Professional Documents
Culture Documents
NEXT GENERATION
LIGHTING
SOLUTIONS
Fans
Home Appliances
Lighting
Orient Electric
A division of Orient Paper & Industries (Ltd)
82, 1st Floor, Okhla Industrial Estate,
Phase III, New Delhi-110020.
Email: customer.connect@orientelectric.com
Website: www.orientelectric.com
Customer Care No.: 1800 103 7574
For over sixty years, weve strived to delight you with something new.
In the process, not only have we become the largest manufacturer and
exporter of fans, but also paved the way for groundbreaking developments
in home appliances and lighting.
True to tradition, were delighted to present our next generation avatar.
Crafted like works of art, these intelligent and energy-efficient lighting
solutions bring to you a wide arrray of functional benefits. Upgrade today
and enter a world of unparalleled innovation.
PRODUCT CODIFICATION
AQ
42
LED
LED Tile 2x2
P: Pendent
System power
AQUA
(product family name)
Color temperature
(Cool day light)
Recess mounting
The products are assigned Catalogue nos. based lamp type, Luminaire type, Mounting, Family name
and wattage of the lamp used.
For example
3 6: 36W
1 5: 15W
L: LED
1 2 0: 120W
G: Gear
1 1 0: 110W
0 7 0: 70W
4 5: 45W
T: Tile
D: Down lighter
S: Street Light
W: Warm white
H: Highbay
N: Neutral White
F: Flood Light
W: Well glass
E: Emergency
L: Land Scape
LIGHTING
FOR HOMES
Different parts of your home set different moods and thus need different lighting
solutions. Thats where our handpicked range of designs come into play. From walls
through to ceilings to that dim light under the staircase, give every part of your personal
space your personal touch.
ETERNAL
SHINE
ETERNAL
SPOT
0.5W - Eternal Shine
Long Life upto 10* years 50% more energy saving as compared to CFL
Under normal working of 8 hrs a day No mercury content
No heat generation Operation volt 220-240V
ETERNAL
SLEEK RECESSED
ETERNAL
SLEEK WALL
MOUNTED
LED Wall Mount Surface Panel Light - Round and Square Shaped
Energy Efficient Not Dimmable Ultra-slim design Seamless fitting Formed metal front & back cover
Provides ideal light control an extreme homogeneous light distribution well-being in offices,
hotels, industrial areas, shops & lobbies
ETERNAL
iBALL
ETERNAL
LUNA
ETERNAL
ORILINA
LIGHTING
FOR OFFICES
Orient Electric unfolds an array of solutions which is the most ideal replacement for the
existing lighting in offices and commercial spaces. Excellent energy-saving and
maintenance-free operation, with some equipment even exhibiting features like glare-free
light. An incredibly smart line-up of innovative lighting solutions!
POWERLINE
32
28
1199
Electrical Specifications
Input Power
Operating
Voltage range
Input Current
PF
THD
Surge
Protection
18W
120-265V AC
0.07-0.09A
0.9
20%
3kv
Housing
Optics
Protection
Lumen Output
Extruded powder
coated aluminium
Extruded
polycarbonate
opal diffuser
IP20
1400Lm
Specifications
POWERLINE-18W LED retrofit tube which offers excellent energy saving and
maintenance-free operation is an ideal solution for replacing T8 fluorescent lamps
in the existing luminaires. POWERLINE is featured with long lasting LED light
sources having high luminous efficacy and highly translucent optical system to
ensure maximum light output with excellent glare control and uniformity.
Applications
Commercial buildings I Residential buildings I Other indoor applications
Product
Code
LRT8-18--C
System
Power (W)
18
Rated
Voltage (V)
Input Current
(A)
Weight
(Kg)
CCT
(K)
CRI
240
0.08
0.3
5500
>70
27
35
TASKLINE
1150
Electrical Specifications
Input Power
Operating
Voltage range
Input Current
PF
THD
Surge
Protection
14W
120-265V AC
0.06-0.08A
0.9
20%
3kv
Housing
Optics
Protection
Lumen Output
Extruded powder
coated aluminium
Extruded
polycarbonate
opal diffuser
IP20
1200Lm
Specifications
TASKLINE-18W LED slim batten which offers excellent energy saving and
maintenance-free operation is an ideal solution for using against battens with
T5 lamps. TASKLINE is featured with long lasting LED light sources having high
luminous efficacy and highly translucence optical system to ensure maximum
light output with excellent glare control and uniformity.
