You are on page 1of 6

AIR-CONDITIONING & REFRIGERATION EXPERIMENTAL EQIUPMENT

KTENG CORPORATION | 2013



NO. EQUIPMENT NAME MODEL

Car Air-Conditioner (A/ C) Experiment
Equipment
KTE-9000AU

I . IMAGE



Appearance and specifications may be changed by the upgrade.

I I . FEATURE

1. It is easy to do a testing, repairing and operating of air condition system for
vehicle, because it is similar to real air condition module of vehicle
2. This apparatus helps user to understand about each part and can measure
a cooling performance for vehicle air conditioner
3. And can monitor a real time by using a PC because of setting of the
pressure and temperature sensor at the low and high pressure
(temperature) areas.
4. Pressure gauge is installed at a manifold gauge of the low and high
pressure (temperature)areas, so tester see a pressure as quantity of
refrigerants
I I I . SPECIFICATION

1. The driving power and the heat source of vehicle air conditioner
(1) Engine substitution: AC 220V 3Phase 5HP (4KW) class Motor (Max
3,500RPM) using.
(2) Fan operating power: DC 12V
2. Vehicle air condition system
(1) Using at the air condition module of the Avante class(in South of Korea)
(2) Fan driving power: DC 12V
3. Composition
(1) Air condition system : Compressor, Condenser, EVA Assembly, Flexible
Hose of High Compression, Flexible Hose of Low Compression, Drier,
Air conditioner S/W, FAN(DC12V), Valve, refrigerant R134a
(2) Power system : AC 220V 3Phase 5HP Motor, The other establish parts
(3) Many kinds of the sensor & the trainer: A pressure & temperature
sensor, the cross point sequence board of vehicle air handling unit,
system monitoring program.
4. T-type thermocouple 1.5m up to 9EA (basis specification)
5. The pressure sensor (-1 ~ 35bar) 2EA (basis specification)
6. Performance Automatic Measuring Equipment
(1) Refrigerator Performance Automatic Measuring Equipment (KTE-100DA)
(2) Data Acquisition and System Monitoring Program (KTE-100SMP)
1) Function : Monitoring the measured data of temperature and
pressure in real time, and enthalpy on a diagram of the
refrigeration system in real time, and factors like as refrigeration
effect, compressor work, condensing heat in condenser,
evaporating latent heat, amount of flash gas at expansion V/V
outlet, dry ratio at expansion V/V outlet, humidity at expansion V/V
outlet, coefficient of performance in the abstract with temperature
and pressure data which are measure in real time, and being saved
data all of temperature, pressure and enthalpy on every minute as
excel
2) Composition: Main Page, Sector for display of temperature data,
graph chart of temperature, display of pressure data, graph chart
of pressure, flowing diagram of the refrigeration system, display
K
T
E
N
G

K
T
E
-
9
0
0
0
A
U

9













P
T
.

G
r
a
h
a

E
l
e
k
t
r
o

T
a
m
a

J
a
k
a
r
t
a
,

t
:

+
6
2

2
1

3
8
5
-
6
6
3
6


e
:

j
a
k
a
r
t
a
@
g
r
a
h
a
e
l
e
k
t
r
o
t
a
m
a
.
c
o
m

|

S
u
r
a
b
a
y
a
,

t
:

+
6
2

3
1

5
3
4
-
8
0
7
1

e
:

s
u
r
a
b
a
y
a
@
g
r
a
h
a
e
l
e
k
t
r
o
t
a
m
a
.
c
o
m
AIR-CONDITIONING & REFRIGERATION EXPERIMENTAL EQIUPMENT
KTENG CORPORATION | 2013

the P-H chart of the refrigeration system on real time, setting
interval for saving data, and Run/Stop operation

I V. ACCESSORIES, GUARANTEE AND DELIVERY

1. Power Cable: 1EA
2. Connection Cable: 1EA
3. Banana jack: Red 20EA, Black 20EA
4. Manual book: 1EA
5. DA-100 Software: 1EA
6. Delivery: 3Month
7. Guarantee: For 1 year


9
K
T
E
N
G

K
T
E
-
9
0
0
0
A
U













P
T
.

