You are on page 1of 47

Total Water consumption

Fuel availabilty in GL
Waste collection
Basement Ground Floor 16th Floor Chiller Roof GRP Roof
FCU
Chiller 3
FAHU 1 1
FACP Panel 1
Central Battery system 1
Fire extinguisher (Co2)
Fire extinguisher (DP)
Fire Fighting Electrical pump 1
Fire Fighting Diesel Pump 1
Fire Fighting Jockey Pump 1
RCC Water Tanks 1
GRP water Tanks 2
Main DEWA valve 1
DB
DIESEL GENERATOR 1
SMDB
ATS 1
MCC 1
Control Panel
Capacitor Bank 3
Steam unit 2
Sauna unit 2
Elevators
Staircase pressurization fans 2
Basement Extract fans 4
CCTV
3.1 18.1
DOMESTIC WATER SYSTEM
ELECTRICAL EQUIPMENTS
ELECTRO - MECHANICAL EQUIPMENTS
ELECTRONICS EQUIPMENTS
Total Electrical consumption Readings in KWH
206
50 (Diesel Generator & Diesel Fire Pump)
2 x 2.5CBM
HVAC EQUIPMENTS
LIFE SAFETY SYSTEM
LV1 LV2 LV3
2.7
DAILY REPORT : HAMZA TOWER
Systems Location Ground Floor
Intercom Panel 1
Booster Pump 2
Sump Pump 2
Transfer Pump 2
Secondary Pump 4
Chiller Dosing manual 1
CHW Make up Pump 2
Sand Filter 1
Pool Pump 3
Pool Dosing Pump 1
Gate Barrier 3
ACTIVITY
In 3rd Floor Garbage Room Wooden Door found not closing Properly,same rectified
Swimming Pool Backwash Drainage line work Carried Out by Al basit
In Gound Floor Ofiice Door Found not closing propery,same rctified
Al Basit Technical services people doing renovation works
Al - Fajer people doing Faade cleaning
ACTIVITIES - 01.09.13
OK
Not OK
Partially OK
Remarks:
Date: 01-09-2013
SUB METER
7
All Floors Whole Tower
31 Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect DIB Submitted report
42 Defect DIB Submitted report
42 Defect DIB Submitted report
Defect DIB Submitted report
Defect DIB Submitted report
Defect DIB Submitted report
No Defect
2 No Defect
No Defect
12 Defect Afetr approval from NCM
Defect Afetr approval from NCM
19 Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
15 Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
3 No Defect
01no Defect Afetr approval from NCM
04nos Defect Afetr approval from NCM
13 03nos Defect Afetr approval from NCM
18.1
DOMESTIC WATER SYSTEM
ELECTRICAL EQUIPMENTS
ELECTRO - MECHANICAL EQUIPMENTS
ELECTRONICS EQUIPMENTS
206
50 (Diesel Generator & Diesel Fire Pump)
2 x 2.5CBM
HVAC EQUIPMENTS
LIFE SAFETY SYSTEM
LV3
DAILY REPORT : HAMZA TOWER
Ground Floor Defect with date
Expected date of
completion
Remarks
Defect Afetr approval from NCM
No Defect
No Defect
No Defect
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
01no Defect Afetr approval from NCM
PICTURE STATUS
Complete
Complete
Complete
In progress
In progress
ACTIVITY
In 3rd Floor Garbage Room Wooden Door found not closing Properly,same rectified
Swimming Pool Backwash Drainage line work Carried Out by Al basit
In Gound Floor Ofiice Door Found not closing propery,same rctified
Al Basit Technical services people doing renovation works
Al - Fajer people doing Faade cleaning
ACTIVITIES - 01.09.13
Total Water consumption
Fuel availabilty in GL
Waste collection
Basement Ground Floor 16th Floor Chiller Roof GRP Roof
FCU
Chiller 3
FAHU 1 1
FACP Panel 1
Central Battery system 1
Fire extinguisher (Co2)
Fire extinguisher (DP)
Fire Fighting Electrical pump 1
Fire Fighting Diesel Pump 1
Fire Fighting Jockey Pump 1
RCC Water Tanks 1
GRP water Tanks 2
Main DEWA valve 1
DB
DIESEL GENERATOR 1
SMDB
ATS 1
MCC 1
Control Panel
Capacitor Bank 3
Steam unit 2
Sauna unit 2
Elevators
Staircase pressurization fans 2
Basement Extract fans 4
CCTV
DAILY REPORT : HAMZA TOWER
Systems Location Ground Floor
Total Electrical consumption Readings in KWH
LV1 LV2 LV3
19.6 3.1 3
77
50 (Diesel Generator & Diesel Fire Pump)
2 x 2.5CBM
HVAC EQUIPMENTS
LIFE SAFETY SYSTEM
DOMESTIC WATER SYSTEM
ELECTRICAL EQUIPMENTS
ELECTRO - MECHANICAL EQUIPMENTS
ELECTRONICS EQUIPMENTS
Intercom Panel 1
