems, Inc.
Activity ID Activity Name Original
Duration
Start Finish
PME1350 MEP final fix 20 07-Nov-13 07-Dec-13
Roof level Roof level 125 12-Aug-13 10-Feb-14
Civil / Arch Civil / Arch 120 12-Aug-13 03-Feb-14
RF1000 Masonry Walls 10 12-Aug-13 26-Aug-13
RF1010 Plastering works 10 27-Aug-13 10-Sep-13
RF1015 Painting on wall 10 10-Sep-13 24-Sep-13
RF1020 Waterproofing on floor 10 25-Sep-13 09-Oct-13
RF1030 Tiling works 10 09-Oct-13 23-Oct-13
RF1040 Circular tower works 30 24-Oct-13 07-Dec-13
RF1050 Square tower works 30 24-Oct-13 07-Dec-13
RF1060 Water tank water proofing 10 25-Sep-13 09-Oct-13
RF1070 Epoxy coating 7 09-Oct-13 20-Oct-13
RF1080 Roof structure 30 07-Nov-13 21-Dec-13
RF1090 Roof sheeting 30 30-Nov-13 12-J an-14
RF1100 Roof tiling 30 22-Dec-13 03-Feb-14
RF1110 Protective coating 10 07-Dec-13 21-Dec-13
MEP MEP 115 27-Aug-13 10-Feb-14
RFM1000 Light & small power 1st & 2nd fix 10 27-Aug-13 10-Sep-13
RFM1010 Fire fighting pipe installation 10 10-Sep-13 24-Sep-13
RFM1020 Chilled Water piping 10 25-Sep-13 09-Oct-13
RFM1030 Installation of AHU 15 09-Oct-13 31-Oct-13
RFM1040 Installation of Exhuast fans 20 09-Oct-13 07-Nov-13
RFM1050 Ducting & insulation works 40 07-Nov-13 05-J an-14
RFM1060 BMS 1st & 2nd fix 10 10-Sep-13 24-Sep-13
RFM1070 MEP testing 15 05-J an-14 27-J an-14
RFM1080 MEP final fix 10 27-J an-14 10-Feb-14
Amenit y Floor Amenit y Floor 147 30-J un-13 29-J an-14
Mockup room Mockup room 42 09-Oct-13 09-Dec-13
Civil / Arch Civil / Arch 20 24-Oct-13 21-Nov-13
AME1020 Light & Small power 1st & 2nd fix 5 03-Nov-13 10-Nov-13
AME1090 Fire alarm 1st & 2nd fix 4 03-Nov-13 09-Nov-13
AME1100 Data 1st & 2nd fix 4 03-Nov-13 09-Nov-13
AME1110 HVAC Ducting & FCU installation 7 24-Oct-13 03-Nov-13
AME1120 Chilled water piping 4 03-Nov-13 09-Nov-13
M J J A S O N D J F M A M J J A S O N D
MEP final fix
10-Feb-14, Roof level
03-Feb-14, Civil / Arch
Masonry Walls
Plastering works
Painting on wall
Waterproofing on floor
Tiling works
Circular tower works
Square tower works
Water tank water proofing
Epoxy coating
Roof structure
Roof sheeting
Roof tiling
Protective coating
10-Feb-14, MEP
Light & small power 1st & 2nd fix
Fire fighting pipe installation
Chilled Water piping
Installation of AHU
Installation of Exhuast fans
Ducting & insulation works
BMS 1st & 2nd fix
MEP testing
MEP final fix
29-J an-14, Amenity Floor
09-Dec-13, Mockup room
21-Nov-13, Civil / Arch
Light & Small power 1st & 2nd fix
Fire alarm 1st & 2nd fix
Data 1st & 2nd fix
HVAC Ducting & FCU installation
Chilled water piping
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 11 of 44 TASK filter: All Activities
Primavera Systems, Inc.
Activity ID Activity Name Original
Duration
Start Finish
AME1130 Firefighting pipe installation 5 03-Nov-13 10-Nov-13
AME1140 MEP testing 5 11-Nov-13 18-Nov-13
AME1150 MEP final fix 5 14-Nov-13 21-Nov-13
MEP MEP 42 09-Oct-13 09-Dec-13
AMC1140 Masonry walls 5 09-Oct-13 16-Oct-13
AMC1150 Plastering 5 16-Oct-13 23-Oct-13
AMC1160 1st coat paint on walls 5 24-Oct-13 31-Oct-13
AMC1170 Wet area water proofing 5 31-Oct-13 07-Nov-13
AMC1180 Wet area flooring 4 07-Nov-13 13-Nov-13
AMC1190 Wet area wall tiles 4 13-Nov-13 19-Nov-13
AMC1200 Dry area Ceiling gypsum works 5 31-Oct-13 07-Nov-13
AMC1210 Wet area ceiling works 4 19-Nov-13 25-Nov-13
AMC1220 Ceiling 1st coat painting 5 07-Nov-13 14-Nov-13
AMC1230 Aluminum doors & windows 3 14-Nov-13 19-Nov-13
AMC1240 Kitchen cabinets & wardrobes 5 25-Nov-13 02-Dec-13
AMC1250 Woodendoors & Accessories 3 14-Nov-13 19-Nov-13
AMC1260 Ceiling final coat painting 5 23-Nov-13 30-Nov-13
AMC1270 Final coat paint on walls 5 02-Dec-13 09-Dec-13
Apart ment s Apart ment s 105 30-J un-13 30-Nov-13
MEP MEP 85 30-J un-13 31-Oct-13
AME1000 Light & Small power 1st & 2nd fix 15 21-J ul-13 12-Aug-13
AME1010 Fire alarm 1st & 2nd fix 10 21-J ul-13 05-Aug-13
AME1030 Data 1st & 2nd fix 10 21-J ul-13 05-Aug-13
AME1040 HVAC Ducting & FCU installation 15 30-J un-13 21-J ul-13
AME1050 Chilled water piping 10 21-J ul-13 05-Aug-13
AME1060 Firefighting pipe installation 15 21-J ul-13 12-Aug-13
AME1070 MEP testing 15 12-Aug-13 03-Sep-13
AME1080 MEP final fix 15 09-Oct-13 31-Oct-13
Civil / Arch Civil / Arch 105 30-J un-13 30-Nov-13
AMC1000 Masonry walls 10 30-J un-13 14-J ul-13
AMC1010 Plastering 10 14-J ul-13 28-J ul-13
AMC1020 1st coat paint on walls 10 29-J ul-13 12-Aug-13
AMC1030 Wet area water proofing 7 12-Aug-13 22-Aug-13
AMC1040 Wet area flooring 10 22-Aug-13 05-Sep-13
M J J A S O N D J F M A M J J A S O N D
Firefighting pipe installation
MEP testing
MEP final fix
09-Dec-13, MEP
Masonry walls
Plastering
1st coat paint on walls
Wet area water proofing
Wet area flooring
Wet area wall tiles
Dry area Ceiling gypsum works
Wet area ceiling works
Ceiling 1st coat painting
Aluminum doors & windows
Kitchen cabinets & wardrobes
Woodendoors & Accessories
Ceiling final coat painting
Final coat paint on walls
30-Nov-13, Apartments
31-Oct-13, MEP
Light & Small power 1st & 2nd fix
Fire alarm 1st & 2nd fix
Data 1st & 2nd fix
HVAC Ducting & FCU installation
Chilled water piping
Firefighting pipe installation
MEP testing
MEP final fix
30-Nov-13, Civil / Arch
Masonry walls
Plastering
1st coat paint on walls
Wet area water proofing
Wet area flooring
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 12 of 44 TASK filter: All Activities
Primavera Systems, Inc.
Activity ID Activity Name Original
Duration
Start Finish
AMC1050 Wet area wall tiles 10 05-Sep-13 21-Sep-13
AMC1060 Dry area Ceiling gypsum works 15 03-Sep-13 24-Sep-13
AMC1070 Wet area ceiling works 10 21-Sep-13 05-Oct-13
AMC1080 Ceiling 1st coat painting 10 25-Sep-13 09-Oct-13
AMC1090 Aluminum doors & windows 10 09-Oct-13 23-Oct-13
AMC1100 Kitchen cabinets & wardrobes 10 09-Oct-13 23-Oct-13
AMC1110 Woodendoors & Accessories 10 09-Oct-13 23-Oct-13
AMC1120 Ceiling final coat painting 10 31-Oct-13 14-Nov-13
AMC1130 Final coat paint on walls 10 14-Nov-13 30-Nov-13
Corridor Corridor 83 21-J ul-13 19-Nov-13
Civil / Arch Civil / Arch 78 29-J ul-13 19-Nov-13
LCC11600 Plastering works 7 29-J ul-13 07-Aug-13
LCC11610 1st coat paint on walls 5 07-Aug-13 14-Aug-13
LCC11620 Marble flooring 7 15-Aug-13 25-Aug-13
LCC11630 Ceiling gypsum works 7 13-Oct-13 22-Oct-13
LCC11640 1st coat paint on ceiling 5 22-Oct-13 29-Oct-13
LCC11650 Steel doors & accessories 4 30-Oct-13 04-Nov-13
LCC11660 Final coat paint on ceiling 5 05-Nov-13 12-Nov-13
LCC11670 Final coat paint on walls 5 12-Nov-13 19-Nov-13
MEP MEP 76 21-J ul-13 09-Nov-13
LCM11600 HVAC ducting & FCU installation 15 21-J ul-13 12-Aug-13
LCM11610 Fire fighting pipe Installation 7 12-Aug-13 22-Aug-13
LCM11620 Chilled water Piping 7 22-Aug-13 01-Sep-13
LCM11630 Light & Power 1st & 2nd fix 7 02-Sep-13 11-Sep-13
LCM11640 Fire alarm 1st & 2nd fix 7 11-Sep-13 22-Sep-13
LCM11650 BMS 1st & 2nd fix 7 22-Sep-13 02-Oct-13
LCM11660 MEP testing 7 02-Oct-13 12-Oct-13
LCM11670 MEP final fix 7 30-Oct-13 09-Nov-13
Public area Public area 137 14-J ul-13 29-J an-14
Gym room Gym room 56 14-J ul-13 03-Oct-13
Civil / Arch Civil / Arch 56 14-J ul-13 03-Oct-13
PA1000 Masorny works 5 14-J ul-13 21-J ul-13
PA1010 Palstering 5 21-J ul-13 28-J ul-13
PA1020 Painting 1st coat on wall 5 29-J ul-13 05-Aug-13
M J J A S O N D J F M A M J J A S O N D
Wet area wall tiles
Dry area Ceiling gypsum works
Wet area ceiling works
Ceiling 1st coat painting
Aluminum doors & windows
Kitchen cabinets & wardrobes
Woodendoors & Accessories
Ceiling final coat painting
Final coat paint on walls
19-Nov-13, Corridor
19-Nov-13, Civil / Arch
Plastering works
1st coat paint on walls
Marble flooring
Ceiling gypsum works
1st coat paint on ceiling
Steel doors & accessories
Final coat paint on ceiling
Final coat paint on walls
09-Nov-13, MEP
HVAC ducting & FCU installation
Fire fighting pipe Installation
Chilled water Piping
Light & Power 1st & 2nd fix
Fire alarm 1st & 2nd fix
BMS 1st & 2nd fix
MEP testing
MEP final fix
29-J an-14, Public area
03-Oct-13, Gym room
03-Oct-13, Civil / Arch
Masorny works
Palstering
Painting 1st coat on wall
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 13 of 44 TASK filter: All Activities
Primavera Systems, Inc.
Activity ID Activity Name Original
Duration
Start Finish
PA1030 Acoustic Ceiling works 5 11-Aug-13 18-Aug-13
PA1040 Ceiling 1st coat painting 5 18-Aug-13 25-Aug-13
PA1050 Rubber flooring 5 25-Aug-13 01-Sep-13
PA1060 Final coat on ceiling 5 04-Sep-13 11-Sep-13
PA1070 Aluminium Doors & windows 5 11-Sep-13 18-Sep-13
PA1080 Wooden Doors & accessories 5 19-Sep-13 26-Sep-13
PA1090 Final coat on wall 5 26-Sep-13 03-Oct-13
MEP MEP 31 21-J ul-13 04-Sep-13
LAM11600 HVAC Ducting & FCU installation 7 21-J ul-13 31-J ul-13
LAM11610 Fire fighting pipe installation 7 21-J ul-13 31-J ul-13
LAM11620 Chilled water piping 7 21-J ul-13 31-J ul-13
LAM11640 Light, small power & Data 1st & 2nd fix 7 21-J ul-13 31-J ul-13
LAM11650 Fire alarm 1st & 2nd fix 7 21-J ul-13 31-J ul-13
LAM11660 MEP testing 7 31-J ul-13 11-Aug-13
LAM11670 MEP final fix 7 25-Aug-13 04-Sep-13
Kids Play ro Kids Play room 58 21-J ul-13 14-Oct-13
Civil / Arch Civil / Arch 58 21-J ul-13 14-Oct-13
PA1100 Masorny works 5 21-J ul-13 28-J ul-13
PA1110 Palstering 5 29-J ul-13 05-Aug-13
PA1120 Painting 1st coat on wall 5 05-Aug-13 12-Aug-13
PA1130 Acoustic Ceiling works 5 21-Aug-13 28-Aug-13
PA1140 Ceiling 1st coat painting 5 28-Aug-13 04-Sep-13
PA1150 Rubber flooring 5 04-Sep-13 11-Sep-13
PA1160 Final coat on ceiling 5 15-Sep-13 22-Sep-13
PA1170 Aluminium Doors & windows 5 22-Sep-13 29-Sep-13
PA1180 Wooden Doors & accessories 5 29-Sep-13 06-Oct-13
PA1190 Final coat on wall 5 07-Oct-13 14-Oct-13
MEP MEP 31 31-J ul-13 15-Sep-13
LAM11630 HVAC Ducting & FCU installation 7 31-J ul-13 11-Aug-13
LAM11680 Fire fighting pipe installation 7 31-J ul-13 11-Aug-13
LAM11690 Chilled water piping 7 31-J ul-13 11-Aug-13
LAM11700 Light, small power & Data 1st & 2nd fix 7 31-J ul-13 11-Aug-13
LAM11710 Fire alarm 1st & 2nd fix 7 31-J ul-13 11-Aug-13
LAM11720 MEP testing 7 11-Aug-13 20-Aug-13
M J J A S O N D J F M A M J J A S O N D
Acoustic Ceiling works
Ceiling 1st coat painting
Rubber flooring
Final coat on ceiling
Aluminium Doors & windows
Wooden Doors & accessories
Final coat on wall
04-Sep-13, MEP
HVAC Ducting & FCU installation
Fire fighting pipe installation
Chilled water piping
Light, small power & Data 1st & 2nd fix
Fire alarm 1st & 2nd fix
MEP testing
MEP final fix
14-Oct-13, Kids Play room
14-Oct-13, Civil / Arch
Masorny works
Palstering
Painting 1st coat on wall
Acoustic Ceiling works
Ceiling 1st coat painting
Rubber flooring
Final coat on ceiling
Aluminium Doors & windows
Wooden Doors & accessories
Final coat on wall
15-Sep-13, MEP
HVAC Ducting & FCU installation
Fire fighting pipe installation
Chilled water piping
Light, small power & Data 1st & 2nd fix
Fire alarm 1st & 2nd fix
MEP testing
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 14 of 44 TASK filter: All Activities
Primavera Systems, Inc.