G
r
a
h
a

E
l
e
k
t
r
o

T
a
m
a

J
a
k
a
r
t
a
,

t
:

+
6
2

2
1

3
8
5
-
6
6
3
6


e
:

j
a
k
a
r
t
a
@
g
r
a
h
a
e
l
e
k
t
r
o
t
a
m
a
.
c
o
m

|

S
u
r
a
b
a
y
a
,

t
:

+
6
2

3
1

5
3
4
-
8
0
7
1

e
:

s
u
r
a
b
a
y
a
@
g
r
a
h
a
e
l
e
k
t
r
o
t
a
m
a
.
c
o
m
AIR-CONDITIONING & REFRIGERATION EXPERIMENTAL EQIUPMENT
KTENG CORPORATION | 2013

NO. EQUIPMENT NAME MODEL
Refrigeration PLC Control Training Kit KTE-4000PL

I . IMAGE


Appearance and specifications may be changed by the upgrade.

I I . FEATURE

1. Should possible PLC experimentation & training begin to progress at the
refrigeration & air-conditioning industry.
2. Should be cording into a computer for experiment on programming about
air conditioning and refrigeration using in industrial field.
3. Should be available to study on software program about basic refrigeration
system, defrosting system, heat pump system, binary refrigeration system,
and brine refrigeration system.
I I I . SPECIFICATION

4. Automatic Control Device
(1) GLOFA G7M-DR30A
1) Operation process speed: 0.1(0.5) /Step
2) Maximum control point: 80 point
3) Program capacity: 68Kbyte
4) Function: PID, HSC, Position settlement, Cnet etc.
(2) N.F.B (30A, single, 220V)
(3) S.M.P.S (Output 24V)
(4) AC Lamp: Red
(5) Buzzer (DC24V)
(6) Lamp: Red, Green, Yellow
(7) Toggle Switch
(8) Push Button (1a)
(9) Select Switch

I V. ACCESSORIES, GUARANTEE AND DELIVERY

1. Lead Wire: 1set to 5EA & 1,500mm Wire 1set
2. PLC Serial Cable: 1EA
3. Manual book 1EA
4. Delivery: 3Month
5. Guarantee: For 1 year


9
K
T
E
N
G

K
T
E
-
9
0
0
0
A
U













P
T
.

G
r
a
h
a

E
l
e
k
t
r
o

T
a
m
a

J
a
k
a
r
t
a
,

t
:

+
6
2

2
1

3
8
5
-
6
6
3
6


e
:

j
a
k
a
r
t
a
@
g
r
a
h
a
e
l
e
k
t
r
o
t
a
m
a
.
c
o
m

|

S
u
r
a
b
a
y
a
,

t
:

+
6
2

3
1

5
3
4
-
8
0
7
1

e
:

s
u
r
a
b
a
y
a
@
g
r
a
h
a
e
l
e
k
t
r
o
t
a
m
a
.
c
o
m
AIR-CONDITIONING & REFRIGERATION EXPERIMENTAL EQIUPMENT
KTENG CORPORATION | 2013

NO. EQUIPMENT NAME MODEL
Refrigeration Sequence Control Training Kit KTE-4000SQ

I . IMAGE


Appearance and specifications may be changed by the upgrade.

I I . FEATURE

1. Trainee must be able to practice the skill related with control of Temperature,
Pressure, Power, and defrost. Also every practice must be connected with a
mechanical refrigeration system using PC cable using.
2. To adopt safe DC24V input power experiment and practice must be done.
3. Connect each of the following issues in favor of frozen copyright registered
in the system using the original materials that it must be done.
(1) Qualification to perform a function
1) Practice for wiring work
2) Lab experiments with the primary circuit to drive the switch
configuration
3) Magnetic Switch (MC) with "a" "b" contact the circuit configuration
driving experiments and practices
4) Using a thermal overload relay, circuit configuration driving
experiments and practices
5) circuit configuration driving experiments and practices for c
contact using a Relay(Ry)
6) circuit configuration driving experiments and practices for AND
7) circuit configuration driving experiments and practices for OR
8) circuit configuration driving experiments and practices for NOT
9) circuit configuration driving experiments and practices for NAND
10) circuit configuration driving experiments and practices for NOR
11) circuit configuration driving experiments and practices for rock up
circuit using a MC
12) circuit configuration driving experiments and practices for inter rock
13) circuit configuration driving experiments and practices for low
temperature control using a temperature switch
14) circuit configuration driving experiments and practices for high
temperature control using a temperature switch
15) circuit configuration driving experiments and practices for low
pressure control using a low pressure switch(LPS)
16) circuit configuration driving experiments and practices for high
pressure control using a high pressure switch(HPS)
17) circuit configuration driving experiments and practices for cutting out
high pressure control
(2) Craft skill program for Air conditioning and refrigeration
1) 1 Experimental practice of motor running or reversing using
Interlock circuit
2) 2 Experimental practice of motor running or reversing using
Interlock circuit
3) Experimental practice motor operation using a Timer (instant
running)
4) Experimental practice motor operation using a Timer (instant
running) and a flicker relay
5) Experimental practice AUTO or MANUAL operation using a select
switch
6) 1 Experimental practice motor ON or OFF operation using a A
contact push button

