Professional Documents
Culture Documents
ii) Supplying and back filling with external hard murrum Rates as per Latest KPWD SR + 10%
CMT
soil with proper consolidation including lead and lift. extra
ii) For Plain terrian KM 8685 4030 3760 with coyote ACSR
a) Anchoring single span upto 320 mtrs. 1 Span 6285 3135 2685 with coyote ACSR
b) Anchoring 2 span interval upto 640 mtrs with 1 tangent 3330 with coyote
2 Spans 7835 3910
tower only ACSR
c) Anchoring 3 span interval up to 960 mtrs with two 3905 with Coyote
3 Spans 9425 4710
tangent towers only ACSR
v) For each additional 11KV panel out door type/Kiosk Each 7535
1. Using 10 MT Lorry
Rs.35/- per KM, subject to a Min. of Rs.
i) 1 to 50 KMs
8220/-
ii) 51 to 100 KMs Min + Rs. 27/- per KM
iii) 101 to 150 KMs Min + Rs. 20/- per KM
iv) Beyond 150 KMs Min + Rs. 13/- per KM
2. Using 10 MT Truck & Trailor
Rs.35/- per KM, subject to a Min. of Rs.
i) 1 to 50 KMs
16437/-
ii) 51 to 100 KMs Min + Rs. 27/- per KM
iii) 101 to 150 KMs Min + Rs. 20/- per KM
iv) Beyond 150 KMs Min + Rs. 13/- per KM
3. Using 11 to 20 MT Truck & Trailor.
Rs. 275/- per KM, subject to a Min. of Rs.
i) 1 to 50 KMs
20546/-
ii) 51 to 100 KMs Min + Rs. 240/- per KM
iii) 101 to 150 KMs Min + Rs. 130/- per KM
iv) Beyond 150 KMs Min + Rs. 116/- per KM
4. Using 21 MT to 40 MT Truck & Trailor.
Rs. 308/-per KM, subject to a Min. of Rs.
i) 1 to 50 KMs
24656/-
ii) 51 to 100 KMs Min + Rs. 192/- per KM
iii) 101 to 150 KMs Min + Rs. 165/- per KM
iv) Beyond 150 KMs Min + Rs. 137/- per KM
5. Using 41 MT to 80 MT Truck & Trailor.
Rs. 308/-per KM, subject to a Min. of Rs.
i) 1 to 50 KMs
27395/-
ii) 51 to 100 KMs Min + Rs. 192/- per KM
iii) 101 to 150 KMs Min + Rs. 165/- per KM
iv) Beyond 150 KMs Min + Rs. 137/- per KM
6. Using 81 MT to 120 MT Truck & Trailor.
Rs. 336/- per KM, subject to a Min. of Rs.
i) 1 to 50 KMs
29568/-
Rs. 336/- per KM, subject to a Min. of Rs.
ii) 51 to 100 KMs
29568/-
iii) 101 to 150 KMs Min + Rs. 168/- per KM
iv) Beyond 150 KMs Min + Rs.146/- per KM
Mobilisation charges of IDLE Transportation applicable
for places where heavy duty trucks are not available, is
Per KM 15
admissible in addition to (a) as far as possible full load
shall be transported.
b) Transportation of other materials 25% of the above
Sl.
c) Transportation by Head Load wherever there is no accessability for
transportation by vehicle for transmission line works only.
Page 17 of 23
Rate as Proposed 2006-07
No. Discription Unit 220 110 66 33
KV KV KV KV
d) Using light vehicle including fuel, oil, lubricants and
Prevailing Board approved
crew subject to a minimum of 100 Kms per day in case of Per Day
Rates
break down/ subject to prior approval of CEE(MW).
40 Loading and Unloading
a) Loading of Power Trs, CT's. PT's Breakers, C&R Panels,
11KV Switchgears, wavetrap, coupling capacitors, HT UG
MT 845
Cables, Insulators, ACSR Conductor, Ground Conductors,
etc.,
43 Dismantling