Activity ID Activity Name Original
Duration
Start Finish
LAM11730 MEP final fix 7 04-Sep-13 15-Sep-13
Swimming P Swimming Pool area 127 29-J ul-13 29-J an-14
SW1000 Swimming Pool Works 90 29-J ul-13 07-Dec-13
SW1010 Pooldeck area Screeding 7 07-Dec-13 17-Dec-13
SW1020 Pooldeck area Waterproofing 10 17-Dec-13 31-Dec-13
SW1030 Pooldeck area Tiling 7 31-Dec-13 11-J an-14
SW1040 Planters 30 17-Dec-13 29-J an-14
Landscaping Landscaping 108 17-Nov-13 22-Apr-14
Ent ry side Ent ry side 53 17-Nov-13 02-Feb-14
LS1000 Site preparation 7 17-Nov-13 26-Nov-13
LS1010 Pits for planters 7 26-Nov-13 07-Dec-13
LS1020 Irrigation lines 7 07-Dec-13 17-Dec-13
LS1030 Soil filling 7 17-Dec-13 26-Dec-13
LS1040 Fertilizers mixing 5 28-Dec-13 04-J an-14
LS1050 Planting 15 04-J an-14 25-J an-14
LS1060 Light fittings 5 26-J an-14 02-Feb-14
Radial road s Radial road side 60 26-J an-14 22-Apr-14
LS1070 Site preparation 7 26-J an-14 04-Feb-14
LS1080 Pits for planters 7 04-Feb-14 15-Feb-14
LS1090 Irrigation lines 7 15-Feb-14 25-Feb-14
LS1100 Soil filling 7 25-Feb-14 06-Mar-14
LS1110 Fertilizers mixing 5 08-Mar-14 15-Mar-14
LS1120 Planting 15 15-Mar-14 05-Apr-14
LS1130 Pebbles filling 5 06-Apr-14 13-Apr-14
LS1140 Pavers tiling 7 13-Apr-14 22-Apr-14
Tower Tower 252 14-J ul-13 16-J ul-14
Level 1 Level 1 117 14-J ul-13 31-Dec-13
Apart ment s Apart ment s 117 14-J ul-13 31-Dec-13
Civil / Arch Civil / Arch 117 14-J ul-13 31-Dec-13
LAC10000 Masonry walls 15 14-J ul-13 05-Aug-13
LAC10010 Plastering works 15 05-Aug-13 26-Aug-13
LAC10020 1st coat paint on walls 15 27-Aug-13 17-Sep-13
LAC10030 Wet area water proofing 10 17-Sep-13 02-Oct-13
LAC10040 Wet area flooring 10 02-Oct-13 16-Oct-13
M J J A S O N D J F M A M J J A S O N D
MEP final fix
29-J an-14, Swimming Pool area
Swimming Pool Works
Pooldeck area Screeding
Pooldeck area Waterproofing
Pooldeck area Tiling
Planters
22-Apr-14, Landscaping
02-Feb-14, Entry side
Site preparation
Pits for planters
Irrigation lines
Soil filling
Fertilizers mixing
Planting
Light fittings
22-Apr-14, Radial road side
Site preparation
Pits for planters
Irrigation lines
Soil filling
Fertilizers mixing
Planting
Pebbles filling
Pavers tiling
16-J ul-14, Tower
31-Dec-13, Level 1
31-Dec-13, Apartments
31-Dec-13, Civil / Arch
Masonry walls
Plastering works
1st coat paint on walls
Wet area water proofing
Wet area flooring
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 15 of 44 TASK filter: All Activities
Primavera Systems, Inc.
Activity ID Activity Name Original
Duration
Start Finish
LAC10050 Wet area wall tile works 10 16-Oct-13 31-Oct-13
LAC10060 Dry area ceiling gypsum works 20 17-Sep-13 16-Oct-13
LAC10070 Wet area ceiling works 12 31-Oct-13 18-Nov-13
LAC10080 1st coat paint on ceiling 15 16-Oct-13 07-Nov-13
LAC10090 Aluminium doors & windows 12 07-Nov-13 25-Nov-13
LAC10100 Kitchen cabinets & wardrobes 15 18-Nov-13 09-Dec-13
LAC10110 Wooden doors& accessories 15 07-Nov-13 30-Nov-13
LAC10120 Final coat paint on ceiling 15 07-Dec-13 29-Dec-13
LAC10130 Final coat paint on walls 15 10-Dec-13 31-Dec-13
MEP MEP 95 21-J ul-13 07-Dec-13
LAM10000 HVAC Ducting & FCU installation 15 21-J ul-13 12-Aug-13
LAM10010 Fire fighting pipe installation 15 21-J ul-13 12-Aug-13
LAM10020 Chilled water piping 15 21-J ul-13 12-Aug-13
LAM10030 Plumbing 1st & 2nd fix 10 21-J ul-13 05-Aug-13
LAM10040 Light, small power & Data 1st & 2nd fix 15 05-Aug-13 26-Aug-13
LAM10050 Fire alarm 1st & 2nd fix 10 05-Aug-13 19-Aug-13
LAM10060 MEP testing 15 27-Aug-13 17-Sep-13
LAM10070 MEP final fix 20 07-Nov-13 07-Dec-13
Corridor Corridor 86 12-Aug-13 15-Dec-13
Civil / Arch Civil / Arch 76 27-Aug-13 15-Dec-13
LCC10000 Plastering works 7 27-Aug-13 05-Sep-13
LCC10010 1st coat paint on walls 5 05-Sep-13 12-Sep-13
LCC10020 Marble flooring 7 14-Sep-13 23-Sep-13
LCC10030 Ceiling gypsum works 7 03-Nov-13 13-Nov-13
LCC10040 1st coat paint on ceiling 5 13-Nov-13 20-Nov-13
LCC10050 Steel doors & accessories 4 20-Nov-13 26-Nov-13
LCC10060 Final coat paint on ceiling 5 01-Dec-13 08-Dec-13
LCC10070 Final coat paint on walls 5 08-Dec-13 15-Dec-13
MEP MEP 76 12-Aug-13 01-Dec-13
LCM10000 HVAC ducting & FCU installation 15 12-Aug-13 03-Sep-13
LCM10010 Fire fighting pipe Installation 7 03-Sep-13 12-Sep-13
LCM10020 Chilled water Piping 7 14-Sep-13 23-Sep-13
LCM10030 Light & Power 1st & 2nd fix 7 23-Sep-13 03-Oct-13
LCM10040 Fire alarm 1st & 2nd fix 7 03-Oct-13 14-Oct-13
M J J A S O N D J F M A M J J A S O N D
Wet area wall tile works
Dry area ceiling gypsum works
Wet area ceiling works
1st coat paint on ceiling
Aluminium doors & windows
Kitchen cabinets & wardrobes
Wooden doors& accessories
Final coat paint on ceiling
Final coat paint on walls
07-Dec-13, MEP
HVAC Ducting & FCU installation
Fire fighting pipe installation
Chilled water piping
Plumbing 1st & 2nd fix
Light, small power & Data 1st & 2nd fix
Fire alarm 1st & 2nd fix
MEP testing
MEP final fix
15-Dec-13, Corridor
15-Dec-13, Civil / Arch
Plastering works
1st coat paint on walls
Marble flooring
Ceiling gypsum works
1st coat paint on ceiling
Steel doors & accessories
Final coat paint on ceiling
Final coat paint on walls
01-Dec-13, MEP
HVAC ducting & FCU installation
Fire fighting pipe Installation
Chilled water Piping
Light & Power 1st & 2nd fix
Fire alarm 1st & 2nd fix
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 16 of 44 TASK filter: All Activities
Primavera Systems, Inc.
Activity ID Activity Name Original
Duration
Start Finish
LCM10050 BMS 1st & 2nd fix 7 14-Oct-13 23-Oct-13
LCM10060 MEP testing 7 24-Oct-13 03-Nov-13
LCM10070 MEP final fix 7 20-Nov-13 01-Dec-13
Level 2 Level 2 117 14-J ul-13 31-Dec-13
Apart ment s Apart ment s 117 14-J ul-13 31-Dec-13
Civil / Arch Civil / Arch 117 14-J ul-13 31-Dec-13
LAC10140 Masonry walls 15 14-J ul-13 05-Aug-13
LAC10150 Plastering works 15 05-Aug-13 26-Aug-13
LAC10160 1st coat paint on walls 15 27-Aug-13 17-Sep-13
LAC10170 Wet area water proofing 10 17-Sep-13 02-Oct-13
LAC10180 Wet area flooring 10 02-Oct-13 16-Oct-13
LAC10190 Wet area wall tile works 10 16-Oct-13 31-Oct-13
LAC10200 Dry area ceiling gypsum works 20 17-Sep-13 16-Oct-13
LAC10210 Wet area ceiling works 12 31-Oct-13 18-Nov-13
LAC10220 1st coat paint on ceiling 15 16-Oct-13 07-Nov-13
LAC10230 Aluminium doors & windows 12 07-Nov-13 25-Nov-13
LAC10240 Kitchen cabinets & wardrobes 15 18-Nov-13 09-Dec-13
LAC10250 Wooden doors& accessories 15 07-Nov-13 30-Nov-13
LAC10260 Final coat paint on ceiling 15 07-Dec-13 29-Dec-13
LAC10270 Final coat paint on walls 15 10-Dec-13 31-Dec-13
MEP MEP 95 21-J ul-13 07-Dec-13
LAM10080 HVAC Ducting & FCU installation 15 21-J ul-13 12-Aug-13
LAM10090 Fire fighting pipe installation 15 21-J ul-13 12-Aug-13
LAM10100 Chilled water piping 15 21-J ul-13 12-Aug-13
LAM10110 Plumbing 1st & 2nd fix 10 21-J ul-13 05-Aug-13
LAM10120 Light, small power & Data 1st & 2nd fix 15 05-Aug-13 26-Aug-13
LAM10130 Fire alarm 1st & 2nd fix 10 05-Aug-13 19-Aug-13
LAM10140 MEP testing 15 27-Aug-13 17-Sep-13
LAM10150 MEP final fix 20 07-Nov-13 07-Dec-13
Corridor Corridor 86 12-Aug-13 15-Dec-13
Civil / Arch Civil / Arch 76 27-Aug-13 15-Dec-13
LCC10080 Plastering works 7 27-Aug-13 05-Sep-13
LCC10090 1st coat paint on walls 5 05-Sep-13 12-Sep-13
LCC10100 Marble flooring 7 14-Sep-13 23-Sep-13
M J J A S O N D J F M A M J J A S O N D
BMS 1st & 2nd fix
MEP testing
MEP final fix
31-Dec-13, Level 2
31-Dec-13, Apartments
31-Dec-13, Civil / Arch
Masonry walls
Plastering works
1st coat paint on walls
Wet area water proofing
Wet area flooring
Wet area wall tile works
Dry area ceiling gypsum works
Wet area ceiling works
1st coat paint on ceiling
Aluminium doors & windows
Kitchen cabinets & wardrobes
Wooden doors& accessories
Final coat paint on ceiling
Final coat paint on walls
07-Dec-13, MEP
HVAC Ducting & FCU installation
Fire fighting pipe installation
Chilled water piping
Plumbing 1st & 2nd fix
Light, small power & Data 1st & 2nd fix
Fire alarm 1st & 2nd fix
MEP testing
MEP final fix
15-Dec-13, Corridor
15-Dec-13, Civil / Arch
Plastering works
1st coat paint on walls
Marble flooring
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 17 of 44 TASK filter: All Activities
Primavera Systems, Inc.
Activity ID Activity Name Original
Duration
Start Finish
LCC10110 Ceiling gypsum works 7 03-Nov-13 13-Nov-13
LCC10120 1st coat paint on ceiling 5 13-Nov-13 20-Nov-13
LCC10130 Steel doors & accessories 4 20-Nov-13 26-Nov-13
LCC10140 Final coat paint on ceiling 5 01-Dec-13 08-Dec-13
LCC10150 Final coat paint on walls 5 08-Dec-13 15-Dec-13
MEP MEP 76 12-Aug-13 01-Dec-13
LCM10080 HVAC ducting & FCU installation 15 12-Aug-13 03-Sep-13
LCM10090 Fire fighting pipe Installation 7 03-Sep-13 12-Sep-13
LCM10100 Chilled water Piping 7 14-Sep-13 23-Sep-13
LCM10110 Light & Power 1st & 2nd fix 7 23-Sep-13 03-Oct-13
LCM10120 Fire alarm 1st & 2nd fix 7 03-Oct-13 14-Oct-13
LCM10130 BMS 1st & 2nd fix 7 14-Oct-13 23-Oct-13
LCM10140 MEP testing 7 24-Oct-13 03-Nov-13
LCM10150 MEP final fix 7 20-Nov-13 01-Dec-13
Level 3 Level 3 127 21-J ul-13 22-J an-14
Apart ment s Apart ment s 127 21-J ul-13 22-J an-14
Civil / Arch Civil / Arch 117 05-Aug-13 22-J an-14
LAC10280 Masonry walls 15 05-Aug-13 26-Aug-13
LAC10290 Plastering works 15 27-Aug-13 17-Sep-13
LAC10300 1st coat paint on walls 15 17-Sep-13 09-Oct-13
LAC10310 Wet area water proofing 10 09-Oct-13 23-Oct-13
LAC10320 Wet area flooring 10 24-Oct-13 07-Nov-13
LAC10330 Wet area wall tile works 10 07-Nov-13 21-Nov-13
LAC10340 Dry area ceiling gypsum works 20 09-Oct-13 07-Nov-13
LAC10350 Wet area ceiling works 12 23-Nov-13 09-Dec-13
LAC10360 1st coat paint on ceiling 15 07-Nov-13 30-Nov-13
LAC10370 Aluminium doors & windows 12 30-Nov-13 17-Dec-13
LAC10380 Kitchen cabinets & wardrobes 15 10-Dec-13 31-Dec-13
LAC10390 Wooden doors& accessories 15 30-Nov-13 21-Dec-13
LAC10400 Final coat paint on ceiling 15 29-Dec-13 19-J an-14
LAC10410 Final coat paint on walls 15 31-Dec-13 22-J an-14
MEP MEP 110 21-J ul-13 29-Dec-13
LAM10160 HVAC Ducting & FCU installation 15 21-J ul-13 12-Aug-13
LAM10170 Fire fighting pipe installation 15 21-J ul-13 12-Aug-13
M J J A S O N D J F M A M J J A S O N D
Ceiling gypsum works
1st coat paint on ceiling
Steel doors & accessories
Final coat paint on ceiling
Final coat paint on walls
01-Dec-13, MEP
HVAC ducting & FCU installation
Fire fighting pipe Installation
Chilled water Piping
Light & Power 1st & 2nd fix
Fire alarm 1st & 2nd fix
BMS 1st & 2nd fix
MEP testing
MEP final fix
22-J an-14, Level 3
22-J an-14, Apartments
22-J an-14, Civil / Arch
Masonry walls
Plastering works
1st coat paint on walls
Wet area water proofing
Wet area flooring
Wet area wall tile works
Dry area ceiling gypsum works
Wet area ceiling works
1st coat paint on ceiling
Aluminium doors & windows
Kitchen cabinets & wardrobes
Wooden doors& accessories
Final coat paint on ceiling
Final coat paint on walls
29-Dec-13, MEP
HVAC Ducting & FCU installation
Fire fighting pipe installation
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 18 of 44 TASK filter: All Activities
Primavera Systems, Inc.
