DuringtheInfraredThermographicSurveythatwascarriedoutatMaxisBroadbandSdnBhd(NilaiTOC)on

11&14April2014,noHotspotswasdetectedduringthetimeofthesurvey.
Alldefectsidentifiedinthisreportshouldbescheduledforrectificationandtherepairedareasshouldbe
scannedagainaftertheworkshavebeencompleted.
Allequipmentshouldbescheduledforanotherinspectionwithinaminimumof4monthsfromthis
inspectionorearlier,dependingupontheirimportance.
1. FOREWORD
2. SUMMARYOFSURVEY
3. SCHEDULEOFEQUIPMENTCOVEREDINSURVEY
4. INFRAREDTHERMOGRAMS
5. APPENDIXI DATALOG
6. APPENDIXII TYPICALEMISSIVITYVALUESTABLE
7. APPENDIXIII

MAXISBROADBANDSDNBHD(NILAITOC)NILAI
INFRAREDTHERMOGRAPHICTESTING
EFFECTSOFTEMPERATURERISEINELECTRICALCONTACTS&
TERMINATIONSTEMPERATURECRITERIAFORELECTRICALSYSTEMS
DisclaimerClause
InfraredThermographyisanoncontactmethodoftemperaturemeasurementonsurfaces.Temperaturesof
componentswithinenclosurescannotbemeasuredunlessspecialThermographic"Windows"madefrommaterials
whichwouldallowtheInfraredraystopenetrateareinstalled.Brightsurfaceswithlowemissivityareproneto y p g y p
reflections,andtemperaturesonthesesurfacescannotbemeasuredaccuratelyandhencecannotbeguaranteed.Solar
gainonoutdoorsurfacesisanotherfactortoconsiderwhentakingmeasurements,hence,theimportanceofmeasuring
aftersunsettoovercomethisdrawback.
ThisReportprovidesaDocumentationofthe"ANOMALIES"(i.e.abnormallywarmorcool
component)identifiedduringtheInfraredThermographicSurveyoftheElectricalInstallation.
Toidentifyandevaluatetemperatureseverityofelectricalconnections,severalcriteriamaybe
usedi.e.
(i)AbsolutetemperaturecriteriabasedonANSI,IEEE&NEMAorotherinternationalstandardslikeIEC,
etc.
(ii)DeltaTCriteriawhichevaluatesthetemperatureriseabovethetemperatureofadefinedreference.
BasedonouryearsofexperienceinthefieldofInfraredThermography,wehavecomeupwithaRepair
PriorityRatingtablebasedonaDeltaTCriteriaforanomaliesfoundinElectricalInstallations,toprioritize
therepairurgencytherebyprovidingyouwiththegreatestreturnfromyourPredictiveMaintenance
efforts.
ItistobenotedthattheRepairPriorityRatingtablecannotbeusedforMechanicalequipmentduetothe
natureofoperationofmechanicalequipmentwhichareusedfordifferenttypesofapplication.
Operationallimitsofdifferenttypeofmechanicalequipmentwoulddependmostlyonthelimitsgivenby
themanufacturersaswellasmanyfactorsliketypeofmaterials,environment,speed,load,etc.
Bytakingmultiplemeasurementsovertimeorcreatingbaselinetemperaturesofsimilarcomponents
operatingundersimilarconditions,statisticalanalysisisoftenusedtosettheoperationallimitsfortrending
andpredictingthetemperatureperformanceofthemechanicalcomponents.
Inmostcases,care,experienceandgoodjudgementmustbeusedtoidentifyproblemareas.
TheSurveywascarriedoutbyHANAFEEZAINAL CertifiedLevelIThermographer,andtheReporthasbeen
preparedinconjunctionwithLEEMUNWOHCertifiedLevelIIIInfraredThermographer&STCompetent
ElectricalEngineer.
1120C NextScheduleShutdown
DeltaT PriorityRating Maximumtimetorepair
110C N.A.
AnInfraredThermographicSurveywascarriedoutfortheElectricalInstallationat:
MaxisBroadbandSdnBhd(NilaiTOC)on11&14April2014
Duringthesurvey,Thermogramsweretakenofeachindividualboard/equipmentandthenumberstothese
Thermogramsarelistedinthe'EquipmentList:ScheduleofEquipmentCoveredinSurvey'.However,only
selectedTypicalsandHotspotsareprintedoutinthereportandthesearemarkedinBOLDinthelist.The
restoftheThermogramsarenotincludedinthereportbutareincludedintheCDforfuturereference.
NotethattheHighVoltageSwitchgearwerenotthoroughlyinspectedbecauseofcertainlimitations.The
panelsorcompartmentscouldnotbeopenedforinspectionduetosafetyregulations.
Assuch,werecommendthatHighVoltageInfraredWindows(HVIR)beinstalledontotheseHighVoltage
equipment.TheseHVIRWindowswouldallowInfraredraysto'seethrough'thepanelsandthecomponents
withintheequipmentcouldbeinspected.
AsageneralruleforInfraredThermographicSurveysonElectricalInstallations ,thefollowingexperience
basedRepairPriorityRating(RPR)Tablefortemperaturedifferentialsonelectricalconnectionsis
recommended:
>130C VERYHOT
<100C TYPICAL
100130C HOT
Hotspotsexceeding100CareseriousHotspotsandshouldbelookedintoIMMEDIATELY:
>100C IMMEDIATELY
ForCastresinTransformers,thefollowingPriorityRatingisused.Refertothemanufacturerforthe
temperaturedesignlimits.(TemperaturelimitsforMicais160C)
Temperatures PriorityRating
>30C Immediately
Insomecases,theabovePriorityRatingmaynotapply.i.e.TheDeltaTmaynotbemeasurablebutthe
absolutetemperatureishigh.e.g..AnyCopperconductorsurfaceexceeding80Cwillrequireimmediate
action,ascopperoxidizesat80C.
ForanyElectricalComponentexceeding80C,refertothetablebelow:
>80C Immediately
2130C AsSoonAsPossible
FurtherdetailsoftheaboveHotspotscanbefoundonthecorrespondingpagesin'INFRARED
THERMOGRAMS'.OneachThermogrampage,detailsoftheThermogram(i.e..Location,Equipment,
Component)andtheanalysisarelistedbelowtheThermalPictureandassociatedvisiblephoto.
Wherepossible,anomaliesareidentifiedwithalabelatthetimeofinspection.Thisistofacilitatethe
maintenancepersonnelduringtheirrectificationprogram.
Alldefectsidentifiedinthisreportshouldbescheduledforrectificationandtherepairedareasshouldbe
scannedagainaftertheworkshavebeencompleted.
Allequipmentshouldbescheduledforanotherinspectionwithin4monthsfromthisinspectionorearlier,
dependingupontheirimportance.
NoHotspotwasdetectedduringthissurvey.
DESCRIPTION CHECKED NOT THERMOGRAM REMARKS
CHECKED REF.
1 HTROOM