Booster Pump 2
Sump Pump 2
Transfer Pump 2
Secondary Pump 4
Chiller Dosing manual 1
CHW Make up Pump 2
Sand Filter 1
Pool Pump 3
Pool Dosing Pump 1
Gate Barrier 3
ACTIVITIES - 02.09.13
ACTIVITY
In 16th Floor we found aluminium door handle broken,Same fixed
In 16th Floor Garbage room Floor Drop Block,Same cleared
UTTC People Came for Swimming Pool Maintenance Works
Al Basit Technical services people doing renovation works
Al - Fajer people doing Faade cleaning
OK
Not OK
Partially OK
Remarks:
Date: 02-09-2013
SUB METER
8.2
All Floors Whole Tower
31 Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect DIB Submitted report
42 Defect DIB Submitted report
42 Defect DIB Submitted report
Defect DIB Submitted report
Defect DIB Submitted report
Defect DIB Submitted report
No Defect
2 No Defect
No Defect
12 Defect Afetr approval from NCM
Defect Afetr approval from NCM
19 Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
15 Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
3 No Defect
01no Defect Afetr approval from NCM
04nos Defect Afetr approval from NCM
13 03nos Defect Afetr approval from NCM
DAILY REPORT : HAMZA TOWER
Ground Floor Defect with date
Expected date of
completion
Remarks
LV3
3
77
50 (Diesel Generator & Diesel Fire Pump)
2 x 2.5CBM
HVAC EQUIPMENTS
LIFE SAFETY SYSTEM
DOMESTIC WATER SYSTEM
ELECTRICAL EQUIPMENTS
ELECTRO - MECHANICAL EQUIPMENTS
ELECTRONICS EQUIPMENTS
Defect Afetr approval from NCM
No Defect
No Defect
No Defect
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
01no Defect Afetr approval from NCM
PICTURE STATUS
Complete
Complete
Complete
In progress
In progress
ACTIVITIES - 02.09.13
ACTIVITY
In 16th Floor we found aluminium door handle broken,Same fixed
In 16th Floor Garbage room Floor Drop Block,Same cleared
UTTC People Came for Swimming Pool Maintenance Works
Al Basit Technical services people doing renovation works
Al - Fajer people doing Faade cleaning
Total Water consumption
Fuel availabilty in GL
Waste collection
Basement Ground Floor 16th Floor Chiller Roof GRP Roof
FCU
Chiller 3
FAHU 1 1
FACP Panel 1
Central Battery system 1
Fire extinguisher (Co2)
Fire extinguisher (DP)
Fire Fighting Electrical pump 1
Fire Fighting Diesel Pump 1
Fire Fighting Jockey Pump 1
RCC Water Tanks 1
GRP water Tanks 2
Main DEWA valve 1
DB
DIESEL GENERATOR 1
SMDB
ATS 1
MCC 1
Control Panel
Capacitor Bank 3
Steam unit 2
Sauna unit 2
Elevators
Staircase pressurization fans 2
Basement Extract fans 4
CCTV
DAILY REPORT : HAMZA TOWER
Systems Location Ground Floor
Total Electrical consumption Readings in KWH
LV1 LV2 LV3
18.2 2.9 2.7
153
50 (Diesel Generator & Diesel Fire Pump)
2 x 2.5CBM
HVAC EQUIPMENTS
LIFE SAFETY SYSTEM
DOMESTIC WATER SYSTEM
ELECTRICAL EQUIPMENTS
ELECTRO - MECHANICAL EQUIPMENTS
ELECTRONICS EQUIPMENTS
Intercom Panel 1
Booster Pump 2
Sump Pump 2
Transfer Pump 2
Secondary Pump 4
Chiller Dosing manual 1
CHW Make up Pump 2
Sand Filter 1
Pool Pump 3
Pool Dosing Pump 1
Gate Barrier 3
ACTIVITIES - 03.09.13
ACTIVITY
In 16th Floor toilet found floor drop block,same rectified
In Basement found light not working,same replaced
In Roof swimming pool cleaning work carried out
Al Basit Technical services people doing renovation works
Al - Fajer people doing Faade cleaning
OK
Not OK
Partially OK
Remarks:
Date: 03-09-2013
SUB METER
9.4
All Floors Whole Tower
31 Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect DIB Submitted report
42 Defect DIB Submitted report
42 Defect DIB Submitted report
Defect DIB Submitted report
Defect DIB Submitted report
Defect DIB Submitted report
No Defect
2 No Defect
No Defect
12 Defect Afetr approval from NCM
Defect Afetr approval from NCM
19 Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
15 Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