9
K
T
E
N
G

K
T
E
-
9
0
0
0
A
U













P
T
.

G
r
a
h
a

E
l
e
k
t
r
o

T
a
m
a

J
a
k
a
r
t
a
,

t
:

+
6
2

2
1

3
8
5
-
6
6
3
6


e
:

j
a
k
a
r
t
a
@
g
r
a
h
a
e
l
e
k
t
r
o
t
a
m
a
.
c
o
m

|

S
u
r
a
b
a
y
a
,

t
:

+
6
2

3
1

5
3
4
-
8
0
7
1

e
:

s
u
r
a
b
a
y
a
@
g
r
a
h
a
e
l
e
k
t
r
o
t
a
m
a
.
c
o
m
AIR-CONDITIONING & REFRIGERATION EXPERIMENTAL EQIUPMENT
KTENG CORPORATION | 2013

7) 2 Experimental practice motor ON or OFF operation using a A
contact push button
8) 3 Experimental practice motor ON or OFF operation using a A
contact push button
9) Experimental practice motor running or reversing operation using a
Timer (instant running)
(3) Skill competition problem for air conditioning and refrigeration
1) 1Automatic control circuit of temperature for refrigerator
2) 2Automatic control circuit of temperature for refrigerator
3) Hot gas defrosting system using a timer and a solenoid valve
4) Circuit configuration for hot gas defrosting system and manual pump
down
5) Circuit configuration when power is Off

(4) Temperature, pressure, and defrost control system
1) Circuit configuration for low temperature control and adjusting of
Temperature switch
2) Circuit configuration for low pressure control and adjusting of
Pressure switch
3) Circuit configuration for high pressure control and adjusting of
refrigerator
4) Experimental practice configuration circuit for low temperature
control of refrigerator
5) Configuration pump down circuit and operation in basic refrigeration
system
6) Configuration hot gas defrosting circuit and operation
(5) Refrigerant parallel expansion refrigeration system
1) Configuration temperature automatic control circuit for "refrigerant
parallel expansion refrigeration system" and operation
2) Configuration temperature manual control circuit for "refrigerant
parallel expansion refrigeration system" and operation
3) Configuration temperature pump down control circuit for "refrigerant
parallel expansion refrigeration system" and operation
4) Configuration compulsory pump down control circuit and operation
(6) Evaporation pressure parallel control refrigeration system
1) Configuration manual control circuit for "Evaporation pressure
parallel control refrigeration system" and operation
2) Configuration automatic control circuit for "Evaporation pressure
parallel control refrigeration system" and operation
3) Configuration pump down control circuit for "Evaporation pressure
parallel control refrigeration system" and operation
4) Configuration compulsory pump down control circuit for
"Evaporation pressure parallel control refrigeration system" and
operation
(7) Brine refrigeration system
1) Configuration manual control circuit for "brine refrigeration system"
and operation
2) Configuration temperature automatic control circuit for "brine
refrigeration system" and operation
3) Configuration pump down control circuit for "brine refrigeration
system" and operation
4) Configuration compulsory pump down control circuit for "brine
refrigeration system" and operation
(8) Heat pump refrigeration system
1) Configuration circuit reversing refrigerant flow direction using
manual V/V for "heat pump refrigeration system" and operation
2) Configuration manual control circuit (self-control) for "cooling and
heating heat pump refrigeration system" and operation
3) Configuration temperature automatic control circuit for "cooling and
heating heat pump refrigeration system" and operation
4) Configuration temperature and pressure automatic control circuit for
"cooling and heating heat pump refrigeration system" and operation
(9) Binary refrigeration system
1) Configuration manual control circuit of binary refrigeration system
and operation
2) Configuration temperature automatic control circuit at No.1 cycle
side (high pressure side) of binary refrigeration system, and manual
control circuit at No.2 cycle side (low pressure side) of it
3) Configuration temperature automatic control circuit of binary
refrigeration system and operation
4) Configuration pump down automatic control circuit at No.1 cycle,
and temperature automatic control operation and operation

9
K
T
E
N
G

K
T
E
-
9
0
0
0
A
U













P
T
.