Activity ID Activity Name Original
Duration
Start Finish
LAM10180 Chilled water piping 15 21-J ul-13 12-Aug-13
LAM10190 Plumbing 1st & 2nd fix 10 21-J ul-13 05-Aug-13
LAM10200 Light, small power & Data 1st & 2nd fix 15 05-Aug-13 26-Aug-13
LAM10210 Fire alarm 1st & 2nd fix 10 05-Aug-13 19-Aug-13
LAM10220 MEP testing 15 27-Aug-13 17-Sep-13
LAM10230 MEP final fix 20 30-Nov-13 29-Dec-13
Corridor Corridor 86 12-Aug-13 15-Dec-13
Civil / Arch Civil / Arch 61 17-Sep-13 15-Dec-13
LCC10160 Plastering works 7 17-Sep-13 28-Sep-13
LCC10170 1st coat paint on walls 5 28-Sep-13 05-Oct-13
LCC10180 Marble flooring 7 05-Oct-13 15-Oct-13
LCC10190 Ceiling gypsum works 7 03-Nov-13 13-Nov-13
LCC10200 1st coat paint on ceiling 5 13-Nov-13 20-Nov-13
LCC10210 Steel doors & accessories 4 20-Nov-13 26-Nov-13
LCC10220 Final coat paint on ceiling 5 01-Dec-13 08-Dec-13
LCC10230 Final coat paint on walls 5 08-Dec-13 15-Dec-13
MEP MEP 76 12-Aug-13 01-Dec-13
LCM10160 HVAC ducting & FCU installation 15 12-Aug-13 03-Sep-13
LCM10170 Fire fighting pipe Installation 7 03-Sep-13 12-Sep-13
LCM10180 Chilled water Piping 7 14-Sep-13 23-Sep-13
LCM10190 Light & Power 1st & 2nd fix 7 23-Sep-13 03-Oct-13
LCM10200 Fire alarm 1st & 2nd fix 7 03-Oct-13 14-Oct-13
LCM10210 BMS 1st & 2nd fix 7 14-Oct-13 23-Oct-13
LCM10220 MEP testing 7 24-Oct-13 03-Nov-13
LCM10230 MEP final fix 7 20-Nov-13 01-Dec-13
Level 4 Level 4 117 05-Aug-13 22-J an-14
Apart ment s Apart ment s 117 05-Aug-13 22-J an-14
Civil / Arch Civil / Arch 117 05-Aug-13 22-J an-14
LAC10420 Masonry walls 15 05-Aug-13 26-Aug-13
LAC10430 Plastering works 15 27-Aug-13 17-Sep-13
LAC10440 1st coat paint on walls 15 17-Sep-13 09-Oct-13
LAC10450 Wet area water proofing 10 09-Oct-13 23-Oct-13
LAC10460 Wet area flooring 10 24-Oct-13 07-Nov-13
LAC10470 Wet area wall tile works 10 07-Nov-13 21-Nov-13
M J J A S O N D J F M A M J J A S O N D
Chilled water piping
Plumbing 1st & 2nd fix
Light, small power & Data 1st & 2nd fix
Fire alarm 1st & 2nd fix
MEP testing
MEP final fix
15-Dec-13, Corridor
15-Dec-13, Civil / Arch
Plastering works
1st coat paint on walls
Marble flooring
Ceiling gypsum works
1st coat paint on ceiling
Steel doors & accessories
Final coat paint on ceiling
Final coat paint on walls
01-Dec-13, MEP
HVAC ducting & FCU installation
Fire fighting pipe Installation
Chilled water Piping
Light & Power 1st & 2nd fix
Fire alarm 1st & 2nd fix
BMS 1st & 2nd fix
MEP testing
MEP final fix
22-J an-14, Level 4
22-J an-14, Apartments
22-J an-14, Civil / Arch
Masonry walls
Plastering works
1st coat paint on walls
Wet area water proofing
Wet area flooring
Wet area wall tile works
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 19 of 44 TASK filter: All Activities
Primavera Systems, Inc.
Activity ID Activity Name Original
Duration
Start Finish
LAC10480 Dry area ceiling gypsum works 20 09-Oct-13 07-Nov-13
LAC10490 Wet area ceiling works 12 23-Nov-13 09-Dec-13
LAC10500 1st coat paint on ceiling 15 07-Nov-13 30-Nov-13
LAC10510 Aluminium doors & windows 12 30-Nov-13 17-Dec-13
LAC10520 Kitchen cabinets & wardrobes 15 10-Dec-13 31-Dec-13
LAC10530 Wooden doors& accessories 15 30-Nov-13 21-Dec-13
LAC10540 Final coat paint on ceiling 15 29-Dec-13 19-J an-14
LAC10550 Final coat paint on walls 15 31-Dec-13 22-J an-14
MEP MEP 95 12-Aug-13 29-Dec-13
LAM10240 HVAC Ducting & FCU installation 15 12-Aug-13 03-Sep-13
LAM10250 Fire fighting pipe installation 15 12-Aug-13 03-Sep-13
LAM10260 Chilled water piping 15 12-Aug-13 03-Sep-13
LAM10270 Plumbing 1st & 2nd fix 10 12-Aug-13 26-Aug-13
LAM10280 Light, small power & Data 1st & 2nd fix 15 27-Aug-13 17-Sep-13
LAM10290 Fire alarm 1st & 2nd fix 10 27-Aug-13 10-Sep-13
LAM10300 MEP testing 15 17-Sep-13 09-Oct-13
LAM10310 MEP final fix 20 30-Nov-13 29-Dec-13
Corridor Corridor 86 03-Sep-13 06-J an-14
Civil / Arch Civil / Arch 76 17-Sep-13 06-J an-14
LCC10240 Plastering works 7 17-Sep-13 28-Sep-13
LCC10250 1st coat paint on walls 5 28-Sep-13 05-Oct-13
LCC10260 Marble flooring 7 05-Oct-13 15-Oct-13
LCC10270 Ceiling gypsum works 7 25-Nov-13 05-Dec-13
LCC10280 1st coat paint on ceiling 5 05-Dec-13 12-Dec-13
LCC10290 Steel doors & accessories 4 12-Dec-13 18-Dec-13
LCC10300 Final coat paint on ceiling 5 23-Dec-13 30-Dec-13
LCC10310 Final coat paint on walls 5 30-Dec-13 06-J an-14
MEP MEP 76 03-Sep-13 23-Dec-13
LCM10240 HVAC ducting & FCU installation 15 03-Sep-13 24-Sep-13
LCM10250 Fire fighting pipe Installation 7 25-Sep-13 05-Oct-13
LCM10260 Chilled water Piping 7 05-Oct-13 15-Oct-13
LCM10270 Light & Power 1st & 2nd fix 7 15-Oct-13 26-Oct-13
LCM10280 Fire alarm 1st & 2nd fix 7 26-Oct-13 04-Nov-13
LCM10290 BMS 1st & 2nd fix 7 05-Nov-13 14-Nov-13
M J J A S O N D J F M A M J J A S O N D
Dry area ceiling gypsum works
Wet area ceiling works
1st coat paint on ceiling
Aluminium doors & windows
Kitchen cabinets & wardrobes
Wooden doors& accessories
Final coat paint on ceiling
Final coat paint on walls
29-Dec-13, MEP
HVAC Ducting & FCU installation
Fire fighting pipe installation
Chilled water piping
Plumbing 1st & 2nd fix
Light, small power & Data 1st & 2nd fix
Fire alarm 1st & 2nd fix
MEP testing
MEP final fix
06-J an-14, Corridor
06-J an-14, Civil / Arch
Plastering works
1st coat paint on walls
Marble flooring
Ceiling gypsum works
1st coat paint on ceiling
Steel doors & accessories
Final coat paint on ceiling
Final coat paint on walls
23-Dec-13, MEP
HVAC ducting & FCU installation
Fire fighting pipe Installation
Chilled water Piping
Light & Power 1st & 2nd fix
Fire alarm 1st & 2nd fix
BMS 1st & 2nd fix
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 20 of 44 TASK filter: All Activities
Primavera Systems, Inc.
Activity ID Activity Name Original
Duration
Start Finish
LCM10300 MEP testing 7 14-Nov-13 25-Nov-13
LCM10310 MEP final fix 7 12-Dec-13 23-Dec-13
Level 5 Level 5 117 27-Aug-13 13-Feb-14
Apart ment s Apart ment s 117 27-Aug-13 13-Feb-14
Civil / Arch Civil / Arch 117 27-Aug-13 13-Feb-14
LAC10560 Masonry walls 15 27-Aug-13 17-Sep-13
LAC10570 Plastering works 15 17-Sep-13 09-Oct-13
LAC10580 1st coat paint on walls 15 09-Oct-13 31-Oct-13
LAC10590 Wet area water proofing 10 31-Oct-13 14-Nov-13
LAC10600 Wet area flooring 10 14-Nov-13 30-Nov-13
LAC10610 Wet area wall tile works 10 30-Nov-13 14-Dec-13
LAC10620 Dry area ceiling gypsum works 20 31-Oct-13 30-Nov-13
LAC10630 Wet area ceiling works 12 14-Dec-13 31-Dec-13
LAC10640 1st coat paint on ceiling 15 30-Nov-13 21-Dec-13
LAC10650 Aluminium doors & windows 12 22-Dec-13 07-J an-14
LAC10660 Kitchen cabinets & wardrobes 15 31-Dec-13 22-J an-14
LAC10670 Wooden doors& accessories 15 22-Dec-13 12-J an-14
LAC10680 Final coat paint on ceiling 15 20-J an-14 10-Feb-14
LAC10690 Final coat paint on walls 15 22-J an-14 13-Feb-14
MEP MEP 95 03-Sep-13 19-J an-14
LAM10320 HVAC Ducting & FCU installation 15 03-Sep-13 24-Sep-13
LAM10330 Fire fighting pipe installation 15 03-Sep-13 24-Sep-13
LAM10340 Chilled water piping 15 03-Sep-13 24-Sep-13
LAM10350 Plumbing 1st & 2nd fix 10 03-Sep-13 17-Sep-13
LAM10360 Light, small power & Data 1st & 2nd fix 15 17-Sep-13 09-Oct-13
LAM10370 Fire alarm 1st & 2nd fix 10 17-Sep-13 02-Oct-13
LAM10380 MEP testing 15 09-Oct-13 31-Oct-13
LAM10390 MEP final fix 20 22-Dec-13 19-J an-14
Corridor Corridor 86 25-Sep-13 28-J an-14
Civil / Arch Civil / Arch 76 09-Oct-13 28-J an-14
LCC10320 Plastering works 7 09-Oct-13 20-Oct-13
LCC10330 1st coat paint on walls 5 20-Oct-13 27-Oct-13
LCC10340 Marble flooring 7 27-Oct-13 06-Nov-13
LCC10350 Ceiling gypsum works 7 17-Dec-13 26-Dec-13
M J J A S O N D J F M A M J J A S O N D
MEP testing
MEP final fix
13-Feb-14, Level 5
13-Feb-14, Apartments
13-Feb-14, Civil / Arch
Masonry walls
Plastering works
1st coat paint on walls
Wet area water proofing
Wet area flooring
Wet area wall tile works
Dry area ceiling gypsum works
Wet area ceiling works
1st coat paint on ceiling
Aluminium doors & windows
Kitchen cabinets & wardrobes
Wooden doors& accessories
Final coat paint on ceiling
Final coat paint on walls
19-J an-14, MEP
HVAC Ducting & FCU installation
Fire fighting pipe installation
Chilled water piping
Plumbing 1st & 2nd fix
Light, small power & Data 1st & 2nd fix
Fire alarm 1st & 2nd fix
MEP testing
MEP final fix
28-J an-14, Corridor
28-J an-14, Civil / Arch
Plastering works
1st coat paint on walls
Marble flooring
Ceiling gypsum works
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 21 of 44 TASK filter: All Activities
Primavera Systems, Inc.
Activity ID Activity Name Original
Duration
Start Finish
LCC10360 1st coat paint on ceiling 5 28-Dec-13 04-J an-14
LCC10370 Steel doors & accessories 4 04-J an-14 09-J an-14
LCC10380 Final coat paint on ceiling 5 14-J an-14 21-J an-14
LCC10390 Final coat paint on walls 5 21-J an-14 28-J an-14
MEP MEP 76 25-Sep-13 13-J an-14
LCM10320 HVAC ducting & FCU installation 15 25-Sep-13 16-Oct-13
LCM10330 Fire fighting pipe Installation 7 16-Oct-13 27-Oct-13
LCM10340 Chilled water Piping 7 27-Oct-13 06-Nov-13
LCM10350 Light & Power 1st & 2nd fix 7 06-Nov-13 16-Nov-13
LCM10360 Fire alarm 1st & 2nd fix 7 17-Nov-13 26-Nov-13
LCM10370 BMS 1st & 2nd fix 7 26-Nov-13 07-Dec-13
LCM10380 MEP testing 7 07-Dec-13 17-Dec-13
LCM10390 MEP final fix 7 04-J an-14 13-J an-14
Level 6 Level 6 117 27-Aug-13 13-Feb-14
Apart ment s Apart ment s 117 27-Aug-13 13-Feb-14
Civil / Arch Civil / Arch 117 27-Aug-13 13-Feb-14
LAC10700 Masonry walls 15 27-Aug-13 17-Sep-13
LAC10710 Plastering works 15 17-Sep-13 09-Oct-13
LAC10720 1st coat paint on walls 15 09-Oct-13 31-Oct-13
LAC10730 Wet area water proofing 10 31-Oct-13 14-Nov-13
LAC10740 Wet area flooring 10 14-Nov-13 30-Nov-13
LAC10750 Wet area wall tile works 10 30-Nov-13 14-Dec-13
LAC10760 Dry area ceiling gypsum works 20 31-Oct-13 30-Nov-13
LAC10770 Wet area ceiling works 12 14-Dec-13 31-Dec-13
LAC10780 1st coat paint on ceiling 15 30-Nov-13 21-Dec-13
LAC10790 Aluminium doors & windows 12 22-Dec-13 07-J an-14
LAC10800 Kitchen cabinets & wardrobes 15 31-Dec-13 22-J an-14
LAC10810 Wooden doors& accessories 15 22-Dec-13 12-J an-14
LAC10820 Final coat paint on ceiling 15 20-J an-14 10-Feb-14
LAC10830 Final coat paint on walls 15 22-J an-14 13-Feb-14
MEP MEP 95 03-Sep-13 19-J an-14
LAM10400 HVAC Ducting & FCU installation 15 03-Sep-13 24-Sep-13
LAM10410 Fire fighting pipe installation 15 03-Sep-13 24-Sep-13
LAM10420 Chilled water piping 15 03-Sep-13 24-Sep-13
M J J A S O N D J F M A M J J A S O N D
1st coat paint on ceiling
Steel doors & accessories
Final coat paint on ceiling
Final coat paint on walls
13-J an-14, MEP
HVAC ducting & FCU installation
Fire fighting pipe Installation
Chilled water Piping
Light & Power 1st & 2nd fix
Fire alarm 1st & 2nd fix
BMS 1st & 2nd fix
MEP testing
MEP final fix
13-Feb-14, Level 6
13-Feb-14, Apartments
13-Feb-14, Civil / Arch
Masonry walls
Plastering works
1st coat paint on walls
Wet area water proofing
Wet area flooring
Wet area wall tile works
Dry area ceiling gypsum works
Wet area ceiling works
1st coat paint on ceiling
Aluminium doors & windows
Kitchen cabinets & wardrobes
Wooden doors& accessories
Final coat paint on ceiling
Final coat paint on walls
19-J an-14, MEP
HVAC Ducting & FCU installation
Fire fighting pipe installation
Chilled water piping
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 22 of 44 TASK filter: All Activities
Primavera Systems, Inc.
Activity ID Activity Name Original
Duration
Start Finish
LAM10430 Plumbing 1st & 2nd fix 10 03-Sep-13 17-Sep-13
LAM10440 Light, small power & Data 1st & 2nd fix 15 17-Sep-13 09-Oct-13
LAM10450 Fire alarm 1st & 2nd fix 10 17-Sep-13 02-Oct-13
LAM10460 MEP testing 15 09-Oct-13 31-Oct-13
LAM10470 MEP final fix 20 22-Dec-13 19-J an-14
Corridor Corridor 86 25-Sep-13 28-J an-14
Civil / Arch Civil / Arch 76 09-Oct-13 28-J an-14
LCC10400 Plastering works 7 09-Oct-13 20-Oct-13
LCC10410 1st coat paint on walls 5 20-Oct-13 27-Oct-13
LCC10420 Marble flooring 7 27-Oct-13 06-Nov-13
LCC10430 Ceiling gypsum works 7 17-Dec-13 26-Dec-13
LCC10440 1st coat paint on ceiling 5 28-Dec-13 04-J an-14
LCC10450 Steel doors & accessories 4 04-J an-14 09-J an-14
LCC10460 Final coat paint on ceiling 5 14-J an-14 21-J an-14
LCC10470 Final coat paint on walls 5 21-J an-14 28-J an-14
MEP MEP 76 25-Sep-13 13-J an-14
LCM10400 HVAC ducting & FCU installation 15 25-Sep-13 16-Oct-13
LCM10410 Fire fighting pipe Installation 7 16-Oct-13 27-Oct-13
LCM10420 Chilled water Piping 7 27-Oct-13 06-Nov-13
LCM10430 Light & Power 1st & 2nd fix 7 06-Nov-13 16-Nov-13
LCM10440 Fire alarm 1st & 2nd fix 7 17-Nov-13 26-Nov-13
LCM10450 BMS 1st & 2nd fix 7 26-Nov-13 07-Dec-13
LCM10460 MEP testing 7 07-Dec-13 17-Dec-13
LCM10470 MEP final fix 7 04-J an-14 13-J an-14
Level 7 Level 7 117 17-Sep-13 06-Mar-14
Apart ment s Apart ment s 117 17-Sep-13 06-Mar-14
Civil / Arch Civil / Arch 117 17-Sep-13 06-Mar-14
LAC10840 Masonry walls 15 17-Sep-13 09-Oct-13
LAC10850 Plastering works 15 09-Oct-13 31-Oct-13
LAC10860 1st coat paint on walls 15 31-Oct-13 21-Nov-13
LAC10870 Wet area water proofing 10 23-Nov-13 07-Dec-13
LAC10880 Wet area flooring 10 07-Dec-13 21-Dec-13
LAC10890 Wet area wall tile works 10 22-Dec-13 05-J an-14
LAC10900 Dry area ceiling gypsum works 20 23-Nov-13 21-Dec-13
M J J A S O N D J F M A M J J A S O N D
Plumbing 1st & 2nd fix
Light, small power & Data 1st & 2nd fix
Fire alarm 1st & 2nd fix
MEP testing
MEP final fix
28-J an-14, Corridor
28-J an-14, Civil / Arch
Plastering works
1st coat paint on walls
Marble flooring
Ceiling gypsum works
1st coat paint on ceiling
Steel doors & accessories
Final coat paint on ceiling
Final coat paint on walls
13-J an-14, MEP
HVAC ducting & FCU installation
Fire fighting pipe Installation
Chilled water Piping
Light & Power 1st & 2nd fix
Fire alarm 1st & 2nd fix
BMS 1st & 2nd fix
MEP testing
MEP final fix
06-Mar-14, Level 7
06-Mar-14, Apartments
06-Mar-14, Civil / Arch
Masonry walls
Plastering works
1st coat paint on walls
Wet area water proofing
Wet area flooring
Wet area wall tile works
Dry area ceiling gypsum works
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 23 of 44 TASK filter: All Activities
Primavera Systems, Inc.