3 No Defect
01no Defect Afetr approval from NCM
04nos Defect Afetr approval from NCM
13 03nos Defect Afetr approval from NCM
DAILY REPORT : HAMZA TOWER
Ground Floor Defect with date
Expected date of
completion
Remarks
LV3
2.7
153
50 (Diesel Generator & Diesel Fire Pump)
2 x 2.5CBM
HVAC EQUIPMENTS
LIFE SAFETY SYSTEM
DOMESTIC WATER SYSTEM
ELECTRICAL EQUIPMENTS
ELECTRO - MECHANICAL EQUIPMENTS
ELECTRONICS EQUIPMENTS
Defect Afetr approval from NCM
No Defect
No Defect
No Defect
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
01no Defect Afetr approval from NCM
PICTURE STATUS
Complete
Complete
Complete
In progress
In progress
ACTIVITIES - 03.09.13
ACTIVITY
In 16th Floor toilet found floor drop block,same rectified
In Basement found light not working,same replaced
In Roof swimming pool cleaning work carried out
Al Basit Technical services people doing renovation works
Al - Fajer people doing Faade cleaning
Total Water consumption
Fuel availabilty in GL
Waste collection
Basement Ground Floor 16th Floor Chiller Roof GRP Roof
FCU
Chiller 3
FAHU 1 1
FACP Panel 1
Central Battery system 1
Fire extinguisher (Co2)
Fire extinguisher (DP)
Fire Fighting Electrical pump 1
Fire Fighting Diesel Pump 1
Fire Fighting Jockey Pump 1
RCC Water Tanks 1
GRP water Tanks 2
Main DEWA valve 1
DB
DIESEL GENERATOR 1
SMDB
ATS 1
MCC 1
Control Panel
Capacitor Bank 3
Steam unit 2
Sauna unit 2
Elevators
Staircase pressurization fans 2
Basement Extract fans 4
CCTV
DAILY REPORT : HAMZA TOWER
Systems Location Ground Floor
Total Electrical consumption Readings in KWH
LV1 LV2 LV3
18.2 2.9 2.7
153
50 (Diesel Generator & Diesel Fire Pump)
2 x 2.5CBM
HVAC EQUIPMENTS
LIFE SAFETY SYSTEM
DOMESTIC WATER SYSTEM
ELECTRICAL EQUIPMENTS
ELECTRO - MECHANICAL EQUIPMENTS
ELECTRONICS EQUIPMENTS
Intercom Panel 1
Booster Pump 2
Sump Pump 2
Transfer Pump 2
Secondary Pump 4
Chiller Dosing manual 1
CHW Make up Pump 2
Sand Filter 1
Pool Pump 3
Pool Dosing Pump 1
Gate Barrier 3
ACTIVITIES - 04.09.13
ACTIVITY
In 16th Floor Diffusers cleaning Work Carried out
UTTC Company came for swimming Pool Maintenance
Bad smell comes from basement store room sewage pipe line,we found Elbow and Cab mising,same one fixed
In Ground Floor Office washbasin block,same cleared
Al Basit Technical services people doing renovation works
Al - Fajer people doing Faade cleaning
OK
Not OK
Partially OK
Remarks:
Date: 04-09-2013
SUB METER
9.4
All Floors Whole Tower
31 Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect DIB Submitted report
42 Defect DIB Submitted report
42 Defect DIB Submitted report
Defect DIB Submitted report
Defect DIB Submitted report
Defect DIB Submitted report
No Defect
2 No Defect
No Defect
12 Defect Afetr approval from NCM
Defect Afetr approval from NCM
19 Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
15 Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
3 No Defect
01no Defect Afetr approval from NCM
04nos Defect Afetr approval from NCM
13 03nos Defect Afetr approval from NCM
DAILY REPORT : HAMZA TOWER
Ground Floor Defect with date
Expected date of
completion
Remarks
LV3
2.7
153
50 (Diesel Generator & Diesel Fire Pump)
2 x 2.5CBM
HVAC EQUIPMENTS
LIFE SAFETY SYSTEM
DOMESTIC WATER SYSTEM
ELECTRICAL EQUIPMENTS
ELECTRO - MECHANICAL EQUIPMENTS
ELECTRONICS EQUIPMENTS
Defect Afetr approval from NCM
No Defect
No Defect
No Defect
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
01no Defect Afetr approval from NCM
PICTURE STATUS
Complete
Complete
Complete
Completed
In progress
In progress
ACTIVITIES - 04.09.13
ACTIVITY
In 16th Floor Diffusers cleaning Work Carried out
UTTC Company came for swimming Pool Maintenance
Bad smell comes from basement store room sewage pipe line,we found Elbow and Cab mising,same one fixed
In Ground Floor Office washbasin block,same cleared