Applications
Commercial buildings I Residential buildings I Other indoor applications
Product
Code
LBLN-14-C
System
Power (W)
14
Rated
Voltage (V)
Input Current
(A)
Weight
(Kg)
240
0.07
0.17
CCT
(K)
5500
CRI
>70
MARS
Electrical Specifications
Input Power
15W
Operating
Voltage range
Input Current
PF
THD
Surge
Protection
120-265V AC
0.06-0.09A
0.9
10%
4kv
Mounting
Protection
Lumen Output
CUT-OUT
IP20
1200Lm
150mm
CCT
(K)
CRI
Specifications
Housing
Ring
Optics
Aluminium
pressure
die cast
ABS white
PMMA diffuser
(PC optional)
Spring loaded SS
brackets provided
for installation
in the false ceiling
Applications
Commercial buildings I Hospitals I Residential buildings I Other indoor applications
Product
Code
LDRMS-15-C
System
Power (W)
15
Rated
Voltage (V)
Input Current
(A)
240
0.07
Weight
(Kg)
6000
>70
AQUA
70
595
595
Electrical Specifications
Input Power
36W
Operating
Voltage range
Input Current
PF
THD
Surge
Protection
120-265V AC
0.14-0.16A
>0.9
<10%
2kV
Optics
Mounting
Protection
Lumen Output
CUT-OUT
PMMA diffuser
(PC optional)
IP20
2900Lm
580 x 580mm
(for POP
/Gypsum ceiling)
Specifications
Housing
CRCA, white
powder coated
Applications
Offices I BPOs I Hospitals I Banks I Meeting rooms I Other indoor applications
Product
Code
System
Power (W)
Rated
Voltage (V)
Input Current
(A)
Weight
(Kg)
CCT
(K)
LTRAQ-36-C
36
240
0.15
6000
>80
LTRAQ-36-N
36
240
0.15
4000
>80
CRI
AQUA-36W The LED 2x2 tile is a recessed mounted general lighting solution for
offices which offers excellent energy saving and maintenance-free operation. This
product is featured with long lasting LED light sources having high luminous efficacy
and highly translucent optical system to ensure maximum light output with
excellent glare control and uniformity. AQUA has a unique design of opal diffuser
with large window for wider and more uniform illumination on the working plane.
LIGHTING
FOR INDUSTRY
Manufacturing units and warehouses spend a whole lot of moolah every month on
electricity bills. Well, weve got some good news in this regard too! Highly-efficient,
energy-saving solutions to replace your existing industrial lighting with are finally here!
Our range of cutting-edge industrial lighting also features, among others, LED high-bay
lighting for the high ceilings in industrial spaces.
230
PINNACLE
380
Electrical Specifications
Input Power
Operating
Voltage range
Input Current
PF
THD
Surge
Protection
110W
120-265V AC
0.47-0.50A
0.9
10%
Mounting
Protection
Lumen Output
IP65
(housing)
8000
Specifications
Housing
Front
Cover
Optics
Aluminium
pressure
die cast
Toughened glass
Anodized
aluminium
reflector
SBracket provided
for chain
suspension or
surface mounting
Applications
Warehouses I Industrial sheds I Hyper supermarkets
Product
Code
System
Power (W)
Rated
Voltage (V)
Input Current
(A)
LHPN-110-C
110
240
0.48
Weight
(Kg)
CCT
(K)
CRI
5500
>70
LIGHTING
FOR STREET
Its about time we started opting for energy-saving solutions when it comes to
streetlights! Orient Electrics varied assortment of street lighting which includes
innovations like LED streetlights, LED architectural streetlights and LED floodlights is
precisely that. High performance and excellent energy saving a street lighting
solution par excellence!