Activity ID Activity Name Original
Duration
Start Finish
LAC10910 Wet area ceiling works 12 05-J an-14 22-J an-14
LAC10920 1st coat paint on ceiling 15 22-Dec-13 12-J an-14
LAC10930 Aluminium doors & windows 12 12-J an-14 29-J an-14
LAC10940 Kitchen cabinets & wardrobes 15 22-J an-14 13-Feb-14
LAC10950 Wooden doors& accessories 15 12-J an-14 03-Feb-14
LAC10960 Final coat paint on ceiling 15 10-Feb-14 04-Mar-14
LAC10970 Final coat paint on walls 15 13-Feb-14 06-Mar-14
MEP MEP 95 25-Sep-13 10-Feb-14
LAM10480 HVAC Ducting & FCU installation 15 25-Sep-13 16-Oct-13
LAM10490 Fire fighting pipe installation 15 25-Sep-13 16-Oct-13
LAM10500 Chilled water piping 15 25-Sep-13 16-Oct-13
LAM10510 Plumbing 1st & 2nd fix 10 25-Sep-13 09-Oct-13
LAM10520 Light, small power & Data 1st & 2nd fix 15 09-Oct-13 31-Oct-13
LAM10530 Fire alarm 1st & 2nd fix 10 09-Oct-13 23-Oct-13
LAM10540 MEP testing 15 31-Oct-13 21-Nov-13
LAM10550 MEP final fix 20 12-J an-14 10-Feb-14
Corridor Corridor 86 16-Oct-13 19-Feb-14
Civil / Arch Civil / Arch 76 31-Oct-13 19-Feb-14
LCC10480 Plastering works 7 31-Oct-13 10-Nov-13
LCC10490 1st coat paint on walls 5 11-Nov-13 18-Nov-13
LCC10500 Marble flooring 7 18-Nov-13 27-Nov-13
LCC10510 Ceiling gypsum works 7 08-J an-14 18-J an-14
LCC10520 1st coat paint on ceiling 5 18-J an-14 25-J an-14
LCC10530 Steel doors & accessories 4 26-J an-14 30-J an-14
LCC10540 Final coat paint on ceiling 5 04-Feb-14 11-Feb-14
LCC10550 Final coat paint on walls 5 12-Feb-14 19-Feb-14
MEP MEP 76 16-Oct-13 04-Feb-14
LCM10480 HVAC ducting & FCU installation 15 16-Oct-13 07-Nov-13
LCM10490 Fire fighting pipe Installation 7 07-Nov-13 18-Nov-13
LCM10500 Chilled water Piping 7 18-Nov-13 27-Nov-13
LCM10510 Light & Power 1st & 2nd fix 7 28-Nov-13 08-Dec-13
LCM10520 Fire alarm 1st & 2nd fix 7 08-Dec-13 18-Dec-13
LCM10530 BMS 1st & 2nd fix 7 18-Dec-13 29-Dec-13
LCM10540 MEP testing 7 29-Dec-13 07-J an-14
M J J A S O N D J F M A M J J A S O N D
Wet area ceiling works
1st coat paint on ceiling
Aluminium doors & windows
Kitchen cabinets & wardrobes
Wooden doors& accessories
Final coat paint on ceiling
Final coat paint on walls
10-Feb-14, MEP
HVAC Ducting & FCU installation
Fire fighting pipe installation
Chilled water piping
Plumbing 1st & 2nd fix
Light, small power & Data 1st & 2nd fix
Fire alarm 1st & 2nd fix
MEP testing
MEP final fix
19-Feb-14, Corridor
19-Feb-14, Civil / Arch
Plastering works
1st coat paint on walls
Marble flooring
Ceiling gypsum works
1st coat paint on ceiling
Steel doors & accessories
Final coat paint on ceiling
Final coat paint on walls
04-Feb-14, MEP
HVAC ducting & FCU installation
Fire fighting pipe Installation
Chilled water Piping
Light & Power 1st & 2nd fix
Fire alarm 1st & 2nd fix
BMS 1st & 2nd fix
MEP testing
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 24 of 44 TASK filter: All Activities
Primavera Systems, Inc.
Activity ID Activity Name Original
Duration
Start Finish
LCM10550 MEP final fix 7 26-J an-14 04-Feb-14
Level 8 Level 8 117 17-Sep-13 06-Mar-14
Apart ment s Apart ment s 117 17-Sep-13 06-Mar-14
Civil / Arch Civil / Arch 117 17-Sep-13 06-Mar-14
LAC10980 Masonry walls 15 17-Sep-13 09-Oct-13
LAC10990 Plastering works 15 09-Oct-13 31-Oct-13
LAC11000 1st coat paint on walls 15 31-Oct-13 21-Nov-13
LAC11010 Wet area water proofing 10 23-Nov-13 07-Dec-13
LAC11020 Wet area flooring 10 07-Dec-13 21-Dec-13
LAC11030 Wet area wall tile works 10 22-Dec-13 05-J an-14
LAC11040 Dry area ceiling gypsum works 20 23-Nov-13 21-Dec-13
LAC11050 Wet area ceiling works 12 05-J an-14 22-J an-14
LAC11060 1st coat paint on ceiling 15 22-Dec-13 12-J an-14
LAC11070 Aluminium doors & windows 12 12-J an-14 29-J an-14
LAC11080 Kitchen cabinets & wardrobes 15 22-J an-14 13-Feb-14
LAC11090 Wooden doors& accessories 15 12-J an-14 03-Feb-14
LAC11100 Final coat paint on ceiling 15 10-Feb-14 04-Mar-14
LAC11110 Final coat paint on walls 15 13-Feb-14 06-Mar-14
MEP MEP 95 25-Sep-13 10-Feb-14
LAM10560 HVAC Ducting & FCU installation 15 25-Sep-13 16-Oct-13
LAM10570 Fire fighting pipe installation 15 25-Sep-13 16-Oct-13
LAM10580 Chilled water piping 15 25-Sep-13 16-Oct-13
LAM10590 Plumbing 1st & 2nd fix 10 25-Sep-13 09-Oct-13
LAM10600 Light, small power & Data 1st & 2nd fix 15 09-Oct-13 31-Oct-13
LAM10610 Fire alarm 1st & 2nd fix 10 09-Oct-13 23-Oct-13
LAM10620 MEP testing 15 31-Oct-13 21-Nov-13
LAM10630 MEP final fix 20 12-J an-14 10-Feb-14
Corridor Corridor 86 16-Oct-13 19-Feb-14
Civil / Arch Civil / Arch 76 31-Oct-13 19-Feb-14
LCC10560 Plastering works 7 31-Oct-13 10-Nov-13
LCC10570 1st coat paint on walls 5 11-Nov-13 18-Nov-13
LCC10580 Marble flooring 7 18-Nov-13 27-Nov-13
LCC10590 Ceiling gypsum works 7 08-J an-14 18-J an-14
LCC10600 1st coat paint on ceiling 5 18-J an-14 25-J an-14
M J J A S O N D J F M A M J J A S O N D
MEP final fix
06-Mar-14, Level 8
06-Mar-14, Apartments
06-Mar-14, Civil / Arch
Masonry walls
Plastering works
1st coat paint on walls
Wet area water proofing
Wet area flooring
Wet area wall tile works
Dry area ceiling gypsum works
Wet area ceiling works
1st coat paint on ceiling
Aluminium doors & windows
Kitchen cabinets & wardrobes
Wooden doors& accessories
Final coat paint on ceiling
Final coat paint on walls
10-Feb-14, MEP
HVAC Ducting & FCU installation
Fire fighting pipe installation
Chilled water piping
Plumbing 1st & 2nd fix
Light, small power & Data 1st & 2nd fix
Fire alarm 1st & 2nd fix
MEP testing
MEP final fix
19-Feb-14, Corridor
19-Feb-14, Civil / Arch
Plastering works
1st coat paint on walls
Marble flooring
Ceiling gypsum works
1st coat paint on ceiling
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 25 of 44 TASK filter: All Activities
Primavera Systems, Inc.
Activity ID Activity Name Original
Duration
Start Finish
LCC10610 Steel doors & accessories 4 26-J an-14 30-J an-14
LCC10620 Final coat paint on ceiling 5 04-Feb-14 11-Feb-14
LCC10630 Final coat paint on walls 5 12-Feb-14 19-Feb-14
MEP MEP 76 16-Oct-13 04-Feb-14
LCM10560 HVAC ducting & FCU installation 15 16-Oct-13 07-Nov-13
LCM10570 Fire fighting pipe Installation 7 07-Nov-13 18-Nov-13
LCM10580 Chilled water Piping 7 18-Nov-13 27-Nov-13
LCM10590 Light & Power 1st & 2nd fix 7 28-Nov-13 08-Dec-13
LCM10600 Fire alarm 1st & 2nd fix 7 08-Dec-13 18-Dec-13
LCM10610 BMS 1st & 2nd fix 7 18-Dec-13 29-Dec-13
LCM10620 MEP testing 7 29-Dec-13 07-J an-14
LCM10630 MEP final fix 7 26-J an-14 04-Feb-14
Level 9 Level 9 117 09-Oct-13 29-Mar-14
Apart ment s Apart ment s 117 09-Oct-13 29-Mar-14
Civil / Arch Civil / Arch 117 09-Oct-13 29-Mar-14
LAC11120 Masonry walls 15 09-Oct-13 31-Oct-13
LAC11130 Plastering works 15 31-Oct-13 21-Nov-13
LAC11140 1st coat paint on walls 15 23-Nov-13 14-Dec-13
LAC11150 Wet area water proofing 10 14-Dec-13 29-Dec-13
LAC11160 Wet area flooring 10 29-Dec-13 12-J an-14
LAC11170 Wet area wall tile works 10 12-J an-14 27-J an-14
LAC11180 Dry area ceiling gypsum works 20 14-Dec-13 12-J an-14
LAC11190 Wet area ceiling works 12 27-J an-14 13-Feb-14
LAC11200 1st coat paint on ceiling 15 12-J an-14 03-Feb-14
LAC11210 Aluminium doors & windows 12 03-Feb-14 20-Feb-14
LAC11220 Kitchen cabinets & wardrobes 15 13-Feb-14 06-Mar-14
LAC11230 Wooden doors& accessories 15 03-Feb-14 25-Feb-14
LAC11240 Final coat paint on ceiling 15 04-Mar-14 26-Mar-14
LAC11250 Final coat paint on walls 15 08-Mar-14 29-Mar-14
MEP MEP 95 16-Oct-13 04-Mar-14
LAM10640 HVAC Ducting & FCU installation 15 16-Oct-13 07-Nov-13
LAM10650 Fire fighting pipe installation 15 16-Oct-13 07-Nov-13
LAM10660 Chilled water piping 15 16-Oct-13 07-Nov-13
LAM10670 Plumbing 1st & 2nd fix 10 16-Oct-13 31-Oct-13
M J J A S O N D J F M A M J J A S O N D
Steel doors & accessories
Final coat paint on ceiling
Final coat paint on walls
04-Feb-14, MEP
HVAC ducting & FCU installation
Fire fighting pipe Installation
Chilled water Piping
Light & Power 1st & 2nd fix
Fire alarm 1st & 2nd fix
BMS 1st & 2nd fix
MEP testing
MEP final fix
29-Mar-14, Level 9
29-Mar-14, Apartments
29-Mar-14, Civil / Arch
Masonry walls
Plastering works
1st coat paint on walls
Wet area water proofing
Wet area flooring
Wet area wall tile works
Dry area ceiling gypsum works
Wet area ceiling works
1st coat paint on ceiling
Aluminium doors & windows
Kitchen cabinets & wardrobes
Wooden doors& accessories
Final coat paint on ceiling
Final coat paint on walls
04-Mar-14, MEP
HVAC Ducting & FCU installation
Fire fighting pipe installation
Chilled water piping
Plumbing 1st & 2nd fix
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 26 of 44 TASK filter: All Activities
Primavera Systems, Inc.
Activity ID Activity Name Original
Duration
Start Finish
LAM10680 Light, small power & Data 1st & 2nd fix 15 31-Oct-13 21-Nov-13
LAM10690 Fire alarm 1st & 2nd fix 10 31-Oct-13 14-Nov-13
LAM10700 MEP testing 15 23-Nov-13 14-Dec-13
LAM10710 MEP final fix 20 03-Feb-14 04-Mar-14
Corridor Corridor 86 07-Nov-13 12-Mar-14
Civil / Arch Civil / Arch 76 23-Nov-13 12-Mar-14
LCC10640 Plastering works 7 23-Nov-13 02-Dec-13
LCC10650 1st coat paint on walls 5 02-Dec-13 09-Dec-13
LCC10660 Marble flooring 7 10-Dec-13 19-Dec-13
LCC10670 Ceiling gypsum works 7 29-J an-14 09-Feb-14
LCC10680 1st coat paint on ceiling 5 09-Feb-14 16-Feb-14
LCC10690 Steel doors & accessories 4 16-Feb-14 22-Feb-14
LCC10700 Final coat paint on ceiling 5 26-Feb-14 05-Mar-14
LCC10710 Final coat paint on walls 5 05-Mar-14 12-Mar-14
MEP MEP 76 07-Nov-13 26-Feb-14
LCM10640 HVAC ducting & FCU installation 15 07-Nov-13 30-Nov-13
LCM10650 Fire fighting pipe Installation 7 30-Nov-13 09-Dec-13
LCM10660 Chilled water Piping 7 10-Dec-13 19-Dec-13
LCM10670 Light & Power 1st & 2nd fix 7 19-Dec-13 30-Dec-13
LCM10680 Fire alarm 1st & 2nd fix 7 30-Dec-13 09-J an-14
LCM10690 BMS 1st & 2nd fix 7 09-J an-14 19-J an-14
LCM10700 MEP testing 7 20-J an-14 29-J an-14
LCM10710 MEP final fix 7 16-Feb-14 26-Feb-14
Level 10 Level 10 117 09-Oct-13 29-Mar-14
Apart ment s Apart ment s 117 09-Oct-13 29-Mar-14
Civil / Arch Civil / Arch 117 09-Oct-13 29-Mar-14
LAC11260 Masonry walls 15 09-Oct-13 31-Oct-13
LAC11270 Plastering works 15 31-Oct-13 21-Nov-13
LAC11280 1st coat paint on walls 15 23-Nov-13 14-Dec-13
LAC11290 Wet area water proofing 10 14-Dec-13 29-Dec-13
LAC11300 Wet area flooring 10 29-Dec-13 12-J an-14
LAC11310 Wet area wall tile works 10 12-J an-14 27-J an-14
LAC11320 Dry area ceiling gypsum works 20 14-Dec-13 12-J an-14
LAC11330 Wet area ceiling works 12 27-J an-14 13-Feb-14
M J J A S O N D J F M A M J J A S O N D
Light, small power & Data 1st & 2nd fix
Fire alarm 1st & 2nd fix
MEP testing
MEP final fix
12-Mar-14, Corridor
12-Mar-14, Civil / Arch
Plastering works
1st coat paint on walls
Marble flooring
Ceiling gypsum works
1st coat paint on ceiling
Steel doors & accessories
Final coat paint on ceiling
Final coat paint on walls
26-Feb-14, MEP
HVAC ducting & FCU installation
Fire fighting pipe Installation
Chilled water Piping
Light & Power 1st & 2nd fix
Fire alarm 1st & 2nd fix
BMS 1st & 2nd fix
MEP testing
MEP final fix
29-Mar-14, Level 10
29-Mar-14, Apartments
29-Mar-14, Civil / Arch
Masonry walls
Plastering works
1st coat paint on walls
Wet area water proofing
Wet area flooring
Wet area wall tile works
Dry area ceiling gypsum works
Wet area ceiling works
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 27 of 44 TASK filter: All Activities
Primavera Systems, Inc.