1.1 HTSwitchgear
(FrontView)
P1 Incomer(30AFLC) X
P2 TransformerFeederNo.1(17AFLC) X
P3 TransformerFeederNo.2(13AFLC) X
(RearView)
P1 Incomer(30AFLC) X Ir_5118.jpg
P2 TransformerFeederNo.1(17AFLC) X Ir_5119.jpg
P3 TransformerFeederNo.2(13AFLC) X Ir_5120.jpg
Note:
1.2 TransformerNo.1
LVCableTerminations X Ir_5112.jpg TYPICAL
X Ir_5113.jpg
X Ir_5114.jpg
HTCableTerminations X Ir_5108.jpg TYPICAL
SCHEDULEOFEQUIPMENTCOVEREDINSURVEY
Ir_5117.jpg
TOINSTALLHVIR
WINDOWS
TOINSTALLHVIR
WINDOWS
InternalterminationsforHighVoltageSwitchgearscouldnotbeinspectedasthecoverscouldnotbeopened
forsafetyreasons.Assuch,werecommendthatHighVoltageInfraredWindows(HVIR)beinstalledontothe
compartment.
X Ir_5109.jpg
X Ir_5110.jpg
X Ir_5111.jpg
Core X Ir_5115.jpg
X Ir_5116.jpg
1.3 TransformerNo.2
LVCableTerminations X Ir_5104.jpg
X Ir_5105.jpg TYPICAL
HTCableTerminations X Ir_5099.jpg
X Ir_5100.jpg
X Ir_5101.jpg
X Ir_5102.jpg
X Ir_5103.jpg
X Ir_5106.jpg TYPICAL
Core X Ir_5107.jpg
2 LVROOM