Al Basit Technical services people doing renovation works
Al - Fajer people doing Faade cleaning
Total Water consumption
Fuel availabilty in GL
Waste collection
Basement Ground Floor 16th Floor Chiller Roof GRP Roof
FCU
Chiller 3
FAHU 1 1
FACP Panel 1
Central Battery system 1
Fire extinguisher (Co2)
Fire extinguisher (DP)
Fire Fighting Electrical pump 1
Fire Fighting Diesel Pump 1
Fire Fighting Jockey Pump 1
RCC Water Tanks 1
GRP water Tanks 2
Main DEWA valve 1
DB
DIESEL GENERATOR 1
SMDB
ATS 1
MCC 1
Control Panel
Capacitor Bank 3
Steam unit 2
Sauna unit 2
Elevators
Staircase pressurization fans 2
Basement Extract fans 4
CCTV
DAILY REPORT : HAMZA TOWER
Systems Location Ground Floor
Total Electrical consumption Readings in KWH
LV1 LV2 LV3
17.4 2.9 2.8
134
50 (Diesel Generator & Diesel Fire Pump)
2 x 2.5CBM
HVAC EQUIPMENTS
LIFE SAFETY SYSTEM
DOMESTIC WATER SYSTEM
ELECTRICAL EQUIPMENTS
ELECTRO - MECHANICAL EQUIPMENTS
ELECTRONICS EQUIPMENTS
Intercom Panel 1
Booster Pump 2
Sump Pump 2
Transfer Pump 2
Secondary Pump 4
Chiller Dosing manual 1
CHW Make up Pump 2
Sand Filter 1
Pool Pump 3
Pool Dosing Pump 1
Gate Barrier 3
ACTIVITIES - 05.09.13
ACTIVITY
In Ground floor found Barrier fall Down,same fixed
In Ground Floor Office bathroom found washbasin tape shaking,same fixed
In 15th to 9th Floor Diffusers cleaning Work Carried out
UTTC Company came for swimming Pool Maintenance
Al Basit Technical services people doing renovation works
Al - Fajer people doing Faade cleaning
OK
Not OK
Partially OK
Remarks:
Date: 05-09-2013
SUB METER
7.9
All Floors Whole Tower
31 Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect DIB Submitted report
42 Defect DIB Submitted report
42 Defect DIB Submitted report
Defect DIB Submitted report
Defect DIB Submitted report
Defect DIB Submitted report
No Defect
2 No Defect
No Defect
12 Defect Afetr approval from NCM
Defect Afetr approval from NCM
19 Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
15 Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
3 No Defect
01no Defect Afetr approval from NCM
04nos Defect Afetr approval from NCM
13 03nos Defect Afetr approval from NCM
DAILY REPORT : HAMZA TOWER
Ground Floor Defect with date
Expected date of
completion
Remarks
LV3
2.8
134
50 (Diesel Generator & Diesel Fire Pump)
2 x 2.5CBM
HVAC EQUIPMENTS
LIFE SAFETY SYSTEM
DOMESTIC WATER SYSTEM
ELECTRICAL EQUIPMENTS
ELECTRO - MECHANICAL EQUIPMENTS
ELECTRONICS EQUIPMENTS
Defect Afetr approval from NCM
No Defect
No Defect
No Defect
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
Defect Afetr approval from NCM
01no Defect Afetr approval from NCM
PICTURE STATUS
Complete
Complete
Complete
Completed
In progress
In progress
ACTIVITIES - 05.09.13
ACTIVITY
In Ground floor found Barrier fall Down,same fixed
In Ground Floor Office bathroom found washbasin tape shaking,same fixed
In 15th to 9th Floor Diffusers cleaning Work Carried out
UTTC Company came for swimming Pool Maintenance
Al Basit Technical services people doing renovation works
Al - Fajer people doing Faade cleaning
Total Electrical consumption Readings in KWH MDB3
Current
Previous
Consumption
Water meter reading
Current
Previous USG LITRES
Consumption 23 2000 8694
S.NO TIME
1
8.30-9.30
AM
2
10.30 -
10.30AM
3 8:00 PM
S.NO
TIME
S.NO TIME
1 8 to 10 AM
2
9 AM to 11
AM
3 2PM
DAILY REPORT : LE GRAND CHATEAU Date : 5.10.2013
Booster pump cut off timing problem
22039
Systems Ground Floor
Specialist Service Provider (activity )
4052 4597 3738
3watts LED lamps replaced
1346189 2E+06 2511919 3606249
2812
2516516
MDB1 MDB2 MDB4
1349001 2E+06 3609987
Common Area
DAILY ACTIVITIES
22062
General Checking of Common area, Fire alarm Panel, Gas Panel,Equipment Room, LV
room,Roof Equipments,Airconditioning Equipments.
