TANSFORMER
Proposed Rates
Sl. No. DESCRIPTION OF WORKS UNIT
(Amount in Rs )
5 MVA 600.00
Providing new CRGO lamination to the core in Rs. 280 for all
6 place of damaged lamination wherever necessary Kgs. capacity up to 20
including cost of materials and labour. MVA
5 MVA 11000.00
6.3 MVA 11000.00
8 MVA 16500.00
Repair and overauling of OLTC/Divertor switch 10 MVA 16500.00
including change of oil, lubrication and 12.5 MVA 22000.00
7 a)
replacement of gaskets and other parts which are
locally available
16/20 MVA 22000.00
5 MVA 12000.00
Cleaning, Repairing and painting inside the
Transformer Tank with hot oil bath and acid proof
epoxy paint and painting outside the tank with 6.3 MVA 12000.00
8
enamel paint after thorough cleaning including
8 MVA 14500.00
the cost of materials including the painting of
radiators at site/Firm. 10 MVA 22000.00
12.5 MVA 22000.00
16/20 MVA 24000.00
5 MVA 11000.00
6.3 MVA 11000.00
8 MVA 16500.00
9 Re assembly of Core and winding 10 MVA 31000.00
12.5 MVA 35000.00
16/20 MVA 38500.00
5 MVA 14000.00
Drying out the assembly of core and winding in 6.3 MVA 14000.00
oven/ vacuum chamber, till the specified 8 MVA 21000.00
10
insulation resistance values are obtained 10 MVA 39000.00
(including cost of materials and labour) 12.5 MVA 45000.00
16/20 MVA 49000.00
Proposed Rates
Sl. No. DESCRIPTION OF WORKS UNIT
(Amount in Rs )
5 MVA 8250.00
Tanking the assembly, giving connection,
6.3 MVA 16500.00
providing new gaskets and insulating materials
conforming to relevant ISS, putting back the 8 MVA 16500.00
cover, tightening the fixtures, fixing the bushing 10 MVA 16500.00
11 12.5 MVA 22000.00
etc., including the cost of all materials like
Gasket, insulating materials, Bolts and Nuts etc.,
and labour. Other accessories at repairers work 16/20 MVA 22000.00
to facilitate the testing.