FIESTA
Electrical Specifications
Input Power
Operating
Voltage range
Input Current
PF
THD
Surge
Protection
45W
120-265V AC
0.18-0.21A
0.9
10%
Mounting
Protection
Distribution
Lumen Output
IP65
(housing)
Batwing (1350/850)
3000Lm
Specifications
Housing
Front
Cover
Optics
Aluminium
pressure
die cast
Toughened glass
In-built pole
entry for 50 mm OD
pipe
Applications
Road lighting I Campus lighting I Industrial estates I Open parkings I Circulating areas
Product
Code
LSFS-045-C
System
Power (W)
45
Rated
Voltage (V)
Input Current
(A)
240
0.20
Weight
(Kg)
CCT
(K)
5000
CRI
>70
DEGREE OF PROTECTION
Description
Short Definition
Non-Protected
No special protection
Protected against
dripping water
Non-protected
No special protection
Protected against
solid objects greater
than 50 mm
Protected against
dripping water when
tilted up to 15 degree
Protected against
solid objects greater
than 12 mm
Protected against
splashing water
Protected against
solid objects greater
than 2.5 mm
Protected against
splashing water
Protected against
solid objects greater
than 1.0 mm
Protected against
water jets
Dust-protected
Protected against
heavy seas
Protected against
submersion
Dust-tight
No ingress of dust
Code of practice for internal illumination - General requirement & recommendations for working interiors
Type of Interior or activity
Average Service
illuminance in lux
1.1
1.1.1
1.1.2
1.1.3
1.1.4
1.1.5
1.1.6
1.1.7
1.1.8
1.1.9
1.1.10
1.1.11
General Plan
Turbine Houses (Operating floor).................................................................................................................................................................................. 200
Boiler and Turbine Houses basements ......................................................................................................................................................................100
Boiler houses, platforms, areas around burners ..................................................................................................................................................100
Switch rooms, meter rooms, oil plant rooms, HV Substations (indoor) ............................................................................................150
Control rooms................................................................................................................................................................................................................................ 300
Relay and Telecommunication rooms ...................................................................................................................................................................... 300
Diesel Generator Rooms, compressor rooms ........................................................................................................................................................150
Pump Houses, water treatment plant houses ......................................................................................................................................................150
Battery rooms, chargers, rectifiers ................................................................................................................................................................................100
Precipitator chambers, platforms, etc ..........................................................................................................................................................................100
Cable tunnes & basements, circulating water culverts and screen chambers, ............................................................................ 50
storage tanks (Indoor), operating areas and filling points at outdoor tank
1.2
1.2.1
1.2.2
Coal Plant
Conveyors, gantries, junction towers, unloading hoppers, ash handling plants, ........................................................................100
settling pits, dust hoppers outlets
Other areas where operators may be in attendance......................................................................................................................................150
1.3
1.3.1
Nuclear Plants
Gas circulation bays, reactor area, boiler platform, reactor charges and discharge face....................................................150
Metal Manufacture
2.1
2.1.1
Iron Making
Sinter Plant: Plant Floor, Mixer Drum, Fan House, Screen Houses .................................................................................................... 200
Coolers Transfer Stations......................................................................................................................................................................................................150
Furnaces, cupola
General ................................................................................................................................................................................................................................................150
Control Platforms ...................................................................................................................................................................................................................... 300
Conveyor Galleries, Walkways ............................................................................................................................................................................................ 50
2.1.2
2.2
2.2.1
2.2.2
2.2.2.1
2.2.2.2
2.2.2.3
2.2.2.4
Steel Making
Electric Melting Shops ............................................................................................................................................................................................................ 200
Basic Oxygen Steel making plants
General ................................................................................................................................................................................................................................................150
Convertor Floor, teeming Bay .......................................................................................................................................................................................... 200
Control platforms........................................................................................................................................................................................................................ 300
Scrap Bays ........................................................................................................................................................................................................................................150
2.3
2.3.1
2.3.2
2.3.3
2.3.4
2.3.5
2.4
2.4.1
2.4.1.1
2.4.1.2
2.4.1.3
2.4.1.4
2.4.1.5
2.4.2
2.4.2.1
2.4.2.2
2.4.2.3
2.4.2.4
Foundries
Automatic plant .............................................................................................................................................................................................................................. 50
Without Manual Operation....................................................................................................................................................................................................150
With ocassional Manual Operation .............................................................................................................................................................................. 200
With continous Manual Operation
Control Room ................................................................................................................................................................................................................................ 300
Control Platforms ...................................................................................................................................................................................................................... 300
Non-Automatic Plants
Charging Floor, pouring, shaking out, cleaning, grinding fettling ........................................................................................................ 300
Rough moulding, rough core making .......................................................................................................................................................................... 300
Fine Moulding, fine core making .................................................................................................................................................................................... 500
Inspection ........................................................................................................................................................................................................................................ 500
2.5
2.5.1
2.5.2
Ceramic
3.1
Concrete Products
Mixing Casting Cleaning........................................................................................................................................................................................................ 200
3.2
3.2.1
3.2.2
Potteries
Grinding, Moulding, pressing, cleaning, trimming, glazing, firing ............................................................................................................ 300
Enamelling, colouring .............................................................................................................................................................................................................. 750
3.3
3.3.1
3.3.2
3.3.3
3.3.4
Glass Works
Furnance rooms, bending, annealing ............................................................................................................................................................................150
Mixing rooms, forming, cutting, grinding, polishing, toughening ............................................................................................................ 300
Bevelling, decorative cutting, etching, silvering.................................................................................................................................................. 500
Inspection ........................................................................................................................................................................................................................................ 500