AC leaking
Toilet flush Not working
Drain smell in Bed room Area
Inside Apartment
NIL
4 3PM
5 3PM Shut off leaking in Toilet
Toilet flush overflow
C.HOUSE METER
160629
160548
8.1
Location Status REMARKS
All common
area
Completed
1. Fire alarm panel fault - common
Trouble act block C 1FCC2(Electrical
Room). Informed to vision safety- Inam.
2. Gas Panel Indication Fault- Zone
19,27.Informed to alsabbah- Sachin
B block 1st
floor
completed Lamps blinking
Roof C Block Completed Relay timing fault Adjusted.
Location Status REMARKS
Location Status REMARKS
B304 completed
AC drain flushed and cleaned
A-214 completed
Bath room Drain blocked.Released the
block.
B-311 completed
Flush valve set changed.
DAILY REPORT : LE GRAND CHATEAU Date : 5.10.2013
Booster pump cut off timing problem
Ground Floor
Specialist Service Provider (activity )
3watts LED lamps replaced
Remarks
Common Area
DAILY ACTIVITIES
General Checking of Common area, Fire alarm Panel, Gas Panel,Equipment Room, LV
room,Roof Equipments,Airconditioning Equipments.
AC leaking
Toilet flush Not working
Drain smell in Bed room Area
Inside Apartment
NIL
B-205 completed
Toilet flush repaired and fixed
B-213 completed Shut off changed .Leak Arrested. Shut off leaking in Toilet
Toilet flush overflow
S.NO DESCRIPTION SCOPE STATUS REASON UPDATE
1 Painting for All Blocks A,B & C corridors power Pending
sample paint done. Quotation
sent . Waiting for SNS
Approval
waiting from 23/9/2013
2 Swimming Pool Heat exchanger Repairing power Pending
Quotation sent to SNS.Waiting
for Approval Waiting from still 24/9/13
3
Lamps in Lift room to be changed from
Hologen to LED power Pending
Quotation sent to SNS.Waiting
for Approval Quotation sent on 14/9/2013
4 Gym room Ceiling water Leakage power Pending
Quotation sent to SNS.Waiting
for Approval Quotation sent on 14/9/2013
5 Swimming pool pump no : 1 water leakage power Pending
Quotation sent to SNS.Waiting
for Approval Quotation sent on 24/9/2013
6 Corridor wooden block varnishing power Pending
Quotation sent to SNS.Waiting
for Approval Quotation sent on 17/9/2013
7 Water Proofing power Pending Looking for solution Waiting from still 23/8/2013
8
Access control implementation & activation
for access doors SNS Pending In Progress Activation will be start on 10/10/2013
9
Motion sensor implementation sample work
in C block Garbage room ground floor lights Portdata Completed completed on 11/9/2013
10
Motion sensor implementation in all common
area corridor Lights. Portdata Pending waiting for Quotation Waiting from still 11/9/2013
11 PPM activation Power Completed PPM schedule sent to client started from 19/9/2013
12 Swimming pool Filter water leakage power Pending
Quotation sent to SNS.Waiting
for Approval Waiting from still 24/9/2013
13
Parking lights lights energy saving in
basement power Pending Looking for solution Waiting from still 19/9/2013
14
Water entered in Pressure vessel C block -
roof. Need to change pressure vessel. Power Completed Pressure vessel changed