Activity ID Activity Name Original
Duration
Start Finish
LAC11340 1st coat paint on ceiling 15 12-J an-14 03-Feb-14
LAC11350 Aluminium doors & windows 12 03-Feb-14 20-Feb-14
LAC11360 Kitchen cabinets & wardrobes 15 13-Feb-14 06-Mar-14
LAC11370 Wooden doors& accessories 15 03-Feb-14 25-Feb-14
LAC11380 Final coat paint on ceiling 15 04-Mar-14 26-Mar-14
LAC11390 Final coat paint on walls 15 08-Mar-14 29-Mar-14
MEP MEP 95 16-Oct-13 04-Mar-14
LAM10720 HVAC Ducting & FCU installation 15 16-Oct-13 07-Nov-13
LAM10730 Fire fighting pipe installation 15 16-Oct-13 07-Nov-13
LAM10740 Chilled water piping 15 16-Oct-13 07-Nov-13
LAM10750 Plumbing 1st & 2nd fix 10 16-Oct-13 31-Oct-13
LAM10760 Light, small power & Data 1st & 2nd fix 15 31-Oct-13 21-Nov-13
LAM10770 Fire alarm 1st & 2nd fix 10 31-Oct-13 14-Nov-13
LAM10780 MEP testing 15 23-Nov-13 14-Dec-13
LAM10790 MEP final fix 20 03-Feb-14 04-Mar-14
Corridor Corridor 86 07-Nov-13 12-Mar-14
Civil / Arch Civil / Arch 76 23-Nov-13 12-Mar-14
LCC10720 Plastering works 7 23-Nov-13 02-Dec-13
LCC10730 1st coat paint on walls 5 02-Dec-13 09-Dec-13
LCC10740 Marble flooring 7 10-Dec-13 19-Dec-13
LCC10750 Ceiling gypsum works 7 29-J an-14 09-Feb-14
LCC10760 1st coat paint on ceiling 5 09-Feb-14 16-Feb-14
LCC10770 Steel doors & accessories 4 16-Feb-14 22-Feb-14
LCC10780 Final coat paint on ceiling 5 26-Feb-14 05-Mar-14
LCC10790 Final coat paint on walls 5 05-Mar-14 12-Mar-14
MEP MEP 76 07-Nov-13 26-Feb-14
LCM10720 HVAC ducting & FCU installation 15 07-Nov-13 30-Nov-13
LCM10730 Fire fighting pipe Installation 7 30-Nov-13 09-Dec-13
LCM10740 Chilled water Piping 7 10-Dec-13 19-Dec-13
LCM10750 Light & Power 1st & 2nd fix 7 19-Dec-13 30-Dec-13
LCM10760 Fire alarm 1st & 2nd fix 7 30-Dec-13 09-J an-14
LCM10770 BMS 1st & 2nd fix 7 09-J an-14 19-J an-14
LCM10780 MEP testing 7 20-J an-14 29-J an-14
LCM10790 MEP final fix 7 16-Feb-14 26-Feb-14
M J J A S O N D J F M A M J J A S O N D
1st coat paint on ceiling
Aluminium doors & windows
Kitchen cabinets & wardrobes
Wooden doors& accessories
Final coat paint on ceiling
Final coat paint on walls
04-Mar-14, MEP
HVAC Ducting & FCU installation
Fire fighting pipe installation
Chilled water piping
Plumbing 1st & 2nd fix
Light, small power & Data 1st & 2nd fix
Fire alarm 1st & 2nd fix
MEP testing
MEP final fix
12-Mar-14, Corridor
12-Mar-14, Civil / Arch
Plastering works
1st coat paint on walls
Marble flooring
Ceiling gypsum works
1st coat paint on ceiling
Steel doors & accessories
Final coat paint on ceiling
Final coat paint on walls
26-Feb-14, MEP
HVAC ducting & FCU installation
Fire fighting pipe Installation
Chilled water Piping
Light & Power 1st & 2nd fix
Fire alarm 1st & 2nd fix
BMS 1st & 2nd fix
MEP testing
MEP final fix
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 28 of 44 TASK filter: All Activities
Primavera Systems, Inc.
Activity ID Activity Name Original
Duration
Start Finish
Level 11 Level 11 117 31-Oct-13 20-Apr-14
Apart ment s Apart ment s 117 31-Oct-13 20-Apr-14
Civil / Arch Civil / Arch 117 31-Oct-13 20-Apr-14
LAC11400 Masonry walls 15 31-Oct-13 21-Nov-13
LAC11410 Plastering works 15 23-Nov-13 14-Dec-13
LAC11420 1st coat paint on walls 15 14-Dec-13 05-J an-14
LAC11430 Wet area water proofing 10 05-J an-14 19-J an-14
LAC11440 Wet area flooring 10 20-J an-14 03-Feb-14
LAC11450 Wet area wall tile works 10 03-Feb-14 17-Feb-14
LAC11460 Dry area ceiling gypsum works 20 05-J an-14 03-Feb-14
LAC11470 Wet area ceiling works 12 18-Feb-14 06-Mar-14
LAC11480 1st coat paint on ceiling 15 03-Feb-14 25-Feb-14
LAC11490 Aluminium doors & windows 12 25-Feb-14 15-Mar-14
LAC11500 Kitchen cabinets & wardrobes 15 08-Mar-14 29-Mar-14
LAC11510 Wooden doors& accessories 15 25-Feb-14 18-Mar-14
LAC11520 Final coat paint on ceiling 15 26-Mar-14 16-Apr-14
LAC11530 Final coat paint on walls 15 29-Mar-14 20-Apr-14
MEP MEP 95 07-Nov-13 26-Mar-14
LAM10800 HVAC Ducting & FCU installation 15 07-Nov-13 30-Nov-13
LAM10810 Fire fighting pipe installation 15 07-Nov-13 30-Nov-13
LAM10820 Chilled water piping 15 07-Nov-13 30-Nov-13
LAM10830 Plumbing 1st & 2nd fix 10 07-Nov-13 21-Nov-13
LAM10840 Light, small power & Data 1st & 2nd fix 15 23-Nov-13 14-Dec-13
LAM10850 Fire alarm 1st & 2nd fix 10 23-Nov-13 07-Dec-13
LAM10860 MEP testing 15 14-Dec-13 05-J an-14
LAM10870 MEP final fix 20 25-Feb-14 26-Mar-14
Corridor Corridor 86 30-Nov-13 03-Apr-14
Civil / Arch Civil / Arch 76 14-Dec-13 03-Apr-14
LCC10800 Plastering works 7 14-Dec-13 24-Dec-13
LCC10810 1st coat paint on walls 5 24-Dec-13 31-Dec-13
LCC10820 Marble flooring 7 31-Dec-13 11-J an-14
LCC10830 Ceiling gypsum works 7 20-Feb-14 03-Mar-14
LCC10840 1st coat paint on ceiling 5 03-Mar-14 10-Mar-14
LCC10850 Steel doors & accessories 4 10-Mar-14 16-Mar-14
M J J A S O N D J F M A M J J A S O N D
20-Apr-14, Level 11
20-Apr-14, Apartments
20-Apr-14, Civil / Arch
Masonry walls
Plastering works
1st coat paint on walls
Wet area water proofing
Wet area flooring
Wet area wall tile works
Dry area ceiling gypsum works
Wet area ceiling works
1st coat paint on ceiling
Aluminium doors & windows
Kitchen cabinets & wardrobes
Wooden doors& accessories
Final coat paint on ceiling
Final coat paint on walls
26-Mar-14, MEP
HVAC Ducting & FCU installation
Fire fighting pipe installation
Chilled water piping
Plumbing 1st & 2nd fix
Light, small power & Data 1st & 2nd fix
Fire alarm 1st & 2nd fix
MEP testing
MEP final fix
03-Apr-14, Corridor
03-Apr-14, Civil / Arch
Plastering works
1st coat paint on walls
Marble flooring
Ceiling gypsum works
1st coat paint on ceiling
Steel doors & accessories
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 29 of 44 TASK filter: All Activities
Primavera Systems, Inc.
Activity ID Activity Name Original
Duration
Start Finish
LCC10860 Final coat paint on ceiling 5 20-Mar-14 27-Mar-14
LCC10870 Final coat paint on walls 5 27-Mar-14 03-Apr-14
MEP MEP 76 30-Nov-13 20-Mar-14
LCM10800 HVAC ducting & FCU installation 15 30-Nov-13 21-Dec-13
LCM10810 Fire fighting pipe Installation 7 22-Dec-13 31-Dec-13
LCM10820 Chilled water Piping 7 31-Dec-13 11-J an-14
LCM10830 Light & Power 1st & 2nd fix 7 11-J an-14 21-J an-14
LCM10840 Fire alarm 1st & 2nd fix 7 21-J an-14 30-J an-14
LCM10850 BMS 1st & 2nd fix 7 01-Feb-14 10-Feb-14
LCM10860 MEP testing 7 10-Feb-14 20-Feb-14
LCM10870 MEP final fix 7 10-Mar-14 20-Mar-14
Level 12 Level 12 117 31-Oct-13 20-Apr-14
Apart ment s Apart ment s 117 31-Oct-13 20-Apr-14
Civil / Arch Civil / Arch 117 31-Oct-13 20-Apr-14
LAC11540 Masonry walls 15 31-Oct-13 21-Nov-13
LAC11550 Plastering works 15 23-Nov-13 14-Dec-13
LAC11560 1st coat paint on walls 15 14-Dec-13 05-J an-14
LAC11570 Wet area water proofing 10 05-J an-14 19-J an-14
LAC11580 Wet area flooring 10 20-J an-14 03-Feb-14
LAC11590 Wet area wall tile works 10 03-Feb-14 17-Feb-14
LAC11600 Dry area ceiling gypsum works 20 05-J an-14 03-Feb-14
LAC11610 Wet area ceiling works 12 18-Feb-14 06-Mar-14
LAC11620 1st coat paint on ceiling 15 03-Feb-14 25-Feb-14
LAC11630 Aluminium doors & windows 12 25-Feb-14 15-Mar-14
LAC11640 Kitchen cabinets & wardrobes 15 08-Mar-14 29-Mar-14
LAC11650 Wooden doors& accessories 15 25-Feb-14 18-Mar-14
LAC11660 Final coat paint on ceiling 15 26-Mar-14 16-Apr-14
LAC11670 Final coat paint on walls 15 29-Mar-14 20-Apr-14
MEP MEP 95 07-Nov-13 26-Mar-14
LAM10880 HVAC Ducting & FCU installation 15 07-Nov-13 30-Nov-13
LAM10890 Fire fighting pipe installation 15 07-Nov-13 30-Nov-13
LAM10900 Chilled water piping 15 07-Nov-13 30-Nov-13
LAM10910 Plumbing 1st & 2nd fix 10 07-Nov-13 21-Nov-13
LAM10920 Light, small power & Data 1st & 2nd fix 15 23-Nov-13 14-Dec-13
M J J A S O N D J F M A M J J A S O N D
Final coat paint on ceiling
Final coat paint on walls
20-Mar-14, MEP
HVAC ducting & FCU installation
Fire fighting pipe Installation
Chilled water Piping
Light & Power 1st & 2nd fix
Fire alarm 1st & 2nd fix
BMS 1st & 2nd fix
MEP testing
MEP final fix
20-Apr-14, Level 12
20-Apr-14, Apartments
20-Apr-14, Civil / Arch
Masonry walls
Plastering works
1st coat paint on walls
Wet area water proofing
Wet area flooring
Wet area wall tile works
Dry area ceiling gypsum works
Wet area ceiling works
1st coat paint on ceiling
Aluminium doors & windows
Kitchen cabinets & wardrobes
Wooden doors& accessories
Final coat paint on ceiling
Final coat paint on walls
26-Mar-14, MEP
HVAC Ducting & FCU installation
Fire fighting pipe installation
Chilled water piping
Plumbing 1st & 2nd fix
Light, small power & Data 1st & 2nd fix
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 30 of 44 TASK filter: All Activities
Primavera Systems, Inc.
Activity ID Activity Name Original
Duration
Start Finish
LAM10930 Fire alarm 1st & 2nd fix 10 23-Nov-13 07-Dec-13
LAM10940 MEP testing 15 14-Dec-13 05-J an-14
LAM10950 MEP final fix 20 25-Feb-14 26-Mar-14
Corridor Corridor 86 30-Nov-13 03-Apr-14
Civil / Arch Civil / Arch 76 14-Dec-13 03-Apr-14
LCC10880 Plastering works 7 14-Dec-13 24-Dec-13
LCC10890 1st coat paint on walls 5 24-Dec-13 31-Dec-13
LCC10900 Marble flooring 7 31-Dec-13 11-J an-14
LCC10910 Ceiling gypsum works 7 20-Feb-14 03-Mar-14
LCC10920 1st coat paint on ceiling 5 03-Mar-14 10-Mar-14
LCC10930 Steel doors & accessories 4 10-Mar-14 16-Mar-14
LCC10940 Final coat paint on ceiling 5 20-Mar-14 27-Mar-14
LCC10950 Final coat paint on walls 5 27-Mar-14 03-Apr-14
MEP MEP 76 30-Nov-13 20-Mar-14
LCM10880 HVAC ducting & FCU installation 15 30-Nov-13 21-Dec-13
LCM10890 Fire fighting pipe Installation 7 22-Dec-13 31-Dec-13
LCM10900 Chilled water Piping 7 31-Dec-13 11-J an-14
LCM10910 Light & Power 1st & 2nd fix 7 11-J an-14 21-J an-14
LCM10920 Fire alarm 1st & 2nd fix 7 21-J an-14 30-J an-14
LCM10930 BMS 1st & 2nd fix 7 01-Feb-14 10-Feb-14
LCM10940 MEP testing 7 10-Feb-14 20-Feb-14
LCM10950 MEP final fix 7 10-Mar-14 20-Mar-14
Level 13 Level 13 117 23-Nov-13 12-May-14
Apart ment s Apart ment s 117 23-Nov-13 12-May-14
Civil / Arch Civil / Arch 117 23-Nov-13 12-May-14
LAC11680 Masonry walls 15 23-Nov-13 14-Dec-13
LAC11690 Plastering works 15 14-Dec-13 05-J an-14
LAC11700 1st coat paint on walls 15 05-J an-14 27-J an-14
LAC11710 Wet area water proofing 10 27-J an-14 10-Feb-14
LAC11720 Wet area flooring 10 10-Feb-14 25-Feb-14
LAC11730 Wet area wall tile works 10 25-Feb-14 11-Mar-14
LAC11740 Dry area ceiling gypsum works 20 27-J an-14 25-Feb-14
LAC11750 Wet area ceiling works 12 11-Mar-14 29-Mar-14
LAC11760 1st coat paint on ceiling 15 25-Feb-14 18-Mar-14
M J J A S O N D J F M A M J J A S O N D
Fire alarm 1st & 2nd fix
MEP testing
MEP final fix
03-Apr-14, Corridor
03-Apr-14, Civil / Arch
Plastering works
1st coat paint on walls
Marble flooring
Ceiling gypsum works
1st coat paint on ceiling
Steel doors & accessories
Final coat paint on ceiling
Final coat paint on walls
20-Mar-14, MEP
HVAC ducting & FCU installation
Fire fighting pipe Installation
Chilled water Piping
Light & Power 1st & 2nd fix
Fire alarm 1st & 2nd fix
BMS 1st & 2nd fix
MEP testing
MEP final fix
12-May-14, Level 13
12-May-14, Apartments
12-May-14, Civil / Arch
Masonry walls
Plastering works
1st coat paint on walls
Wet area water proofing
Wet area flooring
Wet area wall tile works
Dry area ceiling gypsum works
Wet area ceiling works
1st coat paint on ceiling
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 31 of 44 TASK filter: All Activities
Primavera Systems, Inc.