2.1 1600AMSBLVC
P1 MCCB X Ir_4936.jpg
X Ir_4937.jpg
X Ir_4938.jpg
X Ir_4956.jpg
P2 MCCB X Ir_4939.jpg
X Ir_4940.jpg
X I 4957 j X Ir_4957.jpg
Maxis Nilai: 1/7
DESCRIPTION CHECKED NOT THERMOGRAM REMARKS
CHECKED REF.
SCHEDULEOFEQUIPMENTCOVEREDINSURVEY
P3 Isolator X Ir_4941.jpg TYPICAL
Ir_4955.jpg
P4 ACBIncomingMSBLVC(400AFLC/1600ARated) X Ir_4954.jpg TYPICAL
P5 MCCB's X Ir_4942.jpg
X Ir_4943.jpg
X Ir_4944.jpg
P6 Coupler X CANNOTOPEN
P7 MCCB's X Ir_4945.jpg
X Ir_4946.jpg
X Ir_4947.jpg
P8 Isolator(AutoTransferSwitch) X Ir_4948.jpg TYPICAL
X Ir_4953.jpg
P9 ACBIncomingMSBLVNC(300AFLC/1600ARated) X Ir_4952.jpg TYPICAL
P10 MCCB's X Ir_4949.jpg
X Ir_4950.jpg
X Ir_4951.jpg
2.2 SSBMAIN2
P1 MainMCCB X Ir_4962.jpg TYPICAL
P2 400AInputChangeover,MCCB X Ir_4964.jpg
X Ir_4965.jpg
P3 MCCB X Ir_4966.jpg
X Ir_4967.jpg
X Ir_4968.jpg
2.3 SUBMSB3
P1 MCCB's X Ir_4985.jpg
X Ir_4986.jpg
X Ir_4987.jpg
P2 MCCB X Ir_4989.jpg
2.4 SUBMSB4
P1 MCCB's X Ir_4969.jpg
X Ir_4970.jpg
P2 MCCB X Ir_4971.jpg
2.5 SSBMAIN1
P1 MCCB X Ir_4975.jpg
X Ir_4976.jpg
X Ir_4977.jpg
X Ir_4978.jpg
X Ir_4979.jpg
P2 MainMCCB X Ir_4980.jpg
2.6 ToCapacitorBankLeft1 X Ir_4981.jpg
X Ir_4982.jpg
2.7 ToCapacitorBankRight2 X Ir_4983.jpg
X I 4984 j X Ir_4984.jpg
Maxis Nilai: 2/7
DESCRIPTION CHECKED NOT THERMOGRAM REMARKS
CHECKED REF.
SCHEDULEOFEQUIPMENTCOVEREDINSURVEY
2.8 400ASSBACNC X Ir_4958.jpg
2.9 400ASSBACC X Ir_4959.jpg
2.10 250ASSBLP X Ir_4960.jpg
X Ir_4961.jpg
2.11 DBSR X Ir_4973.jpg
X Ir_4974.jpg
2.12 ACPG1G2 X Ir_4972.jpg
3 OFFICE,GROUNDFLOOR
3.1 CORRIDOR
2x10HpAirCondPanel1 X Ir_5003.jpg
X Ir_5004.jpg
X Ir_5005.jpg
2x10HpAirCondPanel2 X Ir_5006.jpg
X Ir_5007.jpg
X Ir_5008.jpg
3.2 OFFICE
AirCondPanel X Ir_5010.jpg
3.3 MDFROOM
DBP01A X Ir_5009.jpg
3.4 CABINNO.3
DB X Ir_5130.jpg
X Ir_5131.jpg
X Ir_5132.jpg
A/CC/P X Ir_5129.jpg
3.5 CABINNO.2
FeelPillar X Ir_5121.jpg
X Ir_5122.jpg
A/CC1&C2StarterPanel X Ir_5123.jpg
X Ir_5124.jpg
3.6 CABINNO.1
DistributionBoard X Ir_5125.jpg
X Ir_5126.jpg
X Ir_5127.jpg
X Ir_5128.jpg
Maxis Nilai: 3/7
DESCRIPTION CHECKED NOT THERMOGRAM REMARKS
CHECKED REF.
SCHEDULEOFEQUIPMENTCOVEREDINSURVEY
4 1STFLOOR,SWITCHROOM
4.1 DBPAC X Ir_5018.jpg
X Ir_5019.jpg
X Ir_5020.jpg
4.2 ACPOFF4toF6 X Ir_5016.jpg
X Ir_5017.jpg
4.3 ACPOFF1toF3 X Ir_5015.jpg
4.4 UPS1DB00 X Ir_5021.jpg
X Ir_5022.jpg
4.5 DBLPF X Ir_5023.jpg
X Ir_5024.jpg
X Ir_5025.jpg
4.6 DBIN(B)
P1 MCCB X Ir_5030.jpg
P2 CTCompartment X Ir_5031.jpg
X Ir_5032.jpg
P3 MCCB X Ir_5033.jpg
X Ir_5034.jpg
4.7 DBIN(A)
P1 MCCB X Ir_5027.jpg
P2 CTCompartment X Ir_5028.jpg
X Ir_5029.jpg
4.8 DBIN7.5(A) X Ir_5035.jpg
X Ir_5036.jpg
4.9 DBIN7.5(B) X OFF
4.10 PDU/SW/A1 X Ir_5013.jpg
4.11 PDU/SW/B1 X Ir_5014.jpg
4.12 DBBOARD X Ir_5026.jpg
5 2NDFLOOR,SWITCHROOM