Chemicals
4.1
4.1.1
4.1.2
4.1.3
4.1.4
4.1.5
4.1.6
4.1.7
4.2
4.2.1
4.2.2
4.2.2.1
4.2.2.2
4.2.2.3
Continued
4.2.2.4
4.3
4.3.1
4.3.2
4.3.3
4.3.4
Soap Manufacture
General Area.................................................................................................................................................................................................................................. 300
Automatic Process .................................................................................................................................................................................................................... 200
Control panels .............................................................................................................................................................................................................................. 300
Machines .......................................................................................................................................................................................................................................... 300
4.4
4.4.1
4.4.2
4.4.3
4.4.4
4.4.5
Paint work
General .............................................................................................................................................................................................................................................. 300
Automatic Process .................................................................................................................................................................................................................... 200
Control panels .............................................................................................................................................................................................................................. 300
Special Batch mixing .............................................................................................................................................................................................................. 750
Colour Matching ........................................................................................................................................................................................................................ 1000
5.8
5.8.1
5.8.2
5.8.3
5.8.4
5.9
5.9.1
5.9.2
5.9.3
Plating Shops
Vats and baths ............................................................................................................................................................................................................................ 300
Buffing, Polishing burnishing.............................................................................................................................................................................................. 500
Final Buffing and Polishing ................................................................................................................................................................................................ 750
6.1
6.1.1
6.1.4
6.2
6.2.1
6.2.1.1
6.2.1.2
6.2.1.3
6.2.1.4
6.2.1.5
6.2.2
6.2.2.1
6.2.2.2
7.1
7.1.1
7.1.2
Slaughter Houses
General .............................................................................................................................................................................................................................................. 300
Inspection ........................................................................................................................................................................................................................................ 500
7.2
7.2.1
7.2.2
7.2.3
7.2.3.1
7.2.3.2
7.2.3.3
7.2.4
7.2.4.1
7.2.4.2
Mechanical Engineering
5.1
5.1.1
5.1.2
5.2
5.2.1
5.2.2
5.3
5.3.1
5.3.2
5.3.3
5.3.4
5.4
5.4.1
5.4.2
5.5
5.5.1
5.5.2
5.5.3
5.6
5.6.1
5.6.2
5.6.3
5.6.4
5.6.5
Assembly Shops
Rough Work for example frame and heavy machine assembling...................................................................................................... 300
Medium Work for example, engine assembly vehicle body assembly.............................................................................................. 500
Fine work for example, office machinery assembly ...................................................................................................................................... 750
Very fine work for example, instrument assembly........................................................................................................................................ 1000
Minute work for example, watch making .............................................................................................................................................................. 1500
5.7
5.7.1
5.7.2
5.7.3
5.7.4
5.7.5
6.1.2
6.1.3
Continued
7.3
7.3.1
7.3.2
7.3.3
7.3.4
7.4
7.4.1
7.4.2
7.5
7.6
7.6.1
7.6.2
Bakeries
General .............................................................................................................................................................................................................................................. 300
Hand Decoration and Icing ................................................................................................................................................................................................ 500
7.7
7.7.1
7.7.2
7.7.3
7.8
7.8.1
7.8.2
Tobacco processing
Material Prepartion and making and packing ...................................................................................................................................................... 500
Hand Processes .......................................................................................................................................................................................................................... 750
Textiles
8.1
8.1.1
8.1.2
Fibre Prepartion
Bale Breaking and washing................................................................................................................................................................................................ 300
Stock dying and tinting.......................................................................................................................................................................................................... 300
8.2
8.2.1
8.2.2
Yam Manufacture
Spining, roving, winding, etc............................................................................................................................................................................................... 500
Healding .......................................................................................................................................................................................................................................... 1000
8.3
8.3.1
8.3.2
8.3.2.1
8.3.2.2
8.3.2.3
8.3.2.4
8.3.2.5
8.3.2.6
Fabric Production
Knitting .............................................................................................................................................................................................................................................. 500
Weaving
Jute and Hamp.............................................................................................................................................................................................................................. 300
Heavy woolens............................................................................................................................................................................................................................ 500
Medium worsted, fine woolens, cottons.................................................................................................................................................................. 750
Fine worsted, fine linens & synthetics .................................................................................................................................................................... 1000
Mending .......................................................................................................................................................................................................................................... 1500
Inspection ...................................................................................................................................................................................................................................... 1500
8.4
8.4.1
8.4.2
8.4.3
8.4.3.1
8.4.3.2
Fabric finishing
Dyeing ................................................................................................................................................................................................................................................ 300
Calendering, Chemical Treatment etc. ...................................................................................................................................................................... 500
Inspection
Grey Cloth ...................................................................................................................................................................................................................................... 1000
Final .................................................................................................................................................................................................................................................... 1500
8.5
8.5.1
8.5.2
8.5.3
8.5.4
8.5.4.1
8.5.4.2
Carpet manufacture
Winding, Beaming ...................................................................................................................................................................................................................... 300
Setting pattern, Tufting Croping, Trimmimg, Fringing, Latexing, and Latex dying .................................................................. 500
Designing, Weaving, Mending .......................................................................................................................................................................................... 750