Activity ID Activity Name Original
Duration
Start Finish
LAC11770 Aluminium doors & windows 12 19-Mar-14 05-Apr-14
LAC11780 Kitchen cabinets & wardrobes 15 29-Mar-14 20-Apr-14
LAC11790 Wooden doors& accessories 15 19-Mar-14 09-Apr-14
LAC11800 Final coat paint on ceiling 15 17-Apr-14 08-May-14
LAC11810 Final coat paint on walls 15 20-Apr-14 12-May-14
MEP MEP 95 30-Nov-13 16-Apr-14
LAM10960 HVAC Ducting & FCU installation 15 30-Nov-13 21-Dec-13
LAM10970 Fire fighting pipe installation 15 30-Nov-13 21-Dec-13
LAM10980 Chilled water piping 15 30-Nov-13 21-Dec-13
LAM10990 Plumbing 1st & 2nd fix 10 30-Nov-13 14-Dec-13
LAM11000 Light, small power & Data 1st & 2nd fix 15 14-Dec-13 05-J an-14
LAM11010 Fire alarm 1st & 2nd fix 10 14-Dec-13 29-Dec-13
LAM11020 MEP testing 15 05-J an-14 27-J an-14
LAM11030 MEP final fix 20 19-Mar-14 16-Apr-14
Corridor Corridor 86 22-Dec-13 26-Apr-14
Civil / Arch Civil / Arch 76 05-J an-14 26-Apr-14
LCC10960 Plastering works 7 05-J an-14 15-J an-14
LCC10970 1st coat paint on walls 5 15-J an-14 22-J an-14
LCC10980 Marble flooring 7 22-J an-14 02-Feb-14
LCC10990 Ceiling gypsum works 7 15-Mar-14 24-Mar-14
LCC11000 1st coat paint on ceiling 5 25-Mar-14 01-Apr-14
LCC11010 Steel doors & accessories 4 01-Apr-14 07-Apr-14
LCC11020 Final coat paint on ceiling 5 12-Apr-14 19-Apr-14
LCC11030 Final coat paint on walls 5 19-Apr-14 26-Apr-14
MEP MEP 76 22-Dec-13 10-Apr-14
LCM10960 HVAC ducting & FCU installation 15 22-Dec-13 12-J an-14
LCM10970 Fire fighting pipe Installation 7 12-J an-14 22-J an-14
LCM10980 Chilled water Piping 7 22-J an-14 02-Feb-14
LCM10990 Light & Power 1st & 2nd fix 7 02-Feb-14 11-Feb-14
LCM11000 Fire alarm 1st & 2nd fix 7 12-Feb-14 22-Feb-14
LCM11010 BMS 1st & 2nd fix 7 22-Feb-14 04-Mar-14
LCM11020 MEP testing 7 04-Mar-14 15-Mar-14
LCM11030 MEP final fix 7 01-Apr-14 10-Apr-14
Level 14 Level 14 117 23-Nov-13 12-May-14
M J J A S O N D J F M A M J J A S O N D
Aluminium doors & windows
Kitchen cabinets & wardrobes
Wooden doors& accessories
Final coat paint on ceiling
Final coat paint on walls
16-Apr-14, MEP
HVAC Ducting & FCU installation
Fire fighting pipe installation
Chilled water piping
Plumbing 1st & 2nd fix
Light, small power & Data 1st & 2nd fix
Fire alarm 1st & 2nd fix
MEP testing
MEP final fix
26-Apr-14, Corridor
26-Apr-14, Civil / Arch
Plastering works
1st coat paint on walls
Marble flooring
Ceiling gypsum works
1st coat paint on ceiling
Steel doors & accessories
Final coat paint on ceiling
Final coat paint on walls
10-Apr-14, MEP
HVAC ducting & FCU installation
Fire fighting pipe Installation
Chilled water Piping
Light & Power 1st & 2nd fix
Fire alarm 1st & 2nd fix
BMS 1st & 2nd fix
MEP testing
MEP final fix
12-May-14, Level 14
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 32 of 44 TASK filter: All Activities
Primavera Systems, Inc.
Activity ID Activity Name Original
Duration
Start Finish
Apart ment s Apart ment s 117 23-Nov-13 12-May-14
Civil / Arch Civil / Arch 117 23-Nov-13 12-May-14
LAC11820 Masonry walls 15 23-Nov-13 14-Dec-13
LAC11830 Plastering works 15 14-Dec-13 05-J an-14
LAC11840 1st coat paint on walls 15 05-J an-14 27-J an-14
LAC11850 Wet area water proofing 10 27-J an-14 10-Feb-14
LAC11860 Wet area flooring 10 10-Feb-14 25-Feb-14
LAC11870 Wet area wall tile works 10 25-Feb-14 11-Mar-14
LAC11880 Dry area ceiling gypsum works 20 27-J an-14 25-Feb-14
LAC11890 Wet area ceiling works 12 11-Mar-14 29-Mar-14
LAC11900 1st coat paint on ceiling 15 25-Feb-14 18-Mar-14
LAC11910 Aluminium doors & windows 12 19-Mar-14 05-Apr-14
LAC11920 Kitchen cabinets & wardrobes 15 29-Mar-14 20-Apr-14
LAC11930 Wooden doors& accessories 15 19-Mar-14 09-Apr-14
LAC11940 Final coat paint on ceiling 15 17-Apr-14 08-May-14
LAC11950 Final coat paint on walls 15 20-Apr-14 12-May-14
MEP MEP 95 30-Nov-13 16-Apr-14
LAM11040 HVAC Ducting & FCU installation 15 30-Nov-13 21-Dec-13
LAM11050 Fire fighting pipe installation 15 30-Nov-13 21-Dec-13
LAM11060 Chilled water piping 15 30-Nov-13 21-Dec-13
LAM11070 Plumbing 1st & 2nd fix 10 30-Nov-13 14-Dec-13
LAM11080 Light, small power & Data 1st & 2nd fix 15 14-Dec-13 05-J an-14
LAM11090 Fire alarm 1st & 2nd fix 10 14-Dec-13 29-Dec-13
LAM11100 MEP testing 15 05-J an-14 27-J an-14
LAM11110 MEP final fix 20 19-Mar-14 16-Apr-14
Corridor Corridor 86 22-Dec-13 26-Apr-14
Civil / Arch Civil / Arch 76 05-J an-14 26-Apr-14
LCC11040 Plastering works 7 05-J an-14 15-J an-14
LCC11050 1st coat paint on walls 5 15-J an-14 22-J an-14
LCC11060 Marble flooring 7 22-J an-14 02-Feb-14
LCC11070 Ceiling gypsum works 7 15-Mar-14 24-Mar-14
LCC11080 1st coat paint on ceiling 5 25-Mar-14 01-Apr-14
LCC11090 Steel doors & accessories 4 01-Apr-14 07-Apr-14
LCC11100 Final coat paint on ceiling 5 12-Apr-14 19-Apr-14
M J J A S O N D J F M A M J J A S O N D
12-May-14, Apartments
12-May-14, Civil / Arch
Masonry walls
Plastering works
1st coat paint on walls
Wet area water proofing
Wet area flooring
Wet area wall tile works
Dry area ceiling gypsum works
Wet area ceiling works
1st coat paint on ceiling
Aluminium doors & windows
Kitchen cabinets & wardrobes
Wooden doors& accessories
Final coat paint on ceiling
Final coat paint on walls
16-Apr-14, MEP
HVAC Ducting & FCU installation
Fire fighting pipe installation
Chilled water piping
Plumbing 1st & 2nd fix
Light, small power & Data 1st & 2nd fix
Fire alarm 1st & 2nd fix
MEP testing
MEP final fix
26-Apr-14, Corridor
26-Apr-14, Civil / Arch
Plastering works
1st coat paint on walls
Marble flooring
Ceiling gypsum works
1st coat paint on ceiling
Steel doors & accessories
Final coat paint on ceiling
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 33 of 44 TASK filter: All Activities
Primavera Systems, Inc.
Activity ID Activity Name Original
Duration
Start Finish
LCC11110 Final coat paint on walls 5 19-Apr-14 26-Apr-14
MEP MEP 76 22-Dec-13 10-Apr-14
LCM11040 HVAC ducting & FCU installation 15 22-Dec-13 12-J an-14
LCM11050 Fire fighting pipe Installation 7 12-J an-14 22-J an-14
LCM11060 Chilled water Piping 7 22-J an-14 02-Feb-14
LCM11070 Light & Power 1st & 2nd fix 7 02-Feb-14 11-Feb-14
LCM11080 Fire alarm 1st & 2nd fix 7 12-Feb-14 22-Feb-14
LCM11090 BMS 1st & 2nd fix 7 22-Feb-14 04-Mar-14
LCM11100 MEP testing 7 04-Mar-14 15-Mar-14
LCM11110 MEP final fix 7 01-Apr-14 10-Apr-14
Level 15 Level 15 117 14-Dec-13 02-J un-14
Apart ment s Apart ment s 117 14-Dec-13 02-J un-14
Civil / Arch Civil / Arch 117 14-Dec-13 02-J un-14
LAC11960 Masonry walls 15 14-Dec-13 05-J an-14
LAC11970 Plastering works 15 05-J an-14 27-J an-14
LAC11980 1st coat paint on walls 15 27-J an-14 17-Feb-14
LAC11990 Wet area water proofing 10 18-Feb-14 04-Mar-14
LAC12000 Wet area flooring 10 04-Mar-14 18-Mar-14
LAC12010 Wet area wall tile works 10 19-Mar-14 02-Apr-14
LAC12020 Dry area ceiling gypsum works 20 18-Feb-14 18-Mar-14
LAC12030 Wet area ceiling works 12 02-Apr-14 20-Apr-14
LAC12040 1st coat paint on ceiling 15 19-Mar-14 09-Apr-14
LAC12050 Aluminium doors & windows 12 09-Apr-14 27-Apr-14
LAC12060 Kitchen cabinets & wardrobes 15 20-Apr-14 12-May-14
LAC12070 Wooden doors& accessories 15 09-Apr-14 01-May-14
LAC12080 Final coat paint on ceiling 15 08-May-14 31-May-14
LAC12090 Final coat paint on walls 15 12-May-14 02-J un-14
MEP MEP 95 22-Dec-13 08-May-14
LAM11120 HVAC Ducting & FCU installation 15 22-Dec-13 12-J an-14
LAM11130 Fire fighting pipe installation 15 22-Dec-13 12-J an-14
LAM11140 Chilled water piping 15 22-Dec-13 12-J an-14
LAM11150 Plumbing 1st & 2nd fix 10 22-Dec-13 05-J an-14
LAM11160 Light, small power & Data 1st & 2nd fix 15 05-J an-14 27-J an-14
LAM11170 Fire alarm 1st & 2nd fix 10 05-J an-14 19-J an-14
M J J A S O N D J F M A M J J A S O N D
Final coat paint on walls
10-Apr-14, MEP
HVAC ducting & FCU installation
Fire fighting pipe Installation
Chilled water Piping
Light & Power 1st & 2nd fix
Fire alarm 1st & 2nd fix
BMS 1st & 2nd fix
MEP testing
MEP final fix
02-J un-14, Level 15
02-J un-14, Apartments
02-J un-14, Civil / Arch
Masonry walls
Plastering works
1st coat paint on walls
Wet area water proofing
Wet area flooring
Wet area wall tile works
Dry area ceiling gypsum works
Wet area ceiling works
1st coat paint on ceiling
Aluminium doors & windows
Kitchen cabinets & wardrobes
Wooden doors& accessories
Final coat paint on ceiling
Final coat paint on walls
08-May-14, MEP
HVAC Ducting & FCU installation
Fire fighting pipe installation
Chilled water piping
Plumbing 1st & 2nd fix
Light, small power & Data 1st & 2nd fix
Fire alarm 1st & 2nd fix
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 34 of 44 TASK filter: All Activities
Primavera Systems, Inc.
Activity ID Activity Name Original
Duration
Start Finish
LAM11180 MEP testing 15 27-J an-14 17-Feb-14
LAM11190 MEP final fix 20 09-Apr-14 08-May-14
Corridor Corridor 86 12-J an-14 18-May-14
Civil / Arch Civil / Arch 76 27-J an-14 18-May-14
LCC11120 Plastering works 7 27-J an-14 05-Feb-14
LCC11130 1st coat paint on walls 5 06-Feb-14 13-Feb-14
LCC11140 Marble flooring 7 13-Feb-14 23-Feb-14
LCC11150 Ceiling gypsum works 7 06-Apr-14 15-Apr-14
LCC11160 1st coat paint on ceiling 5 15-Apr-14 22-Apr-14
LCC11170 Steel doors & accessories 4 23-Apr-14 28-Apr-14
LCC11180 Final coat paint on ceiling 5 03-May-14 10-May-14
LCC11190 Final coat paint on walls 5 11-May-14 18-May-14
MEP MEP 76 12-J an-14 03-May-14
LCM11120 HVAC ducting & FCU installation 15 12-J an-14 03-Feb-14
LCM11130 Fire fighting pipe Installation 7 03-Feb-14 13-Feb-14
LCM11140 Chilled water Piping 7 13-Feb-14 23-Feb-14
LCM11150 Light & Power 1st & 2nd fix 7 24-Feb-14 05-Mar-14
LCM11160 Fire alarm 1st & 2nd fix 7 05-Mar-14 16-Mar-14
LCM11170 BMS 1st & 2nd fix 7 16-Mar-14 26-Mar-14
LCM11180 MEP testing 7 26-Mar-14 05-Apr-14
LCM11190 MEP final fix 7 23-Apr-14 03-May-14
Level 16 Level 16 117 14-Dec-13 02-J un-14
Apart ment s Apart ment s 117 14-Dec-13 02-J un-14
Civil / Arch Civil / Arch 117 14-Dec-13 02-J un-14
LAC12100 Masonry walls 15 14-Dec-13 05-J an-14
LAC12110 Plastering works 15 05-J an-14 27-J an-14
LAC12120 1st coat paint on walls 15 27-J an-14 17-Feb-14
LAC12130 Wet area water proofing 10 18-Feb-14 04-Mar-14
LAC12140 Wet area flooring 10 04-Mar-14 18-Mar-14
LAC12150 Wet area wall tile works 10 19-Mar-14 02-Apr-14
LAC12160 Dry area ceiling gypsum works 20 18-Feb-14 18-Mar-14
LAC12170 Wet area ceiling works 12 02-Apr-14 20-Apr-14
LAC12180 1st coat paint on ceiling 15 19-Mar-14 09-Apr-14
LAC12190 Aluminium doors & windows 12 09-Apr-14 27-Apr-14
M J J A S O N D J F M A M J J A S O N D
MEP testing
MEP final fix
18-May-14, Corridor
18-May-14, Civil / Arch
Plastering works
1st coat paint on walls
Marble flooring
Ceiling gypsum works
1st coat paint on ceiling
Steel doors & accessories
Final coat paint on ceiling
Final coat paint on walls
03-May-14, MEP
HVAC ducting & FCU installation
Fire fighting pipe Installation
Chilled water Piping
Light & Power 1st & 2nd fix
Fire alarm 1st & 2nd fix
BMS 1st & 2nd fix
MEP testing
MEP final fix
02-J un-14, Level 16
02-J un-14, Apartments
02-J un-14, Civil / Arch
Masonry walls
Plastering works
1st coat paint on walls
Wet area water proofing
Wet area flooring
Wet area wall tile works
Dry area ceiling gypsum works
Wet area ceiling works
1st coat paint on ceiling
Aluminium doors & windows
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 35 of 44 TASK filter: All Activities
Primavera Systems, Inc.
