Commissioning Sequence Progress Check Sheet

System: LSI Chilled Water Systems


Overview: A 20 inch chilled water supply and return line comes from the tunnel into the second
level mechanical room. The system then splits into three pumped tertiary loops, one for the Lab
and Office Chilled ater !ystem, one for the "ivarium Chilled ater !ystem, and one for the
#rocess Chilled ater !ystem.
The "ivarium Chilled ater !ystem uses pumps C$#%& and ' and serves A$(%&, ', ), and *
on the second level.
The #rocess Chilled ater !ystem uses pumps C$#%) and * and serves A$(%+, 2, ,, and -
on the second level.
The Lab and Office Chilled ater !ystem uses pumps C$#%+ and 2 and serves A$(%., +0,
++, and +2 in the penthouse/ A$(%+& at the first floor/ fan coil units on level 2/ environmental
room condensin0 units on levels &, ', ), and */ lab e1uipment 23%20 on level &/ and A$(%+) on
level &.
4var4www4apps4conversion4tmp4scratch5+42'0*,.'0+.doc
L!6
-4-420+'
Commissioning Sequence Progress Check Sheet
System: Vivarium Chilled Water Systems
C7 !e1uence:
6nitial ac8nowled0ment and date when item is complete.
Ac8nowled0ements
Owner Contractor
!hop 9rawin0s Approved
55555 "alves
55555 #umps C$#%&, '
55555 :a;or Components 9elivered
55555 #re%6nstallation Chec8list Completed <#umps=
55555 55555 6nstallation 6nstructions #rovided
55555 55555 #ipe 4 #ump ali0nment confirmed
(: C7 to view before boltin0 pipe to pump flan0es.
55555 6nstallations Complete
55555 Controls Complete <subcontractor=
55555 Controls Complete <(: 99C=
55555 #ressure Testin0 Complete
55555 55555 >lushin04Cleanin0 #lan !ubmitted4Approved
55555 55555 >lushin0 Complete
55555 55555 #re%start Chec8 !heet Complete
55555 55555 !tart ? up @otification !ubmitted
55555 55555 >unctional Testin0 Chec8 !heet Complete
55555 55555 Trainin0 !cheduled
55555 55555 Trainin0 Completed
55555 All #unch%list 6tems Completed
55555 55555 Contract Commissionin0 Ae1uirements Completed
4var4www4apps4conversion4tmp4scratch5+42'0*,.'0+.doc
L!6
-4-420+'
Commissioning Sequence Progress Check Sheet
System: Process Chilled Water Systems
C7 !e1uence:
6nitial ac8nowled0ment and date when item is complete.
Ac8nowled0ements
Owner Contractor
!hop 9rawin0s Approved
55555 "alves
55555 #umps C$#%), *
55555 :a;or Components 9elivered
55555 #re%6nstallation Chec8list Completed <#umps=
55555 55555 6nstallation 6nstructions #rovided
55555 55555 #ipe 4 #ump ali0nment confirmed
(: C7 to view before boltin0 pipe to pump flan0es.
55555 6nstallations Complete
55555 Controls Complete <subcontractor=
55555 Controls Complete <(: 99C=
55555 #ressure Testin0 Complete
55555 55555 >lushin04Cleanin0 #lan !ubmitted4Approved
55555 55555 >lushin0 Complete
55555 55555 #re%start Chec8 !heet Complete
55555 55555 !tart ? up @otification !ubmitted
55555 55555 >unctional Testin0 Chec8 !heet Complete
55555 55555 Trainin0 !cheduled
55555 55555 Trainin0 Completed
55555 All #unch%list 6tems Completed
55555 55555 Contract Commissionin0 Ae1uirements Completed
4var4www4apps4conversion4tmp4scratch5+42'0*,.'0+.doc
L!6
-4-420+'
Commissioning Sequence Progress Check Sheet
System: Lab and Office Chilled Water Systems
C7 !e1uence:
6nitial ac8nowled0ment and date when item is complete.
Ac8nowled0ements
Owner Contractor
!hop 9rawin0s Approved
55555 "alves
55555 #umps C$#%+, 2
55555 :a;or Components 9elivered
55555 #re%6nstallation Chec8list Completed <#umps=
55555 55555 6nstallation 6nstructions #rovided
55555 55555 #ipe 4 #ump ali0nment confirmed
(: C7 to view before boltin0 pipe to pump flan0es.
55555 6nstallations Complete
55555 Controls Complete <subcontractor=
55555 Controls Complete <(: 99C=
55555 #ressure Testin0 Complete
55555 55555 >lushin04Cleanin0 #lan !ubmitted4Approved
55555 55555 >lushin0 Complete
55555 55555 #re%start Chec8 !heet Complete
55555 55555 !tart ? up @otification !ubmitted
55555 55555 >unctional Testin0 Chec8 !heet Complete
55555 55555 Trainin0 !cheduled
55555 55555 Trainin0 Completed
55555 All #unch%list 6tems Completed
55555 55555 Contract Commissionin0 Ae1uirements Completed