Inspection
General ............................................................................................................................................................................................................................................ 1000
Piece dying...................................................................................................................................................................................................................................... 750
Leather Industry
9.1
9.1.1
9.1.2
Leather manufacture
Cleaning, Tanning and Stretching vats and Cutting, Fleshing stuffing ............................................................................................ 300
Finishing, Scarfing ...................................................................................................................................................................................................................... 500
9.2
9.2.1
9.2.2
9.2.3
Leather Working
General .............................................................................................................................................................................................................................................. 300
Pressing, glazing.......................................................................................................................................................................................................................... 500
Cutting, spliting, scarfing, sewing .................................................................................................................................................................................. 750
10
10.1
10.1.1
10.1.2
10.1.3
10.1.4
10.1.5
10.1.6
10.1.7
Clothing Manufacture
Prepration of cloth .................................................................................................................................................................................................................... 300
Cutting ................................................................................................................................................................................................................................................ 750
Matching............................................................................................................................................................................................................................................ 750
Sewing.............................................................................................................................................................................................................................................. 1000
Pressing ............................................................................................................................................................................................................................................ 500
Inspection ...................................................................................................................................................................................................................................... 1500
Hand Tailoring ............................................................................................................................................................................................................................ 1500
10.2
10.2.1
10.2.2
10.2.3
10.2.4
10.2.5
10.2.6
10.3
10.3.1
10.3.2
10.3.3
10.3.4
Glove manufacture
Sorting and Grading.................................................................................................................................................................................................................. 750
Pressing, Knitting, Cutting.................................................................................................................................................................................................... 500
Sewing................................................................................................................................................................................................................................................ 750
Inspection ...................................................................................................................................................................................................................................... 1500
10.4
10.4.1
10.4.2
10.4.3
10.4.4
Hat manufacture
Stifening, braiding, refing, forming, sizing, pounding, ironing.................................................................................................................... 300
Cleaning, flanging, finishing ................................................................................................................................................................................................ 500
Sewing................................................................................................................................................................................................................................................ 750
Inspection ...................................................................................................................................................................................................................................... 1500
Continued
10.5
10.5.1
10.5.2
10.5.3
10.5.4
10.5.5
10.5.6
10.5.6.1
10.5.6.2
11
11.1
11.1.1
11.1.2
11.1.3
Sawmills
General .............................................................................................................................................................................................................................................. 200
Head saw ........................................................................................................................................................................................................................................ 500
Grading .............................................................................................................................................................................................................................................. 750
11.2
11.2.1
11.2.2
11.2.3
Woodwork Shops
Rough sawing Bench Work ................................................................................................................................................................................................ 300
Sizing, planning, sanding, medium machining and bench work .............................................................................................................. 500
Fine Bench and Machine Work, fine sanding, finish ........................................................................................................................................ 700
11.3
11.3.1
11.3.2
11.3.3
11.3.4
11.3.5
11.3.6
11.3.6.1
11.3.6.2
11.3.7
11.3.7.1
11.3.7.2
11.3.7.3
Furniture manufacture
Raw material Stores ..................................................................................................................................................................................................................100
Finished Goods Store................................................................................................................................................................................................................150
Wood matching and assembly, rough sawing, cutting.................................................................................................................................. 300
Machining, sandingand assembly, polishing .......................................................................................................................................................... 500
Tool rooms ...................................................................................................................................................................................................................................... 500
Spray booths
Colour finishing ............................................................................................................................................................................................................................ 500
Clear finishing................................................................................................................................................................................................................................ 300
Cabinet making
Vaneer Sorting and Grading ............................................................................................................................................................................................ 1000
Marquetry, pressing, patching and fitting................................................................................................................................................................ 500
Final Inspection............................................................................................................................................................................................................................ 750
11.4
11.4.1
11.4.2
11.4.3
11.4.4
11.4.5
Upholstry Manufacturing
Cloth inspection ........................................................................................................................................................................................................................ 1500
Filing, covering.............................................................................................................................................................................................................................. 500
Slipping, cutting, sewing........................................................................................................................................................................................................ 750
Assembly .......................................................................................................................................................................................................................................... 500