Activity ID Activity Name Original
Duration
Start Finish
LAC12200 Kitchen cabinets & wardrobes 15 20-Apr-14 12-May-14
LAC12210 Wooden doors& accessories 15 09-Apr-14 01-May-14
LAC12220 Final coat paint on ceiling 15 08-May-14 31-May-14
LAC12230 Final coat paint on walls 15 12-May-14 02-J un-14
MEP MEP 95 22-Dec-13 08-May-14
LAM11200 HVAC Ducting & FCU installation 15 22-Dec-13 12-J an-14
LAM11210 Fire fighting pipe installation 15 22-Dec-13 12-J an-14
LAM11220 Chilled water piping 15 22-Dec-13 12-J an-14
LAM11230 Plumbing 1st & 2nd fix 10 22-Dec-13 05-J an-14
LAM11240 Light, small power & Data 1st & 2nd fix 15 05-J an-14 27-J an-14
LAM11250 Fire alarm 1st & 2nd fix 10 05-J an-14 19-J an-14
LAM11260 MEP testing 15 27-J an-14 17-Feb-14
LAM11270 MEP final fix 20 09-Apr-14 08-May-14
Corridor Corridor 86 12-J an-14 18-May-14
Civil / Arch Civil / Arch 76 27-J an-14 18-May-14
LCC11200 Plastering works 7 27-J an-14 05-Feb-14
LCC11210 1st coat paint on walls 5 06-Feb-14 13-Feb-14
LCC11220 Marble flooring 7 13-Feb-14 23-Feb-14
LCC11230 Ceiling gypsum works 7 06-Apr-14 15-Apr-14
LCC11240 1st coat paint on ceiling 5 15-Apr-14 22-Apr-14
LCC11250 Steel doors & accessories 4 23-Apr-14 28-Apr-14
LCC11260 Final coat paint on ceiling 5 03-May-14 10-May-14
LCC11270 Final coat paint on walls 5 11-May-14 18-May-14
MEP MEP 76 12-J an-14 03-May-14
LCM11200 HVAC ducting & FCU installation 15 12-J an-14 03-Feb-14
LCM11210 Fire fighting pipe Installation 7 03-Feb-14 13-Feb-14
LCM11220 Chilled water Piping 7 13-Feb-14 23-Feb-14
LCM11230 Light & Power 1st & 2nd fix 7 24-Feb-14 05-Mar-14
LCM11240 Fire alarm 1st & 2nd fix 7 05-Mar-14 16-Mar-14
LCM11250 BMS 1st & 2nd fix 7 16-Mar-14 26-Mar-14
LCM11260 MEP testing 7 26-Mar-14 05-Apr-14
LCM11270 MEP final fix 7 23-Apr-14 03-May-14
Level 17 Level 17 117 05-J an-14 24-J un-14
Apart ment s Apart ment s 117 05-J an-14 24-J un-14
M J J A S O N D J F M A M J J A S O N D
Kitchen cabinets & wardrobes
Wooden doors& accessories
Final coat paint on ceiling
Final coat paint on walls
08-May-14, MEP
HVAC Ducting & FCU installation
Fire fighting pipe installation
Chilled water piping
Plumbing 1st & 2nd fix
Light, small power & Data 1st & 2nd fix
Fire alarm 1st & 2nd fix
MEP testing
MEP final fix
18-May-14, Corridor
18-May-14, Civil / Arch
Plastering works
1st coat paint on walls
Marble flooring
Ceiling gypsum works
1st coat paint on ceiling
Steel doors & accessories
Final coat paint on ceiling
Final coat paint on walls
03-May-14, MEP
HVAC ducting & FCU installation
Fire fighting pipe Installation
Chilled water Piping
Light & Power 1st & 2nd fix
Fire alarm 1st & 2nd fix
BMS 1st & 2nd fix
MEP testing
MEP final fix
24-J un-14, Level 17
24-J un-14, Apartments
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 36 of 44 TASK filter: All Activities
Primavera Systems, Inc.
Activity ID Activity Name Original
Duration
Start Finish
Civil / Arch Civil / Arch 117 05-J an-14 24-J un-14
LAC12240 Masonry walls 15 05-J an-14 27-J an-14
LAC12250 Plastering works 15 27-J an-14 17-Feb-14
LAC12260 1st coat paint on walls 15 18-Feb-14 11-Mar-14
LAC12270 Wet area water proofing 10 11-Mar-14 26-Mar-14
LAC12280 Wet area flooring 10 26-Mar-14 09-Apr-14
LAC12290 Wet area wall tile works 10 09-Apr-14 24-Apr-14
LAC12300 Dry area ceiling gypsum works 20 11-Mar-14 09-Apr-14
LAC12310 Wet area ceiling works 12 24-Apr-14 12-May-14
LAC12320 1st coat paint on ceiling 15 09-Apr-14 01-May-14
LAC12330 Aluminium doors & windows 12 01-May-14 19-May-14
LAC12340 Kitchen cabinets & wardrobes 15 12-May-14 02-J un-14
LAC12350 Wooden doors& accessories 15 01-May-14 24-May-14
LAC12360 Final coat paint on ceiling 15 31-May-14 22-J un-14
LAC12370 Final coat paint on walls 15 03-J un-14 24-J un-14
MEP MEP 95 12-J an-14 31-May-14
LAM11280 HVAC Ducting & FCU installation 15 12-J an-14 03-Feb-14
LAM11290 Fire fighting pipe installation 15 12-J an-14 03-Feb-14
LAM11300 Chilled water piping 15 12-J an-14 03-Feb-14
LAM11310 Plumbing 1st & 2nd fix 10 12-J an-14 27-J an-14
LAM11320 Light, small power & Data 1st & 2nd fix 15 27-J an-14 17-Feb-14
LAM11330 Fire alarm 1st & 2nd fix 10 27-J an-14 10-Feb-14
LAM11340 MEP testing 15 18-Feb-14 11-Mar-14
LAM11350 MEP final fix 20 01-May-14 31-May-14
Corridor Corridor 86 03-Feb-14 08-J un-14
Civil / Arch Civil / Arch 76 18-Feb-14 08-J un-14
LCC11280 Plastering works 7 18-Feb-14 27-Feb-14
LCC11290 1st coat paint on walls 5 27-Feb-14 06-Mar-14
LCC11300 Marble flooring 7 08-Mar-14 17-Mar-14
LCC11310 Ceiling gypsum works 7 27-Apr-14 07-May-14
LCC11320 1st coat paint on ceiling 5 07-May-14 14-May-14
LCC11330 Steel doors & accessories 4 14-May-14 20-May-14
LCC11340 Final coat paint on ceiling 5 25-May-14 01-J un-14
LCC11350 Final coat paint on walls 5 01-J un-14 08-J un-14
M J J A S O N D J F M A M J J A S O N D
24-J un-14, Civil / Arch
Masonry walls
Plastering works
1st coat paint on walls
Wet area water proofing
Wet area flooring
Wet area wall tile works
Dry area ceiling gypsum works
Wet area ceiling works
1st coat paint on ceiling
Aluminium doors & windows
Kitchen cabinets & wardrobes
Wooden doors& accessories
Final coat paint on ceiling
Final coat paint on walls
31-May-14, MEP
HVAC Ducting & FCU installation
Fire fighting pipe installation
Chilled water piping
Plumbing 1st & 2nd fix
Light, small power & Data 1st & 2nd fix
Fire alarm 1st & 2nd fix
MEP testing
MEP final fix
08-J un-14, Corridor
08-J un-14, Civil / Arch
Plastering works
1st coat paint on walls
Marble flooring
Ceiling gypsum works
1st coat paint on ceiling
Steel doors & accessories
Final coat paint on ceiling
Final coat paint on walls
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 37 of 44 TASK filter: All Activities
Primavera Systems, Inc.
Activity ID Activity Name Original
Duration
Start Finish
MEP MEP 76 03-Feb-14 25-May-14
LCM11280 HVAC ducting & FCU installation 15 03-Feb-14 25-Feb-14
LCM11290 Fire fighting pipe Installation 7 25-Feb-14 06-Mar-14
LCM11300 Chilled water Piping 7 08-Mar-14 17-Mar-14
LCM11310 Light & Power 1st & 2nd fix 7 17-Mar-14 27-Mar-14
LCM11320 Fire alarm 1st & 2nd fix 7 27-Mar-14 07-Apr-14
LCM11330 BMS 1st & 2nd fix 7 07-Apr-14 16-Apr-14
LCM11340 MEP testing 7 17-Apr-14 27-Apr-14
LCM11350 MEP final fix 7 14-May-14 25-May-14
Level 18 Level 18 117 05-J an-14 24-J un-14
Apart ment s Apart ment s 117 05-J an-14 24-J un-14
Civil / Arch Civil / Arch 117 05-J an-14 24-J un-14
LAC12380 Masonry walls 15 05-J an-14 27-J an-14
LAC12390 Plastering works 15 27-J an-14 17-Feb-14
LAC12400 1st coat paint on walls 15 18-Feb-14 11-Mar-14
LAC12410 Wet area water proofing 10 11-Mar-14 26-Mar-14
LAC12420 Wet area flooring 10 26-Mar-14 09-Apr-14
LAC12430 Wet area wall tile works 10 09-Apr-14 24-Apr-14
LAC12440 Dry area ceiling gypsum works 20 11-Mar-14 09-Apr-14
LAC12450 Wet area ceiling works 12 24-Apr-14 12-May-14
LAC12460 1st coat paint on ceiling 15 09-Apr-14 01-May-14
LAC12470 Aluminium doors & windows 12 01-May-14 19-May-14
LAC12480 Kitchen cabinets & wardrobes 15 12-May-14 02-J un-14
LAC12490 Wooden doors& accessories 15 01-May-14 24-May-14
LAC12500 Final coat paint on ceiling 15 31-May-14 22-J un-14
LAC12510 Final coat paint on walls 15 03-J un-14 24-J un-14
MEP MEP 95 12-J an-14 31-May-14
LAM11360 HVAC Ducting & FCU installation 15 12-J an-14 03-Feb-14
LAM11370 Fire fighting pipe installation 15 12-J an-14 03-Feb-14
LAM11380 Chilled water piping 15 12-J an-14 03-Feb-14
LAM11390 Plumbing 1st & 2nd fix 10 12-J an-14 27-J an-14
LAM11400 Light, small power & Data 1st & 2nd fix 15 27-J an-14 17-Feb-14
LAM11410 Fire alarm 1st & 2nd fix 10 27-J an-14 10-Feb-14
LAM11420 MEP testing 15 18-Feb-14 11-Mar-14
M J J A S O N D J F M A M J J A S O N D
25-May-14, MEP
HVAC ducting & FCU installation
Fire fighting pipe Installation
Chilled water Piping
Light & Power 1st & 2nd fix
Fire alarm 1st & 2nd fix
BMS 1st & 2nd fix
MEP testing
MEP final fix
24-J un-14, Level 18
24-J un-14, Apartments
24-J un-14, Civil / Arch
Masonry walls
Plastering works
1st coat paint on walls
Wet area water proofing
Wet area flooring
Wet area wall tile works
Dry area ceiling gypsum works
Wet area ceiling works
1st coat paint on ceiling
Aluminium doors & windows
Kitchen cabinets & wardrobes
Wooden doors& accessories
Final coat paint on ceiling
Final coat paint on walls
31-May-14, MEP
HVAC Ducting & FCU installation
Fire fighting pipe installation
Chilled water piping
Plumbing 1st & 2nd fix
Light, small power & Data 1st & 2nd fix
Fire alarm 1st & 2nd fix
MEP testing
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 38 of 44 TASK filter: All Activities
Primavera Systems, Inc.
Activity ID Activity Name Original
Duration
Start Finish
LAM11430 MEP final fix 20 01-May-14 31-May-14
Corridor Corridor 86 03-Feb-14 08-J un-14
Civil / Arch Civil / Arch 76 18-Feb-14 08-J un-14
LCC11360 Plastering works 7 18-Feb-14 27-Feb-14
LCC11370 1st coat paint on walls 5 27-Feb-14 06-Mar-14
LCC11380 Marble flooring 7 08-Mar-14 17-Mar-14
LCC11390 Ceiling gypsum works 7 27-Apr-14 07-May-14
LCC11400 1st coat paint on ceiling 5 07-May-14 14-May-14
LCC11410 Steel doors & accessories 4 14-May-14 20-May-14
LCC11420 Final coat paint on ceiling 5 25-May-14 01-J un-14
LCC11430 Final coat paint on walls 5 01-J un-14 08-J un-14
MEP MEP 76 03-Feb-14 25-May-14
LCM11360 HVAC ducting & FCU installation 15 03-Feb-14 25-Feb-14
LCM11370 Fire fighting pipe Installation 7 25-Feb-14 06-Mar-14
LCM11380 Chilled water Piping 7 08-Mar-14 17-Mar-14
LCM11390 Light & Power 1st & 2nd fix 7 17-Mar-14 27-Mar-14
LCM11400 Fire alarm 1st & 2nd fix 7 27-Mar-14 07-Apr-14
LCM11410 BMS 1st & 2nd fix 7 07-Apr-14 16-Apr-14
LCM11420 MEP testing 7 17-Apr-14 27-Apr-14
LCM11430 MEP final fix 7 14-May-14 25-May-14
Level 19 Level 19 117 27-J an-14 16-J ul-14
Apart ment s Apart ment s 117 27-J an-14 16-J ul-14
Civil / Arch Civil / Arch 117 27-J an-14 16-J ul-14
LAC12520 Masonry walls 15 27-J an-14 17-Feb-14
LAC12530 Plastering works 15 18-Feb-14 11-Mar-14
LAC12540 1st coat paint on walls 15 11-Mar-14 02-Apr-14
LAC12550 Wet area water proofing 10 02-Apr-14 16-Apr-14
LAC12560 Wet area flooring 10 17-Apr-14 01-May-14
LAC12570 Wet area wall tile works 10 01-May-14 15-May-14
LAC12580 Dry area ceiling gypsum works 20 02-Apr-14 01-May-14
LAC12590 Wet area ceiling works 12 17-May-14 02-J un-14
LAC12600 1st coat paint on ceiling 15 01-May-14 24-May-14
LAC12610 Aluminium doors & windows 12 24-May-14 10-J un-14
LAC12620 Kitchen cabinets & wardrobes 15 03-J un-14 24-J un-14
M J J A S O N D J F M A M J J A S O N D
MEP final fix
08-J un-14, Corridor
08-J un-14, Civil / Arch
Plastering works
1st coat paint on walls
Marble flooring
Ceiling gypsum works
1st coat paint on ceiling
Steel doors & accessories
Final coat paint on ceiling
Final coat paint on walls
25-May-14, MEP
HVAC ducting & FCU installation
Fire fighting pipe Installation
Chilled water Piping
Light & Power 1st & 2nd fix
Fire alarm 1st & 2nd fix
BMS 1st & 2nd fix
MEP testing
MEP final fix
16-J ul-14, Level 19
16-J ul-14, Apartments
16-J ul-14, Civil / Arch
Masonry walls
Plastering works
1st coat paint on walls
Wet area water proofing
Wet area flooring
Wet area wall tile works
Dry area ceiling gypsum works
Wet area ceiling works
1st coat paint on ceiling
Aluminium doors & windows
Kitchen cabinets & wardrobes
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 39 of 44 TASK filter: All Activities
Primavera Systems, Inc.