5.1 AC/03/R4/5 X Ir_5040.jpg


5.2 AC/04/R4/5 X Ir_5039.jpg
Maxis Nilai: 4/7
DESCRIPTION CHECKED NOT THERMOGRAM REMARKS
CHECKED REF.
SCHEDULEOFEQUIPMENTCOVEREDINSURVEY
5.3 400ADBSSS
P1 Isolator X Ir_5050.jpg
P2 SeriesSurgeSuppressorCompartment X Ir_5051.jpg
X Ir_5052.jpg
5.4 400ADBBT1
P1 MCCB's X Ir_5043.jpg
X Ir_5044.jpg
X Ir_5045.jpg
P2 ChangeoverIsolator X Ir_5049.jpg
P3 SeriesSurgeSuppressorCompartment X Ir_5053.jpg
X Ir_5054.jpg
5.5 400ADBBT2
P1 MCCB's X Ir_5041.jpg
X Ir_5042.jpg
X Ir_5047.jpg
P2 ChangeoverIsolator X Ir_5046.jpg
X Ir_5048.jpg
P3 SeriesSurgeSuppressorCompartment X Ir_5055.jpg
X Ir_5056.jpg
5.6 PDU/SW/A2 X Ir_5037.jpg
5.7 PDU/SW/B2 X Ir_5038.jpg
6 DCPLANTROOM
6.1 DBUPS2(OUT) X Ir_5063.jpg
6.2 UPS1DB01 X Ir_5064.jpg
6.3 FromSSBLPDBS8/S9 X NOTINSPECTED
6.4 ACP1 X Ir_5065.jpg
6.5 ACPOFS1toS5 X Ir_5084.jpg
X Ir_5085.jpg
6.6 AirCondDB1 X Ir_5083.jpg
6.7 DBLPS X Ir_5082.jpg
6.8 DBUPS3(OUT) X Ir_5068.jpg
6.9 AC04R15 X Ir_5070.jpg
X Ir_5071.jpg
X Ir_5072.jpg
6.10 AirCondDB2 X Ir_5069.jpg
Maxis Nilai: 5/7
DESCRIPTION CHECKED NOT THERMOGRAM REMARKS
CHECKED REF.
SCHEDULEOFEQUIPMENTCOVEREDINSURVEY
6.11 DBBT3FROMDBSSS
P1 SeriesSurgeSuppressor X Ir_5077.jpg
X Ir_5078.jpg
P2 MCCB X Ir_5073.jpg
X Ir_5076.jpg
P3 MCCB X Ir_5074.jpg
X Ir_5075.jpg
6.12 150AChangeoverIsolator X Ir_5062.jpg
6.13 150ADBUPS(IN) X Ir_5061.jpg
6.14 150ADBUPS(OUT) X Ir_5059.jpg
X Ir_5060.jpg
6.15 UPSDistributionSSB1 X Ir_5057.jpg
6.16 DBUPS2(IN) X Ir_5066.jpg
6.17 UPSDistributionSSB2 X Ir_5067.jpg
6.17 GalaxyPowerSystemBay1 X Ir_5082.jpg
6.17 GalaxyPowerSystemBay2 X Ir_5081.jpg
6.17 GalaxyPowerSystemBay X Ir_5079.jpg
7 3RDFLOOR,SWITCHROOM
7.1 PDU/SW/A3 X Ir_5088.jpg
7.2 PDU/SW/B3 X Ir_5089.jpg
7.3 DBLPT X Ir_5090.jpg
7.4 NEWDB X Ir_5086.jpg
7.5 UPS1DB02 X Ir_5090.jpg
7.6 DBUPS X Ir_5092.jpg
7.7 Z1/W4/AC/03/R4/T X Ir_5093.jpg
X Ir_5094.jpg
7.8 Z1/W4/AC/04/R4/T X Ir_5095.jpg
X Ir_5096.jpg
7.9 MapRoom
Z1/W1/AC/02/RS/T X I 5097 j Z1/W1/AC/02/RS/T X Ir_5097.jpg
Maxis Nilai: 6/7
DESCRIPTION CHECKED NOT THERMOGRAM REMARKS
CHECKED REF.
SCHEDULEOFEQUIPMENTCOVEREDINSURVEY
8 MGEUPSROOM1
8.1 DBUPSOut/1 X Ir_4990.jpg
X Ir_4991.jpg
8.2 DBASTS1 X Ir_4992.jpg
X Ir_4993.jpg
8.3 DBUPSMain3 X Ir_4994.jpg
X Ir_4995.jpg
9 MGEUPSROOM2
9.1 DBUPSOut/2 X Ir_4997.jpg
X Ir_4998.jpg
9.2 DBASTS2 X Ir_4999.jpg
X Ir_5000.jpg
9.3 DBUPSMain4 X Ir_5001.jpg
X Ir_5002.jpg
9.4 DBSPUPS X NOTINSPECTED
10 GUARDHOUSE
10.1 DBGH X Ir_5098.jpg
Maxis Nilai: 7/7
0.0C
27.7C
0
10
20
SP01 SP02
SP03 LI01
0
10
20
Line Min Max Cursor
li01 4.0C 13.0C -
C IR01
FILENAME: Ir_4941.jpg