Tape edging.................................................................................................................................................................................................................................. 1000
12
12.1
12.1.1
12.1.2
12.1.2.1
12.1.2.2
12.1.2.3
12.1.3
12.1.3.1
12.1.3.2
Paper Mills
Pup mills, preparabon plants ............................................................................................................................................................................................ 300
Paper and board making
General .............................................................................................................................................................................................................................................. 300
Automatic process .................................................................................................................................................................................................................... 200
Inspection, sorting .................................................................................................................................................................................................................... 500
Paper convecting processes
General .............................................................................................................................................................................................................................................. 300
Associated Printrig.................................................................................................................................................................................................................... 500
12.2
12.2.1
12.2.1.1
12.2.1.2
12.2.2
12.2.2.1
12.2.2.2
12.2.2.3
12.2.2.4
12.2.2.3
12.2.2.6
12.2.2.7
12.2.2.8
12.2.3
12.2.3.1
12.2.3.2
12.2.3.3
12.2.4
12.2.4.1
12.2.4.2
12.2.4.3
12.2.5
12.2.5.1
12.2.5.2
Printing Works
Type foundries
Matrix making, dressing type, hand and machine coating ........................................................................................................................ 300
Front assembly, sorting ........................................................................................................................................................................................................ 750
Composing rooms
Hand composing, imposition and distribution...................................................................................................................................................... 750
Hot metal keyboard ................................................................................................................................................................................................................ 750
Hot metal casting ...................................................................................................................................................................................................................... 300
Photo composing keyboard setters ............................................................................................................................................................................ 500
Paste up ............................................................................................................................................................................................................................................ 750
Illuminated tables - general lighting............................................................................................................................................................................ 300
Proof presses ................................................................................................................................................................................................................................ 500
Proof Reading .............................................................................................................................................................................................................................. 750
Graphic Reproduction
General .............................................................................................................................................................................................................................................. 500
Precision proofing, retouching, etching .................................................................................................................................................................. 1000
Colour reproduction and inspection .......................................................................................................................................................................... 1000
Printing machine room
Presses ............................................................................................................................................................................................................................................ 500
Premake ready ............................................................................................................................................................................................................................ 500
Printed sheet inspection .................................................................................................................................................................................................... 1000
Binding
Folding, pasting, punching and stitching .................................................................................................................................................................. 500
Cutting, assenting, embossing ........................................................................................................................................................................................ 750
13
13.1
13.1.1
13.1.1.1
13.1.1.2
13.1.1.3
13.1.1.4
13.1.1.5
13.1.2
13.1.2.1
13.1.2.2
13.1.2.3
Plastic Products
Automatic Products
Without manual control ............................................................................................................................................................................................................ 50
With occasional manual control........................................................................................................................................................................................100
With continuous manual control .................................................................................................................................................................................... 300
Control rooms................................................................................................................................................................................................................................ 300
Control platforms........................................................................................................................................................................................................................ 300
Non-automatic plant
Mixing, calendering, extrusion, injection, compression and blow moulding, sheet fabrication...................................... 300
Trimming, cutting, polshng, cementing ...................................................................................................................................................................... 500
Printing, inspection.................................................................................................................................................................................................................. 1000
13.2
13.2.1
13.2.2
13.2.3
13.2.4
Rubber Products
Stock preparation plasticizing, milling ........................................................................................................................................................................ 200
Calendering, fabric preparation, stock cutting .................................................................................................................................................... 500
Extruding, moulding.................................................................................................................................................................................................................. 500
Inspection ...................................................................................................................................................................................................................................... 1000
14
14.1
14.1.1
14.1.2
14.1.3
14.1.4
14.2
14.2.1
14.2.2
14.2.3
14.2.3.1
14.2.3.2
14.2.3.3
14.2.3.4
14.3
14.3.1
14.3.2
14.3.3
Cold stores
General .............................................................................................................................................................................................................................................. 300
Breakdown, make-up and despatch............................................................................................................................................................................ 300
Loading bays ..................................................................................................................................................................................................................................150
I5
16.3
16.3.1
16.3.2
16.3.3
16.3.4
Laundries
Commercial laundries
Receiving, sorting, wasting, drying, ironing, despatch, dry cleaning, bulk machine work .................................................. 300
Head ironing, pressing, mending, spatting, inspection .................................................................................................................................. 500
Launderettes ................................................................................................................................................................................................................................ 300
16.4
16.4.1
16.4.2
17
Retailing
17.1
