2 Year : 2008-09
15 Delayed period : -
1 to 36
1 to 58
1 to 35
1 to 96
09-04-2009 5-09-2009
1
to 100
1 to 96
1 to 99
1 to
Original- ER No 135/2007-08
Revised- ER No 04/2008-09
Estimate No.
Since Last
Total Previous Measurment Remarks
Item Upto Date Upto date Measurment
Description work RATE Rs. Per (Agreement
No Qty Value
Item No.)
Page Qty Amount Rs. Qty Amount Rs.
CONSTRUCTION OF
COLLECTOR WELL I - 6M
INNER DIA
1 Earthwork excavation above water
level in light or sandy or clay soil for
collector well including levelling the
site -From bed level =69.58m to 87.92 117 M3 10286.64 1/56 87.92 10286.64 0 0.00 TR. No 1
LSWL 68.08m Ist depth.
CONSTRUCTION OF FOOT
BRIDGE FOR COLLECTOR
WELL I - 380M
FOR MATERIALS
CONSTRUCTION OF
COLLECTOR WELL II - 6M
INNER DIA
18
28
CONSTRUCTION OF FOOT
BRIDGE IN COLLECTOR
WELL II - 410M
Since Last
Total Previous Measurment Remarks
Item Upto Date Upto date Measurment
Description work RATE Rs. Per (Agreement
No Qty Value
Item No.)
Page Qty Amount Rs. Qty Amount Rs.
29 Earthwork excavation above Water
Level in light or sandy soil for
infiltration wells ,suction wells etc
including levelling the site with the
initial lead of 10 m and initial lift of TR. No 164
2m etc. complete.
a I depth of 2 m.
3.10 1290 M 3999 22/56 3.10 3999.00 0.00 TR. No 166a
b II depth of 2 m.
9.10 1930 M 17563 22/56 9.10 17563.00 0.00 TR. No 166b
c III depth of 2 m.
14.00 3090 M 43260 22/56 14.00 43260.00 0.00 TR. No 166c
d IV depth of 2 m.
6.00 4950 M 29700 22/56 6.00 29700.00 0.00 TR. No 166d
For MATERIALS
36 Supply and delivery of the following
sizes of DI-K7 & MS pipes as per IS
8329/2000 and including rubber
gaskets as per IS 5382/1985 TR. No 228
standard specification. As per page
5/59
Counter Signed
5445857.11 5525718.31
Form No. MCF 26 TIRUCHIRAPPALLI CITY CORPORATION No Date
CONTRACTORS' JOURNAL VOUCHER
Dept.: Engineering
Name of Contractor Contract Detail M.Book Nos Contract Bill No Date
Trichy Water Supply Improvement Scheme Package III
M/s. IVRCL Improvements to water supply in Ariyamangalam and 044, 053, 056, 057, 058, 059, 060,
Infrastructures & Ponmalaipatty area: Creation of source of collector well - 1 & II, 2nd & Part Bill 30-11-2009
Construction of common sump and laying conveying main from 062, 071, 072
Projects Ltd. collector I and II to Common
and for other recoveries and they have been posted in the respective Sub-Ledgers.
Total Prepared by Checkmeasuring Folio No Folio No.
Budget Officer in Contractors Ledger in Projects
Provision Ledger
SLE
Project Engineer Folio No
Expenditure
Approved by in Projects Ledger
upto this bill
Team Leader
Counter Signed
Folio No
in Contractors Recovery Regr
Accountant Commissioner / Accounts Officer
EE (East) EE (West) City Engineer
27521761 9942496
550435.22 351585 198850 198849.92