LOCATION: LV ROOM

EQUIPMENT: 1600A MSB-LVC

COMPONENT: P3 - Isolator, Busbar Terminations - TYPICAL

REMARKS:
ACTION: N.A.
Reference Spot 1: 12.7C

Reference Spot 2: 12.7C

Reference Spot 3: 12.0C

Date: 11/04/2014

Time: 10:13:51 AM

Scanner: FLIR E60

Emissivity: 0.60

Atm. Temp: 27.0C

Distance: 1.0 m

REPAIR PRIORITY RATING:
No abnormal temperatures noted.
MAXIS TOC NILAI

-9.0C
16.1C
0
10
SP01
SP02 SP03
LI01
0
10
Line Min Max Cursor
li01 0.0C 7.5C -
C IR01
FILENAME: Ir_4948.jpg

LOCATION: LV ROOM

EQUIPMENT: 1600A MSB-LVC

COMPONENT: P8 - Isolator (Auto Transfer Switch),

Busbar Terminations - TYPICAL
REMARKS:
ACTION: N.A.
Reference Spot 1: 7.0C

Reference Spot 2: 7.0C

Reference Spot 3: 6.3C

Date: 11/04/2014

Time: 10:20:47 AM

Scanner: FLIR E60

Emissivity: 0.60

Atm. Temp: 27.0C

Distance: 1.0 m

REPAIR PRIORITY RATING:
No abnormal temperatures noted.
MAXIS TOC NILAI

-5.2C
22.7C
0
10
20
SP01
SP02
SP03
SP04
FILENAME: Ir_4952.jpg

LOCATION: LV ROOM

EQUIPMENT: 1600A MSB-LVC

COMPONENT: P9 - ACB Incoming MSB-LVNC (300A FLC/1600A Rated),

Cable Terminations - TYPICAL
REMARKS:
ACTION: N.A.
Reference Spot 1: 11.7C

Reference Spot 2: 12.0C

Reference Spot 3: 11.6C

Reference Spot 4: 19.0C

Date: 11/04/2014

Time: 10:24:14 AM

Scanner: FLIR E60

Emissivity: 0.80

Atm. Temp: 30.0C

Distance: 1.0 m

REPAIR PRIORITY RATING:
No abnormal temperatures noted.
Note that SP04 is a reflection of the heat from thermographer and is not a Hotspot.
MAXIS TOC NILAI