Commerce
17.2
15.1
15.1.1
15.1.2
15.1.3
15.1.4
15.1.5
15.1.6
Offices
General offices ............................................................................................................................................................................................................................ 300
Deep plan general offices.................................................................................................................................................................................................... 500
Computer work stations ...................................................................................................................................................................................................... 300
Conference rooms, executive offices ........................................................................................................................................................................ 300
Computer and data preparation rooms .................................................................................................................................................................... 300
Fling rooms...................................................................................................................................................................................................................................... 200
17.3
17.3.1
17.3.2
17.3.3
17.3.4
18
15.2
15.2.1
15.2.2
15.2.3
15.3
15.3.1
15.3.2
Drawing offices
General .............................................................................................................................................................................................................................................. 300
Drawing boards .......................................................................................................................................................................................................................... 500
Print rooms...................................................................................................................................................................................................................................... 200
Banks and Building societies
Counter, office area.................................................................................................................................................................................................................. 300
Public area ...................................................................................................................................................................................................................................... 200
18.1
18.2
18.2.1
18.2.2
18.2.3
18.2.4
18.2.5
16
Services
18.3
18.3.1
18.3.2
18.3.3
18.3.4
18.3.5
18.3.6
Churches
Body of church ..............................................................................................................................................................................................................................150
Pulpit, lectern ................................................................................................................................................................................................................................ 300
Choir stalls ...................................................................................................................................................................................................................................... 300
Alter, communion table, chancel ......................................................................................................................................................................................150
Vestries................................................................................................................................................................................................................................................150
Organ .................................................................................................................................................................................................................................................. 300
18.4
18.4.1
18.4.1.1
18.4.1.2
18.4.2
18.4.2.1
18.4.2.2
Hospitals
Anaesthatic rooms
General .............................................................................................................................................................................................................................................. 300
Local .................................................................................................................................................................................................................................................. 1000
Consulting areas
General .............................................................................................................................................................................................................................................. 300
Examination.................................................................................................................................................................................................................................. 1000
16.1
16.1.1
16.1.2
16.1.3
16.1.4
16.1.5
16.1.5.1
16.1.5.2
Garages
Interior parking area .................................................................................................................................................................................................................... 30
General repairs, servicing, washing, polishing...................................................................................................................................................... 300
Workbench ...................................................................................................................................................................................................................................... 500
Spray booths ................................................................................................................................................................................................................................ 500
External apron
General .................................................................................................................................................................................................................................................. 50
Pump area (retail Sales)............................................................................................................................................................................................................ 30
16.2
16.2.1
16.2.1.1
16.2.1.2
16.2.1.3
16.2.1.4
Appliances Servicing
Workshop
General .............................................................................................................................................................................................................................................. 300
Workbench ...................................................................................................................................................................................................................................... 500
Counter .............................................................................................................................................................................................................................................. 300
Stores .................................................................................................................................................................................................................................................. 300
Continued
18.4.3
18.4.3.1
18.4.4
18.4.4.1
18.4.4.2
18.4.4.3
18.4.4.4
18.4.5
18.4.5.1
18.4.5.2
18.4.6
18.4.6.1
18.4.6.2
18.4.7
18.4.7.1
18.4.7.2
18.4.7.3
18.4.7.4
18.4.7.5
18.4.7.6
18.4.8
18.4.8.1
18.4.8.2
18.4.9
18.4.9.1
18.4.9.2
18.4.9.3
18.4.10
18.4.10.1
18.4.10.2
18.4.11
18.4.11.1
18.4.11.2
18.4.11.3
18.4.11.4
18.4.11.5
18.4.12
18.4.12.1
18.4.12.2
18.4.12.3
17.4.13
18.4.13.1
18.4.13.2
18.4.14
18.4.14.1
18.4.14.2
18.4.14.3
18.4.14.4
18.4.15
18.4.15.1
18.4.15.2
18.4.15.3
18.4.15.4
Corridors
General ................................................................................................................................................................................................................................................150
Ward Corridors
Day, Screened from bays .................................................................................................................................................................................................... 200
Day, Open to natural light .................................................................................................................................................................................................. 200
Morning / Evening........................................................................................................................................................................................................................150
Night ........................................................................................................................................................................................................................................................ 10
Cubicles
General .............................................................................................................................................................................................................................................. 300
Treatment...................................................................................................................................................................................................................................... 1000
Examination..............................................................................................................................................................................................................................................