Activity ID Activity Name Original
Duration
Start Finish
LAC12630 Wooden doors& accessories 15 24-May-14 14-J un-14
LAC12640 Final coat paint on ceiling 15 22-J un-14 13-J ul-14
LAC12650 Final coat paint on walls 15 24-J un-14 16-J ul-14
MEP MEP 95 03-Feb-14 22-J un-14
LAM11440 HVAC Ducting & FCU installation 15 03-Feb-14 25-Feb-14
LAM11450 Fire fighting pipe installation 15 03-Feb-14 25-Feb-14
LAM11460 Chilled water piping 15 03-Feb-14 25-Feb-14
LAM11470 Plumbing 1st & 2nd fix 10 03-Feb-14 17-Feb-14
LAM11480 Light, small power & Data 1st & 2nd fix 15 18-Feb-14 11-Mar-14
LAM11490 Fire alarm 1st & 2nd fix 10 18-Feb-14 04-Mar-14
LAM11500 MEP testing 15 11-Mar-14 02-Apr-14
LAM11510 MEP final fix 20 24-May-14 22-J un-14
Corridor Corridor 86 25-Feb-14 30-J un-14
Civil / Arch Civil / Arch 76 11-Mar-14 30-J un-14
LCC11440 Plastering works 7 11-Mar-14 22-Mar-14
LCC11450 1st coat paint on walls 5 22-Mar-14 29-Mar-14
LCC11460 Marble flooring 7 29-Mar-14 08-Apr-14
LCC11470 Ceiling gypsum works 7 19-May-14 29-May-14
LCC11480 1st coat paint on ceiling 5 29-May-14 05-J un-14
LCC11490 Steel doors & accessories 4 05-J un-14 11-J un-14
LCC11500 Final coat paint on ceiling 5 16-J un-14 23-J un-14
LCC11510 Final coat paint on walls 5 23-J un-14 30-J un-14
MEP MEP 76 25-Feb-14 16-J un-14
LCM11440 HVAC ducting & FCU installation 15 25-Feb-14 18-Mar-14
LCM11450 Fire fighting pipe Installation 7 19-Mar-14 29-Mar-14
LCM11460 Chilled water Piping 7 29-Mar-14 08-Apr-14
LCM11470 Light & Power 1st & 2nd fix 7 08-Apr-14 19-Apr-14
LCM11480 Fire alarm 1st & 2nd fix 7 19-Apr-14 28-Apr-14
LCM11490 BMS 1st & 2nd fix 7 29-Apr-14 08-May-14
LCM11500 MEP testing 7 08-May-14 19-May-14
LCM11510 MEP final fix 7 05-J un-14 16-J un-14
Level 20 Level 20 117 27-J an-14 16-J ul-14
Apart ment s Apart ment s 117 27-J an-14 16-J ul-14
Civil / Arch Civil / Arch 117 27-J an-14 16-J ul-14
M J J A S O N D J F M A M J J A S O N D
Wooden doors& accessories
Final coat paint on ceiling
Final coat paint on walls
22-J un-14, MEP
HVAC Ducting & FCU installation
Fire fighting pipe installation
Chilled water piping
Plumbing 1st & 2nd fix
Light, small power & Data 1st & 2nd fix
Fire alarm 1st & 2nd fix
MEP testing
MEP final fix
30-J un-14, Corridor
30-J un-14, Civil / Arch
Plastering works
1st coat paint on walls
Marble flooring
Ceiling gypsum works
1st coat paint on ceiling
Steel doors & accessories
Final coat paint on ceiling
Final coat paint on walls
16-J un-14, MEP
HVAC ducting & FCU installation
Fire fighting pipe Installation
Chilled water Piping
Light & Power 1st & 2nd fix
Fire alarm 1st & 2nd fix
BMS 1st & 2nd fix
MEP testing
MEP final fix
16-J ul-14, Level 20
16-J ul-14, Apartments
16-J ul-14, Civil / Arch
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 40 of 44 TASK filter: All Activities
Primavera Systems, Inc.
Activity ID Activity Name Original
Duration
Start Finish
LAC12660 Masonry walls 15 27-J an-14 17-Feb-14
LAC12670 Plastering works 15 18-Feb-14 11-Mar-14
LAC12680 1st coat paint on walls 15 11-Mar-14 02-Apr-14
LAC12690 Wet area water proofing 10 02-Apr-14 16-Apr-14
LAC12700 Wet area flooring 10 17-Apr-14 01-May-14
LAC12710 Wet area wall tile works 10 01-May-14 15-May-14
LAC12720 Dry area ceiling gypsum works 20 02-Apr-14 01-May-14
LAC12730 Wet area ceiling works 12 17-May-14 02-J un-14
LAC12740 1st coat paint on ceiling 15 01-May-14 24-May-14
LAC12750 Aluminium doors & windows 12 24-May-14 10-J un-14
LAC12760 Kitchen cabinets & wardrobes 15 03-J un-14 24-J un-14
LAC12770 Wooden doors& accessories 15 24-May-14 14-J un-14
LAC12780 Final coat paint on ceiling 15 22-J un-14 13-J ul-14
LAC12790 Final coat paint on walls 15 24-J un-14 16-J ul-14
MEP MEP 95 03-Feb-14 22-J un-14
LAM11520 HVAC Ducting & FCU installation 15 03-Feb-14 25-Feb-14
LAM11530 Fire fighting pipe installation 15 03-Feb-14 25-Feb-14
LAM11540 Chilled water piping 15 03-Feb-14 25-Feb-14
LAM11550 Plumbing 1st & 2nd fix 10 03-Feb-14 17-Feb-14
LAM11560 Light, small power & Data 1st & 2nd fix 15 18-Feb-14 11-Mar-14
LAM11570 Fire alarm 1st & 2nd fix 10 18-Feb-14 04-Mar-14
LAM11580 MEP testing 15 11-Mar-14 02-Apr-14
LAM11590 MEP final fix 20 24-May-14 22-J un-14
Corridor Corridor 86 25-Feb-14 30-J un-14
Civil / Arch Civil / Arch 76 11-Mar-14 30-J un-14
LCC11520 Plastering works 7 11-Mar-14 22-Mar-14
LCC11530 1st coat paint on walls 5 22-Mar-14 29-Mar-14
LCC11540 Marble flooring 7 29-Mar-14 08-Apr-14
LCC11550 Ceiling gypsum works 7 19-May-14 29-May-14
LCC11560 1st coat paint on ceiling 5 29-May-14 05-J un-14
LCC11570 Steel doors & accessories 4 05-J un-14 11-J un-14
LCC11580 Final coat paint on ceiling 5 16-J un-14 23-J un-14
LCC11590 Final coat paint on walls 5 23-J un-14 30-J un-14
MEP MEP 76 25-Feb-14 16-J un-14
M J J A S O N D J F M A M J J A S O N D
Masonry walls
Plastering works
1st coat paint on walls
Wet area water proofing
Wet area flooring
Wet area wall tile works
Dry area ceiling gypsum works
Wet area ceiling works
1st coat paint on ceiling
Aluminium doors & windows
Kitchen cabinets & wardrobes
Wooden doors& accessories
Final coat paint on ceiling
Final coat paint on walls
22-J un-14, MEP
HVAC Ducting & FCU installation
Fire fighting pipe installation
Chilled water piping
Plumbing 1st & 2nd fix
Light, small power & Data 1st & 2nd fix
Fire alarm 1st & 2nd fix
MEP testing
MEP final fix
30-J un-14, Corridor
30-J un-14, Civil / Arch
Plastering works
1st coat paint on walls
Marble flooring
Ceiling gypsum works
1st coat paint on ceiling
Steel doors & accessories
Final coat paint on ceiling
Final coat paint on walls
16-J un-14, MEP
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 41 of 44 TASK filter: All Activities
Primavera Systems, Inc.
Activity ID Activity Name Original
Duration
Start Finish
LCM11520 HVAC ducting & FCU installation 15 25-Feb-14 18-Mar-14
LCM11530 Fire fighting pipe Installation 7 19-Mar-14 29-Mar-14
LCM11540 Chilled water Piping 7 29-Mar-14 08-Apr-14
LCM11550 Light & Power 1st & 2nd fix 7 08-Apr-14 19-Apr-14
LCM11560 Fire alarm 1st & 2nd fix 7 19-Apr-14 28-Apr-14
LCM11570 BMS 1st & 2nd fix 7 29-Apr-14 08-May-14
LCM11580 MEP testing 7 08-May-14 19-May-14
LCM11590 MEP final fix 7 05-J un-14 16-J un-14
Mezzanine Flo Mezzanine Floor 97 27-J an-14 17-J un-14
Civil / Arch Civil / Arch 97 27-J an-14 17-J un-14
MEC1000 Masorny walls 10 27-J an-14 10-Feb-14
MEC1010 Plastering works 10 10-Feb-14 25-Feb-14
MEC1015 Ceiling Painting 10 25-Feb-14 11-Mar-14
MEC1020 1st coat paint on wall 10 11-Mar-14 26-Mar-14
MEC1030 Floor screeding 7 24-Apr-14 04-May-14
MEC1040 Floor epoxy preparation 10 05-May-14 19-May-14
MEC1050 Floor epoxy coating 10 19-May-14 02-J un-14
MEC1060 Final Coat paint on wall 10 03-J un-14 17-J un-14
MEP MEP 45 11-Mar-14 15-May-14
MEM1000 Light & Small Power 1st & 2nd Fix 15 11-Mar-14 02-Apr-14
MEM1010 Fire fighting 1st & 2nd Fix 30 11-Mar-14 24-Apr-14
MEM1020 HVAC ducting & FCU installation 15 11-Mar-14 02-Apr-14
MEM1030 BMS 1st & 2nd Fix 10 11-Mar-14 26-Mar-14
MEM1035 Fire Alarm 1st & 2nd Fix 10 11-Mar-14 26-Mar-14
MEM1040 AHU Installation 15 24-Apr-14 15-May-14
MEM1050 MEP final Fix 15 24-Apr-14 15-May-14
Eleveat ors Eleveat ors 250 30-J un-13 29-J un-14
EL 01 & 02 EL 01 & 02 170 30-J un-13 04-Mar-14
EL1000 Scaffolding Erection 40 30-J un-13 26-Aug-13
EL1010 Separator beams installation 15 27-Aug-13 17-Sep-13
EL1020 Guide rails 30 17-Sep-13 31-Oct-13
EL1030 Doors 20 31-Oct-13 30-Nov-13
EL1040 Machine room Mechanical works 10 30-Nov-13 14-Dec-13
EL1050 Machine room Electrical works 10 14-Dec-13 29-Dec-13
M J J A S O N D J F M A M J J A S O N D
HVAC ducting & FCU installation
Fire fighting pipe Installation
Chilled water Piping
Light & Power 1st & 2nd fix
Fire alarm 1st & 2nd fix
BMS 1st & 2nd fix
MEP testing
MEP final fix
17-J un-14, Mezzanine Floor
17-J un-14, Civil / Arch
Masorny walls
Plastering works
Ceiling Painting
1st coat paint on wall
Floor screeding
Floor epoxy preparation
Floor epoxy coating
Final Coat paint on wall
15-May-14, MEP
Light & Small Power 1st & 2nd Fix
Fire fighting 1st & 2nd Fix
HVAC ducting & FCU installation
BMS 1st & 2nd Fix
Fire Alarm 1st & 2nd Fix
AHU Installation
MEP final Fix
29-J un-14, Eleveators
04-Mar-14, EL 01 & 02
Scaffolding Erection
Separator beams installation
Guide rails
Doors
Machine room Mechanical works
Machine room Electrical works
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 42 of 44 TASK filter: All Activities
Primavera Systems, Inc.
Activity ID Activity Name Original
Duration
Start Finish
EL1060 Roping 10 29-Dec-13 12-J an-14
EL1070 Cabin 10 12-J an-14 27-J an-14
EL1080 Removal of Scaffolding 20 27-J an-14 25-Feb-14
EL1090 Running at High speeds 5 25-Feb-14 04-Mar-14
EL 03 & 04 EL 03 & 04 170 27-Aug-13 01-May-14
EL1100 Scaffolding Erection 40 27-Aug-13 23-Oct-13
EL1110 Separator beams installation 15 24-Oct-13 14-Nov-13
EL1120 Guide rails 30 14-Nov-13 29-Dec-13
EL1130 Doors 20 29-Dec-13 27-J an-14
EL1140 Machine room Mechanical works 10 27-J an-14 10-Feb-14
EL1150 Machine room Electrical works 10 10-Feb-14 25-Feb-14
EL1160 Roping 10 25-Feb-14 11-Mar-14
EL1170 Cabin 10 11-Mar-14 26-Mar-14
EL1180 Removal of Scaffolding 20 26-Mar-14 24-Apr-14
EL1190 Running at High speeds 5 24-Apr-14 01-May-14
EL 05 & 06 EL 05 & 06 170 24-Oct-13 29-J un-14
EL1200 Scaffolding Erection 40 24-Oct-13 21-Dec-13
EL1210 Separator beams installation 15 22-Dec-13 12-J an-14
EL1220 Guide rails 30 12-J an-14 25-Feb-14
EL1230 Doors 20 25-Feb-14 26-Mar-14
EL1240 Machine room Mechanical works 10 26-Mar-14 09-Apr-14
EL1250 Machine room Electrical works 10 09-Apr-14 24-Apr-14
EL1260 Roping 10 24-Apr-14 08-May-14
EL1270 Cabin 10 08-May-14 24-May-14
EL1280 Removal of Scaffolding 20 24-May-14 22-J un-14
EL1290 Running at High speeds 5 22-J un-14 29-J un-14
Post Construc Post Construction 155 13-Feb-14 27-Sep-14
Test ing & Com Test ing & Commissioning 60 22-J un-14 17-Sep-14
TC1000 Electrical system 45 22-J un-14 26-Aug-14
TC1010 BMS system 60 22-J un-14 17-Sep-14
TC1020 CO system 20 22-J un-14 21-J ul-14
TC1030 Chilled water system 30 22-J un-14 04-Aug-14
TC1040 Domestic water system 30 22-J un-14 04-Aug-14
TC1050 Fire fighting system 45 22-J un-14 26-Aug-14
M J J A S O N D J F M A M J J A S O N D
Roping
Cabin
Removal of Scaffolding
Running at High speeds
01-May-14, EL 03 & 04
Scaffolding Erection
Separator beams installation
Guide rails
Doors
Machine room Mechanical works
Machine room Electrical works
Roping
Cabin
Removal of Scaffolding
Running at High speeds
29-J un-14, EL 05 & 06
Scaffolding Erection
Separator beams installation
Guide rails
Doors
Machine room Mechanical works
Machine room Electrical works
Roping
Cabin
Removal of Scaffolding
Running at High speeds
27-Sep-14, P
17-Sep-14, Tes
Electrical system
BMS system
CO system
Chilled water system
Domestic water system
Fire fighting system
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 43 of 44 TASK filter: All Activities
Primavera Systems, Inc.
Activity ID Activity Name Original
Duration
Start Finish
TC1060 Fire alarm system 45 22-J un-14 26-Aug-14
QCDD QCDD 40 31-J ul-14 27-Sep-14
QCDD1000 QCDD Inspection 10 31-J ul-14 14-Aug-14
QCDD1010 Necessary remedial works after inspection 20 14-Aug-14 13-Sep-14
QCDD1020 QCDD approval 10 13-Sep-14 27-Sep-14
Close out Close out 155 13-Feb-14 27-Sep-14
CR1000 Submittal of As built drawings 110 13-Feb-14 23-J ul-14
CR1010 Submittal of O & M manuals 110 13-Feb-14 23-J ul-14
CR1020 UDC forms for substantial completion 10 16-J ul-14 30-J ul-14
CR1030 UDC forms for Occupancy 7 17-Sep-14 27-Sep-14
Snagging & d Snagging & desnagging 150 13-Feb-14 20-Sep-14
SD1000 Sagging Level 1 - 6 15 13-Feb-14 06-Mar-14
SD1010 Desnagging Level 1 - 6 45 08-Mar-14 12-May-14
SD1020 Snagging Level 7 - 12 15 20-Apr-14 12-May-14
SD1030 Desnagging Level 7 - 12 45 12-May-14 16-J ul-14
SD1040 Snagging Level 13 - 18 15 24-J un-14 16-J ul-14
SD1050 Desnagging Level 13 - 18 45 16-J ul-14 20-Sep-14
SD1060 Snagging Level 19 - 20 7 16-J ul-14 27-J ul-14
SD1070 Desnagging Level 19 - 20 30 27-J ul-14 08-Sep-14
SD1080 Snagging Podium 1 - 4 & Amenity Floor 10 16-J ul-14 30-J ul-14
SD1090 Desnagging Podium 1 - 4 & Amenity Floor 30 31-J ul-14 13-Sep-14
M J J A S O N D J F M A M J J A S O N D
Fire alarm system
27-Sep-14, Q
QCDD Inspection
Necessary reme
QCDD appro
27-Sep-14, C
Submittal of As built draw
Submittal of O & M manu
UDC forms for substan
UDC forms fo
20-Sep-14, Sn
Sagging Level 1 - 6
Desnagging Level 1 - 6
Snagging Level 7 - 12
Desnagging Level 7 - 12
Snagging Level 13 - 18
Desnagging Le
Snagging Level 19 - 20
Desnagging Lev
Snagging Podium 1 - 4
Desnagging Pod
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 44 of 44 TASK filter: All Activities
Primavera Systems, Inc.

You might also like