0.0C
29.7C
0
10
20
SP01
SP02
SP03
FILENAME: Ir_4954.jpg

LOCATION: LV ROOM

EQUIPMENT: 1600A MSB-LVC

COMPONENT: P4 - ACB Incoming MSB-LVC (400A FLC/1600A Rated),

Cable Terminations - TYPICAL
REMARKS:
ACTION: N.A.
Reference Spot 1: 16.9C

Reference Spot 2: 18.3C

Reference Spot 3: 16.6C

Date: 11/04/2014

Time: 10:28:47 AM

Scanner: FLIR E60

Emissivity: 0.80

Atm. Temp: 30.0C

Distance: 1.0 m

REPAIR PRIORITY RATING:
No abnormal temperatures noted.
MAXIS TOC NILAI

-0.6C
22.0C
0
10
20
SP01
SP02
SP03
LI01
0
10
20
Line Min Max Cursor
li01 12.3C 14.9C -
C IR01
FILENAME: Ir_4962.jpg

LOCATION: LV ROOM

EQUIPMENT: SSB-MAIN 2

COMPONENT: P1 - Main MCCB, Busbar Terminations - TYPICAL

REMARKS:
ACTION: N.A.
Reference Spot 1: 14.2C

Reference Spot 2: 13.5C

Reference Spot 3: 14.4C

Date: 11/04/2014

Time: 10:38:56 AM

Scanner: FLIR E60

Emissivity: 0.80

Atm. Temp: 30.0C

Distance: 1.0 m

REPAIR PRIORITY RATING:
No abnormal temperatures noted.
MAXIS TOC NILAI

14.4C
55.0C
20
30
40
50
SP01
SP02
SP03
FILENAME: Ir_5105.jpg

LOCATION: HT ROOM

EQUIPMENT: Transformer No.2

COMPONENT: LV Cable Terminations - TYPICAL

REMARKS:
ACTION: N.A.
Reference Spot 1: 36.7C

Reference Spot 2: 37.0C

Reference Spot 3: 36.4C

Date: 14/04/2014

Time: 11:16:13 AM

Scanner: FLIR E60

Emissivity: 0.80

Atm. Temp: 30.0C

Distance: 1.0 m

REPAIR PRIORITY RATING:
No abnormal temperatures noted.
MAXIS TOC NILAI

0.0C
65.8C
0
20
40
60
SP01
SP02
3
SP04: 59.4C
FILENAME: Ir_5106.jpg

LOCATION: HT ROOM

EQUIPMENT: Transformer No.2

COMPONENT: HT Cable Terminations - TYPICAL

REMARKS:
ACTION: N.A.
Reference Spot 1: 33.8C

Reference Spot 2: 34.6C

Reference Spot 3: 33.0C

Date: 14/04/2014

Time: 11:17:54 AM

Scanner: FLIR E60

Emissivity: 0.80

Atm. Temp: 30.0C

Distance: 1.0 m

REPAIR PRIORITY RATING:
No abnormal temperatures noted.
Note that SP04 is on the Transformer Core Support and is not a Hotspot
MAXIS TOC NILAI

0.0C
70.0C
0
20
40
60
SP01
SP02
SP03
FILENAME: Ir_5108.jpg

LOCATION: HT ROOM

EQUIPMENT: Transformer No.1

COMPONENT: HT Cable Terminations - TYPICAL

REMARKS:
ACTION: N.A.
Reference Spot 1: 36.7C

Reference Spot 2: 36.3C

Reference Spot 3: 65.9C

Date: 14/04/2014

Time: 11:22:14 AM

Scanner: FLIR E60

Emissivity: 0.80

Atm. Temp: 30.0C

Distance: 1.0 m

REPAIR PRIORITY RATING:
No abnormal temperatures noted.
Note that SP03 is on the Transformer Core and is not a Hotspot.
MAXIS TOC NILAI

0.0C
73.0C
0
20
40
60
SP01
SP02
SP03
SP04: 61.4C
FILENAME: Ir_5113.jpg

LOCATION: HT ROOM

EQUIPMENT: Transformer No.1

COMPONENT: LV Cable Terminations - TYPICAL

REMARKS:
ACTION: N.A.
Reference Spot 1: 41.2C

Reference Spot 2: 44.7C

Reference Spot 3: 41.5C

Date: 14/04/2014

Time: 11:25:11 AM

Scanner: FLIR E60

Emissivity: 0.60

Atm. Temp: 30.0C

Distance: 1.0 m

REPAIR PRIORITY RATING:
No abnormal temperatures noted.
Note that SP04 is on the Transformer Core Support and is not a Hotspot.
MAXIS TOC NILAI