General .............................................................................................................................................................................................................................................. 300
Local inspection ........................................................................................................................................................................................................................ 1000
Intensive therapy
Bad head .............................................................................................................................................................................................................................................. 50
Circulation between bed ends ..........................................................................................................................................................................................100
Observation .................................................................................................................................................................................................................................... 300
Local observation .................................................................................................................................................................................................................... 1000
Staff base (day) .......................................................................................................................................................................................................................... 300
Staff base (night)............................................................................................................................................................................................................................ 30
Laboratories
General .............................................................................................................................................................................................................................................. 300
Examination.................................................................................................................................................................................................................................... 500
Nurses stations
Morning / Day / Evening ...................................................................................................................................................................................................... 300
Night desks ........................................................................................................................................................................................................................................ 30
Night, medical trolleys..............................................................................................................................................................................................................100
Operating theatres
General .............................................................................................................................................................................................................................................. 500
Local ..............................................................................................................................................................................................................................................50000
Pathology departments
General .............................................................................................................................................................................................................................................. 300
Examination.................................................................................................................................................................................................................................... 500
Pharmacies...................................................................................................................................................................................................................................... 300
Reception / enquiry.................................................................................................................................................................................................................. 300
Recovery rooms.......................................................................................................................................................................................................................... 300
Ward-circulation
Day ..........................................................................................................................................................................................................................................................100
Morning / Evening........................................................................................................................................................................................................................100
Night ............................................................................................................................................................................................................................................................5
Ward-bed head
Morning / Evening.......................................................................................................................................................................................................................... 50
Reading................................................................................................................................................................................................................................................150
Night
Adult ............................................................................................................................................................................................................................................................ 1
Paediatric.................................................................................................................................................................................................................................................. 1
Psychiatric................................................................................................................................................................................................................................................5
Watch ..........................................................................................................................................................................................................................................................5
X-Ray areas
General .............................................................................................................................................................................................................................................. 200
Diagnostic ........................................................................................................................................................................................................................................ 200
Operative .......................................................................................................................................................................................................................................... 300
Process dark room ........................................................................................................................................................................................................................ 50
18.4.16
18.4.16.1
18.4.16.2
18.4.17
18.4.17.1
18.4.17.2
18.4.18
18.4.18.1
18.4.18.2
18.4.18.3
18.4.18.4
Surgeries
General .............................................................................................................................................................................................................................................. 300
Waiting rooms ................................................................................................................................................................................................................................150
Dental Surgeries
Chair.......................................................................................................................................................................................................................... Special Lighting
Laboratories .................................................................................................................................................................................................................................. 500
Consulting rooms
General .............................................................................................................................................................................................................................................. 300
Desk...................................................................................................................................................................................................................................................... 500
Examination couch.................................................................................................................................................................................................................... 500
Ophthalmic wall and near-vision carts ...................................................................................................................................................................... 500
18.5
18.5.1
18.5.2
18.5.3
18.5.4
18.5.5
18.5.6
Hotels
Entrance halls ................................................................................................................................................................................................................................100
Reception, cashier's and porter's desks .................................................................................................................................................................. 300
Bars, coffee base, dining rooms, grill rooms, restaurants, lounges .................................................................................................... 200
Cloak rooms, baggage rooms..............................................................................................................................................................................................100
Bed rooms............................................................................................................................................................................................................................................ 50
Bathroom............................................................................................................................................................................................................................................100
18.6
18.6.1
18.6.1.1
18.6.1.2
18.6.1.3
18.6.1.4
18.6.1.5
18.6.2
18.6.2.1
18.6.2.2
18.6.3
18.6.3.1
18.6.3.2
18.6.3.3
18.6.3.4
18.6.3.5
18.6.4
18.6.4.1
18.6.4.2
18.6.5
18.6.5.1
18.6.5.2
18.6.5.3
Libraries
Lending Library
General .............................................................................................................................................................................................................................................. 300
Counters............................................................................................................................................................................................................................................ 500
Bookshelves ....................................................................................................................................................................................................................................150
Reading rooms ............................................................................................................................................................................................................................ 300
Reading tables.............................................................................................................................................................................................................................. 300
Catalogues ................................................................................................................................................................................................................................................
Card ........................................................................................................................................................................................................................................................150
Microfiche / Visual display units ......................................................................................................................................................................................150
Reference libraries ..............................................................................................................................................................................................................................
General .............................................................................................................................................................................................................................................. 300
Counters............................................................................................................................................................................................................................................ 500
Bookshelves ....................................................................................................................................................................................................................................150
Study Tables, Carrels .............................................................................................................................................................................................................. 500
Map room ........................................................................................................................................................................................................................................ 300
Display and exhibition areas ......................................................................................................................................................................................................
Exhibits insensitive to light ................................................................................................................................................................................................ 300
Exhibits sensitive to light, for example, picutres, Prints rare books in archives ........................................................................150
Library workrooms
Book repair and binding ........................................................................................................................................................................................................ 500
Catalogue and sorting ............................................................................................................................................................................................................ 500
Remote book stores ..................................................................................................................................................................................................................150
18.7
18.7.1
18.7.2
18.7.3