G
r
a
h
a

E
l
e
k
t
r
o

T
a
m
a

J
a
k
a
r
t
a
,

t
:

+
6
2

2
1

3
8
5
-
6
6
3
6


e
:

j
a
k
a
r
t
a
@
g
r
a
h
a
e
l
e
k
t
r
o
t
a
m
a
.
c
o
m

|

S
u
r
a
b
a
y
a
,

t
:

+
6
2

3
1

5
3
4
-
8
0
7
1

e
:

s
u
r
a
b
a
y
a
@
g
r
a
h
a
e
l
e
k
t
r
o
t
a
m
a
.
c
o
m
AIR-CONDITIONING & REFRIGERATION EXPERIMENTAL EQIUPMENT
KTENG CORPORATION | 2013

5) Configuration compulsory pump down operation and operation
(10) Air-conditioning system
1) Configuration circuit for mixture and heating between returned air
(RA) and outside air (OA) of air-conditioning system and operation
2) Configuration circuit for mixture and cooling between returned air (RA)
and outside air(OA) of air-conditioning system and operation
3) Configuration circuit for mixture, getting wet and heating between
returned air(RA) and outside air(OA) of air-conditioning system and
operation
4) Configuration circuit for mixture and preheating, cleaning and
reheating between RA and OA of the air-conditioning system and
operation
5) Configuration circuit for precooling of OA, and mixture of the OA and
RA, and then cleaning and reheating operation
6) Configuration circuit for precooling of OA, and mixture of the OA and
RA, and then cleaning and re-cooling operation

I I I . SPECIFICATION

1. Electric device
(1) N.F.B (30A, single)
(2) Magnet Contact (DC24V)
(3) Thermal Overload Relay
(4) Relay (DC24V, 8Pin)
(5) Relay Base (DC24V, 8Pin)
(6) Relay (DC24V, 11Pin)
(7) Relay Base (DC24V, 11Pin)
(8) IC Timer (DC24V, 60sec, 8Pin)
(9) IC Timer Base (DC24V, 8Pin)
(10) Flicker (DC24V, 60sec, 8Pin)
(11) Flicker Base (DC24V, 8Pin)
(12) Timer (DC24V, 24Hour)
(13) Terminal Base (20Pin)
(14) Terminal Base (15Pin)
(15) Terminal Base (10Pin)
(16) Terminal Base (3Pin)
(17) Lamp (DC24V)
(18) Buzzer (DC24V)
(19) Toggle Switch
(20) Push Button (1a)
(21) Push Button (1a1b)
(22) Lamp Push Button (1a1b)
(23) Select Switch (3select)
(24) DC24V Motor
(25) Wire Assembly connector (36pin, 505mm)

I V. ACCESSORIES, GUARANTEE AND DELIVERY

1. Power Cable: 1EA
2. Connection Cable: 2EA
3. Banana jack: Red 20EA, Black 20EA
4. Manual book 1EA
5. Delivery: 3Month
6. Guarantee: For 1 year


9
K
T
E
N
G

K
T
E
-
9
0
0
0
A
U













P
T
.

G
r
a
h
a

E
l
e
k
t
r
o

T
a
m
a

J
a
k
a
r
t
a
,

t
:

+
6
2

2
1

3
8
5
-
6
6
3
6


e
:

j
a
k
a
r
t
a
@
g
r
a
h
a
e
l
e
k
t
r
o
t
a
m
a
.
c
o
m

|

S
u
r
a
b
a
y
a
,

t
:

+
6
2

3
1

5
3
4
-
8
0
7
1

e
:

s
u
r
a
b
a
y
a
@
g
r
a
h
a
e
l
e
k
t
r
o
t
a
m
a
.
c
o
m

You might also like